The document summarizes a safety internal walkthrough of the King Salman International Complex for Marine Industries and Services Project. It notes observations made by the lead auditor and members, such as a diesel tank being uncovered, a worker using a substandard face shield, electric cables laying exposed on the ground without protection, and cables not being properly arranged. The rectifications made to address each observation are also documented, such as covering the diesel tank, replacing the face shield, protecting cables, arranging cables properly, and posting a head bump signage. The status of each observation is closed once rectified.