Migrating Oracle workloads to Azure requires understanding the workload and hardware requirements. It is important to analyze the workload using the Automatic Workload Repository (AWR) report to accurately size infrastructure needs. The right virtual machine series and storage options must be selected to meet the identified input/output and capacity needs. Rather than moving existing hardware, the focus should be migrating the Oracle workload to take advantage of cloud capabilities while ensuring performance and high availability.