Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”,
June 2016 by Eng José Saraiva Cabral
www.manwinwin.com/EN/ support@manwinwin.com
Maintenance KPI
1. Setting maintenance management objectives and indicators
Any management exercise requires the specification of objectives and indicators to control performance or,
in other words, expressing:
 What do we want? What are the objectives / goals / aims?
 How do we target them? How do we control them?
Objectives express in common language what we want. A set of objectives for maintenance could include:
1. Maintenance management in accordance with established good practices
2. Energy control and optimization
3. Effective preventive maintenance, minimum failures and quick repairs
4. Effort on improvement maintenance for better maintainability and energy efficiency
5. Optimized operating costs
6. Good image
To take even more advantage of this article, I highly recommend that you carefully read the EN 15341
standard.
To quantify objectives, we use indicators that translate objectives into numbers that enable us to follow
their evolution along time and point out problem areas and domains for improvement. According to EN
15341, indicator is a measured feature of a given phenomenon established by a formula that evaluates its
evolution.
The selection of indicators could start by a simple exercise of good common sense choosing, to the practical
extent, some (not too many!) standard indicators described in EN 15341.
Remember that once you select an indicator you should keep the consistency of its formulation – otherwise
its evolution and comparisons would be misleading – and use it for long enough so that you learn anything
with it.
Another recommendation is not to use too many indicators as data collection and analysis are time
consuming matters and it may happen that the more information you have the more confused you can get!
Let us exemplify along the next paragraphs the creation of some performance indicators to interpret the
objectives set down above remembering that many other objectives and indicators could be selected.
Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”,
June 2016 by Eng José Saraiva Cabral
www.manwinwin.com/EN/ support@manwinwin.com
We shall identify the standard indicators as in the source EN 15341, e.g. T17, E21, by a letter plus a number
where the letters E, T and O stand, respectively, for Economical, Technical and Organizational.
Now, regarding those objectives …
1.1. Maintenance according to good practices
Indeed, a broad scope objective.
Good maintenance practice understood as the basic set of rules required to manage it properly involve:
 Maintenance items characterization and preventive maintenance planning
 Maintenance spares and materials characterization and logistics
 Work planning and management of work orders
 Maintenance costing
 Maintenance history build up
 Maintenance analysis and indicator computation
This is more easily accomplished by an easy-to-use computerized maintenance management system
(CMMS).
If you introduce some established maintenance indicators and are able to consistently report their evolution
that means with great probability that you have a sound maintenance management system. And remember
that the crucial issue in working with indicators is not their computation but rather the collection of the
necessary information to compute them; you can only collect information consistently if everything above
that level is properly organized. A well set management system should be able to produce consistent
indicators; an adequate CMMS should produce the indicators without any dedicated effort.
So if you are able to produce reliable indicators you can reasonably conclude that you are managing
maintenance according to good practices.
It is interesting to note that some industrial organizations with plants spread over various geographical
areas, stipulate that every plant should compute the same set of indicators, naturally based on the same
source parameters. This is interesting for benchmarking purposes but the main merit seems to be ensuring
that all the plants carry out maintenance according to established good practices. The same applies to
buildings.
1.2. Energy control and optimization
Gathering information about the overall energy consumption of the facility is essential.
Further to that overall evaluation, individual energy appraisal of some assets and systems should also be
made to get a more detailed picture of the energy consumption, enabling us to eventually identify weak
points and elect areas deserving effort for improvement. We will learn a lot about our production facility /
building and, in the short term, will be confronted with a lot of possible improvements in individual assets
and systems and will probably be introducing particular indicators and targets in this context.
Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”,
June 2016 by Eng José Saraiva Cabral
www.manwinwin.com/EN/ support@manwinwin.com
We must remember that energy consumption does not depend only on the performance and efficiency of
the equipment. It depends on a great number of factors most of which are not under the direct
responsibility of the maintenance department but they can, in most cases, be identified by the maintenance
people that should develop a pro-active attitude towards identifying them. Let us enumerate a number of
possibilities:
 Drive motor upgrades introducing more economical prime movers
 Checking / calibrating sensors to avoid wrong data inputs
 Improvements in insulation, design and equipment to avoid heat losses
 Eliminating steam, heated or refrigerated water and compressed air leaks
 Improving lubrication
 Early detection of bad condition of bearings
 Inputs for the detection of bad practices concerning waste of energy: operating set points;
equipment running when not needed; open windows.
 Inputs for better designs.
Most of these can be positively accomplished by systematic walk-around routines and a basic obsession
over the energy issue.
1.3. Effective preventive maintenance / minimum failures
Maintenance effectiveness indicators are well served by standardized maintenance indicators.
T17 =
Total operating time
Number of failures
Hours
T21 =
Total restoration time
Number of failures
Hours
Where:
 Operating time = time during which an item is performing its required function;
 Restoration time = time interval during which an item is in downstate due to a failure
(including administrative and logistic delays)
 Number of failures.
T 17 expresses the average operating time between failures; in maintenance conceptual language the so
called MTBF, mean time between failures; T 21, the average time to complete repairs; in maintenance
language, an indicator that is close to the MTTR, mean time to repair.
Note that in all indicators numerator and denominator must refer to the same maintenance item (the
production facility / building as a whole, a system, etc.) and to the same time period.
Remember that the crucial matter for the computation of indicators is the reliability of the source
information; without these there are no meaningful indicators.
Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”,
June 2016 by Eng José Saraiva Cabral
www.manwinwin.com/EN/ support@manwinwin.com
1.4. Effort on improvement
Let us assume that the necessity of improvements had been diagnosed and we wanted some metrics to
express effort in this area. Improvement maintenance is frequently identified as an ever present objective in
buildings (introduction of energy saving equipment, improving accesses for maintenance, monitoring
equipment and the like). A suitable indicator for this could also be selected from the standard referenced
above:
E19 =
Cost of improvement maintenance
Total maintenance cost
x 100%
Where:
 Total maintenance cost = wages + social taxes + extra time of personnel + external
personnel + materials and spares + contractors + departmental costs (energy, machine tools,
depreciation, etc.). It excludes downtime costs.
 Cost of improvement maintenance is the part of the maintenance costs dedicated to the
improvement type of work
1.5. Optimized operating costs
Operating costs fall in the domain of the operational management. So let the production establish their own
indicators. Maintenance should take a good note of those indicators as they are bound to be closely linked to
their own, as the major cost issues in a facility, are clearly connected with maintenance and energy issues.
1.6. Good image
Image is also in the domain of operational management. Operational management makes their own
indicators and you should try to use or create one or more indicators for maintenance that somehow express
what they want.
Of course maintenance performance is a great contributor to the overall image of a facility and everybody in
the department should be fully aware of that. There are many critical eyes looking around - safety related
matters, hygiene, condition of visible maintenance items among many other.
1.7. Maintenance scorecard
It should be stressed that to compute maintenance indicators it is necessary to have implemented a
management system that generates consistently and accurately the factors that integrate their formulations.
The input of source information is the most critical component to work with indicators and if you are
successful in doing so you have an adequate maintenance management system.
If the top management of an organization establishes the requirement of a set of maintenance Key
Performance Indicators (KPI) for the buildings to be reported it is implicitly specifying the requirement
that an adequate management system is in place and that maintenance is conducted according to good
practices.
Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”,
June 2016 by Eng José Saraiva Cabral
www.manwinwin.com/EN/ support@manwinwin.com
The set of selected KPI normally involve mutual relationships that should be analysed to identify
interactions between the indicators helping the manager to better understand the actual tendency of its
actions and policies. The set KPIs selected by management to feel the organization constitute the Balanced
Scorecard.
To improve the energy consumption, you may require higher investments in the type of work that we have
designated by improvement maintenance, therefore, it is reasonable to expect higher figures in the
indicators related to the effort in improvement maintenance (E19) 1.4.
Improving availability, as expressed by indicator T21, # 1.3., may penalize maintenance costs.
The analysis of these interactions may suggest improvement measures in a balanced way, the expression
Balanced Scorecard meaning that it should include a set of balanced interacting performance targets.

More Related Content

Similar to MaintenanceKPI_EN.pdf

World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraDurga Prasad Mishra
 
Module Financial-Controllership.pdf
Module Financial-Controllership.pdfModule Financial-Controllership.pdf
Module Financial-Controllership.pdfAlmieFundano
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementramduttkholia
 
Life Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation ReportLife Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation ReportAnkur Aggarwal
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceMANUEL PACINI
 
Maintenance management and control
Maintenance management and controlMaintenance management and control
Maintenance management and controlNafis Ahmad
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptThushan9
 
Read Chapter 13 from Page 216-234Based on the literature answe.docx
Read Chapter 13 from Page 216-234Based on the literature answe.docxRead Chapter 13 from Page 216-234Based on the literature answe.docx
Read Chapter 13 from Page 216-234Based on the literature answe.docxcatheryncouper
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementconsult4solutions
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
EFFECTIVE MAINTENANCE MANAGEMENT.pdf
EFFECTIVE MAINTENANCE MANAGEMENT.pdfEFFECTIVE MAINTENANCE MANAGEMENT.pdf
EFFECTIVE MAINTENANCE MANAGEMENT.pdfFemiObiomah
 

Similar to MaintenanceKPI_EN.pdf (20)

World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishra
 
Module Financial-Controllership.pdf
Module Financial-Controllership.pdfModule Financial-Controllership.pdf
Module Financial-Controllership.pdf
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Life Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation ReportLife Cycle Costing Critical Evaluation Report
Life Cycle Costing Critical Evaluation Report
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
Maintenance management and control
Maintenance management and controlMaintenance management and control
Maintenance management and control
 
Lecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.pptLecture-3-Introduction to Maintenance Management.ppt
Lecture-3-Introduction to Maintenance Management.ppt
 
reliability plan.pdf
reliability plan.pdfreliability plan.pdf
reliability plan.pdf
 
Read Chapter 13 from Page 216-234Based on the literature answe.docx
Read Chapter 13 from Page 216-234Based on the literature answe.docxRead Chapter 13 from Page 216-234Based on the literature answe.docx
Read Chapter 13 from Page 216-234Based on the literature answe.docx
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
TPM.ppt
TPM.pptTPM.ppt
TPM.ppt
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance management
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
Strategic Cost Management
Strategic Cost ManagementStrategic Cost Management
Strategic Cost Management
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
EFFECTIVE MAINTENANCE MANAGEMENT.pdf
EFFECTIVE MAINTENANCE MANAGEMENT.pdfEFFECTIVE MAINTENANCE MANAGEMENT.pdf
EFFECTIVE MAINTENANCE MANAGEMENT.pdf
 
Viziya
Viziya Viziya
Viziya
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

MaintenanceKPI_EN.pdf

  • 1. Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”, June 2016 by Eng José Saraiva Cabral www.manwinwin.com/EN/ support@manwinwin.com Maintenance KPI 1. Setting maintenance management objectives and indicators Any management exercise requires the specification of objectives and indicators to control performance or, in other words, expressing:  What do we want? What are the objectives / goals / aims?  How do we target them? How do we control them? Objectives express in common language what we want. A set of objectives for maintenance could include: 1. Maintenance management in accordance with established good practices 2. Energy control and optimization 3. Effective preventive maintenance, minimum failures and quick repairs 4. Effort on improvement maintenance for better maintainability and energy efficiency 5. Optimized operating costs 6. Good image To take even more advantage of this article, I highly recommend that you carefully read the EN 15341 standard. To quantify objectives, we use indicators that translate objectives into numbers that enable us to follow their evolution along time and point out problem areas and domains for improvement. According to EN 15341, indicator is a measured feature of a given phenomenon established by a formula that evaluates its evolution. The selection of indicators could start by a simple exercise of good common sense choosing, to the practical extent, some (not too many!) standard indicators described in EN 15341. Remember that once you select an indicator you should keep the consistency of its formulation – otherwise its evolution and comparisons would be misleading – and use it for long enough so that you learn anything with it. Another recommendation is not to use too many indicators as data collection and analysis are time consuming matters and it may happen that the more information you have the more confused you can get! Let us exemplify along the next paragraphs the creation of some performance indicators to interpret the objectives set down above remembering that many other objectives and indicators could be selected.
  • 2. Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”, June 2016 by Eng José Saraiva Cabral www.manwinwin.com/EN/ support@manwinwin.com We shall identify the standard indicators as in the source EN 15341, e.g. T17, E21, by a letter plus a number where the letters E, T and O stand, respectively, for Economical, Technical and Organizational. Now, regarding those objectives … 1.1. Maintenance according to good practices Indeed, a broad scope objective. Good maintenance practice understood as the basic set of rules required to manage it properly involve:  Maintenance items characterization and preventive maintenance planning  Maintenance spares and materials characterization and logistics  Work planning and management of work orders  Maintenance costing  Maintenance history build up  Maintenance analysis and indicator computation This is more easily accomplished by an easy-to-use computerized maintenance management system (CMMS). If you introduce some established maintenance indicators and are able to consistently report their evolution that means with great probability that you have a sound maintenance management system. And remember that the crucial issue in working with indicators is not their computation but rather the collection of the necessary information to compute them; you can only collect information consistently if everything above that level is properly organized. A well set management system should be able to produce consistent indicators; an adequate CMMS should produce the indicators without any dedicated effort. So if you are able to produce reliable indicators you can reasonably conclude that you are managing maintenance according to good practices. It is interesting to note that some industrial organizations with plants spread over various geographical areas, stipulate that every plant should compute the same set of indicators, naturally based on the same source parameters. This is interesting for benchmarking purposes but the main merit seems to be ensuring that all the plants carry out maintenance according to established good practices. The same applies to buildings. 1.2. Energy control and optimization Gathering information about the overall energy consumption of the facility is essential. Further to that overall evaluation, individual energy appraisal of some assets and systems should also be made to get a more detailed picture of the energy consumption, enabling us to eventually identify weak points and elect areas deserving effort for improvement. We will learn a lot about our production facility / building and, in the short term, will be confronted with a lot of possible improvements in individual assets and systems and will probably be introducing particular indicators and targets in this context.
  • 3. Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”, June 2016 by Eng José Saraiva Cabral www.manwinwin.com/EN/ support@manwinwin.com We must remember that energy consumption does not depend only on the performance and efficiency of the equipment. It depends on a great number of factors most of which are not under the direct responsibility of the maintenance department but they can, in most cases, be identified by the maintenance people that should develop a pro-active attitude towards identifying them. Let us enumerate a number of possibilities:  Drive motor upgrades introducing more economical prime movers  Checking / calibrating sensors to avoid wrong data inputs  Improvements in insulation, design and equipment to avoid heat losses  Eliminating steam, heated or refrigerated water and compressed air leaks  Improving lubrication  Early detection of bad condition of bearings  Inputs for the detection of bad practices concerning waste of energy: operating set points; equipment running when not needed; open windows.  Inputs for better designs. Most of these can be positively accomplished by systematic walk-around routines and a basic obsession over the energy issue. 1.3. Effective preventive maintenance / minimum failures Maintenance effectiveness indicators are well served by standardized maintenance indicators. T17 = Total operating time Number of failures Hours T21 = Total restoration time Number of failures Hours Where:  Operating time = time during which an item is performing its required function;  Restoration time = time interval during which an item is in downstate due to a failure (including administrative and logistic delays)  Number of failures. T 17 expresses the average operating time between failures; in maintenance conceptual language the so called MTBF, mean time between failures; T 21, the average time to complete repairs; in maintenance language, an indicator that is close to the MTTR, mean time to repair. Note that in all indicators numerator and denominator must refer to the same maintenance item (the production facility / building as a whole, a system, etc.) and to the same time period. Remember that the crucial matter for the computation of indicators is the reliability of the source information; without these there are no meaningful indicators.
  • 4. Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”, June 2016 by Eng José Saraiva Cabral www.manwinwin.com/EN/ support@manwinwin.com 1.4. Effort on improvement Let us assume that the necessity of improvements had been diagnosed and we wanted some metrics to express effort in this area. Improvement maintenance is frequently identified as an ever present objective in buildings (introduction of energy saving equipment, improving accesses for maintenance, monitoring equipment and the like). A suitable indicator for this could also be selected from the standard referenced above: E19 = Cost of improvement maintenance Total maintenance cost x 100% Where:  Total maintenance cost = wages + social taxes + extra time of personnel + external personnel + materials and spares + contractors + departmental costs (energy, machine tools, depreciation, etc.). It excludes downtime costs.  Cost of improvement maintenance is the part of the maintenance costs dedicated to the improvement type of work 1.5. Optimized operating costs Operating costs fall in the domain of the operational management. So let the production establish their own indicators. Maintenance should take a good note of those indicators as they are bound to be closely linked to their own, as the major cost issues in a facility, are clearly connected with maintenance and energy issues. 1.6. Good image Image is also in the domain of operational management. Operational management makes their own indicators and you should try to use or create one or more indicators for maintenance that somehow express what they want. Of course maintenance performance is a great contributor to the overall image of a facility and everybody in the department should be fully aware of that. There are many critical eyes looking around - safety related matters, hygiene, condition of visible maintenance items among many other. 1.7. Maintenance scorecard It should be stressed that to compute maintenance indicators it is necessary to have implemented a management system that generates consistently and accurately the factors that integrate their formulations. The input of source information is the most critical component to work with indicators and if you are successful in doing so you have an adequate maintenance management system. If the top management of an organization establishes the requirement of a set of maintenance Key Performance Indicators (KPI) for the buildings to be reported it is implicitly specifying the requirement that an adequate management system is in place and that maintenance is conducted according to good practices.
  • 5. Article published by ManWinWin Software Source: “Practical Guide to Facilities Maintenance Management”, June 2016 by Eng José Saraiva Cabral www.manwinwin.com/EN/ support@manwinwin.com The set of selected KPI normally involve mutual relationships that should be analysed to identify interactions between the indicators helping the manager to better understand the actual tendency of its actions and policies. The set KPIs selected by management to feel the organization constitute the Balanced Scorecard. To improve the energy consumption, you may require higher investments in the type of work that we have designated by improvement maintenance, therefore, it is reasonable to expect higher figures in the indicators related to the effort in improvement maintenance (E19) 1.4. Improving availability, as expressed by indicator T21, # 1.3., may penalize maintenance costs. The analysis of these interactions may suggest improvement measures in a balanced way, the expression Balanced Scorecard meaning that it should include a set of balanced interacting performance targets.