Scope Management
Martin Sillaots
2019
# 3
www.projektor.ee/pm/#scope
Scope Definition
• Project Scope - The work that needs to be
accomplished to deliver a product, service, or result
with the specified features and functions
• Product Scope - The features and functions that
characterize a product, service, or result
www.projektor.ee/pm/#scope
Project Scope Management
• Scope planning
• Scope definition
• WBS
• Scope verification
• Scope control
www.projektor.ee/pm/#scope
Project Phases and Processes
Initiation
Planning
Execution Control
Closing
www.projektor.ee/pm/#scope
Scope in the Project Plan
Scope
definition
Quality
planning
Activity
definition
Activity
sequencing
Duration
estimation
Schedule
development
Organization
planning
Resource
planning
Communica-
tion planning
Procurement
planning
Plan
contracting
Select
sellers
Seller
responses
Risk
management
Risk
identification
Qualitative
analysis
Quantitative
analysis
Response
planning
Budgeting
Project
plan
Initiation
Execution
WBS
www.projektor.ee/pm/#scope
Inputs:
- Org process assets
- Project charter*
- Preliminary project
scope statement
- Project scope
management plan
- Approved change
requests
Methods:
- SMART
- Decomposition
(WBS)
Outputs
- Scope statement
- WBS
- WBS dictionary
- Request changes
- Project scope
management plan
updates
Scope Planning
www.projektor.ee/pm/#scope
Inputs
Scope Planning
www.projektor.ee/pm/#scope
Project Charter*
• Project manager name
• Organization (team)
• Requirements and Business needs
• Description of the end result
• Main deliverables
• Stakeholders influence
• Business case
• Summary milestones (estimated deadline)
• Summary budget (estimated price)
• Assumptions and constrains
www.projektor.ee/pm/#scope
Scope Management Plan
• Process how the scope will be defined
• Process how the WBS will be created
• Process how verification will be obtained
• Process how changes will be handled
www.projektor.ee/pm/#scope
Methods
Scope Planning
www.projektor.ee/pm/#scope
SMART – Method for Defining Objectives
• Specific
• Measurable
• Assignable
• Realistic
• Time-related
www.projektor.ee/pm/#scope
Example Objective
• Project scope is to develop 2D graphical-adventure game for
learning language. Game is in FPV, web based and story
related. Dialogues will be presented in text format.
• Game contains 3 chapters (levels). Each chapter contains 5
scenes (action points). Each scene contains 1-2 dialogues (1-
2 NPC’s).
• Fully operational game is finished in the end of 3 month
project.
• Estimated budget 20 000 EUR
www.projektor.ee/pm/#scope
Exercise
Use SMART rule and define your project
objective
www.projektor.ee/pm/#scope
Needs VS Scope
www.projektor.ee/pm/#scope
WBS
Work Breakdown Structure
Deliverable oriented hierarchical
decomposition of the work
www.projektor.ee/pm/#scope
Purpose of the WBS
• Subdivides the project into smaller manageable units –
Work Packages
• Refine the scope, duration, cost and resources
• Basis for further planning
• Basis for responsibility assignments
www.projektor.ee/pm/#scope
Decomposition Procedure
1. Define main deliverables
2. Is it possible to estimate cost and duration for
deliverables?
3. If yes then continue with step 5, else step 4
4. Divide deliverables into sub-deliverables. Repeat
step 2
5. Check is the decomposition logical and complete?
6. Coding
www.projektor.ee/pm/#scope
Decomposition Procedure
Define level N deliverables
Can you
estimate
deliverable
duration
and cost?
Integrity and logical check
NO
YES
www.projektor.ee/pm/#scope
WBS Example
Game
Analyze Design Develop Implement Evaluation
www.projektor.ee/pm/#scope
WBS Example
Game
Rules Story Graphics Sound Code
www.projektor.ee/pm/#scope
Game
Rules
Resources Objects Events Connections Conditions
Story
Narrative Dialogues
Graphics
Avatar Characters Items Scenes
WBS Example
Game
Graphics
atar Characters Items Scenes UI
Sound
Music Effects Voice over
Code
Core
Main
gameplay
Menu
www.projektor.ee/pm/#scope
Exercise
Create your project WBS
www.projektor.ee/pm/#scope
www.projektor.ee/pm/#scope
Outcome
Scope Planning
www.projektor.ee/pm/#scope
Project Scope Statement
• Objectives
• Product description
• Requirements
• Boundaries
• Deliverables
• Acceptance criteria
• Constrains
• Assumptions
• Initial organization
• Initial risks
• Milestones
• Fund limitation
• Cost estimate
• Change management
• Specifications
• Approvals
www.projektor.ee/pm/#scope
Scope Verification and Control
www.projektor.ee/pm/#scope
Project Phases and Processes
Initiation
Planning
Execution Control
Closing
www.projektor.ee/pm/#scope
Scope Verification and Control
Information
distribution
Project
execution
Procurement
management
Reporting
Team
development
Schedule
control
Scope
verification
Cost
control
Quality
control
Risk
monitoring
Change
management
Planning
Closing
www.projektor.ee/pm/#scope
Scope Verification
Process for obtaining stakeholder’s formal
acceptance to the project scope and
deliverables
www.projektor.ee/pm/#scope
Scope Control
Management of scope changes
• Avoiding scope changes
• Identifying scope changes
• Evaluating change requests
• Planning and executing changes
• Communicating changes
• Archiving
www.projektor.ee/pm/#scope
Inputs:
- Project scope
statement
- WBS
- Project plan
- Performance reports
- Deliverables
Methods:
- Inspection
- Scope Change
control system
- Variance analysis
- Configuration
management system
Outputs
- Deliverables
- Change requests
- Corrective actions
- Plan updates
Scope Verification and Control
www.projektor.ee/pm/#scope
Scope Inspection (Review)
• Measuring
• Examining
• Verifying
Does the project work and deliverables meet
acceptance criteria?
www.projektor.ee/pm/#scope
Scope Change Control System
Procedures how the scope can be
changed (documentation, tracking,
approval procedures)
www.projektor.ee/pm/#scope
The End of Scope
martinsillaots@gmail.com

More Related Content

What's hot

Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionGalala University
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2test prod1
 
File 3 removed 1 slide 1
File 3 removed 1 slide 1File 3 removed 1 slide 1
File 3 removed 1 slide 1test prod1
 
Wolff - 2016 Resume
Wolff - 2016 ResumeWolff - 2016 Resume
Wolff - 2016 ResumeJamie Wolff
 
File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1test prod1
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam ResumeSamsul Alam
 
File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2test prod1
 
File 3 original
File 3 original File 3 original
File 3 original test prod1
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1test prod1
 
File 3 removed 1 word 2
File 3 removed 1 word 2File 3 removed 1 word 2
File 3 removed 1 word 2test prod1
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1test prod1
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2test prod1
 
File 3 extra four slides 1
File 3 extra four slides 1File 3 extra four slides 1
File 3 extra four slides 1test prod1
 
File 3 removed 1 slide 2
File 3 removed 1 slide 2File 3 removed 1 slide 2
File 3 removed 1 slide 2test prod1
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project ManagementAravind Samala
 

What's hot (18)

Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
File 3 extra slide 2
File 3 extra slide 2File 3 extra slide 2
File 3 extra slide 2
 
And The Oscar For Best Supporting Role Goes
And The Oscar For Best Supporting Role GoesAnd The Oscar For Best Supporting Role Goes
And The Oscar For Best Supporting Role Goes
 
File 3 removed 1 slide 1
File 3 removed 1 slide 1File 3 removed 1 slide 1
File 3 removed 1 slide 1
 
Wolff - 2016 Resume
Wolff - 2016 ResumeWolff - 2016 Resume
Wolff - 2016 Resume
 
File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1File 3 removed 1 word from 5 slides 1
File 3 removed 1 word from 5 slides 1
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2File 3 removed 1 word from 5 slides 2
File 3 removed 1 word from 5 slides 2
 
File 3 original
File 3 original File 3 original
File 3 original
 
File 3 removed 5 words 1
File 3 removed 5 words 1File 3 removed 5 words 1
File 3 removed 5 words 1
 
File 3 removed 1 word 2
File 3 removed 1 word 2File 3 removed 1 word 2
File 3 removed 1 word 2
 
File 3 removed 1 word 1
File 3 removed 1 word 1File 3 removed 1 word 1
File 3 removed 1 word 1
 
File 3 removed 5 words 2
File 3 removed 5 words 2File 3 removed 5 words 2
File 3 removed 5 words 2
 
Construction project manager
Construction project managerConstruction project manager
Construction project manager
 
SenthilKumar_Resume
SenthilKumar_ResumeSenthilKumar_Resume
SenthilKumar_Resume
 
File 3 extra four slides 1
File 3 extra four slides 1File 3 extra four slides 1
File 3 extra four slides 1
 
File 3 removed 1 slide 2
File 3 removed 1 slide 2File 3 removed 1 slide 2
File 3 removed 1 slide 2
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 

Similar to Project Scope Management

L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.pptMUST
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.pptMUST
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint university(kust)
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.pptMehediHasan636262
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MIlonaThornburg83
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Processstorybridge
 
Presentation construction management profiles
Presentation construction management profilesPresentation construction management profiles
Presentation construction management profilesPriyankaKale53
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017Daniel Thuraiappah
 
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...BDO IT Solutions
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentationKumar M.
 
Solve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementSolve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementRafael Sultanov
 
project planning components.pdf
project planning components.pdfproject planning components.pdf
project planning components.pdfsaman Iftikhar
 
Primavera Course @ First CADD - Jayanagar,Bangalore
 Primavera Course @  First CADD - Jayanagar,Bangalore Primavera Course @  First CADD - Jayanagar,Bangalore
Primavera Course @ First CADD - Jayanagar,BangaloreRavi Jeyaraman
 
First cadd primavera course
First cadd primavera courseFirst cadd primavera course
First cadd primavera courseFirstCADD2014
 
Project design and management
Project design and managementProject design and management
Project design and managementAndrew Zolnai
 

Similar to Project Scope Management (20)

L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
 
L2_Scope Management.ppt
L2_Scope Management.pptL2_Scope Management.ppt
L2_Scope Management.ppt
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.ppt
 
MIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project MMIS485 Capstone Project in MIS 2MGT 400 - Project M
MIS485 Capstone Project in MIS 2MGT 400 - Project M
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Process
 
Project management
Project managementProject management
Project management
 
Pm training day 3
Pm training   day 3Pm training   day 3
Pm training day 3
 
Presentation construction management profiles
Presentation construction management profilesPresentation construction management profiles
Presentation construction management profiles
 
Gtm development framework aug 2017
Gtm development framework   aug 2017Gtm development framework   aug 2017
Gtm development framework aug 2017
 
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
What is the Client Involvement in an Implementation/Upgrade? | BDO Connection...
 
Sap solutions presentation
Sap solutions presentationSap solutions presentation
Sap solutions presentation
 
Solve It Labs Offshore Project Management
Solve It Labs Offshore Project ManagementSolve It Labs Offshore Project Management
Solve It Labs Offshore Project Management
 
SPM_UNIT-2.pptx
SPM_UNIT-2.pptxSPM_UNIT-2.pptx
SPM_UNIT-2.pptx
 
7.2 Estimate Cost
7.2 Estimate Cost7.2 Estimate Cost
7.2 Estimate Cost
 
project planning components.pdf
project planning components.pdfproject planning components.pdf
project planning components.pdf
 
Primavera Course @ First CADD - Jayanagar,Bangalore
 Primavera Course @  First CADD - Jayanagar,Bangalore Primavera Course @  First CADD - Jayanagar,Bangalore
Primavera Course @ First CADD - Jayanagar,Bangalore
 
First cadd primavera course
First cadd primavera courseFirst cadd primavera course
First cadd primavera course
 
Project design and management
Project design and managementProject design and management
Project design and management
 
Project management
Project managementProject management
Project management
 

More from Martin Sillaots (20)

eAdventureEN
eAdventureENeAdventureEN
eAdventureEN
 
Documents
DocumentsDocuments
Documents
 
Game Monetisation and Marketing
Game Monetisation and MarketingGame Monetisation and Marketing
Game Monetisation and Marketing
 
Prototyping
PrototypingPrototyping
Prototyping
 
User Interface
User InterfaceUser Interface
User Interface
 
Level Design
Level DesignLevel Design
Level Design
 
Story
StoryStory
Story
 
Characters
CharactersCharacters
Characters
 
Game World
Game WorldGame World
Game World
 
Game Balancing
Game BalancingGame Balancing
Game Balancing
 
Core Mechanics
Core MechanicsCore Mechanics
Core Mechanics
 
Gameplay
GameplayGameplay
Gameplay
 
Game Concept
Game ConceptGame Concept
Game Concept
 
Game Idea
Game IdeaGame Idea
Game Idea
 
Game Design Process
Game Design ProcessGame Design Process
Game Design Process
 
Game Elements
Game ElementsGame Elements
Game Elements
 
Introduction to Game Design
Introduction to Game DesignIntroduction to Game Design
Introduction to Game Design
 
Project Control
Project ControlProject Control
Project Control
 
Project Integration Management
Project Integration ManagementProject Integration Management
Project Integration Management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 

Recently uploaded

microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 

Recently uploaded (20)

microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 

Project Scope Management

  • 1. Scope Management Martin Sillaots 2019 # 3 www.projektor.ee/pm/#scope
  • 2. Scope Definition • Project Scope - The work that needs to be accomplished to deliver a product, service, or result with the specified features and functions • Product Scope - The features and functions that characterize a product, service, or result www.projektor.ee/pm/#scope
  • 3. Project Scope Management • Scope planning • Scope definition • WBS • Scope verification • Scope control www.projektor.ee/pm/#scope
  • 4. Project Phases and Processes Initiation Planning Execution Control Closing www.projektor.ee/pm/#scope
  • 5. Scope in the Project Plan Scope definition Quality planning Activity definition Activity sequencing Duration estimation Schedule development Organization planning Resource planning Communica- tion planning Procurement planning Plan contracting Select sellers Seller responses Risk management Risk identification Qualitative analysis Quantitative analysis Response planning Budgeting Project plan Initiation Execution WBS www.projektor.ee/pm/#scope
  • 6. Inputs: - Org process assets - Project charter* - Preliminary project scope statement - Project scope management plan - Approved change requests Methods: - SMART - Decomposition (WBS) Outputs - Scope statement - WBS - WBS dictionary - Request changes - Project scope management plan updates Scope Planning www.projektor.ee/pm/#scope
  • 8. Project Charter* • Project manager name • Organization (team) • Requirements and Business needs • Description of the end result • Main deliverables • Stakeholders influence • Business case • Summary milestones (estimated deadline) • Summary budget (estimated price) • Assumptions and constrains www.projektor.ee/pm/#scope
  • 9. Scope Management Plan • Process how the scope will be defined • Process how the WBS will be created • Process how verification will be obtained • Process how changes will be handled www.projektor.ee/pm/#scope
  • 11. SMART – Method for Defining Objectives • Specific • Measurable • Assignable • Realistic • Time-related www.projektor.ee/pm/#scope
  • 12. Example Objective • Project scope is to develop 2D graphical-adventure game for learning language. Game is in FPV, web based and story related. Dialogues will be presented in text format. • Game contains 3 chapters (levels). Each chapter contains 5 scenes (action points). Each scene contains 1-2 dialogues (1- 2 NPC’s). • Fully operational game is finished in the end of 3 month project. • Estimated budget 20 000 EUR www.projektor.ee/pm/#scope
  • 13. Exercise Use SMART rule and define your project objective www.projektor.ee/pm/#scope
  • 15. WBS Work Breakdown Structure Deliverable oriented hierarchical decomposition of the work www.projektor.ee/pm/#scope
  • 16. Purpose of the WBS • Subdivides the project into smaller manageable units – Work Packages • Refine the scope, duration, cost and resources • Basis for further planning • Basis for responsibility assignments www.projektor.ee/pm/#scope
  • 17. Decomposition Procedure 1. Define main deliverables 2. Is it possible to estimate cost and duration for deliverables? 3. If yes then continue with step 5, else step 4 4. Divide deliverables into sub-deliverables. Repeat step 2 5. Check is the decomposition logical and complete? 6. Coding www.projektor.ee/pm/#scope
  • 18. Decomposition Procedure Define level N deliverables Can you estimate deliverable duration and cost? Integrity and logical check NO YES www.projektor.ee/pm/#scope
  • 19. WBS Example Game Analyze Design Develop Implement Evaluation www.projektor.ee/pm/#scope
  • 20. WBS Example Game Rules Story Graphics Sound Code www.projektor.ee/pm/#scope
  • 21. Game Rules Resources Objects Events Connections Conditions Story Narrative Dialogues Graphics Avatar Characters Items Scenes WBS Example Game Graphics atar Characters Items Scenes UI Sound Music Effects Voice over Code Core Main gameplay Menu www.projektor.ee/pm/#scope
  • 22. Exercise Create your project WBS www.projektor.ee/pm/#scope
  • 25. Project Scope Statement • Objectives • Product description • Requirements • Boundaries • Deliverables • Acceptance criteria • Constrains • Assumptions • Initial organization • Initial risks • Milestones • Fund limitation • Cost estimate • Change management • Specifications • Approvals www.projektor.ee/pm/#scope
  • 26. Scope Verification and Control www.projektor.ee/pm/#scope
  • 27. Project Phases and Processes Initiation Planning Execution Control Closing www.projektor.ee/pm/#scope
  • 28. Scope Verification and Control Information distribution Project execution Procurement management Reporting Team development Schedule control Scope verification Cost control Quality control Risk monitoring Change management Planning Closing www.projektor.ee/pm/#scope
  • 29. Scope Verification Process for obtaining stakeholder’s formal acceptance to the project scope and deliverables www.projektor.ee/pm/#scope
  • 30. Scope Control Management of scope changes • Avoiding scope changes • Identifying scope changes • Evaluating change requests • Planning and executing changes • Communicating changes • Archiving www.projektor.ee/pm/#scope
  • 31. Inputs: - Project scope statement - WBS - Project plan - Performance reports - Deliverables Methods: - Inspection - Scope Change control system - Variance analysis - Configuration management system Outputs - Deliverables - Change requests - Corrective actions - Plan updates Scope Verification and Control www.projektor.ee/pm/#scope
  • 32. Scope Inspection (Review) • Measuring • Examining • Verifying Does the project work and deliverables meet acceptance criteria? www.projektor.ee/pm/#scope
  • 33. Scope Change Control System Procedures how the scope can be changed (documentation, tracking, approval procedures) www.projektor.ee/pm/#scope
  • 34. The End of Scope martinsillaots@gmail.com

Editor's Notes

  1. Piirangud: Org, struktuur Standardid Infrastruktuur Ressursid Turutingimused Riskitundlikus IS
  2. A - Accepted
  3. Testimine – kuidas kasutajad vastu võtavad? Levitamine – mitu kasutajat? Müük – palju raha?
  4. Based on project phases
  5. Project deliverables
  6. Objectives – include measurable success criteria Scope description – characteristics of the project, product or service (preliminary functionalities) Requirements – client needs, standards, Boundaries – what is excluded Deliverables – product outputs and project documents Criteria – Constrains – e.g. predefined budget, deadline Assumptions – e.g. experts with specific competences Organization – e.g. team members, stakeholders Risks –
  7. AKA Review, Audit, Walkthrough