The document provides details on the demolition project at the former Koppers Facility in Gainesville, Florida. Chemtron Corporation will demolish 8 buildings and 2 tanks using heavy equipment like excavators and bobcats over 4 weeks. Dust control is a priority given the site's location. Buildings will be dismantled and debris removed offsite. Utilities have been disconnected and chemicals removed from buildings. The site will be seeded with grass after completion to control dust.