SlideShare a Scribd company logo
1 of 21
© 2012 by McGraw-Hill All Rights Reserved
9-1
Lecture slides to accompany
Engineering Economy
7th
edition
Leland Blank
Anthony Tarquin
Chapter 9Chapter 9
Benefit/CostBenefit/Cost
AnalysisAnalysis
9-2
LEARNING OUTCOMESLEARNING OUTCOMES
1. Explain difference in public vs. private sector
projects
2. Calculate B/C ratio for single project
3. Select better of two alternatives using B/C method
4. Select best of multiple alternatives using B/C
method
5. Use cost-effectiveness analysis (CEA) to evaluate
service sector projects
6. Describe how ethical compromises may enter
public
sector projects
© 2012 by McGraw-Hill All Rights Reserved
© 2012 by McGraw-Hill All Rights Reserved
9-3
Differences: Public vs. Private ProjectsDifferences: Public vs. Private Projects
Characteristic Public Private
Size of Investment Large Small, medium, large
Life Longer (30 – 50+ years) Shorter (2 – 25 years)
Annual CF No profit Profit-driven
Funding Taxes, fees, bonds, etc. Stocks, bonds, loans,
etc.
Interest rate Lower Higher
Selection criteria Multiple criteria Primarily ROR
Environment of evaluation Politically inclined Economic
Types of ContractsTypes of Contracts
Contractors does not share project risk
 Fixed price - lump-sum payment
 Cost reimbursable - Cost plus, as negotiated
Contractor shares in project risk
 Public-private partnerships (PPP), such as:
 Design-build projects - Contractor responsible from
design stage to operations stage
 Design-build-operate-maintain-finance (DBOMF)
projects - Turnkey project with contractor managing
financing (manage cash flow); government obtains
funding for project
© 2012 by McGraw-Hill All Rights Reserved
9-4
9-5
Cash Flow Classifications and B/C RelationsCash Flow Classifications and B/C Relations
Must identify each cash flow as either benefit, disbenefit, or cost
Benefit (B) -- Advantages to the public
Disbenefit (D) -- Disadvantages to the public
Cost (C) -- Expenditures by the government
Note: Savings to government are subtracted from costs
Conventional B/C ratio = (B–D) / C
Modified B/C ratio = [(B–D) – C] / Initial Investment
Profitability Index = NCF / Initial Investment
Note 1: All terms must be expressed in same units, i.e., PW, AW, or FW
Note 2: Do not use minus sign ahead of costs
© 2012 by McGraw-Hill All Rights Reserved
Decision Guidelines for B/C and PIDecision Guidelines for B/C and PI
Benefit/cost analysis
If B/C ≥ 1.0, project is economically justified at
discount rate applied
If B/C < 1.0, project is not economically acceptable
Profitability index analysis of
revenue projects
If PI ≥ 1.0, project is economically justified at
discount rate applied
If PI < 1.0, project is not economically acceptable
© 2012 by McGraw-Hill All Rights Reserved
9-6
9-7
B/C Analysis – Single ProjectB/C Analysis – Single Project
Conventional B/C ratio =
B - D
C
Modified B/C ratio =
B – D – M&O
C
If B/C ≥ 1.0,
accept project;
otherwise, reject
PI =
PW of initial investment
PW of NCFt
Denominator is
initial investment
© 2012 by McGraw-Hill All Rights Reserved
If PI ≥ 1.0,
accept project;
otherwise, reject
9-8
B = $175,000
Example: B/C Analysis – Single ProjectExample: B/C Analysis – Single Project
A flood control project will have a first cost of $1.4 million with an annual
maintenance cost of $40,000 and a 10 year life. Reduced flood damage is
expected to amount to $175,000 per year. Lost income to farmers is estimated
to be $25,000 per year. At an interest rate of 6% per year, should the
project be undertaken?
Solution: Express all values in AW terms and find B/C ratio
D = $25,000
C = 1,400,000(A/P,6%,10) + $40,000 = $230,218
B/C = (175,000 – 25,000)/230,218
= 0.65 < 1.0
Do not build project
© 2012 by McGraw-Hill All Rights Reserved
9-9
Defender, Challenger and Do Nothing AlternativesDefender, Challenger and Do Nothing Alternatives
General approach for incremental B/C analysis of two ME alternatives:
 Lower total cost alternative is first compared to Do-nothing (DN)
 If B/C for the lower cost alternative is < 1.0, the DN option is compared
to
∆B/C of the higher-cost alternative
 If both alternatives lose out to DN option, DN prevails, unless overriding
needs requires selection of one of the alternatives
When selecting from two or more ME alternatives, there is a:
 Defender – in-place system or currently selected alternative
 Challenger – Alternative challenging the defender
 Do-nothing option – Status quo system
© 2012 by McGraw-Hill All Rights Reserved
9-10
Alternative Selection Using Incremental B/CAlternative Selection Using Incremental B/C
Analysis – Two or More ME AlternativesAnalysis – Two or More ME Alternatives
(1) Determine equivalent total cost for each alternative
(2) Order alternatives by increasing total cost
(3) Identify B and D for each alternative, if given, or go to step 5
(4) Calculate B/C for each alternative and eliminate all with B/C < 1.0
(5) Determine incremental costs and benefits for first two alternatives
(6) Calculate ∆B/C; if >1.0, higher cost alternative becomes defender
(7) Repeat steps 5 and 6 until only one alternative remains
Procedure similar to ROR analysis for multiple alternatives
© 2012 by McGraw-Hill All Rights Reserved
Example: Incremental B/C AnalysisExample: Incremental B/C Analysis
© 2012 by McGraw-Hill All Rights Reserved9-11
Example:Example: ∆∆B/C Analysis; Selection RequiredB/C Analysis; Selection Required
© 2012 by McGraw-Hill All Rights Reserved9-12
B/C Analysis of Independent ProjectsB/C Analysis of Independent Projects
 Independent projects comparison does not require
incremental analysis
 Compare each alternative’s overall B/C with DN option
+ No budget limit: Accept all alternatives with B/C ≥ 1.0
+ Budget limit specified: capital budgeting problem; selection
follows different procedure (discussed in chapter 12)
© 2012 by McGraw-Hill All Rights Reserved9-13
© 2012 by McGraw-Hill All Rights Reserved
9-14
Cost Effectiveness AnalysisCost Effectiveness Analysis
Service sector projects primarily involve intangibles, not
physical facilities; examples include health care, security
programs, credit card services, etc.
Cost-effectiveness analysis (CEA) combines monetary cost
estimates with non-monetary benefit estimates to calculate the
Cost-effectiveness ratio (CER)
Equivalent total costs
Total effectiveness measure
= C/E
CER =
9-15
CER Analysis for Independent ProjectsCER Analysis for Independent Projects
Procedure is as follows:
(1) Determine equivalent total cost C, total effectiveness measure E and CER
(2) Order projects by smallest to largest CER
(3) Determine cumulative cost of projects and compare to budget limit b
(4) Fund all projects such that b is not exceeded
Example: The effectiveness measure E is the number of graduates from adult
training programs. For the CERs shown, determine which independent
programs should be selected; b = $500,000.
Program CER, $/graduate Program Cost, $
A 1203 305,000
B 752 98,000
C 2010 126,000
D 1830 365,000
© 2012 by McGraw-Hill All Rights Reserved
9-16
Example: CER for Independent ProjectsExample: CER for Independent Projects
First, rank programs according to increasing CER:
Cumulative
Program CER, $/graduate Program Cost, $ Cost, $
B 752 98,000 98,000
A 1203 305,000 403,000
D 1830 365,000 768,000
C 2010 126,000 894,000
Next, select programs until budget is not exceeded
Select programs B and A at total cost of $403,000
Note: To expend the entire $500,000, accept as many additional
individuals as possible from D at the per-student rate
© 2012 by McGraw-Hill All Rights Reserved
9-17
CER Analysis for Mutually Exclusive ProjectsCER Analysis for Mutually Exclusive Projects
Procedure is as follows
(1) Order alternatives smallest to largest by effectiveness measure E
(2) Calculate CER for first alternative (defender) and compare to DN option
(3) Calculate incremental cost (∆C), effectiveness (∆E), and incremental measure
∆C/E for challenger (next higher E measure)
(4) If ∆C/Echallenger < C/Edefender challenger becomes defender (dominance);
otherwise, no dominance is present and both alternatives are retained
(5) Dominance present: Eliminate defender and compare next alternative
to new defender per steps (3) and (4).
Dominance not present: Current challenger becomes new defender against
next challenger, but old defender remains viable
(6) Continue steps (3) through (5) until only 1 alternative remains or only
non-dominated alternatives remain
(7) Apply budget limit or other criteria to determine which of remaining
non-dominated alternatives can be funded
© 2012 by McGraw-Hill All Rights Reserved
9-18
Example: CER for ME Service ProjectsExample: CER for ME Service Projects
The effectiveness measure E is wins per person. From the cost
and effectiveness values shown, determine which alternative to
select.
Cost (C) Effectiveness (E) CER
Program $/person wins/person $/win
A 2200 4 550
B 1400 2 700
C 6860 7 980
© 2012 by McGraw-Hill All Rights Reserved
9-19
Example: CER for ME Service ProjectsExample: CER for ME Service Projects
Order programs according to increasing effectiveness measure E
Cost (C) Effectiveness (E) CER
Program $/person wins/person $/win
B 1,400 2 700
A 2,200 4 550
C 6,860 7 980
Solution:
B vs. DN: C/EB = 1400/2 = 700
A vs. B: ∆C/E = (2200 – 1400)/(4 – 2) = 400 Dominance; eliminate B
C vs. A: ∆C/E = (6860 – 2200)/(7 – 4) = 1553 No dominance; retain C
Must use other criteria to select either A or C
© 2012 by McGraw-Hill All Rights Reserved
9-20
Ethical ConsiderationsEthical Considerations
Engineers are routinely involved in two areas
where ethics may be compromised:
Public policy making – Development of strategy, e.g.,
water system management (supply/demand strategy;
ground vs. surface sources)
Public planning - Development of projects, e.g., water
operations (distribution, rates, sales to outlying areas)
Engineers must maintain integrity and impartiality and
always adhere to Code of Ethics
© 2012 by McGraw-Hill All Rights Reserved
9-21
B/C method used in public sector project evaluation
Summary of Important PointsSummary of Important Points
Can use PW, AW, or FW for incremental B/C analysis, but must
be consistent with units for B,C, and D estimates
For multiple mutually exclusive alternatives, compare two at a time
and eliminate alternatives until only one remains
For independent alternatives with no budget limit, compare each against
DN and select all alternatives that have B/C ≥ 1.0
CEA analysis for service sector projects combines cost and
nonmonetary measures
Ethical dilemmas are especially prevalent in public sector projects
© 2012 by McGraw-Hill All Rights Reserved

More Related Content

What's hot

Chapter 6 annual worth analysis
Chapter 6   annual worth analysisChapter 6   annual worth analysis
Chapter 6 annual worth analysisBich Lien Pham
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysisBich Lien Pham
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methodsBich Lien Pham
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysisBich Lien Pham
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysisBich Lien Pham
 
Chapter 2 factors, effect of time & interest on money
Chapter 2   factors, effect of time & interest on moneyChapter 2   factors, effect of time & interest on money
Chapter 2 factors, effect of time & interest on moneyBich Lien Pham
 
Lecture # 9 taxes and eva
Lecture # 9 taxes and evaLecture # 9 taxes and eva
Lecture # 9 taxes and evaBich Lien Pham
 
Chapter 1 foundations of engineering economy
Chapter 1   foundations of engineering economyChapter 1   foundations of engineering economy
Chapter 1 foundations of engineering economyBich Lien Pham
 
Chapter 3 combining factors
Chapter 3   combining factorsChapter 3   combining factors
Chapter 3 combining factorsBich Lien Pham
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysisBich Lien Pham
 
Lecture # 8 depreciation ii
Lecture # 8 depreciation iiLecture # 8 depreciation ii
Lecture # 8 depreciation iiBich Lien Pham
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methodsBich Lien Pham
 
Chapter 6 annual worth analysis
Chapter 6   annual worth analysisChapter 6   annual worth analysis
Chapter 6 annual worth analysisBich Lien Pham
 
Replacement analysis
Replacement analysisReplacement analysis
Replacement analysisNafis Ahmad
 
Chapter 6&amp;7 annual worth analysis &amp; ror lo3b
Chapter 6&amp;7  annual worth analysis &amp; ror   lo3bChapter 6&amp;7  annual worth analysis &amp; ror   lo3b
Chapter 6&amp;7 annual worth analysis &amp; ror lo3bAbdulaziz AlSuwaidi
 
8. Rate of return analysis
8. Rate of return analysis8. Rate of return analysis
8. Rate of return analysisMohsin Siddique
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesBich Lien Pham
 
7. annual cash flow analysis
7. annual cash flow analysis7. annual cash flow analysis
7. annual cash flow analysisMohsin Siddique
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysisBich Lien Pham
 
Chapter 3 combining factors
Chapter 3   combining factorsChapter 3   combining factors
Chapter 3 combining factorsBich Lien Pham
 

What's hot (20)

Chapter 6 annual worth analysis
Chapter 6   annual worth analysisChapter 6   annual worth analysis
Chapter 6 annual worth analysis
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysis
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methods
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysis
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysis
 
Chapter 2 factors, effect of time & interest on money
Chapter 2   factors, effect of time & interest on moneyChapter 2   factors, effect of time & interest on money
Chapter 2 factors, effect of time & interest on money
 
Lecture # 9 taxes and eva
Lecture # 9 taxes and evaLecture # 9 taxes and eva
Lecture # 9 taxes and eva
 
Chapter 1 foundations of engineering economy
Chapter 1   foundations of engineering economyChapter 1   foundations of engineering economy
Chapter 1 foundations of engineering economy
 
Chapter 3 combining factors
Chapter 3   combining factorsChapter 3   combining factors
Chapter 3 combining factors
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysis
 
Lecture # 8 depreciation ii
Lecture # 8 depreciation iiLecture # 8 depreciation ii
Lecture # 8 depreciation ii
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methods
 
Chapter 6 annual worth analysis
Chapter 6   annual worth analysisChapter 6   annual worth analysis
Chapter 6 annual worth analysis
 
Replacement analysis
Replacement analysisReplacement analysis
Replacement analysis
 
Chapter 6&amp;7 annual worth analysis &amp; ror lo3b
Chapter 6&amp;7  annual worth analysis &amp; ror   lo3bChapter 6&amp;7  annual worth analysis &amp; ror   lo3b
Chapter 6&amp;7 annual worth analysis &amp; ror lo3b
 
8. Rate of return analysis
8. Rate of return analysis8. Rate of return analysis
8. Rate of return analysis
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest rates
 
7. annual cash flow analysis
7. annual cash flow analysis7. annual cash flow analysis
7. annual cash flow analysis
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysis
 
Chapter 3 combining factors
Chapter 3   combining factorsChapter 3   combining factors
Chapter 3 combining factors
 

Viewers also liked

Chapter 8 ror analysis for multiple alternatives
Chapter 8   ror analysis for multiple alternativesChapter 8   ror analysis for multiple alternatives
Chapter 8 ror analysis for multiple alternativesBich Lien Pham
 
economy Ch4part2_by louy Al hami
economy Ch4part2_by louy Al hami economy Ch4part2_by louy Al hami
economy Ch4part2_by louy Al hami Louy Alhamy
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysisBich Lien Pham
 
Chapter 18 sensitivity analysis
Chapter 18   sensitivity analysisChapter 18   sensitivity analysis
Chapter 18 sensitivity analysisBich Lien Pham
 
economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami Louy Alhamy
 
Chapter 14 effects of inflation
Chapter 14   effects of inflationChapter 14   effects of inflation
Chapter 14 effects of inflationBich Lien Pham
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimationBich Lien Pham
 
economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami Louy Alhamy
 
economy Chapter7_by louy Al hami
economy Chapter7_by louy Al hamieconomy Chapter7_by louy Al hami
economy Chapter7_by louy Al hamiLouy Alhamy
 
Wind Power and New Technology
Wind Power and New TechnologyWind Power and New Technology
Wind Power and New TechnologyTejveer Choudhary
 
Workshops for engineers to understand engineering more better.
Workshops for engineers to understand engineering more better.Workshops for engineers to understand engineering more better.
Workshops for engineers to understand engineering more better.Pradeep Aswani
 
The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...IrSOLaV Pomares
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Rohini Haridas
 
economy Ch4 part.1 _by louy Alhami
economy Ch4 part.1 _by louy Alhamieconomy Ch4 part.1 _by louy Alhami
economy Ch4 part.1 _by louy AlhamiLouy Alhamy
 
Solar Energy presentation
Solar Energy presentationSolar Energy presentation
Solar Energy presentationAbhishek Choksi
 
4 interest and equivalence
4 interest and equivalence4 interest and equivalence
4 interest and equivalenceMohsin Siddique
 
economy Chapter4 part3_by louy al hami
economy Chapter4 part3_by louy al hami economy Chapter4 part3_by louy al hami
economy Chapter4 part3_by louy al hami Louy Alhamy
 
Chapter 19 decision-making under risk
Chapter 19   decision-making under riskChapter 19   decision-making under risk
Chapter 19 decision-making under riskBich Lien Pham
 
Rohini haridas wind energy
Rohini haridas wind energyRohini haridas wind energy
Rohini haridas wind energyRohini Haridas
 

Viewers also liked (20)

Chapter 8 ror analysis for multiple alternatives
Chapter 8   ror analysis for multiple alternativesChapter 8   ror analysis for multiple alternatives
Chapter 8 ror analysis for multiple alternatives
 
economy Ch4part2_by louy Al hami
economy Ch4part2_by louy Al hami economy Ch4part2_by louy Al hami
economy Ch4part2_by louy Al hami
 
Chapter 17 after-tax economic analysis
Chapter 17   after-tax economic analysisChapter 17   after-tax economic analysis
Chapter 17 after-tax economic analysis
 
Chapter 18 sensitivity analysis
Chapter 18   sensitivity analysisChapter 18   sensitivity analysis
Chapter 18 sensitivity analysis
 
economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami
 
Pumps
PumpsPumps
Pumps
 
Chapter 14 effects of inflation
Chapter 14   effects of inflationChapter 14   effects of inflation
Chapter 14 effects of inflation
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimation
 
economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami economy Chapter2_by louy Al hami
economy Chapter2_by louy Al hami
 
economy Chapter7_by louy Al hami
economy Chapter7_by louy Al hamieconomy Chapter7_by louy Al hami
economy Chapter7_by louy Al hami
 
Wind Power and New Technology
Wind Power and New TechnologyWind Power and New Technology
Wind Power and New Technology
 
Workshops for engineers to understand engineering more better.
Workshops for engineers to understand engineering more better.Workshops for engineers to understand engineering more better.
Workshops for engineers to understand engineering more better.
 
The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...The CECRE: Making renewable energy technologies compatible with the security ...
The CECRE: Making renewable energy technologies compatible with the security ...
 
Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)Ppt maintenance cb(encrypted)
Ppt maintenance cb(encrypted)
 
economy Ch4 part.1 _by louy Alhami
economy Ch4 part.1 _by louy Alhamieconomy Ch4 part.1 _by louy Alhami
economy Ch4 part.1 _by louy Alhami
 
Solar Energy presentation
Solar Energy presentationSolar Energy presentation
Solar Energy presentation
 
4 interest and equivalence
4 interest and equivalence4 interest and equivalence
4 interest and equivalence
 
economy Chapter4 part3_by louy al hami
economy Chapter4 part3_by louy al hami economy Chapter4 part3_by louy al hami
economy Chapter4 part3_by louy al hami
 
Chapter 19 decision-making under risk
Chapter 19   decision-making under riskChapter 19   decision-making under risk
Chapter 19 decision-making under risk
 
Rohini haridas wind energy
Rohini haridas wind energyRohini haridas wind energy
Rohini haridas wind energy
 

Similar to Chapter 9 benefit & cost analysis

3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf18010YeashRahman
 
Lo4a benefit cost analysis (nabil)
Lo4a benefit  cost analysis (nabil)Lo4a benefit  cost analysis (nabil)
Lo4a benefit cost analysis (nabil)Abdulaziz AlSuwaidi
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitationBich Lien Pham
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitationBich Lien Pham
 
Ch9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).pptCh9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).ppt4723bilal
 
Chapter 8 - ROR Analysis for Multiple Alternatives.ppt
Chapter 8 - ROR Analysis for Multiple Alternatives.pptChapter 8 - ROR Analysis for Multiple Alternatives.ppt
Chapter 8 - ROR Analysis for Multiple Alternatives.pptParmeshworVetwal1
 
Chapter 5 present worth analysis -with examples
Chapter 5   present worth analysis -with examplesChapter 5   present worth analysis -with examples
Chapter 5 present worth analysis -with examplesAbdulaziz AlSuwaidi
 
Chapter 5 present worth analysis -with examples
Chapter 5   present worth analysis -with examplesChapter 5   present worth analysis -with examples
Chapter 5 present worth analysis -with examplesAbdulaziz AlSuwaidi
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimationBich Lien Pham
 
Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Landry De Chabe
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer Bilal Mohamed
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Lecture # 1 foundation
Lecture # 1 foundationLecture # 1 foundation
Lecture # 1 foundationBich Lien Pham
 
Lecture # 1 foundation
Lecture # 1 foundationLecture # 1 foundation
Lecture # 1 foundationBich Lien Pham
 
Selected solutions 9
Selected solutions   9Selected solutions   9
Selected solutions 9Tlepoorit
 

Similar to Chapter 9 benefit & cost analysis (20)

3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf
 
Lo4a benefit cost analysis (nabil)
Lo4a benefit  cost analysis (nabil)Lo4a benefit  cost analysis (nabil)
Lo4a benefit cost analysis (nabil)
 
Lo4a(arif)
Lo4a(arif)Lo4a(arif)
Lo4a(arif)
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitation
 
Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitation
 
Kuliah minggu 7 bca
Kuliah minggu 7  bcaKuliah minggu 7  bca
Kuliah minggu 7 bca
 
Ch9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).pptCh9-Lecture 2018 (2).ppt
Ch9-Lecture 2018 (2).ppt
 
Chapter_13.ppt
Chapter_13.pptChapter_13.ppt
Chapter_13.ppt
 
Chapter 8 - ROR Analysis for Multiple Alternatives.ppt
Chapter 8 - ROR Analysis for Multiple Alternatives.pptChapter 8 - ROR Analysis for Multiple Alternatives.ppt
Chapter 8 - ROR Analysis for Multiple Alternatives.ppt
 
Unit-7.pdf
Unit-7.pdfUnit-7.pdf
Unit-7.pdf
 
Chapter 5 present worth analysis -with examples
Chapter 5   present worth analysis -with examplesChapter 5   present worth analysis -with examples
Chapter 5 present worth analysis -with examples
 
Chapter 5 present worth analysis -with examples
Chapter 5   present worth analysis -with examplesChapter 5   present worth analysis -with examples
Chapter 5 present worth analysis -with examples
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimation
 
Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1
 
feasibility study
 feasibility study feasibility study
feasibility study
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Lecture # 1 foundation
Lecture # 1 foundationLecture # 1 foundation
Lecture # 1 foundation
 
Lecture # 1 foundation
Lecture # 1 foundationLecture # 1 foundation
Lecture # 1 foundation
 
Selected solutions 9
Selected solutions   9Selected solutions   9
Selected solutions 9
 

More from Bich Lien Pham

Lecture # 13 investment alternatives i
Lecture # 13 investment alternatives iLecture # 13 investment alternatives i
Lecture # 13 investment alternatives iBich Lien Pham
 
Lecture # 12 measures of profitability ii
Lecture # 12 measures of profitability iiLecture # 12 measures of profitability ii
Lecture # 12 measures of profitability iiBich Lien Pham
 
Lecture # 11 measures of profitability i
Lecture # 11 measures of profitability iLecture # 11 measures of profitability i
Lecture # 11 measures of profitability iBich Lien Pham
 
Lecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assetsLecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assetsBich Lien Pham
 
Lecture # 7 depreciation i
Lecture # 7 depreciation iLecture # 7 depreciation i
Lecture # 7 depreciation iBich Lien Pham
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation iiBich Lien Pham
 
Lecture # 5 cost estimation i
Lecture # 5 cost estimation iLecture # 5 cost estimation i
Lecture # 5 cost estimation iBich Lien Pham
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesBich Lien Pham
 
Lecture # 3 compounding factors effects of inflation
Lecture # 3 compounding factors   effects of inflationLecture # 3 compounding factors   effects of inflation
Lecture # 3 compounding factors effects of inflationBich Lien Pham
 
Lecture # 2 time value of money
Lecture # 2 time value of moneyLecture # 2 time value of money
Lecture # 2 time value of moneyBich Lien Pham
 
Chapter 10 making choices & marr
Chapter 10   making choices & marrChapter 10   making choices & marr
Chapter 10 making choices & marrBich Lien Pham
 
Chapter 4 nominal & effective interest rates
Chapter 4   nominal & effective interest ratesChapter 4   nominal & effective interest rates
Chapter 4 nominal & effective interest ratesBich Lien Pham
 
Chapter 2 factors, effect of time & interest on money
Chapter 2   factors, effect of time & interest on moneyChapter 2   factors, effect of time & interest on money
Chapter 2 factors, effect of time & interest on moneyBich Lien Pham
 

More from Bich Lien Pham (13)

Lecture # 13 investment alternatives i
Lecture # 13 investment alternatives iLecture # 13 investment alternatives i
Lecture # 13 investment alternatives i
 
Lecture # 12 measures of profitability ii
Lecture # 12 measures of profitability iiLecture # 12 measures of profitability ii
Lecture # 12 measures of profitability ii
 
Lecture # 11 measures of profitability i
Lecture # 11 measures of profitability iLecture # 11 measures of profitability i
Lecture # 11 measures of profitability i
 
Lecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assetsLecture # 10 eva and disposal of assets
Lecture # 10 eva and disposal of assets
 
Lecture # 7 depreciation i
Lecture # 7 depreciation iLecture # 7 depreciation i
Lecture # 7 depreciation i
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation ii
 
Lecture # 5 cost estimation i
Lecture # 5 cost estimation iLecture # 5 cost estimation i
Lecture # 5 cost estimation i
 
Lecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest ratesLecture # 4 gradients factors and nominal and effective interest rates
Lecture # 4 gradients factors and nominal and effective interest rates
 
Lecture # 3 compounding factors effects of inflation
Lecture # 3 compounding factors   effects of inflationLecture # 3 compounding factors   effects of inflation
Lecture # 3 compounding factors effects of inflation
 
Lecture # 2 time value of money
Lecture # 2 time value of moneyLecture # 2 time value of money
Lecture # 2 time value of money
 
Chapter 10 making choices & marr
Chapter 10   making choices & marrChapter 10   making choices & marr
Chapter 10 making choices & marr
 
Chapter 4 nominal & effective interest rates
Chapter 4   nominal & effective interest ratesChapter 4   nominal & effective interest rates
Chapter 4 nominal & effective interest rates
 
Chapter 2 factors, effect of time & interest on money
Chapter 2   factors, effect of time & interest on moneyChapter 2   factors, effect of time & interest on money
Chapter 2 factors, effect of time & interest on money
 

Recently uploaded

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 

Recently uploaded (20)

Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 

Chapter 9 benefit & cost analysis

  • 1. © 2012 by McGraw-Hill All Rights Reserved 9-1 Lecture slides to accompany Engineering Economy 7th edition Leland Blank Anthony Tarquin Chapter 9Chapter 9 Benefit/CostBenefit/Cost AnalysisAnalysis
  • 2. 9-2 LEARNING OUTCOMESLEARNING OUTCOMES 1. Explain difference in public vs. private sector projects 2. Calculate B/C ratio for single project 3. Select better of two alternatives using B/C method 4. Select best of multiple alternatives using B/C method 5. Use cost-effectiveness analysis (CEA) to evaluate service sector projects 6. Describe how ethical compromises may enter public sector projects © 2012 by McGraw-Hill All Rights Reserved
  • 3. © 2012 by McGraw-Hill All Rights Reserved 9-3 Differences: Public vs. Private ProjectsDifferences: Public vs. Private Projects Characteristic Public Private Size of Investment Large Small, medium, large Life Longer (30 – 50+ years) Shorter (2 – 25 years) Annual CF No profit Profit-driven Funding Taxes, fees, bonds, etc. Stocks, bonds, loans, etc. Interest rate Lower Higher Selection criteria Multiple criteria Primarily ROR Environment of evaluation Politically inclined Economic
  • 4. Types of ContractsTypes of Contracts Contractors does not share project risk  Fixed price - lump-sum payment  Cost reimbursable - Cost plus, as negotiated Contractor shares in project risk  Public-private partnerships (PPP), such as:  Design-build projects - Contractor responsible from design stage to operations stage  Design-build-operate-maintain-finance (DBOMF) projects - Turnkey project with contractor managing financing (manage cash flow); government obtains funding for project © 2012 by McGraw-Hill All Rights Reserved 9-4
  • 5. 9-5 Cash Flow Classifications and B/C RelationsCash Flow Classifications and B/C Relations Must identify each cash flow as either benefit, disbenefit, or cost Benefit (B) -- Advantages to the public Disbenefit (D) -- Disadvantages to the public Cost (C) -- Expenditures by the government Note: Savings to government are subtracted from costs Conventional B/C ratio = (B–D) / C Modified B/C ratio = [(B–D) – C] / Initial Investment Profitability Index = NCF / Initial Investment Note 1: All terms must be expressed in same units, i.e., PW, AW, or FW Note 2: Do not use minus sign ahead of costs © 2012 by McGraw-Hill All Rights Reserved
  • 6. Decision Guidelines for B/C and PIDecision Guidelines for B/C and PI Benefit/cost analysis If B/C ≥ 1.0, project is economically justified at discount rate applied If B/C < 1.0, project is not economically acceptable Profitability index analysis of revenue projects If PI ≥ 1.0, project is economically justified at discount rate applied If PI < 1.0, project is not economically acceptable © 2012 by McGraw-Hill All Rights Reserved 9-6
  • 7. 9-7 B/C Analysis – Single ProjectB/C Analysis – Single Project Conventional B/C ratio = B - D C Modified B/C ratio = B – D – M&O C If B/C ≥ 1.0, accept project; otherwise, reject PI = PW of initial investment PW of NCFt Denominator is initial investment © 2012 by McGraw-Hill All Rights Reserved If PI ≥ 1.0, accept project; otherwise, reject
  • 8. 9-8 B = $175,000 Example: B/C Analysis – Single ProjectExample: B/C Analysis – Single Project A flood control project will have a first cost of $1.4 million with an annual maintenance cost of $40,000 and a 10 year life. Reduced flood damage is expected to amount to $175,000 per year. Lost income to farmers is estimated to be $25,000 per year. At an interest rate of 6% per year, should the project be undertaken? Solution: Express all values in AW terms and find B/C ratio D = $25,000 C = 1,400,000(A/P,6%,10) + $40,000 = $230,218 B/C = (175,000 – 25,000)/230,218 = 0.65 < 1.0 Do not build project © 2012 by McGraw-Hill All Rights Reserved
  • 9. 9-9 Defender, Challenger and Do Nothing AlternativesDefender, Challenger and Do Nothing Alternatives General approach for incremental B/C analysis of two ME alternatives:  Lower total cost alternative is first compared to Do-nothing (DN)  If B/C for the lower cost alternative is < 1.0, the DN option is compared to ∆B/C of the higher-cost alternative  If both alternatives lose out to DN option, DN prevails, unless overriding needs requires selection of one of the alternatives When selecting from two or more ME alternatives, there is a:  Defender – in-place system or currently selected alternative  Challenger – Alternative challenging the defender  Do-nothing option – Status quo system © 2012 by McGraw-Hill All Rights Reserved
  • 10. 9-10 Alternative Selection Using Incremental B/CAlternative Selection Using Incremental B/C Analysis – Two or More ME AlternativesAnalysis – Two or More ME Alternatives (1) Determine equivalent total cost for each alternative (2) Order alternatives by increasing total cost (3) Identify B and D for each alternative, if given, or go to step 5 (4) Calculate B/C for each alternative and eliminate all with B/C < 1.0 (5) Determine incremental costs and benefits for first two alternatives (6) Calculate ∆B/C; if >1.0, higher cost alternative becomes defender (7) Repeat steps 5 and 6 until only one alternative remains Procedure similar to ROR analysis for multiple alternatives © 2012 by McGraw-Hill All Rights Reserved
  • 11. Example: Incremental B/C AnalysisExample: Incremental B/C Analysis © 2012 by McGraw-Hill All Rights Reserved9-11
  • 12. Example:Example: ∆∆B/C Analysis; Selection RequiredB/C Analysis; Selection Required © 2012 by McGraw-Hill All Rights Reserved9-12
  • 13. B/C Analysis of Independent ProjectsB/C Analysis of Independent Projects  Independent projects comparison does not require incremental analysis  Compare each alternative’s overall B/C with DN option + No budget limit: Accept all alternatives with B/C ≥ 1.0 + Budget limit specified: capital budgeting problem; selection follows different procedure (discussed in chapter 12) © 2012 by McGraw-Hill All Rights Reserved9-13
  • 14. © 2012 by McGraw-Hill All Rights Reserved 9-14 Cost Effectiveness AnalysisCost Effectiveness Analysis Service sector projects primarily involve intangibles, not physical facilities; examples include health care, security programs, credit card services, etc. Cost-effectiveness analysis (CEA) combines monetary cost estimates with non-monetary benefit estimates to calculate the Cost-effectiveness ratio (CER) Equivalent total costs Total effectiveness measure = C/E CER =
  • 15. 9-15 CER Analysis for Independent ProjectsCER Analysis for Independent Projects Procedure is as follows: (1) Determine equivalent total cost C, total effectiveness measure E and CER (2) Order projects by smallest to largest CER (3) Determine cumulative cost of projects and compare to budget limit b (4) Fund all projects such that b is not exceeded Example: The effectiveness measure E is the number of graduates from adult training programs. For the CERs shown, determine which independent programs should be selected; b = $500,000. Program CER, $/graduate Program Cost, $ A 1203 305,000 B 752 98,000 C 2010 126,000 D 1830 365,000 © 2012 by McGraw-Hill All Rights Reserved
  • 16. 9-16 Example: CER for Independent ProjectsExample: CER for Independent Projects First, rank programs according to increasing CER: Cumulative Program CER, $/graduate Program Cost, $ Cost, $ B 752 98,000 98,000 A 1203 305,000 403,000 D 1830 365,000 768,000 C 2010 126,000 894,000 Next, select programs until budget is not exceeded Select programs B and A at total cost of $403,000 Note: To expend the entire $500,000, accept as many additional individuals as possible from D at the per-student rate © 2012 by McGraw-Hill All Rights Reserved
  • 17. 9-17 CER Analysis for Mutually Exclusive ProjectsCER Analysis for Mutually Exclusive Projects Procedure is as follows (1) Order alternatives smallest to largest by effectiveness measure E (2) Calculate CER for first alternative (defender) and compare to DN option (3) Calculate incremental cost (∆C), effectiveness (∆E), and incremental measure ∆C/E for challenger (next higher E measure) (4) If ∆C/Echallenger < C/Edefender challenger becomes defender (dominance); otherwise, no dominance is present and both alternatives are retained (5) Dominance present: Eliminate defender and compare next alternative to new defender per steps (3) and (4). Dominance not present: Current challenger becomes new defender against next challenger, but old defender remains viable (6) Continue steps (3) through (5) until only 1 alternative remains or only non-dominated alternatives remain (7) Apply budget limit or other criteria to determine which of remaining non-dominated alternatives can be funded © 2012 by McGraw-Hill All Rights Reserved
  • 18. 9-18 Example: CER for ME Service ProjectsExample: CER for ME Service Projects The effectiveness measure E is wins per person. From the cost and effectiveness values shown, determine which alternative to select. Cost (C) Effectiveness (E) CER Program $/person wins/person $/win A 2200 4 550 B 1400 2 700 C 6860 7 980 © 2012 by McGraw-Hill All Rights Reserved
  • 19. 9-19 Example: CER for ME Service ProjectsExample: CER for ME Service Projects Order programs according to increasing effectiveness measure E Cost (C) Effectiveness (E) CER Program $/person wins/person $/win B 1,400 2 700 A 2,200 4 550 C 6,860 7 980 Solution: B vs. DN: C/EB = 1400/2 = 700 A vs. B: ∆C/E = (2200 – 1400)/(4 – 2) = 400 Dominance; eliminate B C vs. A: ∆C/E = (6860 – 2200)/(7 – 4) = 1553 No dominance; retain C Must use other criteria to select either A or C © 2012 by McGraw-Hill All Rights Reserved
  • 20. 9-20 Ethical ConsiderationsEthical Considerations Engineers are routinely involved in two areas where ethics may be compromised: Public policy making – Development of strategy, e.g., water system management (supply/demand strategy; ground vs. surface sources) Public planning - Development of projects, e.g., water operations (distribution, rates, sales to outlying areas) Engineers must maintain integrity and impartiality and always adhere to Code of Ethics © 2012 by McGraw-Hill All Rights Reserved
  • 21. 9-21 B/C method used in public sector project evaluation Summary of Important PointsSummary of Important Points Can use PW, AW, or FW for incremental B/C analysis, but must be consistent with units for B,C, and D estimates For multiple mutually exclusive alternatives, compare two at a time and eliminate alternatives until only one remains For independent alternatives with no budget limit, compare each against DN and select all alternatives that have B/C ≥ 1.0 CEA analysis for service sector projects combines cost and nonmonetary measures Ethical dilemmas are especially prevalent in public sector projects © 2012 by McGraw-Hill All Rights Reserved