Prince Armahs(Tinky) Brochure, for Funeral service
Sample item report pages (irp's)
1. 7
Item Report Page 1 of 2
CLIENT ENSCO International Offshore Company
FACILITY ENSCO 8504 Semi-Sub rig, Drilling for SHELL offshore Sarawak, Malaysia
LOCATION AIR COMPRESSOR ROOM
EQUIPMENT AIR COMPRESSOR 3
COMPONENT CONTACT BREAKER,
SURVEYOR Anthony R Clouder, Thermographic@gmail.com +60138330093
FIXED
DURING
SURVEY
REMARKS:
SEVERITY: SERIOUS
FAULT TEMP. 75C. / Overheated by 27C approx.
This was fixed and re-checked during the survey, and is now OK.
ARC. 10th
March 2014
2. 8
Item Report Page 2 of 2
CLIENT ENSCO PTY in Miri, Sarawak, East MALAYSIA.
FACILITY ENSCO 105 Jack-up rig, Drilling for SHELL offshore Miri, Sarawak.
LOCATION SCR ROOM
EQUIPMENT DEEP WELL, PORT-LEG, OVER LOAD UNIT
COMPONENT CONTACT BREAKER, TOP LEFT TERMINATION.
SURVEYOR Anthony R Clouder, Thermographic@gmail.com +60138330093
FIXED
DURING
SURVEY
REMARKS: 29th
December 2013
SEVERITY: VERY SERIOUS
FAULT TEMP. 75C. / Overheated by 50C approx.
This was fixed and re-checked during the survey, and is now OK.
ARC.
3. 6
CLIENT MAERSK DRILLING
FACILITY MAERSK COMPLETER drilling offshore BRUNEI Darussalam for SHELL
LOCATION VFD Room.
EQUIPMENT LIGHTING PANEL # 875 EL 002.
COMPONENT CONTACT BREAKER, 001
SURVEYOR Anthony R Clouder, Thermographic@gmail.com +60138330093
REMARKS:
SEVERITY: VERY SERIOUS
FAULT TEMP. 82C. / Overheated by 45C approx.
Needed wire cutting-back a bit, and re-terminating.
ARC. 16th
Sep. 2015
FIXED
DURING
SURVEY
4. 7
Item Report Page 2 of 2
CLIENT ENSCO International Offshore Company
FACILITY ENSCO 8504 Semi-Sub rig, Drilling for SHELL offshore Sarawak, Malaysia
LOCATION AIR COMPRESSOR ROOM
EQUIPMENT AIR COMPRESSOR 3
COMPONENT CONTACT BREAKER.
SURVEYOR Anthony R Clouder, Thermographic@gmail.com +60138330093
FIXED
DURING
SURVEY
REMARKS:
SEVERITY: INTERMIDIATE
FAULT TEMP. 65C. / Overheated by 16C approx.
This was fixed and re-checked during the survey, and is now OK.
ARC. 10th
March 2014.
5. 7
Item Report Page 1 of 2
CLIENT ENSCO PTY in Miri, Sarawak, East MALAYSIA.
FACILITY ENSCO 105 Jack-up rig, Drilling for SHELL offshore Miri, Sarawak.
LOCATION SCR ROOM
EQUIPMENT MUD PUMP 1 BLOWER STARTER. OVERLOAD UNIT
COMPONENT CONTACT BREAKER, BOTTOM RIGHT TERMINATION.
SURVEYOR Anthony R Clouder, Thermographic@gmail.com +60138330093
FIXED
DURING
SURVEY
REMARKS: 29th
DECEMBER 2013
SEVERITY: SERIOUS
FAULT TEMP. 53C. / Overheated by 27C approx.
This was fixed and re-checked during the survey, and is now OK.
ARC.
6. Item Report Page 1 of 2
CLIENT MAERSK DRILLING
FACILITY MAERSK CONVINCER drilling offshore west MALAYSIA
LOCATION SCR ROOM
EQUIPMENT MUD AGITATOR # 8
COMPONENT TERMINAL BLOCK CONNECTOR B6FF. Centre right connection.
SURVEYOR Anthony R Clouder, Thermographic@gmail.com +60138330093
REMARKS: 26th
June 2013
SEVERITY: SERIOUS
FAULT TEMP. 70C. / Overheated by 40c approx.
This was fixed and re-checked during the survey, and is now OK.
ARC.
FIXED
DURING
SURVEY
7. Item Report Page 2 of 2
CLIENT MAERSK DRILLING
FACILITY MAERSK CONVINCER drilling offshore west MALAYSIA
LOCATION DRILL-FLOOR MCC ROOM
EQUIPMENT EMERGENCY LIGHTING PANEL 876EL009
COMPONENT CONTACT BREAKER Bottom Left Termination.
SURVEYOR Anthony R Clouder, Thermographic@gmail.com +60138330093
FIXED
DURING
SURVEY
REMARKS: 27th
June 2013
SEVERITY: SERIOUS
FAULT TEMP. 50C. / Overheated by 25c approx.
This was fixed and re-checked during the survey, and is now OK.
ARC.
8. WASTE HEAT BOILER & TRANSFERLINE
BOTH SIDES, & TOP.
Three anomalies were found on this system, as arrowed.
9. REFORMER CONVECTION MODULE WALL
NORTH-SIDE
Possibly a problem, but there could also be a Thermo-reflection
from the heat-source above the light unit,
As per the photograph, there appears to be a problem with
panel above the light.