History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
Formato sena ingles 2013
1. NATIONAL SERVICE OF LEARNING
FORM FORMATION`S PROJECT
Name:Sergio Andres Giraldo LopezGrade: 9A
Dirección General
Dirección de Formación Profesional
Direction Web: sergio9a.blogspot.comTel: 5481143
1.2 MUNICIPALITY:
1.1 Educational Institution:
I.E.T.I Simona Duque
1.2 Name of the project:
Marinilla
BANTRACORT
1.3 Training Program that responds to
1.4 Estimated time of execution of the
project (months):
Estimated 5 months
1.5Companies or institutions that take part
in his formulation or financing : (if exist)
none
1.7 Key words of search
Transport-mobility-production-sensors
2. 2. Structure of the Project
2.1 Approaching the Problem
¿As making a black line follower robot carrying cotton to the company JGB and improve transport and production?
2.2 Justification of TheProject
This Project is done in order to show how well the line follow robot and its application in everyday life for the implementation in the transport and the
Reduction of cost in the factories.
2.3 General objetive
Develop a black line follower robot that allows the transport of products for better performance and economy
2.4 Specific objetive:
1. Improve the quality of life of people through the creation of artifacts that optimize the production and quality of the products of the company
2. Look for materials that are friendly to the environmental and improve the economy
2.5 scope
2.5.1 Beneficiaries of
TheProject
Employers of big factories seeking a better production
Social
2.5.2 Impact
Economic
Will have a positive Economic impact that will reduce costs an increase profits
Enviro mental
Will have a positive environmental impact that its composition will be environmentally friendly
Technological
Technological impact will improve the economy and innovator in the field of robotics
2.5.3 Restrictions or associated risks:
Could be at risk in terms of the height of the sensors and this would make Reading the line
3. 2.5.4. Products or results of the project
Improve transportation of goods within large factories and optimizes the quality of the products and will reduce high costs
2.6:Innovation/ Technological management
The project addresses a need of the productive sector
yes/no
NO
The project improves the process / product / service exists?.
yes/no
YES
The project involves the use of new techniques and process
technologies
yes/no
YES
The end products are susceptible to industrial protection and /
or copyright
yes/no
NO
The products obtained in the project can be positioned in the
market.
yes/no
YES
2.7 Productive assessment
With the development of the project can meet the need for a
potential customer.
yes/no
YES
YES
Feasibility of project business plan
4. 3. Planning
3.1 PROCESS STAGES
Fase 1:
Fundamentación
PHASE 2:formulación
PHASE 3:DIAGNOSTIC
4 PHASE:ANALYSIS AND
CONSTRUCTION OF THE
PROPOSAL
5 PHASE:
3.2
ACTIVITIES
OF THE
PROJECT
3.3. RESULTS
OF
LEARNING(a
partirof the
program of
formation)
3.4
ASSOCIATE
COMPETITIO
N
DESCRIPTION OF THE ACTIVITY
TEACHERSTHA
HOURS
T TAKE PART
EVIDENCES