ASSIGNMENT
DRIVE SPRING 2016
PROGRAM MBA
SEMESTER IV
SUBJECT CODE & NAME OM 0015 – MAINTENANCE MANAGEMENT
BK ID B2008
Credit & Marks 4 CREDIT, 60 MARKS
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
Question.1. Write short notes on the following:
a. Proactive Maintenance
Answer:Proactive maintenance isapreventive maintenance strategyforstabilizing the reliability of
machines or equipment. It has two parts:
Preventive maintenance
Predictive maintenance
b. Planned Maintenance Work Cycle
Answer:Use Equipment/Plant Maintenance to plan, monitor, and complete routine maintenance
operations.Whenyouuse Equipment/PlantMaintenance,youcanminimize equipmentbreakdowns
and unscheduled repairs.
When you use Equipment/Plant
c. Maintenance organising schedule
Answer:Organizing your daily schedule is something that you know needs to be done, but where
exactlydoesone start? A lot of people see time management as a super-power – there’s surely no
way that a mere mortal could fit it all in between 9 and 5! But effectively organizing your daily
schedule at work is simple if you have a plan, and it’s a skill that anyone can learn. These four
guiding principles will help you while organizing your daily schedule.
Think Before You Act: What does the start of your
d. Areas of Maintenance Practices
Answer:Establishing best practices in production maintenance is an achievable goal. But it’s a goal
that manytalk aboutbut fewachieve.Sowhy is it so difficult? And, why are so many manufactures
still running at over 90 percent reactive?
Many blame it on the age of their manufacturing
Question.2. What do you mean by Asset Strategy? Explain briefly
Steps Involved in Developing an AssetStrategy.
Answer:StrategicAssetManagementinvolvesmanagingthe capital investmenttowards a long-term
program of increasingthe ROA.Thisisa top-downfunctionof settingaperformance specificationfor
each major operating unit, identifying the critical components of performance, and systematically
improving the key controllable variables of operation.
Managing assets strategically involves every function
Question.3. Assume you are the head of the maintenance
department in a manufacturing organisation.You are assigned a
responsibility of implementing a maintenance improvement
program. Whatcomponents would you include in the maintenance
improvement program?
Answer:Many confuse availability with equipment reliability. In reality, it is only one part of the
calculation. Availability is the actual time that the machine or system is capable of production as a
percent of total planned production time. Availability rate should not be confused with overall
availability.The latteriscalculatedusing total calendar time as the divisor, not planned production
time.
Question.4. What do you mean by Machine Quality? Which Aspects
are to be Considered for MachineQuality?
Answer:In business, engineering and manufacturing, quality has a pragmatic interpretation as the
non-inferiority or superiority of something; it is also defined as fitness for purpose. Quality is a
perceptual,conditional, and somewhat subjective attribute and may be understood differently by
differentpeople. Consumers may focus on the specification quality of a product/service, or how it
comparesto competitorsinthe marketplace.Producersmightmeasurethe conformance quality, or
degree to which the product/service was produced correctly.
Question.5. Write short notes on the following
a.Zero based budgeting
Answer:Zero-based budgeting is an approach to planning and decision-making that reverses the
working process of traditional budgeting. In traditional incremental budgeting, departmental
managers justify only variances versus past years based on the assumption that the "baseline" is
automaticallyapproved.Bycontrast,inzero-basedbudgeting, every line item of the budget, rather
than onlythe changes,mustbe approved.Zero-basedbudgetingrequiresthatthe budgetrequestbe
re-evaluated thoroughly, starting from the
b. Remote maintenance audit
Answer:It manages complexity and enables security by providing a single platform from which to
manage remote access policy and connections. Our high-definition network security auditing goes
beyond federal vendor access requirements. Multiple levels of identification and authentication,
agency defined access and control, comprehensive IT security audit reporting, and real-time
monitoringcapabilityforeveryremote supportsessionall worktogethertoprovide easily verifiable
proof of compliance.
c. Codification of spare parts
Answer:Codification/cataloguingisbasicallyanidentificationsystemforeachitemof the inventory.
There are often three broad approaches to developing a suitable identification system:
1.Arbitrary approach:As the name suggests,this approach does not use any design for codification.
Rather, as and when an item is received by Stores in its receiving bay, a running and unique
serialnumber is assigned to it. This number becomes
d. Maintenance Benchmarking
Answer:Benchmarkinghas become a common practice in all kinds of businesses, but nowhere is it
more prevalent than in manufacturing. The idea of measuring yourself against the best is an
attractive one -- one that the gurus say can leadtobreakthroughsinhow you run your business. But
like many other great ideas, benchmarking can lead to frustration and disappointment if it isn't
approached with proper understanding.
Question.6. Discussion questions:
1. Which condition monitoring techniques have been used to
improve plant maintenance atXYZ?
Answer:Condition monitoring (or, colloquially, CM) is the process of monitoring a parameter of
conditioninmachinery(vibration,temperature etc.), in order to identify a significant change which
is indicative of a developing fault. It is a major component of predictive maintenance. The use of
conditionmonitoringallows maintenance to be scheduled, or other actions to be taken to prevent
failure andavoiditsconsequences.Conditionmonitoringhasaunique benefitinthatconditionsthat
wouldshortennormal lifespancanbe addressedbefore theydevelopintoamajorfailure. Condition
monitoring techniques are normally used on rotating
2. Do you think that the implementation of condition monitoring
techniques is the rightdecision of XYZ? Justify your
agreement/disagreement
Answer:Condition monitoring is the process of determining the condition of machinery while in
operation. The key to a successful condition monitoring programme includes:
Knowing what to listen for
How to interpret it
When to put this knowledge to use
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601

More Related Content

What's hot

Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician ArticleRicky Smith CMRP, CMRT
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve ReliabilityRicky Smith CMRP, CMRT
 
Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Ricky Smith CMRP, CMRT
 
Day In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance ManagerDay In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance ManagerRicky Smith CMRP, CMRT
 
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochurePreventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochureRicky Smith CMRP, CMRT
 
Maintenance Planning & Scheduling
Maintenance Planning & SchedulingMaintenance Planning & Scheduling
Maintenance Planning & SchedulingPowerEDGE
 
Electrical Department Maintenance Management Vision
Electrical Department Maintenance Management VisionElectrical Department Maintenance Management Vision
Electrical Department Maintenance Management VisionFouad Ghoneim, PMP®, SSYB®
 
Plains Consulting LLC Intro and Capabilities R3
Plains Consulting LLC Intro and Capabilities R3Plains Consulting LLC Intro and Capabilities R3
Plains Consulting LLC Intro and Capabilities R3jim heptinstall
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraDurga Prasad Mishra
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleRicky Smith CMRP, CMRT
 
Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White PaperRicky Smith CMRP, CMRT
 
The Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset ReliabilityThe Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset ReliabilityRicky Smith CMRP, CMRT
 
Types of maintenance & tpm pillars
Types of maintenance & tpm pillarsTypes of maintenance & tpm pillars
Types of maintenance & tpm pillarsSanjaykumarIngale
 
Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling Ricky Smith CMRP, CMRT
 
Business Continuity Plan PowerPoint Presentation Slides
Business Continuity Plan PowerPoint Presentation Slides Business Continuity Plan PowerPoint Presentation Slides
Business Continuity Plan PowerPoint Presentation Slides SlideTeam
 

What's hot (20)

PdM Maturity Matrix Poster
PdM Maturity Matrix PosterPdM Maturity Matrix Poster
PdM Maturity Matrix Poster
 
Day in the Life of a Proactive Maintenance Technician Article
Day in the Life of a Proactive Maintenance Technician  ArticleDay in the Life of a Proactive Maintenance Technician  Article
Day in the Life of a Proactive Maintenance Technician Article
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability
 
Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?Why should you use repeatable maintenance procedures?
Why should you use repeatable maintenance procedures?
 
Day In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance ManagerDay In the Life Of a Proactive Maintenance Manager
Day In the Life Of a Proactive Maintenance Manager
 
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop BrochurePreventive Maintenance Best Practices plus PM Optimization Workshop Brochure
Preventive Maintenance Best Practices plus PM Optimization Workshop Brochure
 
Maintenance Planning & Scheduling
Maintenance Planning & SchedulingMaintenance Planning & Scheduling
Maintenance Planning & Scheduling
 
Electrical Department Maintenance Management Vision
Electrical Department Maintenance Management VisionElectrical Department Maintenance Management Vision
Electrical Department Maintenance Management Vision
 
Plains Consulting LLC Intro and Capabilities R3
Plains Consulting LLC Intro and Capabilities R3Plains Consulting LLC Intro and Capabilities R3
Plains Consulting LLC Intro and Capabilities R3
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishra
 
Best Maintenance Repair Practices Article
Best Maintenance Repair Practices ArticleBest Maintenance Repair Practices Article
Best Maintenance Repair Practices Article
 
Procedure Based Maintenance White Paper
Procedure Based Maintenance White PaperProcedure Based Maintenance White Paper
Procedure Based Maintenance White Paper
 
Precision Maintenance
Precision MaintenancePrecision Maintenance
Precision Maintenance
 
The Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset ReliabilityThe Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset Reliability
 
Maintenance planning and scheduling
Maintenance planning and schedulingMaintenance planning and scheduling
Maintenance planning and scheduling
 
Why RCM Doesn't Work?
Why RCM Doesn't Work?Why RCM Doesn't Work?
Why RCM Doesn't Work?
 
Types of maintenance & tpm pillars
Types of maintenance & tpm pillarsTypes of maintenance & tpm pillars
Types of maintenance & tpm pillars
 
FMEA Final Project
FMEA Final ProjectFMEA Final Project
FMEA Final Project
 
Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling Best Practices in Maintenance Planning And Scheduling
Best Practices in Maintenance Planning And Scheduling
 
Business Continuity Plan PowerPoint Presentation Slides
Business Continuity Plan PowerPoint Presentation Slides Business Continuity Plan PowerPoint Presentation Slides
Business Continuity Plan PowerPoint Presentation Slides
 

Similar to Om 0015 maintenance management

Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementStudy Stuff
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceMANUEL PACINI
 
Bba501 production and operations management (2)
Bba501   production and operations management (2)Bba501   production and operations management (2)
Bba501 production and operations management (2)smumbahelp
 
Choosing an alm tool set
Choosing an alm tool setChoosing an alm tool set
Choosing an alm tool setIan McDonald
 
Om0015 maintenance management
Om0015  maintenance managementOm0015  maintenance management
Om0015 maintenance managementsmumbahelp
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceJames Fitzgerald
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementconsult4solutions
 
Presentation maintenence management
Presentation maintenence managementPresentation maintenence management
Presentation maintenence managementVaisakh S Babu
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation managementsmumbahelp
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations managementsmumbahelp
 
Comparing RCM and PMO2000
Comparing RCM and PMO2000Comparing RCM and PMO2000
Comparing RCM and PMO2000Steve Turner
 

Similar to Om 0015 maintenance management (20)

Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
The challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenanceThe challenges facing in pharmaceutical maintenance
The challenges facing in pharmaceutical maintenance
 
Bba501 production and operations management (2)
Bba501   production and operations management (2)Bba501   production and operations management (2)
Bba501 production and operations management (2)
 
Choosing an alm tool set
Choosing an alm tool setChoosing an alm tool set
Choosing an alm tool set
 
Procedure Based Maintenance
Procedure Based MaintenanceProcedure Based Maintenance
Procedure Based Maintenance
 
Om0015 maintenance management
Om0015  maintenance managementOm0015  maintenance management
Om0015 maintenance management
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
Presentation maintenence management
Presentation maintenence managementPresentation maintenence management
Presentation maintenence management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Mb0044 production and operation management
Mb0044   production and operation managementMb0044   production and operation management
Mb0044 production and operation management
 
Bba501 & production and operations management
Bba501 & production and operations managementBba501 & production and operations management
Bba501 & production and operations management
 
MaintenanceKPI_EN.pdf
MaintenanceKPI_EN.pdfMaintenanceKPI_EN.pdf
MaintenanceKPI_EN.pdf
 
Comparing RCM and PMO2000
Comparing RCM and PMO2000Comparing RCM and PMO2000
Comparing RCM and PMO2000
 

Recently uploaded

call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 

Recently uploaded (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 

Om 0015 maintenance management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com or call us at : 08263069601 ASSIGNMENT DRIVE SPRING 2016 PROGRAM MBA SEMESTER IV SUBJECT CODE & NAME OM 0015 – MAINTENANCE MANAGEMENT BK ID B2008 Credit & Marks 4 CREDIT, 60 MARKS Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Question.1. Write short notes on the following: a. Proactive Maintenance Answer:Proactive maintenance isapreventive maintenance strategyforstabilizing the reliability of machines or equipment. It has two parts: Preventive maintenance Predictive maintenance b. Planned Maintenance Work Cycle Answer:Use Equipment/Plant Maintenance to plan, monitor, and complete routine maintenance operations.Whenyouuse Equipment/PlantMaintenance,youcanminimize equipmentbreakdowns and unscheduled repairs. When you use Equipment/Plant c. Maintenance organising schedule
  • 2. Answer:Organizing your daily schedule is something that you know needs to be done, but where exactlydoesone start? A lot of people see time management as a super-power – there’s surely no way that a mere mortal could fit it all in between 9 and 5! But effectively organizing your daily schedule at work is simple if you have a plan, and it’s a skill that anyone can learn. These four guiding principles will help you while organizing your daily schedule. Think Before You Act: What does the start of your d. Areas of Maintenance Practices Answer:Establishing best practices in production maintenance is an achievable goal. But it’s a goal that manytalk aboutbut fewachieve.Sowhy is it so difficult? And, why are so many manufactures still running at over 90 percent reactive? Many blame it on the age of their manufacturing Question.2. What do you mean by Asset Strategy? Explain briefly Steps Involved in Developing an AssetStrategy. Answer:StrategicAssetManagementinvolvesmanagingthe capital investmenttowards a long-term program of increasingthe ROA.Thisisa top-downfunctionof settingaperformance specificationfor each major operating unit, identifying the critical components of performance, and systematically improving the key controllable variables of operation. Managing assets strategically involves every function Question.3. Assume you are the head of the maintenance department in a manufacturing organisation.You are assigned a responsibility of implementing a maintenance improvement program. Whatcomponents would you include in the maintenance improvement program? Answer:Many confuse availability with equipment reliability. In reality, it is only one part of the calculation. Availability is the actual time that the machine or system is capable of production as a percent of total planned production time. Availability rate should not be confused with overall availability.The latteriscalculatedusing total calendar time as the divisor, not planned production time.
  • 3. Question.4. What do you mean by Machine Quality? Which Aspects are to be Considered for MachineQuality? Answer:In business, engineering and manufacturing, quality has a pragmatic interpretation as the non-inferiority or superiority of something; it is also defined as fitness for purpose. Quality is a perceptual,conditional, and somewhat subjective attribute and may be understood differently by differentpeople. Consumers may focus on the specification quality of a product/service, or how it comparesto competitorsinthe marketplace.Producersmightmeasurethe conformance quality, or degree to which the product/service was produced correctly. Question.5. Write short notes on the following a.Zero based budgeting Answer:Zero-based budgeting is an approach to planning and decision-making that reverses the working process of traditional budgeting. In traditional incremental budgeting, departmental managers justify only variances versus past years based on the assumption that the "baseline" is automaticallyapproved.Bycontrast,inzero-basedbudgeting, every line item of the budget, rather than onlythe changes,mustbe approved.Zero-basedbudgetingrequiresthatthe budgetrequestbe re-evaluated thoroughly, starting from the b. Remote maintenance audit Answer:It manages complexity and enables security by providing a single platform from which to manage remote access policy and connections. Our high-definition network security auditing goes beyond federal vendor access requirements. Multiple levels of identification and authentication, agency defined access and control, comprehensive IT security audit reporting, and real-time monitoringcapabilityforeveryremote supportsessionall worktogethertoprovide easily verifiable proof of compliance. c. Codification of spare parts Answer:Codification/cataloguingisbasicallyanidentificationsystemforeachitemof the inventory. There are often three broad approaches to developing a suitable identification system: 1.Arbitrary approach:As the name suggests,this approach does not use any design for codification. Rather, as and when an item is received by Stores in its receiving bay, a running and unique serialnumber is assigned to it. This number becomes d. Maintenance Benchmarking
  • 4. Answer:Benchmarkinghas become a common practice in all kinds of businesses, but nowhere is it more prevalent than in manufacturing. The idea of measuring yourself against the best is an attractive one -- one that the gurus say can leadtobreakthroughsinhow you run your business. But like many other great ideas, benchmarking can lead to frustration and disappointment if it isn't approached with proper understanding. Question.6. Discussion questions: 1. Which condition monitoring techniques have been used to improve plant maintenance atXYZ? Answer:Condition monitoring (or, colloquially, CM) is the process of monitoring a parameter of conditioninmachinery(vibration,temperature etc.), in order to identify a significant change which is indicative of a developing fault. It is a major component of predictive maintenance. The use of conditionmonitoringallows maintenance to be scheduled, or other actions to be taken to prevent failure andavoiditsconsequences.Conditionmonitoringhasaunique benefitinthatconditionsthat wouldshortennormal lifespancanbe addressedbefore theydevelopintoamajorfailure. Condition monitoring techniques are normally used on rotating 2. Do you think that the implementation of condition monitoring techniques is the rightdecision of XYZ? Justify your agreement/disagreement Answer:Condition monitoring is the process of determining the condition of machinery while in operation. The key to a successful condition monitoring programme includes: Knowing what to listen for How to interpret it When to put this knowledge to use Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com or call us at : 08263069601