The document summarizes a safety internal walkthrough of the King Salman International Complex for Marine Industries and Services Project. It notes observations made by the lead auditor and members, such as a diesel tank being uncovered, a worker using a substandard face shield, electric cables laying exposed on the ground without protection, and cables not being properly arranged. The rectifications made to address each observation are also documented, such as covering the diesel tank, replacing the face shield, protecting cables, arranging cables properly, and posting a head bump signage. The status of each observation is closed once rectified.
1. DOCUMENT NO. MYP –HSE-P5-WT-0044
KING SALMAN INTERNATIONAL COMPLEX FOR MARINE INDUSTRIES AND SERVICES PROJECT
CONTRACT
NO.
6600042823
(IK)
2. KING SALMAN INTERNATIONAL COMPLEX FOR MARINE INDUSTRIES AND SERVICES PROJECT
Lead Auditor
Muhammad Ali
Members:
Mr.Zhang _ Site Manager
Atif Khan _ Scaffold Supervisor
Mr.Mei _ Foreman
IZZAT Shah _ HSE Officer
Mr .Lu Jiang _ HSE Coordinator
SAFETY INTERNAL
WALKTHROUGH
Position HSE Supervisor
Department HSE –Dry Dock 4 & 5
COMPANY SINOHYDRO
Signature:
Signature:
3. OBSERVATION
Found diesel tank of equipment was covered with the
clothe.
RECTIFICATION
Cloth has been removed from diesel tank of equipment.
Status: Closed
Observation Date/Location: DRY DOCK 5
4. OBSERVATION
Worker was observed by using sub standard face shield
(Sino foundation)
RECTIFICATION
Sub standard face shield has been replaced with ANSI
standard.
Status: Closed
Observation Date/Location: DRY DOCK 5
5. OBSERVATION
Found naked electric power cable was laying on
ground without having any protection.
RECTIFICATION
Electric power cables has been protected properly by
plywood to reduce the tripping hazard and insulation
damage as well.
Status: Closed
Observation Date/Location: DRY DOCK 5
6. OBSERVATION
Electric power cables were not arranged properly
RECTIFICATION
Cables are properly arranged and buried to avoid from
any tripping hazard.
Status: Closed
Observation Date/Location: DRY DOCK 5
7. OBSERVATION
Signages was not placed to indicate the head bump
hazard
RECTIFICATION
Head bump signage has been posted.
Status: Closed
Observation Date/Location: DRY DOCK 4