SlideShare a Scribd company logo
1 of 4
MANISH ANILKUMAR GAJJAR
E-MAIL: magajjar3112@gmail.com
Mobile: 9879101972
Aspiring for career enriching assignments in Planning & purchasing as well as in Maintenance with growth oriented
organization of repute. Well-developed leadership abilities and excellent organizational skills. Can absorb quickly &
contribute productively. I am a conscientious person who works hard and pays attention to detail. I'm flexible, quick to pick up
new skills and eager to learn from others and believe in continual learning.
 B.E (MECHANICAL ENGINEERING) from Sardar Vallbhbhai National Institute of technology,Surat with over
15 years of extensive work experience in Central Maintenance Shop (CMS) of world’s most renowned 10 MTPA
steel plants.CMS having the state of the art facility and any jobs are possible to make or overhaul over here and
here I am enough competent to entwine any technical inextricable problem. Having experience of pipe line project.
 Focused & goal driven with strong work ethics,continuously striving for improvement coupled with commitment
to offer quality work.
 Adaptable and quick learner with skill to work under pressure.
 Possessesstrong negotiation,communication & analytical skills.
PLANNING SAP PP & PM MODULE MS OFFICE POWERPOINT PRESENTATION
IMS EME MAINTENANCE OF ROTARY AND STATIC EQUIPMENT.
STORES PROCUREMENT POSSESSES KNOWLEDGE OF ASSEMBLY, M/C SHOP& NSPECTION
September’99 to August 2004: J.M Corporation, Ahmadabad as a GET & Junior Engineer
 Working as a Junior Engineer.
 Oversaw activity of manufacturing and design.
 Vendor development and procurement.
August’2004 to Septemer’2005
 Joined Essar Steel as a “Graduate Engineer Trainee” in August 2004
 During my tenure, In between 23.08.2004 to 30.08.2005, I had worked as a Store in-charge. During this period I was taken
care of all the spares require for better execution of numerous jobs. I was generated PR and did rigorous follow up for
procurement. I was in contact with various vendors and play intrinsic role to expedite and eke the spares to the plant.
 Generating Purchase Requisition in SAP getting it approved from the Management, follow up for ordering, furnishing
technical details, etc. for Central Maintenance Shop.
 Maintain inventory of indispensable spares which can be use in exigency.
 Had done 5S activity as store in-charge and had won trophy for store.
 Always hawk eye on incoming as well as outgoing spares and maintain records of all movements.
 Keeping Track of the Purchase Orders and sending expediters at appropriate intervals for ensuring the receipt of material
well in time.
 Keeping the minimum inventory in the stores,which would minimize the spares & maintenance cost.
 Based on previous consumption pattern and coming year plan, various equipments and spares for equipments are planned
to procure. Spares are also planned to procure for overhauling and repairing of various equipments. All requirements are
generated by using SAP R/3 ECC 6.0.
SUMMARY
KNOWLEDGE PURVIEW
WORK EXPERIENCE
 Generating service orders for yearly requirement of work force for regular maintenance activities and taking approval of
same.
 Generating service orders in SAP for yearly requirement of heavy cranes, trailers, hydra etc. for various maintenance
activities and taking approval of same.
 Generating Subcontracting order in SAP for various services and taking approval of same. After taking approval material
send to third party for repairing & after repairing receiving at our end.
 Coordinate the supply of capital equipment, consumables and spares to and from warehouse using the SAP system.
September 2005 to till date:
 In May 2005 new role assigned to look after planning and maintenance activities and year by year new plants added as a
part of responsibility enhancement. Right now I am doing planning for entire equipments comes for
repairing/Overhauling/Modification own to the plants like Electric Arc Furnace ( 1 to 4 ) , Continuous casterplant ( 1 to 3),
Sinter plant, Blast Furnace, Corex , Module 1 to 5, Lime plant, Oxygen plant, INI caster, Conarc furnace, Entire cold
rolling mill, Plate Mill, CPP 1, CSP Mill, Material Handling Department, Row material handling department, Utility
department, with this I am also looking after the jobs belong to Essar Shipping as well as Essar Bulk Terminal Limited and
Essar Power Limited.
 Strong knowledge of SHUTDOWN PLANNING AND EXECUTION.
 Strong knowledge of planning as well as maintenance of all types of static as well as rotating equipments. And having in
depth knowledge of maintenance of majority mechanical equipment in use at various industries.
 I believe in quality jobs & of course I am aware about that cost is the supreme for any organization hence I am working as a
bridge between Central Maintenance shop and Internal departments of 10 MTPA of ESSAR STEEL LIMITED.
 I have significant knowledge of SAP (ECC 6) PM module and tad knowledge of MM module. I am making work order in
SAP system. Keep records of that in systemas well as in XL. I am proficient to do work on SAP in regards on planning.
 Keeping track of the Goods Receipt based Invoice Verification and the Invoice Parking and Posting and payments to the
Vendors as per the Payment Terms.
 I have done master data creation for equipment repair activities, frequencies & communicate to userfor operation analysis
on monthly basis.
 Ensure each and every technician as well as employee has got safety training, I had worked as a Plant safety engineer and
during this period 100 % safety index achieved 3 times for department and 100% housekeeping index achieved 1st time
since inception.
 Ensuring hassle free operation not only in Planning but also for all kinds of contracts and services of CMS Plant.
 Keeping the Expenditures well within the Allotted Budget, continuous tracking and follow-up.
 Coordinate with Heavy Equipment Division of Essar Construction India Ltd. to fulfill department requirement of various
kind of heavy duty cranes,and hydra on regular basis as well as during capital shutdown.
 By taking personnelinterest and with solidarity numerous valuable spares has converted from scrap / rejected items which
had helped the plant in both the way, (1) in monitory (2) to achieve production target. I have searched the non -use material
and converted it in to the desire shape by minimum machining so time and cost both has s aved.More than 40% inventory
reduced in compare to the previous financial year. (3) Colossal Cost saving due to this drive is almost around 2.50 crore.
 BOM has created for lengthy and critical jobs, for ex. "Lime plant blower and Sinter: Hot screen Exciter". Master data has
created with incorporation of sketches which original drawings and intrinsic data had NA. More than 50 no critical BOM
has generated, with this number of sketches created and job has produced successfully by using this sketches.
 Coordinate with Secondary sales division of Essar Steel Ltd to sell out obsolete equipments, damaged equipments and
spares.Other than equipments and spares waste oil and grease are also sell out in secondary sales.
 Coordinate with Essar Heavy Engineering Services for critical equipment overhauling, precise machining and assembly of
any material handling equipment.
 Till date more than 200 drawings had developed individually and based on that jobs executed successfully.
 Good knowledge of drawing study and applicable standards,numerous jobs executed without drawings by delve and
applying the realm.
 Always intervene and eke technical support for best execution.
 I am competent to provide adequate technical support to the team for the jobs undergone for repair or modification.
HIGHLIGHTES
 Overhauling of Hydraulic Cylinders
 Overhauling of Gear Boxes and taking trial on test bench for the same.
 Overhauling of compressors like twin lobe compressor, tri-lobe compressor, centrifugal pumps, Screw Pumps, Positive
cavity type pump, Multi-stage centrifugal pumps.
 Overhauling of centrifugal pumps & cooling tower gearbox.
 Overhauling of Process gas compressorgearboxes.
 Overhauling & assembly of twin lobes as well as tri lobes air blowers.
 Overhauling & assembly of hydraulically as well as manual operated slide gates.
 Monitoring job work done on CNC Plano miller ( zayer 8000 & zayer 7000), Horizontal boring machine (like Skoda borer
),5 axis CNC machine made by Juristi, Heavy duty Lathe machine, vertical and radial drill machine and slotting machine,
milling machines.
 Till date more than 100000 K INR saved by innovations.
 Manage and procure all spares for above equipments. Planning and Scheduling done by considering cost effectiveness.
 B.E (MECHANICAL ENGINEERING) from Sardar Vallbhbhai National Institute of technology,(SVNIT – Surat) with
First class distinction (i.e. 66.9%).
 12th from Jeevan Bharati School, Surat in 1995 with 78 % of marks.
 10th from Ratnasagarji jain school, Surat in 1993 with 82.57 % or marks
 Design, Development and testing of regenerator for pulse tube refrigerator.
 Awarded by National Merit Scholarship in the year 1995.
 Handled Project CBPR ( Coil Box Pinch Roll) individually and successfully executed within 4 months at the cost of just 28
lac while OEM quoted 1.45 Crore. From raw material arrangement to final assembly was done solely.
 Taken and completed Quality circle projects of “Revamping of Hot screen exciter unit “own to Sinter plant. Under this
project total cost saving was 1.50 crore and due to this project CMS has clinched 1st position among 20 in zonal QC
competition.
 Completed Process FMEA Project on identification and scheduling of Dust Burner belong to Corex plant.
 Till date,8 QC projects had taken and more than 25 sujhav has given which can play better roll for equipment reliability.
Total cost saving is more than 2.5 crore covered under QC projects.
 In-charge for 5S activities in Mechanical workshop.
 Representative from CMS – Planning to support HSE.
 Awarded Employee of the month in April 2012 and Employee of the Quarter in July 2012 for numerous huge cost saving
developments by using innovations.Almost more than 1.50 crore has saved by applying realm and using innovative ideas.
 Perform duty as a safety captain in a year (2009) along with existing duty and continuous maintain 100% safety index
during this period.
Passport No : L5107027
Date of birth : 31.12.1977
Sex : Male
Marital Status : Married
Father’s name : Mr. Anilkumar N Gajjar
Mother’s Name : Mrs. Raksha A Gajjar
Permanent Address : 402 / Vasudev Complex, Opp. Reliance Township, Behind Kataria Motors,
Near Iskon Mall. Piplod, Surat:-395007
GUJARAT, INDIA
Mobile No : +91987910
Telephone No : 0261 2873515
Hobbies : Driving, listening music.
Languages Known : English, Gujarati and Hindi
Current CTC : 12.98 Lacks P.A.
I hereby declare that all the information provided above is factual and correct to the best of my knowledge and belief.
Yours Sincerely,
Manish Gajjar
EDUCATION
ACADEMICPROJECT
ACHIEVEMENTSAND EXTRA CURRICULAR ACTIVITY
PERSONALDETAILS
Resume MG

More Related Content

What's hot

What's hot (20)

CVJ_31908101_20161111204520
CVJ_31908101_20161111204520CVJ_31908101_20161111204520
CVJ_31908101_20161111204520
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
CV
CVCV
CV
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16Resume - Kedar Borgaonkar -6-Apr-16
Resume - Kedar Borgaonkar -6-Apr-16
 
Resume New
Resume NewResume New
Resume New
 
Ashish Resume.doc
Ashish Resume.docAshish Resume.doc
Ashish Resume.doc
 
CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)CURRICULAM_VITAE (1)
CURRICULAM_VITAE (1)
 
Updated resume
Updated resumeUpdated resume
Updated resume
 
CV_Abhishek Nagam_Mechanical Engineer
CV_Abhishek Nagam_Mechanical EngineerCV_Abhishek Nagam_Mechanical Engineer
CV_Abhishek Nagam_Mechanical Engineer
 
rajiv cv
rajiv cv rajiv cv
rajiv cv
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
Maintenance Engineer having 9 years experience
Maintenance  Engineer having 9 years experienceMaintenance  Engineer having 9 years experience
Maintenance Engineer having 9 years experience
 
Jgj cv 03.08.2018
Jgj cv 03.08.2018Jgj cv 03.08.2018
Jgj cv 03.08.2018
 
Production Engineer - AISIN TAKAOKA INDIA
Production Engineer - AISIN TAKAOKA INDIAProduction Engineer - AISIN TAKAOKA INDIA
Production Engineer - AISIN TAKAOKA INDIA
 
Cv santosh kumar ( Manager Operation)
Cv   santosh kumar ( Manager Operation) Cv   santosh kumar ( Manager Operation)
Cv santosh kumar ( Manager Operation)
 
Resume new
Resume newResume new
Resume new
 
Nayan Dave CV for Suitable with Cover letter
Nayan Dave CV for Suitable with Cover letterNayan Dave CV for Suitable with Cover letter
Nayan Dave CV for Suitable with Cover letter
 
Vikrant Resume
Vikrant ResumeVikrant Resume
Vikrant Resume
 
MY RESUME.MD.REHAN FAROOQUI
MY RESUME.MD.REHAN FAROOQUIMY RESUME.MD.REHAN FAROOQUI
MY RESUME.MD.REHAN FAROOQUI
 

Viewers also liked (17)

The question
The questionThe question
The question
 
Moving beyond email
Moving beyond emailMoving beyond email
Moving beyond email
 
RFS PO % Spent
RFS PO % SpentRFS PO % Spent
RFS PO % Spent
 
Drinking Profile: Meet the High Risk Drinkers
Drinking Profile: Meet the High Risk DrinkersDrinking Profile: Meet the High Risk Drinkers
Drinking Profile: Meet the High Risk Drinkers
 
43-Report Spring
43-Report Spring43-Report Spring
43-Report Spring
 
Why customers need vmoso
Why customers need vmosoWhy customers need vmoso
Why customers need vmoso
 
Aircraft Performance and Design Project Code
Aircraft Performance and Design Project CodeAircraft Performance and Design Project Code
Aircraft Performance and Design Project Code
 
Autonomous Vehicles Project
Autonomous Vehicles ProjectAutonomous Vehicles Project
Autonomous Vehicles Project
 
Физиогномика
ФизиогномикаФизиогномика
Физиогномика
 
Latest Trends in Oil/Gas Claims
Latest Trends in Oil/Gas ClaimsLatest Trends in Oil/Gas Claims
Latest Trends in Oil/Gas Claims
 
Latest Trends in Oil/Gas Claims
Latest Trends in Oil/Gas ClaimsLatest Trends in Oil/Gas Claims
Latest Trends in Oil/Gas Claims
 
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
Christ_Santos_LiquidatedDamagesThePenaltyForFailingToAchieveTheImpossible_201...
 
presentation
presentationpresentation
presentation
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Fog computing paper presentation
Fog computing paper presentationFog computing paper presentation
Fog computing paper presentation
 
Reclaiming control of your business communication
Reclaiming control of your business communicationReclaiming control of your business communication
Reclaiming control of your business communication
 
Silabo del taller de danza
Silabo del taller de danzaSilabo del taller de danza
Silabo del taller de danza
 

Similar to Resume MG

Similar to Resume MG (20)

Krishnan Resume
Krishnan ResumeKrishnan Resume
Krishnan Resume
 
Anthony gachie c.v
Anthony gachie c.v Anthony gachie c.v
Anthony gachie c.v
 
Karthick mm
Karthick  mmKarthick  mm
Karthick mm
 
resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015resume of sanjay update on 01 -04-2015
resume of sanjay update on 01 -04-2015
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
latestResume_Sushant
latestResume_SushantlatestResume_Sushant
latestResume_Sushant
 
vivek kashyap.2
vivek kashyap.2vivek kashyap.2
vivek kashyap.2
 
RahulNavale
RahulNavaleRahulNavale
RahulNavale
 
Anthony gachie c.v
Anthony gachie c.v  Anthony gachie c.v
Anthony gachie c.v
 
Mechanical Maintenance & Operation Engineer
Mechanical Maintenance & Operation EngineerMechanical Maintenance & Operation Engineer
Mechanical Maintenance & Operation Engineer
 
Rohit Jain Resume
Rohit Jain ResumeRohit Jain Resume
Rohit Jain Resume
 
Anil Kumar
Anil KumarAnil Kumar
Anil Kumar
 
Sr. Plant_Engineer_6.5_years_Exp
Sr. Plant_Engineer_6.5_years_ExpSr. Plant_Engineer_6.5_years_Exp
Sr. Plant_Engineer_6.5_years_Exp
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
 
Jagannath Adki
Jagannath AdkiJagannath Adki
Jagannath Adki
 
Resume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCXResume_Press Tool Design & Development & Product Engineering.DOCX
Resume_Press Tool Design & Development & Product Engineering.DOCX
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 
MECHANICAL ENGINEER updated
MECHANICAL ENGINEER updatedMECHANICAL ENGINEER updated
MECHANICAL ENGINEER updated
 
Tikam cv
Tikam cvTikam cv
Tikam cv
 

Resume MG

  • 1. MANISH ANILKUMAR GAJJAR E-MAIL: magajjar3112@gmail.com Mobile: 9879101972 Aspiring for career enriching assignments in Planning & purchasing as well as in Maintenance with growth oriented organization of repute. Well-developed leadership abilities and excellent organizational skills. Can absorb quickly & contribute productively. I am a conscientious person who works hard and pays attention to detail. I'm flexible, quick to pick up new skills and eager to learn from others and believe in continual learning.  B.E (MECHANICAL ENGINEERING) from Sardar Vallbhbhai National Institute of technology,Surat with over 15 years of extensive work experience in Central Maintenance Shop (CMS) of world’s most renowned 10 MTPA steel plants.CMS having the state of the art facility and any jobs are possible to make or overhaul over here and here I am enough competent to entwine any technical inextricable problem. Having experience of pipe line project.  Focused & goal driven with strong work ethics,continuously striving for improvement coupled with commitment to offer quality work.  Adaptable and quick learner with skill to work under pressure.  Possessesstrong negotiation,communication & analytical skills. PLANNING SAP PP & PM MODULE MS OFFICE POWERPOINT PRESENTATION IMS EME MAINTENANCE OF ROTARY AND STATIC EQUIPMENT. STORES PROCUREMENT POSSESSES KNOWLEDGE OF ASSEMBLY, M/C SHOP& NSPECTION September’99 to August 2004: J.M Corporation, Ahmadabad as a GET & Junior Engineer  Working as a Junior Engineer.  Oversaw activity of manufacturing and design.  Vendor development and procurement. August’2004 to Septemer’2005  Joined Essar Steel as a “Graduate Engineer Trainee” in August 2004  During my tenure, In between 23.08.2004 to 30.08.2005, I had worked as a Store in-charge. During this period I was taken care of all the spares require for better execution of numerous jobs. I was generated PR and did rigorous follow up for procurement. I was in contact with various vendors and play intrinsic role to expedite and eke the spares to the plant.  Generating Purchase Requisition in SAP getting it approved from the Management, follow up for ordering, furnishing technical details, etc. for Central Maintenance Shop.  Maintain inventory of indispensable spares which can be use in exigency.  Had done 5S activity as store in-charge and had won trophy for store.  Always hawk eye on incoming as well as outgoing spares and maintain records of all movements.  Keeping Track of the Purchase Orders and sending expediters at appropriate intervals for ensuring the receipt of material well in time.  Keeping the minimum inventory in the stores,which would minimize the spares & maintenance cost.  Based on previous consumption pattern and coming year plan, various equipments and spares for equipments are planned to procure. Spares are also planned to procure for overhauling and repairing of various equipments. All requirements are generated by using SAP R/3 ECC 6.0. SUMMARY KNOWLEDGE PURVIEW WORK EXPERIENCE
  • 2.  Generating service orders for yearly requirement of work force for regular maintenance activities and taking approval of same.  Generating service orders in SAP for yearly requirement of heavy cranes, trailers, hydra etc. for various maintenance activities and taking approval of same.  Generating Subcontracting order in SAP for various services and taking approval of same. After taking approval material send to third party for repairing & after repairing receiving at our end.  Coordinate the supply of capital equipment, consumables and spares to and from warehouse using the SAP system. September 2005 to till date:  In May 2005 new role assigned to look after planning and maintenance activities and year by year new plants added as a part of responsibility enhancement. Right now I am doing planning for entire equipments comes for repairing/Overhauling/Modification own to the plants like Electric Arc Furnace ( 1 to 4 ) , Continuous casterplant ( 1 to 3), Sinter plant, Blast Furnace, Corex , Module 1 to 5, Lime plant, Oxygen plant, INI caster, Conarc furnace, Entire cold rolling mill, Plate Mill, CPP 1, CSP Mill, Material Handling Department, Row material handling department, Utility department, with this I am also looking after the jobs belong to Essar Shipping as well as Essar Bulk Terminal Limited and Essar Power Limited.  Strong knowledge of SHUTDOWN PLANNING AND EXECUTION.  Strong knowledge of planning as well as maintenance of all types of static as well as rotating equipments. And having in depth knowledge of maintenance of majority mechanical equipment in use at various industries.  I believe in quality jobs & of course I am aware about that cost is the supreme for any organization hence I am working as a bridge between Central Maintenance shop and Internal departments of 10 MTPA of ESSAR STEEL LIMITED.  I have significant knowledge of SAP (ECC 6) PM module and tad knowledge of MM module. I am making work order in SAP system. Keep records of that in systemas well as in XL. I am proficient to do work on SAP in regards on planning.  Keeping track of the Goods Receipt based Invoice Verification and the Invoice Parking and Posting and payments to the Vendors as per the Payment Terms.  I have done master data creation for equipment repair activities, frequencies & communicate to userfor operation analysis on monthly basis.  Ensure each and every technician as well as employee has got safety training, I had worked as a Plant safety engineer and during this period 100 % safety index achieved 3 times for department and 100% housekeeping index achieved 1st time since inception.  Ensuring hassle free operation not only in Planning but also for all kinds of contracts and services of CMS Plant.  Keeping the Expenditures well within the Allotted Budget, continuous tracking and follow-up.  Coordinate with Heavy Equipment Division of Essar Construction India Ltd. to fulfill department requirement of various kind of heavy duty cranes,and hydra on regular basis as well as during capital shutdown.  By taking personnelinterest and with solidarity numerous valuable spares has converted from scrap / rejected items which had helped the plant in both the way, (1) in monitory (2) to achieve production target. I have searched the non -use material and converted it in to the desire shape by minimum machining so time and cost both has s aved.More than 40% inventory reduced in compare to the previous financial year. (3) Colossal Cost saving due to this drive is almost around 2.50 crore.  BOM has created for lengthy and critical jobs, for ex. "Lime plant blower and Sinter: Hot screen Exciter". Master data has created with incorporation of sketches which original drawings and intrinsic data had NA. More than 50 no critical BOM has generated, with this number of sketches created and job has produced successfully by using this sketches.  Coordinate with Secondary sales division of Essar Steel Ltd to sell out obsolete equipments, damaged equipments and spares.Other than equipments and spares waste oil and grease are also sell out in secondary sales.  Coordinate with Essar Heavy Engineering Services for critical equipment overhauling, precise machining and assembly of any material handling equipment.  Till date more than 200 drawings had developed individually and based on that jobs executed successfully.  Good knowledge of drawing study and applicable standards,numerous jobs executed without drawings by delve and applying the realm.  Always intervene and eke technical support for best execution.  I am competent to provide adequate technical support to the team for the jobs undergone for repair or modification. HIGHLIGHTES  Overhauling of Hydraulic Cylinders  Overhauling of Gear Boxes and taking trial on test bench for the same.  Overhauling of compressors like twin lobe compressor, tri-lobe compressor, centrifugal pumps, Screw Pumps, Positive cavity type pump, Multi-stage centrifugal pumps.  Overhauling of centrifugal pumps & cooling tower gearbox.  Overhauling of Process gas compressorgearboxes.  Overhauling & assembly of twin lobes as well as tri lobes air blowers.  Overhauling & assembly of hydraulically as well as manual operated slide gates.
  • 3.  Monitoring job work done on CNC Plano miller ( zayer 8000 & zayer 7000), Horizontal boring machine (like Skoda borer ),5 axis CNC machine made by Juristi, Heavy duty Lathe machine, vertical and radial drill machine and slotting machine, milling machines.  Till date more than 100000 K INR saved by innovations.  Manage and procure all spares for above equipments. Planning and Scheduling done by considering cost effectiveness.  B.E (MECHANICAL ENGINEERING) from Sardar Vallbhbhai National Institute of technology,(SVNIT – Surat) with First class distinction (i.e. 66.9%).  12th from Jeevan Bharati School, Surat in 1995 with 78 % of marks.  10th from Ratnasagarji jain school, Surat in 1993 with 82.57 % or marks  Design, Development and testing of regenerator for pulse tube refrigerator.  Awarded by National Merit Scholarship in the year 1995.  Handled Project CBPR ( Coil Box Pinch Roll) individually and successfully executed within 4 months at the cost of just 28 lac while OEM quoted 1.45 Crore. From raw material arrangement to final assembly was done solely.  Taken and completed Quality circle projects of “Revamping of Hot screen exciter unit “own to Sinter plant. Under this project total cost saving was 1.50 crore and due to this project CMS has clinched 1st position among 20 in zonal QC competition.  Completed Process FMEA Project on identification and scheduling of Dust Burner belong to Corex plant.  Till date,8 QC projects had taken and more than 25 sujhav has given which can play better roll for equipment reliability. Total cost saving is more than 2.5 crore covered under QC projects.  In-charge for 5S activities in Mechanical workshop.  Representative from CMS – Planning to support HSE.  Awarded Employee of the month in April 2012 and Employee of the Quarter in July 2012 for numerous huge cost saving developments by using innovations.Almost more than 1.50 crore has saved by applying realm and using innovative ideas.  Perform duty as a safety captain in a year (2009) along with existing duty and continuous maintain 100% safety index during this period. Passport No : L5107027 Date of birth : 31.12.1977 Sex : Male Marital Status : Married Father’s name : Mr. Anilkumar N Gajjar Mother’s Name : Mrs. Raksha A Gajjar Permanent Address : 402 / Vasudev Complex, Opp. Reliance Township, Behind Kataria Motors, Near Iskon Mall. Piplod, Surat:-395007 GUJARAT, INDIA Mobile No : +91987910 Telephone No : 0261 2873515 Hobbies : Driving, listening music. Languages Known : English, Gujarati and Hindi Current CTC : 12.98 Lacks P.A. I hereby declare that all the information provided above is factual and correct to the best of my knowledge and belief. Yours Sincerely, Manish Gajjar EDUCATION ACADEMICPROJECT ACHIEVEMENTSAND EXTRA CURRICULAR ACTIVITY PERSONALDETAILS