SlideShare a Scribd company logo
1 of 123
GAZIANTEP UNIVERSITY
FACULTY OF ENGINEERING
DEPARTMENT OF CIVIL ENGINEERING
HYDROPOWER ENGINEERING
WATER CONVEYANCE SYSTEM
Submitted by:
KHABAT STAR MOHAMMED
MARIF MAHMOOD KARIM
ISRAA NAJAT JABBAR
YASIR SHAKIR MAHMOOD
Submitted to :
Doç.Dr.Aytaç Gßven
Water Conveyance system
Introduction
Any structure that conveys water from
one location to another.
Hydropower Block Diagram
Plan ( 1 )
Plan ( 2 )
Intake
Definition of diversion head work
A structure constructed across a river to raise
the normal water level and drive the required
supply in to main canal or power canal
Diversion Head work
Fig. ( 1 )
Components of diversion
head work
1. Barrage or weir
2. Canal head regulator
3. Divide wall
4. Fish ladder
5. Under sluice portion
6. Silt excluder
7. Marginal bunds
8. Guide bank
Weir Barrage
Canal head regulator
Function of head work
1. A head work raises the water level in the
river.
2. It regulates the intake of water into the canal.
3. It also controls the entry of silt into the canal.
4. A headwork can also store water for small
periods of time.
5. Reduces fluctuations in the level of supply in
river.
What is intake
A hydraulic-engineering installation for
obtaining water from a source of supply
(river, lake, reservoir, and so on) for
purposes of hydroelectric power
engineering, water supply, or irrigation.
Intake
Elements of intake
1. Trash rack and supporting structure.
2. Smolt screens.
3. Bell mouth entrance.
4. Gate slot closing devices with air vents.
5. Ice, log trash boom.
6. Silt excluders and silt ejectors.
7. Under sluices.
1- Trash rack
2- screen
• A trash rack is a wooden or metal structure, that
prevents water-borne debris (such as logs,
boats, animals, masses of cut waterweed, etc.)
from entering the intake of a water mill,
pumping station or water conveyance. This
protects penstock, and sluice gates from
destruction during floods..
• Usually positioned in forebay or intake
structure.
Trash Rack
Trash rack Trash rack
Removing or cleaning process to
trash rack
Smolt Screen
3- Bell mouth entrance
.
4 – gate slot closing
It is control regulates the entry of water into the
intake.
Gates
5- ICE,LOG,AND TRASH
BOOMS
Floating boom use to perform one or more of the
following functions
1. Deflection of logs and trash from the intake
screens.
2. Deflection of ice away from the intake.
3. Prevention of the boats form being carried into
the intake
Trash Boom
.
6- silt excluders and silt ejectors
• Silt Control Devices
A. Silt Excluder: The silt excluder is located on
the u/s of diversion weir and in front of the
head regulator and the object is to remove silt
that has entered in the stilling basin through
scouring sluices.
B.Silt Ejector: Silt Ejector is located in the
canal take off from the diversion weir it ejects
the silt that has entered in the canal
Silt control
Silt excluder Silt Ejector
LOCATION OF INTAKE
The various factors influencing the choice of location of
intake structure are:
1- Type of storage reservoir
2- Location and type of dam/weir
3- Type of water conductor system that is canal or
tunnel
4- Topographical features of the river.
5- should not be located on curves or at least on shape
curves
6- should remain easily accessible during floods.
7- located at place from where can draw water even
during the driest period of the year
TYPE OF INTAKE
•Depending on the function served and the range in
reservoir head under which it is to operate,
•The discharging capacity and frequency of the reservoir
drawdown, intake for hydroelectric projects or more
elaborate structure raised as a tower above maximum
reservoir level.
Type of Intake
PLAN ( 3 )
A- According to source
1- River Intake
River intake
2- Reservoir intake
3- Lake intake
4 - Canal intake
B- According to position of intake
• An Intake structure which remains entirely under water during
its operation is termed as submerged intake.
• It is provided where the structure serves only as an entrance to
the outlet required.
• The conduct intake may be inclined, vertical or horizontal in
accordingly with the intake requirements.
• An inclined intake may be provided with gates and operated
on the upstream slopes of a low dam.
1-submerged intake
submerged intake
2- Exposed intake
• Is in the form of well or tower constructed
near the bank of river or in some cases even
away from the bank of river, they are more
common due to ease in operation and
maintenance .
Exposed intake
C – According to presence of water in
the tower
• In dry intake tower the entry ports are directly
connected with the withdrawal conduit and water
inside the tower when gates are in a closed
position.
• Dry Intake tower has a merit that the intake tower
being dry is made accessible for inspection and
operation besides that the water can be withdrawn
from any level by opening the port at that level.
1- Dry intake tower
2- Wet Intake Tower
• A wet intake tower has entry ports at various levels and
the vertical shaft is filled with water up to reservoir
level.
• It differs from the dry intake tower is that the water
enters from the ports into the tower and then into the
withdrawal conduct through separate gated openings.
Wet intake tower
QUALITY WATER
1- Location of intake is required to be such as to draw
the best quality of water from the reservoir.
2- Depth of water at intake is important.
3- Quality of water varies at different levels in the
reservoir and it is necessary to draw water from
different elevation of the reservoir at different
seasons of the Year for which multi-level intakes
are frequently provided.
Water conveyance system
The main components are :
A. Open channel flow
system
B. Pressure flow system
Open channel flow and pressure flow systems
What is Open channel?
A covered or uncovered conduit in which
liquid (usually water) flows with
its top surface bounded by the atmosphere. Typical
open channels are
rivers, streams, canals, flumes, or
sewers, and water-supply or hydropower aqueducts
Classification of open channel
Based on :
1. shape
2. natural / artificial (man made)
3. change in cross section and slope
4. boundary characteristic
Classification based on a shape
1.Rectangular
2.Trapezoidal
3. Triangular
4. semi-Circular
5.Parabolic
6.Compound
Trapezoidal open
channel
Rectangular
open channel
semi-circular
open channel
Triangular
open channel
Compound open
channel
Parabolic
open channel
Open channel geometric relationships for varies cross-
section
Classification based on
• Natural channel
All watercourses that exist naturally on the
earth like Brooke ,creeks , tidal
• Artificial channel
Those constructed to perform various project
requirements and termed canals
Flumes , culverts
Natural channel Artificial channel
Classification based on change in
slope and cross section
Prismatic : a channel in which cross section shape
and size also the bottom slope are constant , most of
man-made channels(artificial) are prismatic channels
like rectangular ,trapezoidal , triangular ,circular
channels
• Non – prismatic : slope or cross section
changes, all natural channels generally have varying in
cross section and consequently are non- prismatic.
Classification based on boundary
characteristic
Mobile boundary channel Rigid boundary channel
Forebay
• A forebay is an artificial pool of water in
which located before and connected with
penstocks
• Provided in case of run-off- river plants
• The major use of forebay was to distribution
Flow of water in to penstocks , store water
which is rejected by hydropower plant
, Containing a trash rack and bye-pass channel.
Forebay connecting with penstock and
Containing a trash rack and bye-pass channel
Forebay in nature
Trashrack that which used to prevent undesirable
material (planate , dead animals) for entering to
penstock that may choke the system
BANK AND CHANNEL
PROTECTIVE LINING
Lining are Protective layer articial or natural
material which placed in a channel bottom and
banks that may be used to:
• prevent erosion resulting from high velocities
of water
• breaking down resulting from entering water
in Cracks and gaps
• shapely appearance and proper
Lining classification
The main classifications of open channel
linings are based on the material which
that covered the channel and we have two
items :
• Rigid Linings
• Flexible linings
Rigid Linings
Rigid linings are generally constructed of
concrete, pvc, or concrete blocks pavement
they are more expensive , prevent
infiltration and Require periodic
maintenance
whose smoothness offers a higher capacity
for a given cross-sectional area and Higher
Velocities
The following are examples of Rigid
Linings:
Pri –cast concrete channel
concrete blocks channel Pvc channel
Flexible linings
Flexible linings have several advantages compared to
rigid linings They are generally less expensive,
permit infiltration and exhilaration and can be
vegetated to have a natural appearance, have self-
healing qualities which reduce maintenance
In many cases flexible linings are designed to
provide only transitional protection against erosion
The following are examples of Flexible linings:
Grasses or natural vegetation
Grass linings are suitable for applications where they will be
exposed to periodic relatively slow flow of water
This type of lining has a pleasing appearance,
is economical and is not subject to damage as a result of
undermining or settlement of the supporting soils
Rubble riprap
Wire-enclosed riprap
B:Pressure flow system
1- Low-pressure conduits and tunnels
2- High-pressure conduits, commonly called the
penstocks
Tunnels
Tunnels can be designed as underground passages
made without removing the overlying rock or soil.
TBM: also known as a "mole", is a machine used to excavate
tunnels with a circular cross section through a variety of soil and
rock strata. They may also be used for micro tunneling. They can
bore through anything from hard rock to sand.
Layout of a tunnel alignment
The first aspect that needs to be decided for a tunnel is the
alignment .
Hydropower tunnel
•
Hydraulic tunnels can be divided
into the following categories:
1- Pressure tunnels
2- Free flowing tunnels
Depending on their shape, tunnels may be
classified as:
1- D-shaped
2- Horse-shoe shaped
3- Circular shaped
4- Egg Shaped and Egglipse Sections
Tunnel section
Cross – section of a tunnel depends on the
following factors:
1- Geological conditions prevailing along the
alignment,
2- Structural considerations, and
3- Hydraulic requirements,
4- Functional requirements.
D-SHAPED SECTION:
• D-shaped section is found to be suitable in tunnels located
in good quality, intact sedimentary rocks and massive
external igneous, hard ,compacted , metamorphic rocks
where the external or internal pressures.
Horse-Shoe section
This sections are strong in their resistance to external pressure. Quality of rock and
adequate rock cover in terms of the internal pressure to which the tunnel is subjected
govern the use of these sections. This section offers the advantage of flat base for
constructional ease and change over to circular section with minimum additional
expenditure in reaches of inadequate rock cover and poor rock formation.
Note: For tunnel excavated to horse -shoe section
and concreted to circular section.
Modify horse shoe section
Egg Shaped and Egglipse Sections
• Where the rock is stratified soft and very closely laminated (as
laminated sand stones, slates, micaceous schists , etc) and where the
external pressure and tensile forces in the crown are likely to be high
so as to cause serious rock falls, those sections should be
considered.
Circular section
The circular section is most suitable from structural consideration. It is
difficult to excavation where cross-sectional area is small. In case where the
tunnel is subjected to high internal pressure, but does not have good quality
of rock and/or adequate rock cover around it. circular section is considered
to be most suitable.
Steel supports
These are built of steel sections, usually I-sections, either shaped or
welded in pieces in the form of a curve or a straight section
Installing steel supports
ROOF BOLTS OF ROCK
• Rock bolts were used to support the roof and walls of major structures
such as tunnels and power stations
• These steel bolts, of different length and spacing, were inserted into the
rock where they were found to be an excellent anchorage for the rock.
Tunnel Lining
• Tunnel linings: main types. Tunnel linings are grouped into three
main forms some or all of which may be used in the construction
of a tunnel.
• Temporary ground support
• Primary lining
• Secondary lining
• Temporary ground support: In rock tunnels where the ground has
insufficient stand-up time to allow the construction of the
primary lining some distance behind the face.
• Primary lining. A primary lining is the main structural component
of the tunnel support system which is required to sustain the
loads and deformations that the ground may induce during the
tunnel's intended working life.
• Secondary lining. Various tunnels require smooth bore profiles
for their intended use, eg sewer and water tunnels or aesthetic
finishes for public usage, eg highway and pedestrian tunnels.
Arch steel support
Shotcrete in tunnel
Tunnel Grouting: This is a cement mortar with
proportion of cement, sand and water in the ratio 1:1:1 by weight
usually, though it may be modified suitably according to site
conditions.
types of grouting:
• Back-fill grouting :to fill spaces between initial lining and
rock.
• − Contact grouting: to fill gaps between initial lining and plug
concrete.
• − Consolidation grouting: to improve the quality of the
surrounding rock.
• − Curtain grouting: To preventing water seepage from the
waterway end portion.
• Grouting
• Grouting process
• Pattern of Holes for Grouting
• Backfill or Contact Grouting - Backfill grouting is limited to
the arch portion of the tunnel. The number of holes normally
three in each section, the pattern being staggered in each
subsequent sections located 3 m center to center.
Consolidation or Pressure Grouting -
• Consolidation grouting is done to consolidate the shattered rock
all around the cavity. The pattern of holes is such that these are
distributed all along the periphery but staggered in alternate
sections space 3 m center to center. The number of holes may be
four for smaller tunnels six for bigger tunnels.
Consolidation or Pressure Grouting 6
holes
What is surge tank
Surge tank is located between the headrace pressure conduit
and the steeply sloping penstock pipe and is designed either as
a chamber excavated in the mountain or as a tower raising
high above the surrounding terrain.
The main functions of a surge tank are:
• Reduces the amplitude of pressure
fluctuations by reflecting the incoming
pressure waves.
• Improves the regulating characteristics of a
hydraulic turbine because; it reduces the
water starting time of a hydropower scheme.
• Surge tanks, which are used to dissipate
water hammer pressure
Water Hammer
• Water Hammer is a pressure surge or wave that
occurs when there is a sudden momentum change
of a fluid (the motion of a fluid is abruptly forced
to stop or change direction) within an enclosed
space (Water Hammer).
• This commonly occurs in pipelines when a valve
is closed suddenly at the end of a pipeline where
the velocity of the fluid is high. The pressure
wave created will propagate within the pipeline.
Depending upon its configuration, a surge tank may be
classified as follows;
• 1- Simple surge tank: A simple surge tank is a shaft
connected to pressure tunnel directly or by a short
connection of cross-sectional area not less than the area of
the head race tunnel.
2- Orifice surge tank: if the entrance to the surge tank
is restricted by means of an orifice, it is called an orifice
tank.
3- Differential surge tank: an orifice tank having a
riser is called differential tank.
4-Closed surge tank:
If the top of the tank is closed and there is compressed air
between the water surface and the top of the tank, then the
tank is called closed surge tank, a tank with air cushion.
5-Surge Tank with Spilling Chamber
PENSTOCK
What is penstock ?
•A penstock is one of the parts of conveyance system that
construct from a steel or reinforced concrete to resist high
pressure in the water conveyance system
• What is the Function of penstock?
• It’s function is conveying water from for bay
or surge tank to the turbine in the power hous
and it’s help to increase the kinetic energy of
water that comes from the end of head race.
Type of penstock
1. Buried penstocks 2. Exposed penstocks
Buried penstocks:
are supported continuously on the soil at the bottom of a trench
backfilled after placing the pipe. The thickness of the cover over
the pipe should be about 1.o to 1.2 m.
Advantage:
• The soil cover protects the penstock against effect of
temperature variations,
• It protects the conveyed water against freezing.
• Buried pipes do not spoil the landscape.
• They are safer against rock slides, avalanches and falling
trees.
Disadvantage:
• the inspection and faults cannot be determined easily.
• It’s installation expensive Especially For large diameters and
rocky soils.
• On steep hillsides, especially if the friction coefficient of the
soil is low, such pipes may slide.
• Maintenance and repair of the pipe is difficult.
are installed above the terrain surface and supported on piers
(briefly called supports or saddles). Consequently, there is no
contact between the terrain and the pipe itself, and the support is
not continuous but confined piers.
Advantage:
•The possibility of continuous and adequate inspection during
operation.
•Its installation is less expensive in case of large diameters of
rocky terrain.
•Safety against sliding may be ensured by properly designed
anchorages.
•Such pipes are readily accessible and maintenance and repair
operations can be carried out easily
Exposed penstocks:
Disadvantage:
• Full exposure to external variations in temperature.
• The water conveyed may freeze.
• Owing to the spacing of supports and anchorages
significant longitudinal stresses may develop especially
in pipes of large diameters designed for low internal
pressures
Design of penstock:
• According to the Bureau of Indian Standards code IS:
11625-1986 “Criteria for hydraulic design of
penstocks” The determination of penstock diameter
based on the following losses may be expected for a
penstock:
a. Head loss at trash rock .
b. Head loss at intake entrance .
c. Friction losses, and .
d. Other losses as at bends, bifurcations, transitions,
values, etc.
Bends
Depending on topography, the alignment of the penstock is often
required to be changed, in direction, to obtain the most
economical profile.
Reducer piece:
In the case of very long penstocks, it is often necessary to reduce the diameter
of the pipe as the head on the pipe increases. This reduction from one
diameter to another should be effected gradually by introducing a special
pipe piece called reducer piece.
Branch pipe: Depending upon the number of
units a single penstock feeds.
Expansion joints :are installed in exposed
penstocks to prevent longitudinal expansion or
contraction when changes in temperature occur.
Manholes: Manholes are provided in the course
of the penstock length to provide access to the
pipe interior for inspection, maintenance and
repair.
Air vents and valves: These are provided on
the immediate downstream side of the control gate or
valve to facilitate connection with the atmosphere.
How hydropower
system work ?
• Tailraces:
After passing through the turbine the water
returns to the river trough a short canal called a
tailrace.
THANK YOU

More Related Content

What's hot

Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresDamalla Rams
 
Canal Regulation Work
Canal Regulation WorkCanal Regulation Work
Canal Regulation WorkYash Patel
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenancesAjay B.K
 
energy dissipators
energy dissipatorsenergy dissipators
energy dissipatorsSANJEEV Wazir
 
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth damssaibabu48
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeRajdip Bhdaraka
 
types of canal
types of canaltypes of canal
types of canalself-emplyed
 
Spillway gates
Spillway gatesSpillway gates
Spillway gatesmurali mohan
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure Kiran Jadhav
 
Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1Vidhi Khokhani
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage worksJaydeep Dave
 
Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillwayssaibabu48
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity damDivya Vishnoi
 
050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipatorsBinu Karki
 
water supply scheme
water supply schemewater supply scheme
water supply schemesunil9666
 
02 Types of Intake Structures
02 Types of Intake Structures02 Types of Intake Structures
02 Types of Intake Structuresakashpadole
 
Unit 3 spillway
Unit 3 spillwayUnit 3 spillway
Unit 3 spillwayMood Naik
 
Reservoir planning ajitha miss
Reservoir planning ajitha missReservoir planning ajitha miss
Reservoir planning ajitha missSHAMJITH KM
 

What's hot (20)

Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
Canal Regulation Work
Canal Regulation WorkCanal Regulation Work
Canal Regulation Work
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenances
 
energy dissipators
energy dissipatorsenergy dissipators
energy dissipators
 
Modes of failure earth dams
Modes of failure   earth damsModes of failure   earth dams
Modes of failure earth dams
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its discharge
 
types of canal
types of canaltypes of canal
types of canal
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Concrete dam lecture 1
Concrete dam lecture 1Concrete dam lecture 1
Concrete dam lecture 1
 
2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works2170609 irrigation engineering cross drainage works
2170609 irrigation engineering cross drainage works
 
Cve471 lecture notes 4 spillways
Cve471 lecture notes 4   spillwaysCve471 lecture notes 4   spillways
Cve471 lecture notes 4 spillways
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Force acting on gravity dam
Force acting on gravity damForce acting on gravity dam
Force acting on gravity dam
 
050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators
 
Spillways
SpillwaysSpillways
Spillways
 
water supply scheme
water supply schemewater supply scheme
water supply scheme
 
02 Types of Intake Structures
02 Types of Intake Structures02 Types of Intake Structures
02 Types of Intake Structures
 
Unit 3 spillway
Unit 3 spillwayUnit 3 spillway
Unit 3 spillway
 
Reservoir planning ajitha miss
Reservoir planning ajitha missReservoir planning ajitha miss
Reservoir planning ajitha miss
 

Viewers also liked

hydro power energy water conveyance system
hydro power energy water conveyance system   hydro power energy water conveyance system
hydro power energy water conveyance system khabat shekhany
 
PRINCIPLES OF HYDROPOWER ENGINEERING
PRINCIPLES OF HYDROPOWERENGINEERINGPRINCIPLES OF HYDROPOWERENGINEERING
PRINCIPLES OF HYDROPOWER ENGINEERINGArkan Hamza Gardi
 
Intake works at diversion
Intake works at diversion Intake works at diversion
Intake works at diversion RAJ BAIRWA
 
Silt excluders
Silt excludersSilt excluders
Silt excludersRaees Shah
 
Intake structures
Intake structures Intake structures
Intake structures Sachin PatiL
 

Viewers also liked (7)

hydro power energy water conveyance system
hydro power energy water conveyance system   hydro power energy water conveyance system
hydro power energy water conveyance system
 
PRINCIPLES OF HYDROPOWER ENGINEERING
PRINCIPLES OF HYDROPOWERENGINEERINGPRINCIPLES OF HYDROPOWERENGINEERING
PRINCIPLES OF HYDROPOWER ENGINEERING
 
Intake works at diversion
Intake works at diversion Intake works at diversion
Intake works at diversion
 
Silt excluders
Silt excludersSilt excluders
Silt excluders
 
Hydropower
HydropowerHydropower
Hydropower
 
Intake structures
Intake structures Intake structures
Intake structures
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 

Similar to Hydropower water conveyance systam

hydropower water conveyance system
hydropower water conveyance systemhydropower water conveyance system
hydropower water conveyance systemmarif tahayy
 
part ii_intake structures
part ii_intake structurespart ii_intake structures
part ii_intake structuresNRjhm
 
Collection and Conveyance of Water
Collection and Conveyance of WaterCollection and Conveyance of Water
Collection and Conveyance of WaterGAURAV. H .TANDON
 
intakes structures ......................................... .pptx
intakes structures ......................................... .pptxintakes structures ......................................... .pptx
intakes structures ......................................... .pptxDIVYA8090
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thEngrHayatHussain
 
Canal regulation work 1
Canal regulation work 1Canal regulation work 1
Canal regulation work 1manjeet singh
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control WorksGAURAV. H .TANDON
 
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPTHYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPTKavin Raval
 
Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report vikas rahangdale
 
12. Canal Head Regulators.2.pdf
12. Canal Head Regulators.2.pdf12. Canal Head Regulators.2.pdf
12. Canal Head Regulators.2.pdfMuhammadAjmal326519
 
4. Spillways.ppt
4. Spillways.ppt4. Spillways.ppt
4. Spillways.ppthussenbelew
 
WRE II canal structures
WRE II canal structuresWRE II canal structures
WRE II canal structuresMitaliShelke
 
Unit ii introduction to water supply scheme
Unit  ii introduction to water supply schemeUnit  ii introduction to water supply scheme
Unit ii introduction to water supply schemeMadhukarJadhav8
 
12.-Regulators.pptx
12.-Regulators.pptx12.-Regulators.pptx
12.-Regulators.pptxErRakeshKumar5
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKSMood Naik
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwetirath prajapati
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal TypesAbbasZafar3
 
UNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxUNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxDivs97
 

Similar to Hydropower water conveyance systam (20)

hydropower water conveyance system
hydropower water conveyance systemhydropower water conveyance system
hydropower water conveyance system
 
part ii_intake structures
part ii_intake structurespart ii_intake structures
part ii_intake structures
 
Regulation Works
Regulation WorksRegulation Works
Regulation Works
 
Collection and Conveyance of Water
Collection and Conveyance of WaterCollection and Conveyance of Water
Collection and Conveyance of Water
 
intakes structures ......................................... .pptx
intakes structures ......................................... .pptxintakes structures ......................................... .pptx
intakes structures ......................................... .pptx
 
Ce 413 hydraulic structures 8th
Ce 413 hydraulic structures 8thCe 413 hydraulic structures 8th
Ce 413 hydraulic structures 8th
 
Canal regulation work 1
Canal regulation work 1Canal regulation work 1
Canal regulation work 1
 
Spillways and Flood Control Works
Spillways and Flood Control WorksSpillways and Flood Control Works
Spillways and Flood Control Works
 
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPTHYDROLOGY AND WATER RESOURCE MANAGMENT PPT
HYDROLOGY AND WATER RESOURCE MANAGMENT PPT
 
Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report Barrage Gate Operation Rules and Silt Control Devices Report
Barrage Gate Operation Rules and Silt Control Devices Report
 
12. Canal Head Regulators.2.pdf
12. Canal Head Regulators.2.pdf12. Canal Head Regulators.2.pdf
12. Canal Head Regulators.2.pdf
 
4. Spillways.ppt
4. Spillways.ppt4. Spillways.ppt
4. Spillways.ppt
 
WRE II canal structures
WRE II canal structuresWRE II canal structures
WRE II canal structures
 
Unit ii introduction to water supply scheme
Unit  ii introduction to water supply schemeUnit  ii introduction to water supply scheme
Unit ii introduction to water supply scheme
 
12.-Regulators.pptx
12.-Regulators.pptx12.-Regulators.pptx
12.-Regulators.pptx
 
DIVERSION HEAD WORKS
DIVERSION HEAD WORKSDIVERSION HEAD WORKS
DIVERSION HEAD WORKS
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwe
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Canal Regulation & Canal Types
Canal Regulation & Canal TypesCanal Regulation & Canal Types
Canal Regulation & Canal Types
 
UNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptxUNIT 5 Distribution Works.pptx
UNIT 5 Distribution Works.pptx
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerAnamika Sarkar
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned ďťżTube Exchanger
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTACÂŽ CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 

Hydropower water conveyance systam

  • 1. GAZIANTEP UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING HYDROPOWER ENGINEERING WATER CONVEYANCE SYSTEM Submitted by: KHABAT STAR MOHAMMED MARIF MAHMOOD KARIM ISRAA NAJAT JABBAR YASIR SHAKIR MAHMOOD Submitted to : Doç.Dr.Aytaç GĂźven
  • 2. Water Conveyance system Introduction Any structure that conveys water from one location to another.
  • 4. Plan ( 2 ) Intake
  • 5. Definition of diversion head work A structure constructed across a river to raise the normal water level and drive the required supply in to main canal or power canal
  • 7. Components of diversion head work 1. Barrage or weir 2. Canal head regulator 3. Divide wall 4. Fish ladder 5. Under sluice portion 6. Silt excluder 7. Marginal bunds 8. Guide bank
  • 10. Function of head work 1. A head work raises the water level in the river. 2. It regulates the intake of water into the canal. 3. It also controls the entry of silt into the canal. 4. A headwork can also store water for small periods of time. 5. Reduces fluctuations in the level of supply in river.
  • 11. What is intake A hydraulic-engineering installation for obtaining water from a source of supply (river, lake, reservoir, and so on) for purposes of hydroelectric power engineering, water supply, or irrigation.
  • 13. Elements of intake 1. Trash rack and supporting structure. 2. Smolt screens. 3. Bell mouth entrance. 4. Gate slot closing devices with air vents. 5. Ice, log trash boom. 6. Silt excluders and silt ejectors. 7. Under sluices.
  • 14. 1- Trash rack 2- screen • A trash rack is a wooden or metal structure, that prevents water-borne debris (such as logs, boats, animals, masses of cut waterweed, etc.) from entering the intake of a water mill, pumping station or water conveyance. This protects penstock, and sluice gates from destruction during floods.. • Usually positioned in forebay or intake structure.
  • 15. Trash Rack Trash rack Trash rack
  • 16. Removing or cleaning process to trash rack
  • 18. 3- Bell mouth entrance .
  • 19. 4 – gate slot closing It is control regulates the entry of water into the intake.
  • 20. Gates
  • 21. 5- ICE,LOG,AND TRASH BOOMS Floating boom use to perform one or more of the following functions 1. Deflection of logs and trash from the intake screens. 2. Deflection of ice away from the intake. 3. Prevention of the boats form being carried into the intake
  • 23. 6- silt excluders and silt ejectors • Silt Control Devices A. Silt Excluder: The silt excluder is located on the u/s of diversion weir and in front of the head regulator and the object is to remove silt that has entered in the stilling basin through scouring sluices. B.Silt Ejector: Silt Ejector is located in the canal take off from the diversion weir it ejects the silt that has entered in the canal
  • 25. LOCATION OF INTAKE The various factors influencing the choice of location of intake structure are: 1- Type of storage reservoir 2- Location and type of dam/weir 3- Type of water conductor system that is canal or tunnel 4- Topographical features of the river. 5- should not be located on curves or at least on shape curves 6- should remain easily accessible during floods. 7- located at place from where can draw water even during the driest period of the year
  • 26. TYPE OF INTAKE •Depending on the function served and the range in reservoir head under which it is to operate, •The discharging capacity and frequency of the reservoir drawdown, intake for hydroelectric projects or more elaborate structure raised as a tower above maximum reservoir level.
  • 28. A- According to source 1- River Intake
  • 32. 4 - Canal intake
  • 33. B- According to position of intake • An Intake structure which remains entirely under water during its operation is termed as submerged intake. • It is provided where the structure serves only as an entrance to the outlet required. • The conduct intake may be inclined, vertical or horizontal in accordingly with the intake requirements. • An inclined intake may be provided with gates and operated on the upstream slopes of a low dam. 1-submerged intake
  • 35. 2- Exposed intake • Is in the form of well or tower constructed near the bank of river or in some cases even away from the bank of river, they are more common due to ease in operation and maintenance .
  • 37. C – According to presence of water in the tower • In dry intake tower the entry ports are directly connected with the withdrawal conduit and water inside the tower when gates are in a closed position. • Dry Intake tower has a merit that the intake tower being dry is made accessible for inspection and operation besides that the water can be withdrawn from any level by opening the port at that level. 1- Dry intake tower
  • 38.
  • 39.
  • 40. 2- Wet Intake Tower • A wet intake tower has entry ports at various levels and the vertical shaft is filled with water up to reservoir level. • It differs from the dry intake tower is that the water enters from the ports into the tower and then into the withdrawal conduct through separate gated openings.
  • 42.
  • 43. QUALITY WATER 1- Location of intake is required to be such as to draw the best quality of water from the reservoir. 2- Depth of water at intake is important. 3- Quality of water varies at different levels in the reservoir and it is necessary to draw water from different elevation of the reservoir at different seasons of the Year for which multi-level intakes are frequently provided.
  • 44. Water conveyance system The main components are : A. Open channel flow system B. Pressure flow system
  • 45. Open channel flow and pressure flow systems
  • 46. What is Open channel? A covered or uncovered conduit in which liquid (usually water) flows with its top surface bounded by the atmosphere. Typical open channels are rivers, streams, canals, flumes, or sewers, and water-supply or hydropower aqueducts
  • 47. Classification of open channel Based on : 1. shape 2. natural / artificial (man made) 3. change in cross section and slope 4. boundary characteristic
  • 48. Classification based on a shape 1.Rectangular 2.Trapezoidal 3. Triangular 4. semi-Circular 5.Parabolic 6.Compound
  • 52. Open channel geometric relationships for varies cross- section
  • 53. Classification based on • Natural channel All watercourses that exist naturally on the earth like Brooke ,creeks , tidal • Artificial channel Those constructed to perform various project requirements and termed canals Flumes , culverts
  • 55. Classification based on change in slope and cross section Prismatic : a channel in which cross section shape and size also the bottom slope are constant , most of man-made channels(artificial) are prismatic channels like rectangular ,trapezoidal , triangular ,circular channels • Non – prismatic : slope or cross section changes, all natural channels generally have varying in cross section and consequently are non- prismatic.
  • 56. Classification based on boundary characteristic Mobile boundary channel Rigid boundary channel
  • 57. Forebay • A forebay is an artificial pool of water in which located before and connected with penstocks • Provided in case of run-off- river plants • The major use of forebay was to distribution Flow of water in to penstocks , store water which is rejected by hydropower plant , Containing a trash rack and bye-pass channel.
  • 58. Forebay connecting with penstock and Containing a trash rack and bye-pass channel
  • 60. Trashrack that which used to prevent undesirable material (planate , dead animals) for entering to penstock that may choke the system
  • 61. BANK AND CHANNEL PROTECTIVE LINING Lining are Protective layer articial or natural material which placed in a channel bottom and banks that may be used to: • prevent erosion resulting from high velocities of water • breaking down resulting from entering water in Cracks and gaps • shapely appearance and proper
  • 62. Lining classification The main classifications of open channel linings are based on the material which that covered the channel and we have two items : • Rigid Linings • Flexible linings
  • 63. Rigid Linings Rigid linings are generally constructed of concrete, pvc, or concrete blocks pavement they are more expensive , prevent infiltration and Require periodic maintenance whose smoothness offers a higher capacity for a given cross-sectional area and Higher Velocities The following are examples of Rigid Linings:
  • 64. Pri –cast concrete channel concrete blocks channel Pvc channel
  • 65. Flexible linings Flexible linings have several advantages compared to rigid linings They are generally less expensive, permit infiltration and exhilaration and can be vegetated to have a natural appearance, have self- healing qualities which reduce maintenance In many cases flexible linings are designed to provide only transitional protection against erosion The following are examples of Flexible linings:
  • 66. Grasses or natural vegetation Grass linings are suitable for applications where they will be exposed to periodic relatively slow flow of water This type of lining has a pleasing appearance, is economical and is not subject to damage as a result of undermining or settlement of the supporting soils
  • 69. B:Pressure flow system 1- Low-pressure conduits and tunnels 2- High-pressure conduits, commonly called the penstocks
  • 70. Tunnels Tunnels can be designed as underground passages made without removing the overlying rock or soil.
  • 71. TBM: also known as a "mole", is a machine used to excavate tunnels with a circular cross section through a variety of soil and rock strata. They may also be used for micro tunneling. They can bore through anything from hard rock to sand.
  • 72. Layout of a tunnel alignment The first aspect that needs to be decided for a tunnel is the alignment .
  • 74. Hydraulic tunnels can be divided into the following categories: 1- Pressure tunnels 2- Free flowing tunnels Depending on their shape, tunnels may be classified as: 1- D-shaped 2- Horse-shoe shaped 3- Circular shaped 4- Egg Shaped and Egglipse Sections
  • 75. Tunnel section Cross – section of a tunnel depends on the following factors: 1- Geological conditions prevailing along the alignment, 2- Structural considerations, and 3- Hydraulic requirements, 4- Functional requirements.
  • 76. D-SHAPED SECTION: • D-shaped section is found to be suitable in tunnels located in good quality, intact sedimentary rocks and massive external igneous, hard ,compacted , metamorphic rocks where the external or internal pressures.
  • 77. Horse-Shoe section This sections are strong in their resistance to external pressure. Quality of rock and adequate rock cover in terms of the internal pressure to which the tunnel is subjected govern the use of these sections. This section offers the advantage of flat base for constructional ease and change over to circular section with minimum additional expenditure in reaches of inadequate rock cover and poor rock formation.
  • 78. Note: For tunnel excavated to horse -shoe section and concreted to circular section.
  • 79. Modify horse shoe section
  • 80. Egg Shaped and Egglipse Sections • Where the rock is stratified soft and very closely laminated (as laminated sand stones, slates, micaceous schists , etc) and where the external pressure and tensile forces in the crown are likely to be high so as to cause serious rock falls, those sections should be considered.
  • 81. Circular section The circular section is most suitable from structural consideration. It is difficult to excavation where cross-sectional area is small. In case where the tunnel is subjected to high internal pressure, but does not have good quality of rock and/or adequate rock cover around it. circular section is considered to be most suitable.
  • 82. Steel supports These are built of steel sections, usually I-sections, either shaped or welded in pieces in the form of a curve or a straight section
  • 84. ROOF BOLTS OF ROCK • Rock bolts were used to support the roof and walls of major structures such as tunnels and power stations • These steel bolts, of different length and spacing, were inserted into the rock where they were found to be an excellent anchorage for the rock.
  • 85. Tunnel Lining • Tunnel linings: main types. Tunnel linings are grouped into three main forms some or all of which may be used in the construction of a tunnel. • Temporary ground support • Primary lining • Secondary lining • Temporary ground support: In rock tunnels where the ground has insufficient stand-up time to allow the construction of the primary lining some distance behind the face. • Primary lining. A primary lining is the main structural component of the tunnel support system which is required to sustain the loads and deformations that the ground may induce during the tunnel's intended working life. • Secondary lining. Various tunnels require smooth bore profiles for their intended use, eg sewer and water tunnels or aesthetic finishes for public usage, eg highway and pedestrian tunnels.
  • 88. Tunnel Grouting: This is a cement mortar with proportion of cement, sand and water in the ratio 1:1:1 by weight usually, though it may be modified suitably according to site conditions. types of grouting: • Back-fill grouting :to fill spaces between initial lining and rock. • − Contact grouting: to fill gaps between initial lining and plug concrete. • − Consolidation grouting: to improve the quality of the surrounding rock. • − Curtain grouting: To preventing water seepage from the waterway end portion.
  • 91. • Pattern of Holes for Grouting • Backfill or Contact Grouting - Backfill grouting is limited to the arch portion of the tunnel. The number of holes normally three in each section, the pattern being staggered in each subsequent sections located 3 m center to center.
  • 92. Consolidation or Pressure Grouting - • Consolidation grouting is done to consolidate the shattered rock all around the cavity. The pattern of holes is such that these are distributed all along the periphery but staggered in alternate sections space 3 m center to center. The number of holes may be four for smaller tunnels six for bigger tunnels.
  • 93. Consolidation or Pressure Grouting 6 holes
  • 94. What is surge tank Surge tank is located between the headrace pressure conduit and the steeply sloping penstock pipe and is designed either as a chamber excavated in the mountain or as a tower raising high above the surrounding terrain.
  • 95. The main functions of a surge tank are: • Reduces the amplitude of pressure fluctuations by reflecting the incoming pressure waves. • Improves the regulating characteristics of a hydraulic turbine because; it reduces the water starting time of a hydropower scheme. • Surge tanks, which are used to dissipate water hammer pressure
  • 96. Water Hammer • Water Hammer is a pressure surge or wave that occurs when there is a sudden momentum change of a fluid (the motion of a fluid is abruptly forced to stop or change direction) within an enclosed space (Water Hammer). • This commonly occurs in pipelines when a valve is closed suddenly at the end of a pipeline where the velocity of the fluid is high. The pressure wave created will propagate within the pipeline.
  • 97. Depending upon its configuration, a surge tank may be classified as follows; • 1- Simple surge tank: A simple surge tank is a shaft connected to pressure tunnel directly or by a short connection of cross-sectional area not less than the area of the head race tunnel.
  • 98. 2- Orifice surge tank: if the entrance to the surge tank is restricted by means of an orifice, it is called an orifice tank.
  • 99. 3- Differential surge tank: an orifice tank having a riser is called differential tank.
  • 100. 4-Closed surge tank: If the top of the tank is closed and there is compressed air between the water surface and the top of the tank, then the tank is called closed surge tank, a tank with air cushion.
  • 101. 5-Surge Tank with Spilling Chamber
  • 103. What is penstock ? •A penstock is one of the parts of conveyance system that construct from a steel or reinforced concrete to resist high pressure in the water conveyance system
  • 104.
  • 105. • What is the Function of penstock? • It’s function is conveying water from for bay or surge tank to the turbine in the power hous and it’s help to increase the kinetic energy of water that comes from the end of head race.
  • 106. Type of penstock 1. Buried penstocks 2. Exposed penstocks
  • 107. Buried penstocks: are supported continuously on the soil at the bottom of a trench backfilled after placing the pipe. The thickness of the cover over the pipe should be about 1.o to 1.2 m. Advantage: • The soil cover protects the penstock against effect of temperature variations, • It protects the conveyed water against freezing. • Buried pipes do not spoil the landscape. • They are safer against rock slides, avalanches and falling trees.
  • 108. Disadvantage: • the inspection and faults cannot be determined easily. • It’s installation expensive Especially For large diameters and rocky soils. • On steep hillsides, especially if the friction coefficient of the soil is low, such pipes may slide. • Maintenance and repair of the pipe is difficult.
  • 109. are installed above the terrain surface and supported on piers (briefly called supports or saddles). Consequently, there is no contact between the terrain and the pipe itself, and the support is not continuous but confined piers. Advantage: •The possibility of continuous and adequate inspection during operation. •Its installation is less expensive in case of large diameters of rocky terrain. •Safety against sliding may be ensured by properly designed anchorages. •Such pipes are readily accessible and maintenance and repair operations can be carried out easily Exposed penstocks:
  • 110. Disadvantage: • Full exposure to external variations in temperature. • The water conveyed may freeze. • Owing to the spacing of supports and anchorages significant longitudinal stresses may develop especially in pipes of large diameters designed for low internal pressures
  • 111. Design of penstock: • According to the Bureau of Indian Standards code IS: 11625-1986 “Criteria for hydraulic design of penstocks” The determination of penstock diameter based on the following losses may be expected for a penstock: a. Head loss at trash rock . b. Head loss at intake entrance . c. Friction losses, and . d. Other losses as at bends, bifurcations, transitions, values, etc.
  • 112.
  • 113. Bends Depending on topography, the alignment of the penstock is often required to be changed, in direction, to obtain the most economical profile.
  • 114. Reducer piece: In the case of very long penstocks, it is often necessary to reduce the diameter of the pipe as the head on the pipe increases. This reduction from one diameter to another should be effected gradually by introducing a special pipe piece called reducer piece.
  • 115.
  • 116. Branch pipe: Depending upon the number of units a single penstock feeds.
  • 117. Expansion joints :are installed in exposed penstocks to prevent longitudinal expansion or contraction when changes in temperature occur.
  • 118. Manholes: Manholes are provided in the course of the penstock length to provide access to the pipe interior for inspection, maintenance and repair.
  • 119. Air vents and valves: These are provided on the immediate downstream side of the control gate or valve to facilitate connection with the atmosphere.
  • 121.
  • 122. • Tailraces: After passing through the turbine the water returns to the river trough a short canal called a tailrace.