Hydrologic Monitoring System Assessment 
The purpose of the Hydrologic Monitoring System Assessment is to assist a World Bank borrower with the task of preparing technical specifications for tender. Common methods of hydrologic measurement are reviewed. The Assessment requires information that the borrower will provide which will result in developing the overall design of the hydrological information system. A key outcome of this Assessment will be clear, concise specifications which will result in more competitive and cost effective bids. This exercise will also prepare the borrower for the eventual implementation of a highly sustainable hydrologic monitoring system. 
Based on the information you provide, a World Bank consultant can more efficiently assist you in defining project needs and help assemble the most appropriate specifications.
V 1.0 Page 2 
Introduction 
Hydrologic Monitoring Systems of HP 2 generally have the following components: 
 Data Collection Platform 
 Data Communications (Radio, Cable, Antenna) 
 Equipment Enclosures 
 Solar Panels 
 Solar Charger 
 Grounding System 
 Sensors 
 Data Center for: 
o Automatic reception of Data Communication, quality control, and remote station network management 
o Data storage 
o Visualization (Data presented on maps, graphs, tables) 
o Decision Support 
 Alert and alarms based on evaluation of incoming data 
 Forecast models 
 Analytical models 
This Questionnaire will provide assistance in assessing the requirements of the respective hydrologic information system. The scale and scope of the hydrologic information system will be much clearly understood. This will result in a better overall understanding of the project and prepare consultants for possible field Missions or to otherwise help in the preparation/review of specifications.
V 1.0 Page 3 
Goal of Hydrologic Measurement System 
State the goal of the hydrologic measurement system. By stating the goal, the measurement system will constitute objectives designed to meet the goal of the project. 
Goal of the Hydrologic measurement: 
Explain the use of the data and how automated data collection, and real-time telemetry will be used. This should include discussion of public safety, protect of property, as well as industrial capacity.
V 1.0 Page 4 
Data Collection Platforms 
Data Collection Platforms (DCP) are systems that collect and log (store) data automatically. A DCP is synonymous with a Data Logger. A Remote Terminal Unit (RTU) is device that is generally used with Supervisory Control and Data Acquisition (SCADA), whereby the RTU is used to control and/or supervise a remote device. Data Acquisition System (DAS) is generally synonymous with a DCP, where by sensors are monitored and stored. For most hydrologic monitoring systems a simple DCP is sufficient, as DCPs offer not only data collection from a wide range of sensors, but also interfaces to radio systems for data communication. Data communication will be addressed later in the Assessment. Please define the general measurement that will be made and the associated time interval of measurement as well as interval of data transmission.
V 1.0 Page 5 
DCPs can come with displays, and may also be specified without displays. Displays can be quite helpful for the technician, or other interested entity in examining data on-site. Would you prefer a display on the DCP? 
DCPs store can store data in addition to transmitting the data in real-time. It is suggested that the data loggers have enough memory to store a year’s worth of data. It is also suggested that the data be stored in non-volatile memory so that in the event there is a power outage, the stored data will be preserved. Are there other capabilities that are required from the DCP?
V 1.0 Page 6 
Sensors 
Hydrologic data collection systems usually involve measurements of discharge, precipitation, and meteorological state parameters (temperature, relative humidity, wind speed, wind direction, atmospheric pressure, solar radiation), as well as evaporation/evapotranspiration. Automatic measurements of these parameters are described below: 
Discharge: Discharge is generally derived by establishing a stage-discharge relationship, whereby water level is measured a various stages and compared to manual discharge measurements at each of these stages. The result is a rating curve, whereby the water level can be measured and referenced to the corresponding discharge. A rating table requires a continuous effort to maintain, though the maintenance of the stage-discharge relationship is extremely simple if the channel is stable. Discharge measurements at stable cross-sections can take place every six to eight weeks. There should be an effort to perform discharge measurements during peak flows. The reason why network operators prefer measuring stage and then deriving discharge though a stage-discharge relationship, is because the stage sensors are considerably less expensive that just measuring stage (water level). There is a strong desire by many operators to use non-contact methods of measuring water level, which is advantageous if there are flood flows that can carry debris that can damage expensive instruments that are in the water. 
Alternatively, if there is the consideration of backwater effects. Backwater effects are conditions whereby a downstream condition causes the water to back-up to the stage measurement site, thus making it impossible to derive a stage-discharge relationship. In these cases, the use of an Acoustic Doppler Current Profiler (ADCP) is the only solution that can be applied. The ADCP must be placed in the water (contact sensor), making it subject to damage during flood flows that carry debris in the water. ADCP’s can range from $7,000 - $18,000 USD, so the use of these devices should be judicious. 
Prior to determining the discharge measurement method, the operator should understand the limitations of contact sensors and the threat to these sensors from debris being carried by flood waters. The operator or an agent of the operator should perform a survey of all discharge sites so that the correct technology can be recommended. 
Stream Gauging Measurements: Stream gauging measurements are made in order to develop a stage-discharge relationship. The stream gauging measurements can be made as follows: 
 Cableway Measurement 
 Bridge Measurement 
 Boat Measurement
V 1.0 Page 7 
 Remote control boat (w/ADCP) 
 Wading 
The different methods of measurement allow for measurement in different cross-sections. 
Cableway Measurements: Cableway measurements require a steel cableway to be installed which will span the river cross-section. Historically, hydrographers (people who make stream gauging measurements) would climb into a cable car and make measurements from the cable car which moves from one bank to the opposite bank. There have been significant advances in this area, with the automatic cableway systems. The automatic cableway systems allow the hydrographer to stay on the cross-section bank and remotely control a device which travels across the cableway. ADCPs and typical current meters can be used with the automatic cableway systems. These types of systems are highly recommended over the legacy cableway and cable car system. This is a good method of measurement in high velocity water. 
Bridge Measurement: Bridge measurements can utilize either ADCPs or typical current meters. Bridge measurements are very popular and are safer than making measurements from a cableway, boat, or wading. Unfortunately, bridges are not available at all cross-sections. And although bridge measurements may be somewhat safer than other measurements, and more cost effective, there is danger in making bridge measurements from vehicle traffic on the bridge. This is a good method of measurement in high velocity water. 
Boat Measurement: Boat measurements can utilize either ADCP or typical current meters. The boat is used with a tag line that is temporarily placed across the cross-section. The tag line helps the hydrographer to determine measurement points and keeps the boat tethered to the cross-section being measured. Boat measurements do not require the use of a cableway, which saves the initial cost of the cableway. However, the measurements can only be made from the boat in lower velocity water. 
Remote Control Boat Measurement: Remote control boat measurements are usually restricted to use with the ADCP. The ADCP is placed on a small boat and the boat is remotely controlled to make the measurement across the cross-section. This method is only suggested on smooth, low velocity water. In routine practice in open channels, the boat measurement might be most suitable for canals. 
Wading: In conditions of low flow, discharge can be measured by having the hydrographer wade across the channel. A rule of thumb for the upper limit where wading measurements can be made is given by the product of the depth of water and the velocity of water. If the product of the water velocity in ft per second and the depth of water in ft is great than 10, measurement of discharge by wading the river should be discouraged.
V 1.0 Page 8 
Water Level: The water level measurement is necessary if the desire is to use the stage- discharge relationship. The stage-discharge method of determining water level is considered to be more cost effective than using ADCPs for continuous discharge measurements. The most popular water level sensors consist of the following: 
 Shaft encoder with pulley, tape and float 
 Bubbler system with non-submersible pressure transducer 
 Radar water level measurement 
 Ultrasonic water level measurement 
 Submersible pressure transducer 
The proper solution for the operator can only be suggested once a thorough survey of the sites has been completed. The Agency should have a clear idea where the measurement points should be along a given river reach and not leave this up to the supplier. 
Precipitation: Precipitation measurements are usually made with either a storage gauge or a tipping bucket rain gauge. The tipping bucket rain gauges have been generally preferred because of the minimal maintenance requirements. 
When measuring precipitation, there are two generally competing considerations that must be understood. These considerations consist of the desire to measure precipitation rate versus total precipitation. It is very difficult to obtain instantaneous precipitation rates with a tipping bucket rain gauge. As well, the tipping bucket rain gauge cannot accurately resolve cumulative precipitation unless the results are corrected by accounting for the precipitation rate. These inaccuracies are due to the tipping bucket method of the buckets tipping during rainfall. Fortunately, most hydrology projects require accurate measurement of precipitation accumulation over 15 minutes to an hour. The need for rainfall intensities may only exist with an entity such as IMD. In most hydrologic measurement projects a high quality tipping bucket with a siphon arrangement or software applied corrections to the rainfall rates will produce reasonable cumulative precipitation values. Upon filling out the station survey table, a proper solution for precipitation will be provided. 
Meteorological State Parameters and Climate Stations: Meteorological state parameters and measurements are one of the most straightforward measurements in a hydrologic measurement network. The major consideration for these types of stations is exposure. Obstructions and anthropogenic sources of measurement influences should be eliminated. Sites for Climate Stations especially should be very carefully examined prior to selecting the site for consideration for instrumentation. Each meteorological sensor has exposure requirements that
V 1.0 Page 9 
are developed in the World Meteorological Organization publication WMO- No-8, “Guide to Meteorological Instruments and Methods of Observations”, most recently published in 2008. 
In order for your hydrologic network to be properly evaluated the operator should provide information in table format of the following: Table 1: Discharge sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Width of channel at peak and low flow  Maximum and minimum water level height from the bottom of the channel  Maximum velocity of water  Backwater effects  Natural or lined channel (lined, i.e. canal)  Closest bend in the channel upstream and downstream of measurement site  Knowledge or evidence of debris during high flow (high, moderate, low, none)  Closest bridge upstream or downstream Table 2: Reservoir elevation sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Range of reservoir elevations Table 3: Precipitation sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  The height and distance of the closest object to the precise precipitation gauge site. Anything that is greater in height than twice the distance to the proposed gauge site should be noted. Table 4: Climate station or all weather station sites
V 1.0 Page 10 
 Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Distance and height of closest buildings to the site  Available area for site (i.e. 400 m2) Table 5: Snow depth and snow pack water content sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Maximum depth of snow  Maximum snow pack water content Table 6: Cooperative sites, where you may desire data or you may be willing to add sensors to the sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Cooperating Agency (i.e. IMD, CWC, SASE) Schematics and Diagrams  Prepare a schematic of your river system and include the reservoirs and proposed gauging stations in this schematic.  Prepare a map in Google Earth that identifies all of your measurement stations. Examine these points to assure the coordinates are reasonably correct. Export the file as a KMZ.
V 1.0 Page 11 
Do you need assistance designing a hydrologic monitoring network, or have you already determined all of your sites and the parameters that you would like to measure?
V 1.0 Page 12 
Data Communication 
An important capability of any modernized hydrologic monitoring network is the real-time relay of measurements from the field to the operations center where the data can be made available to support decisions. What is your preferred method of data communication? If you have no preference a suitable method of data communication will be recommended based on the requirements of the information being collected as well as radio propagation considerations. 
Many DCPs can accommodate multiple data communication links. This is quite useful in the event a data communication path fails. Two communication paths (dual-path) data is becoming more common for information systems that need data reliably and promptly. How critical is your information. How long can you be without data in the most critical situation? Would you like to employ dual-path communication?
V 1.0 Page 13 
Warranty Period 
Warranty period is a period where if the equipment fails due to manufacturer defect, the unit is replaced at no charge to the agency. However, if the equipment fails by any other means, such as vandalism, or a force majeure, then the responsibility for replacement will be up to the agency, though contractor usually replaces the equipment under the maintenance contract that is tied to the warranty period. Some agencies would like to include all equipment failures, including vandalism or force majeure in the warranty period. It is not recommended that vandalism or force majeure be included in the warranty period, as if the supplier is expected to take on all risk, the agency will certainly overpay for the contract. How many year(s) of warranty are desired?
V 1.0 Page 14 
Maintenance Period 
The maintenance period follows the warranty period. During the maintenance period, all equipment failures are generally the responsibility of the agency, as the supplier performs the field work necessary to restore the station. Again, as in the Warranty Period, it is not advisable to include equipment losses and replacement as a requirement of the supplier. The supplier will take the worst case scenario, and need to add to the contract in a way where the contractor will not assume any risk, thus over pricing the offer. Hardware costs during the maintenance period can be offset with a large supply of spare equipment. During the maintenance period, one can assume that 10% of the equipment will need to be replaced annually. If high quality equipment is specified, this can reduce down to less than 5%. It is important that station security be well thought out during the specification and tendering process, as this will certainly save resources during the warranty and maintenance periods. 
Maintenance contracts should require regular reporting which provides a summary of all maintenance activities. These activities should include the following: 
 Emergency Maintenance activities, including dates, time, action performed, and number of hours required to resolve the situation 
 Preventative maintenance activities, including dates, time, actions performed, and number of hours required per site 
 Status of all hardware components, whether in operation or held in spare. This report should provide the operational readiness of all hardware components, and should identify where all equipment is located, whether it be in the field, in the warehouse, or back at the manufacturers facility for repair or calibration. Equipment identification should be referenced my model and serial number. What length of maintenance period is required? Some entities have specified up to 8 years for the maintenance period.
V 1.0 Page 15 
Do you have field offices that the maintenance crew can share with your staff? Having the maintenance crew alongside your staff is a good way to learn and manage the maintenance contract. 
Do you intend to one day having your staff maintain this equipment?
V 1.0 Page 16 
If you do not intent to maintain your equipment one day, then it is necessary that the outsourced group be subject to a Quality Assurance Program. Quality Assurance means that the outsourced group performing the maintenance will need to be audited at regular intervals to make certain the equipment being operated is within specification, and to also assure the data is of high quality. The Quality Assurance program can also be outsourced or performed in house. Would you prefer to outsource the Quality Assurance program or have it done in house?
V 1.0 Page 17 
Data Center 
The hydrologic monitoring network will transmit data to the Data Center in real-time. The Data Center will have the necessary data receivers and a computer system to act as the first level repository of the information. The computer will also be used to validate information and track erroneous measurements, being used to direct the maintenance staff to tend to station outages. 
The space for the Data Center is required to contain the necessary computer systems under proper environmental conditions. It is suggested that the space for the Data Center be provided with easy access to external data communication facilities, such as radio antenna. Components of a Data Center consist of the following: 
 A computer for the automatic reception of Data Communication, quality control, and remote station network management 
 A computer for Data storage 
 A computer for Data Visualization (Data presented on maps, graphs, tables) 
 A computer for hosting Web services 
 A computer for decision Support 
o Alert and alarms based on evaluation of incoming data 
o Forecast models 
o Analytical models 
The various components can share computers, though the use of multiple computers will help in sharing the load. These computers are usually “Server” grade computers. By no means should a “Server” grade computer be used by the office staff for typical office productivity tasks, such as word processing, browsing the Internet, CAD applications, or other activities normally reserved for a personal work station. 
A Data Center is normally equipped with the following: 
 Computer Servers 
 Computer Workstations with Monitors (Multiple monitors are very useful) 
 Software (Operating System, Data base, Data Collection, Decision Support, Visualization, Web Services, etc.) 
 Uninterruptable Power Supply 
 Backup Power (for outages greater than 30 minutes) 
 Computer furniture (equipment racks, desks, bookshelves, etc.)
V 1.0 Page 18 
Do you have a facility that can be used as the Data Center? This area will be modernized through the Tender process to accept the necessary equipment. 
Describe products or functions that you would like to have as part of your Data Center.

More Related Content

What's hot

Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvi
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvi Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvi
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvihydrologyproject001
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...hydrologyproject001
 
IGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.pptIGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.pptgrssieee
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...hydrologyproject001
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...hydrologyproject001
 
Download-manuals-surface water-manual-sw-volume4designmanualhydrometry
 Download-manuals-surface water-manual-sw-volume4designmanualhydrometry Download-manuals-surface water-manual-sw-volume4designmanualhydrometry
Download-manuals-surface water-manual-sw-volume4designmanualhydrometryhydrologyproject001
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartviihydrologyproject001
 
Ocean Dynamics and Sediment Transport Measuring Acoustic and Optical Instruments
Ocean Dynamics and Sediment Transport Measuring Acoustic and Optical InstrumentsOcean Dynamics and Sediment Transport Measuring Acoustic and Optical Instruments
Ocean Dynamics and Sediment Transport Measuring Acoustic and Optical InstrumentsIRJET Journal
 
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_Naimish Raval
 
IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...
IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...
IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...IRJET Journal
 
Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro...
 Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro... Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro...
Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro...hydrologyproject001
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartihydrologyproject001
 
Groundwater Level Measurment Overview
Groundwater Level Measurment OverviewGroundwater Level Measurment Overview
Groundwater Level Measurment OverviewAbigail Brown
 
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOBTECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOBCSUGulfCoast
 
DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...
DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...
DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...Deltares
 
Workshop Results
Workshop  ResultsWorkshop  Results
Workshop ResultsPsdmn Phil
 
Velocity measurement using current meter
Velocity measurement using current meterVelocity measurement using current meter
Velocity measurement using current meterMuhammad Bilal
 

What's hot (20)

Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvi
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvi Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvi
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvi
 
Current Meters
Current MetersCurrent Meters
Current Meters
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 
IGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.pptIGARSSAirSWOTv2.ppt
IGARSSAirSWOTv2.ppt
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology... Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
Download-manuals-surface water-manual-sw-volume3fieldmanualhydro-meteorology...
 
Download-manuals-surface water-manual-sw-volume4designmanualhydrometry
 Download-manuals-surface water-manual-sw-volume4designmanualhydrometry Download-manuals-surface water-manual-sw-volume4designmanualhydrometry
Download-manuals-surface water-manual-sw-volume4designmanualhydrometry
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometrypartvii
 
Ocean Dynamics and Sediment Transport Measuring Acoustic and Optical Instruments
Ocean Dynamics and Sediment Transport Measuring Acoustic and Optical InstrumentsOcean Dynamics and Sediment Transport Measuring Acoustic and Optical Instruments
Ocean Dynamics and Sediment Transport Measuring Acoustic and Optical Instruments
 
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
MASS MASTER METERING SOLUTION FOR USERS PAIN_ FCRI 2012 KS NR _2_
 
Dragana densitometry 2nd-behydroday_v2
Dragana densitometry 2nd-behydroday_v2Dragana densitometry 2nd-behydroday_v2
Dragana densitometry 2nd-behydroday_v2
 
IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...
IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...
IRJET- Design and Fabrication of Digital Fuel Meter with the Help of Ultrason...
 
Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro...
 Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro... Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro...
Download-manuals-surface water-manual-sw-volume3referencemanualhydro-meteoro...
 
Current meter, cup type
Current meter, cup typeCurrent meter, cup type
Current meter, cup type
 
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
 Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
Download-manuals-surface water-manual-sw-volume4fieldmanualhydrometryparti
 
Groundwater Level Measurment Overview
Groundwater Level Measurment OverviewGroundwater Level Measurment Overview
Groundwater Level Measurment Overview
 
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOBTECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
TECHNIQUES OF UNDERWATER STRUCTURE INSPECTION AND WHO TO CONTACT FOR THE JOB
 
DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...
DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...
DSD-INT 2015 - The river basin explorer – Marieke Fennema, Witteveen+Bos, Cla...
 
Workshop Results
Workshop  ResultsWorkshop  Results
Workshop Results
 
Velocity measurement using current meter
Velocity measurement using current meterVelocity measurement using current meter
Velocity measurement using current meter
 

Viewers also liked

Design concepts
Design conceptsDesign concepts
Design conceptsindiawrm
 
International protection rating
International protection ratingInternational protection rating
International protection ratingindiawrm
 
High availability
High availabilityHigh availability
High availabilityindiawrm
 
Dss planning final contract nov 15, 2008
Dss planning final contract nov 15, 2008Dss planning final contract nov 15, 2008
Dss planning final contract nov 15, 2008indiawrm
 
Gsm GPRS Specifications
Gsm GPRS SpecificationsGsm GPRS Specifications
Gsm GPRS Specificationsindiawrm
 
Management of Reservoirs of BBMB
Management of Reservoirs of BBMBManagement of Reservoirs of BBMB
Management of Reservoirs of BBMBindiawrm
 
Vsat Specifications
Vsat SpecificationsVsat Specifications
Vsat Specificationsindiawrm
 
Questionnaire network - wyniki ankiety POLSKA
Questionnaire network - wyniki ankiety POLSKAQuestionnaire network - wyniki ankiety POLSKA
Questionnaire network - wyniki ankiety POLSKAjanskwara
 
Requests For Proposals: Making RFPs Work for Nonprofits and Vendors
Requests For Proposals: Making RFPs Work for Nonprofits and VendorsRequests For Proposals: Making RFPs Work for Nonprofits and Vendors
Requests For Proposals: Making RFPs Work for Nonprofits and VendorsPeter Campbell
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor managementRaminder Pal Singh
 
7358948 questionnaire-mm
7358948 questionnaire-mm7358948 questionnaire-mm
7358948 questionnaire-mmsravankumaran
 
BABOK 2 Tasks & Techniques
BABOK 2 Tasks & TechniquesBABOK 2 Tasks & Techniques
BABOK 2 Tasks & TechniquesCBAP Master
 

Viewers also liked (12)

Design concepts
Design conceptsDesign concepts
Design concepts
 
International protection rating
International protection ratingInternational protection rating
International protection rating
 
High availability
High availabilityHigh availability
High availability
 
Dss planning final contract nov 15, 2008
Dss planning final contract nov 15, 2008Dss planning final contract nov 15, 2008
Dss planning final contract nov 15, 2008
 
Gsm GPRS Specifications
Gsm GPRS SpecificationsGsm GPRS Specifications
Gsm GPRS Specifications
 
Management of Reservoirs of BBMB
Management of Reservoirs of BBMBManagement of Reservoirs of BBMB
Management of Reservoirs of BBMB
 
Vsat Specifications
Vsat SpecificationsVsat Specifications
Vsat Specifications
 
Questionnaire network - wyniki ankiety POLSKA
Questionnaire network - wyniki ankiety POLSKAQuestionnaire network - wyniki ankiety POLSKA
Questionnaire network - wyniki ankiety POLSKA
 
Requests For Proposals: Making RFPs Work for Nonprofits and Vendors
Requests For Proposals: Making RFPs Work for Nonprofits and VendorsRequests For Proposals: Making RFPs Work for Nonprofits and Vendors
Requests For Proposals: Making RFPs Work for Nonprofits and Vendors
 
Outsourcing and Vendor management
Outsourcing and Vendor managementOutsourcing and Vendor management
Outsourcing and Vendor management
 
7358948 questionnaire-mm
7358948 questionnaire-mm7358948 questionnaire-mm
7358948 questionnaire-mm
 
BABOK 2 Tasks & Techniques
BABOK 2 Tasks & TechniquesBABOK 2 Tasks & Techniques
BABOK 2 Tasks & Techniques
 

Similar to Hydrologic Monitoring Network Questionnaire

Acoustic doppler current profiler
Acoustic doppler current profilerAcoustic doppler current profiler
Acoustic doppler current profilerhydrologyproject0
 
portable_flow_measurement-pr-en PES Scotland NIVUS
portable_flow_measurement-pr-en PES Scotland NIVUSportable_flow_measurement-pr-en PES Scotland NIVUS
portable_flow_measurement-pr-en PES Scotland NIVUSDavid White
 
Prototype SMS Based Fluid Parameter monitoring system.pptx
Prototype SMS Based Fluid Parameter monitoring system.pptxPrototype SMS Based Fluid Parameter monitoring system.pptx
Prototype SMS Based Fluid Parameter monitoring system.pptxLoisDavid2
 
iaetsd A novel approach towards automatic water conservation system
iaetsd A novel approach towards automatic water conservation systemiaetsd A novel approach towards automatic water conservation system
iaetsd A novel approach towards automatic water conservation systemIaetsd Iaetsd
 
Pipeline leak detection system
Pipeline leak detection systemPipeline leak detection system
Pipeline leak detection systemAbhijeet Malhotra
 
Underwater Sensor wireless Network
Underwater Sensor wireless NetworkUnderwater Sensor wireless Network
Underwater Sensor wireless NetworkSunilPoddar7
 
WATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSORWATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSORdeepa bhatia
 
Smart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdaptSmart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdaptSai Bhaskar Reddy Nakka
 
Underwater sensor network
Underwater sensor networkUnderwater sensor network
Underwater sensor networkfrestoadi
 
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...Deltares
 
The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...Paolo Losi
 
Directions OGC CHISP-1 Webinar Slides
Directions OGC CHISP-1 Webinar SlidesDirections OGC CHISP-1 Webinar Slides
Directions OGC CHISP-1 Webinar SlidesAlex Joseph
 
IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...
IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...
IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...IRJET Journal
 
RMC's-brochure.pdf
RMC's-brochure.pdfRMC's-brochure.pdf
RMC's-brochure.pdfIndihoboClub
 
Machine Learning Classification to predict water purity based on Viruses and ...
Machine Learning Classification to predict water purity based on Viruses and ...Machine Learning Classification to predict water purity based on Viruses and ...
Machine Learning Classification to predict water purity based on Viruses and ...CloudTechnologies
 
SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...
SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...
SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...ijiert bestjournal
 
110958678 ee-188-project
110958678 ee-188-project110958678 ee-188-project
110958678 ee-188-projecthomeworkping7
 

Similar to Hydrologic Monitoring Network Questionnaire (20)

Acoustic doppler current profiler
Acoustic doppler current profilerAcoustic doppler current profiler
Acoustic doppler current profiler
 
portable_flow_measurement-pr-en PES Scotland NIVUS
portable_flow_measurement-pr-en PES Scotland NIVUSportable_flow_measurement-pr-en PES Scotland NIVUS
portable_flow_measurement-pr-en PES Scotland NIVUS
 
Prototype SMS Based Fluid Parameter monitoring system.pptx
Prototype SMS Based Fluid Parameter monitoring system.pptxPrototype SMS Based Fluid Parameter monitoring system.pptx
Prototype SMS Based Fluid Parameter monitoring system.pptx
 
iaetsd A novel approach towards automatic water conservation system
iaetsd A novel approach towards automatic water conservation systemiaetsd A novel approach towards automatic water conservation system
iaetsd A novel approach towards automatic water conservation system
 
Pipeline leak detection system
Pipeline leak detection systemPipeline leak detection system
Pipeline leak detection system
 
Underwater Sensor wireless Network
Underwater Sensor wireless NetworkUnderwater Sensor wireless Network
Underwater Sensor wireless Network
 
WATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSORWATER LEVEL DETECTOR WITH TURBIDITY SENSOR
WATER LEVEL DETECTOR WITH TURBIDITY SENSOR
 
INCENDIA
INCENDIAINCENDIA
INCENDIA
 
Smart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdaptSmart technology for Water Use Efficiency ClimaAdapt
Smart technology for Water Use Efficiency ClimaAdapt
 
Underwater sensor network
Underwater sensor networkUnderwater sensor network
Underwater sensor network
 
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
DSD-INT 2020 Real Time Hydrologic, Hydraulic and Water Quality Forecasting in...
 
Final report
Final reportFinal report
Final report
 
The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...The role of open source technology based equipment in developing reliablereli...
The role of open source technology based equipment in developing reliablereli...
 
Directions OGC CHISP-1 Webinar Slides
Directions OGC CHISP-1 Webinar SlidesDirections OGC CHISP-1 Webinar Slides
Directions OGC CHISP-1 Webinar Slides
 
IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...
IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...
IRJET- Smart Water Monitoring System for Real-Time Water Quality and Usage Mo...
 
RMC's-brochure.pdf
RMC's-brochure.pdfRMC's-brochure.pdf
RMC's-brochure.pdf
 
Machine Learning Classification to predict water purity based on Viruses and ...
Machine Learning Classification to predict water purity based on Viruses and ...Machine Learning Classification to predict water purity based on Viruses and ...
Machine Learning Classification to predict water purity based on Viruses and ...
 
SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...
SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...
SENSOR NETWORK FOR REAL‐TIME MONITORING AND DETECTION CONTAMINATION IN DRINKI...
 
Water level sensors repot
Water level sensors repotWater level sensors repot
Water level sensors repot
 
110958678 ee-188-project
110958678 ee-188-project110958678 ee-188-project
110958678 ee-188-project
 

More from indiawrm

Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharmaindiawrm
 
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...indiawrm
 
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...indiawrm
 
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...indiawrm
 
Water Measurement Manual 2001
Water Measurement Manual 2001Water Measurement Manual 2001
Water Measurement Manual 2001indiawrm
 
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 indiawrm
 
Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003indiawrm
 
Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997indiawrm
 
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...indiawrm
 
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009indiawrm
 
Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...indiawrm
 
Cooperative Station Observations - 1989
Cooperative Station Observations - 1989Cooperative Station Observations - 1989
Cooperative Station Observations - 1989indiawrm
 
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008indiawrm
 
Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964indiawrm
 
Mixed phase Specifications
Mixed phase SpecificationsMixed phase Specifications
Mixed phase Specificationsindiawrm
 
Liquid Specifications
Liquid SpecificationsLiquid Specifications
Liquid Specificationsindiawrm
 
Acoustic doppler Specifications
Acoustic doppler SpecificationsAcoustic doppler Specifications
Acoustic doppler Specificationsindiawrm
 
Radar discharge Specifications
Radar discharge SpecificationsRadar discharge Specifications
Radar discharge Specificationsindiawrm
 
Submersible Pressure Transducer Specifications
Submersible Pressure Transducer SpecificationsSubmersible Pressure Transducer Specifications
Submersible Pressure Transducer Specificationsindiawrm
 
Shaft encoder Specifications
Shaft encoder SpecificationsShaft encoder Specifications
Shaft encoder Specificationsindiawrm
 

More from indiawrm (20)

Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
Geospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. SharmaGeospatial data &  Web Portals for IWRM:-NRSC Perspective  By Dr. J.R. Sharma
Geospatial data & Web Portals for IWRM:-NRSC Perspective By Dr. J.R. Sharma
 
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
Measurement and Computation of Streamflow: Volume 2 Computation of Discharge ...
 
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
Measurement and Computation of Streamflow: Volume 1 Measurement of Stage and ...
 
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
Guide to Hydrological Practices: Data Acquisition and Processing, Analysis, F...
 
Water Measurement Manual 2001
Water Measurement Manual 2001Water Measurement Manual 2001
Water Measurement Manual 2001
 
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003 Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
Hydrometry: Field Manual, Field Application of ADCP Volume-4 Part V 2003
 
Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003Hydrometry: Design Manual Volume-4 2003
Hydrometry: Design Manual Volume-4 2003
 
Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997Weather Station Siting and Installation Tools App Note Code 4-S 1997
Weather Station Siting and Installation Tools App Note Code 4-S 1997
 
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
Improving Hydrometric Systems: Institutional and Training Assessment for Hydr...
 
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
WMO Field Intercomparison of Rainfall Intensity Gauges WMO/TD-No.1504 2009
 
Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...Initial Guidance to Obtain Representative Meteorological Observations at Urba...
Initial Guidance to Obtain Representative Meteorological Observations at Urba...
 
Cooperative Station Observations - 1989
Cooperative Station Observations - 1989Cooperative Station Observations - 1989
Cooperative Station Observations - 1989
 
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
Guide to Meteorological Instruments and Methods of Observation-Wmo no8-2008
 
Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964Hydrological Data Management: Present State and Trends-Wmo no964
Hydrological Data Management: Present State and Trends-Wmo no964
 
Mixed phase Specifications
Mixed phase SpecificationsMixed phase Specifications
Mixed phase Specifications
 
Liquid Specifications
Liquid SpecificationsLiquid Specifications
Liquid Specifications
 
Acoustic doppler Specifications
Acoustic doppler SpecificationsAcoustic doppler Specifications
Acoustic doppler Specifications
 
Radar discharge Specifications
Radar discharge SpecificationsRadar discharge Specifications
Radar discharge Specifications
 
Submersible Pressure Transducer Specifications
Submersible Pressure Transducer SpecificationsSubmersible Pressure Transducer Specifications
Submersible Pressure Transducer Specifications
 
Shaft encoder Specifications
Shaft encoder SpecificationsShaft encoder Specifications
Shaft encoder Specifications
 

Recently uploaded

Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Salam Al-Karadaghi
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptxBasil Achie
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)Basil Achie
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Delhi Call girls
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls in Kolkata Vaishnavi 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls in Kolkata Vaishnavi 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Rohini Delhi 💯Call Us 🔝8264348440🔝
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
Exploring protein-protein interactions by Weak Affinity Chromatography (WAC) ...
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
Night 7k Call Girls Noida Sector 128 Call Me: 8448380779
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 

Hydrologic Monitoring Network Questionnaire

  • 1. V 1.0 Page 1 Hydrologic Monitoring System Assessment The purpose of the Hydrologic Monitoring System Assessment is to assist a World Bank borrower with the task of preparing technical specifications for tender. Common methods of hydrologic measurement are reviewed. The Assessment requires information that the borrower will provide which will result in developing the overall design of the hydrological information system. A key outcome of this Assessment will be clear, concise specifications which will result in more competitive and cost effective bids. This exercise will also prepare the borrower for the eventual implementation of a highly sustainable hydrologic monitoring system. Based on the information you provide, a World Bank consultant can more efficiently assist you in defining project needs and help assemble the most appropriate specifications.
  • 2. V 1.0 Page 2 Introduction Hydrologic Monitoring Systems of HP 2 generally have the following components:  Data Collection Platform  Data Communications (Radio, Cable, Antenna)  Equipment Enclosures  Solar Panels  Solar Charger  Grounding System  Sensors  Data Center for: o Automatic reception of Data Communication, quality control, and remote station network management o Data storage o Visualization (Data presented on maps, graphs, tables) o Decision Support  Alert and alarms based on evaluation of incoming data  Forecast models  Analytical models This Questionnaire will provide assistance in assessing the requirements of the respective hydrologic information system. The scale and scope of the hydrologic information system will be much clearly understood. This will result in a better overall understanding of the project and prepare consultants for possible field Missions or to otherwise help in the preparation/review of specifications.
  • 3. V 1.0 Page 3 Goal of Hydrologic Measurement System State the goal of the hydrologic measurement system. By stating the goal, the measurement system will constitute objectives designed to meet the goal of the project. Goal of the Hydrologic measurement: Explain the use of the data and how automated data collection, and real-time telemetry will be used. This should include discussion of public safety, protect of property, as well as industrial capacity.
  • 4. V 1.0 Page 4 Data Collection Platforms Data Collection Platforms (DCP) are systems that collect and log (store) data automatically. A DCP is synonymous with a Data Logger. A Remote Terminal Unit (RTU) is device that is generally used with Supervisory Control and Data Acquisition (SCADA), whereby the RTU is used to control and/or supervise a remote device. Data Acquisition System (DAS) is generally synonymous with a DCP, where by sensors are monitored and stored. For most hydrologic monitoring systems a simple DCP is sufficient, as DCPs offer not only data collection from a wide range of sensors, but also interfaces to radio systems for data communication. Data communication will be addressed later in the Assessment. Please define the general measurement that will be made and the associated time interval of measurement as well as interval of data transmission.
  • 5. V 1.0 Page 5 DCPs can come with displays, and may also be specified without displays. Displays can be quite helpful for the technician, or other interested entity in examining data on-site. Would you prefer a display on the DCP? DCPs store can store data in addition to transmitting the data in real-time. It is suggested that the data loggers have enough memory to store a year’s worth of data. It is also suggested that the data be stored in non-volatile memory so that in the event there is a power outage, the stored data will be preserved. Are there other capabilities that are required from the DCP?
  • 6. V 1.0 Page 6 Sensors Hydrologic data collection systems usually involve measurements of discharge, precipitation, and meteorological state parameters (temperature, relative humidity, wind speed, wind direction, atmospheric pressure, solar radiation), as well as evaporation/evapotranspiration. Automatic measurements of these parameters are described below: Discharge: Discharge is generally derived by establishing a stage-discharge relationship, whereby water level is measured a various stages and compared to manual discharge measurements at each of these stages. The result is a rating curve, whereby the water level can be measured and referenced to the corresponding discharge. A rating table requires a continuous effort to maintain, though the maintenance of the stage-discharge relationship is extremely simple if the channel is stable. Discharge measurements at stable cross-sections can take place every six to eight weeks. There should be an effort to perform discharge measurements during peak flows. The reason why network operators prefer measuring stage and then deriving discharge though a stage-discharge relationship, is because the stage sensors are considerably less expensive that just measuring stage (water level). There is a strong desire by many operators to use non-contact methods of measuring water level, which is advantageous if there are flood flows that can carry debris that can damage expensive instruments that are in the water. Alternatively, if there is the consideration of backwater effects. Backwater effects are conditions whereby a downstream condition causes the water to back-up to the stage measurement site, thus making it impossible to derive a stage-discharge relationship. In these cases, the use of an Acoustic Doppler Current Profiler (ADCP) is the only solution that can be applied. The ADCP must be placed in the water (contact sensor), making it subject to damage during flood flows that carry debris in the water. ADCP’s can range from $7,000 - $18,000 USD, so the use of these devices should be judicious. Prior to determining the discharge measurement method, the operator should understand the limitations of contact sensors and the threat to these sensors from debris being carried by flood waters. The operator or an agent of the operator should perform a survey of all discharge sites so that the correct technology can be recommended. Stream Gauging Measurements: Stream gauging measurements are made in order to develop a stage-discharge relationship. The stream gauging measurements can be made as follows:  Cableway Measurement  Bridge Measurement  Boat Measurement
  • 7. V 1.0 Page 7  Remote control boat (w/ADCP)  Wading The different methods of measurement allow for measurement in different cross-sections. Cableway Measurements: Cableway measurements require a steel cableway to be installed which will span the river cross-section. Historically, hydrographers (people who make stream gauging measurements) would climb into a cable car and make measurements from the cable car which moves from one bank to the opposite bank. There have been significant advances in this area, with the automatic cableway systems. The automatic cableway systems allow the hydrographer to stay on the cross-section bank and remotely control a device which travels across the cableway. ADCPs and typical current meters can be used with the automatic cableway systems. These types of systems are highly recommended over the legacy cableway and cable car system. This is a good method of measurement in high velocity water. Bridge Measurement: Bridge measurements can utilize either ADCPs or typical current meters. Bridge measurements are very popular and are safer than making measurements from a cableway, boat, or wading. Unfortunately, bridges are not available at all cross-sections. And although bridge measurements may be somewhat safer than other measurements, and more cost effective, there is danger in making bridge measurements from vehicle traffic on the bridge. This is a good method of measurement in high velocity water. Boat Measurement: Boat measurements can utilize either ADCP or typical current meters. The boat is used with a tag line that is temporarily placed across the cross-section. The tag line helps the hydrographer to determine measurement points and keeps the boat tethered to the cross-section being measured. Boat measurements do not require the use of a cableway, which saves the initial cost of the cableway. However, the measurements can only be made from the boat in lower velocity water. Remote Control Boat Measurement: Remote control boat measurements are usually restricted to use with the ADCP. The ADCP is placed on a small boat and the boat is remotely controlled to make the measurement across the cross-section. This method is only suggested on smooth, low velocity water. In routine practice in open channels, the boat measurement might be most suitable for canals. Wading: In conditions of low flow, discharge can be measured by having the hydrographer wade across the channel. A rule of thumb for the upper limit where wading measurements can be made is given by the product of the depth of water and the velocity of water. If the product of the water velocity in ft per second and the depth of water in ft is great than 10, measurement of discharge by wading the river should be discouraged.
  • 8. V 1.0 Page 8 Water Level: The water level measurement is necessary if the desire is to use the stage- discharge relationship. The stage-discharge method of determining water level is considered to be more cost effective than using ADCPs for continuous discharge measurements. The most popular water level sensors consist of the following:  Shaft encoder with pulley, tape and float  Bubbler system with non-submersible pressure transducer  Radar water level measurement  Ultrasonic water level measurement  Submersible pressure transducer The proper solution for the operator can only be suggested once a thorough survey of the sites has been completed. The Agency should have a clear idea where the measurement points should be along a given river reach and not leave this up to the supplier. Precipitation: Precipitation measurements are usually made with either a storage gauge or a tipping bucket rain gauge. The tipping bucket rain gauges have been generally preferred because of the minimal maintenance requirements. When measuring precipitation, there are two generally competing considerations that must be understood. These considerations consist of the desire to measure precipitation rate versus total precipitation. It is very difficult to obtain instantaneous precipitation rates with a tipping bucket rain gauge. As well, the tipping bucket rain gauge cannot accurately resolve cumulative precipitation unless the results are corrected by accounting for the precipitation rate. These inaccuracies are due to the tipping bucket method of the buckets tipping during rainfall. Fortunately, most hydrology projects require accurate measurement of precipitation accumulation over 15 minutes to an hour. The need for rainfall intensities may only exist with an entity such as IMD. In most hydrologic measurement projects a high quality tipping bucket with a siphon arrangement or software applied corrections to the rainfall rates will produce reasonable cumulative precipitation values. Upon filling out the station survey table, a proper solution for precipitation will be provided. Meteorological State Parameters and Climate Stations: Meteorological state parameters and measurements are one of the most straightforward measurements in a hydrologic measurement network. The major consideration for these types of stations is exposure. Obstructions and anthropogenic sources of measurement influences should be eliminated. Sites for Climate Stations especially should be very carefully examined prior to selecting the site for consideration for instrumentation. Each meteorological sensor has exposure requirements that
  • 9. V 1.0 Page 9 are developed in the World Meteorological Organization publication WMO- No-8, “Guide to Meteorological Instruments and Methods of Observations”, most recently published in 2008. In order for your hydrologic network to be properly evaluated the operator should provide information in table format of the following: Table 1: Discharge sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Width of channel at peak and low flow  Maximum and minimum water level height from the bottom of the channel  Maximum velocity of water  Backwater effects  Natural or lined channel (lined, i.e. canal)  Closest bend in the channel upstream and downstream of measurement site  Knowledge or evidence of debris during high flow (high, moderate, low, none)  Closest bridge upstream or downstream Table 2: Reservoir elevation sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Range of reservoir elevations Table 3: Precipitation sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  The height and distance of the closest object to the precise precipitation gauge site. Anything that is greater in height than twice the distance to the proposed gauge site should be noted. Table 4: Climate station or all weather station sites
  • 10. V 1.0 Page 10  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Distance and height of closest buildings to the site  Available area for site (i.e. 400 m2) Table 5: Snow depth and snow pack water content sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Maximum depth of snow  Maximum snow pack water content Table 6: Cooperative sites, where you may desire data or you may be willing to add sensors to the sites  Name of site  Latitude of Site in decimal degrees to the 4th decimal point  Longitude of the site in decimal degrees to the 4th decimal point  Elevation of the Site  Cooperating Agency (i.e. IMD, CWC, SASE) Schematics and Diagrams  Prepare a schematic of your river system and include the reservoirs and proposed gauging stations in this schematic.  Prepare a map in Google Earth that identifies all of your measurement stations. Examine these points to assure the coordinates are reasonably correct. Export the file as a KMZ.
  • 11. V 1.0 Page 11 Do you need assistance designing a hydrologic monitoring network, or have you already determined all of your sites and the parameters that you would like to measure?
  • 12. V 1.0 Page 12 Data Communication An important capability of any modernized hydrologic monitoring network is the real-time relay of measurements from the field to the operations center where the data can be made available to support decisions. What is your preferred method of data communication? If you have no preference a suitable method of data communication will be recommended based on the requirements of the information being collected as well as radio propagation considerations. Many DCPs can accommodate multiple data communication links. This is quite useful in the event a data communication path fails. Two communication paths (dual-path) data is becoming more common for information systems that need data reliably and promptly. How critical is your information. How long can you be without data in the most critical situation? Would you like to employ dual-path communication?
  • 13. V 1.0 Page 13 Warranty Period Warranty period is a period where if the equipment fails due to manufacturer defect, the unit is replaced at no charge to the agency. However, if the equipment fails by any other means, such as vandalism, or a force majeure, then the responsibility for replacement will be up to the agency, though contractor usually replaces the equipment under the maintenance contract that is tied to the warranty period. Some agencies would like to include all equipment failures, including vandalism or force majeure in the warranty period. It is not recommended that vandalism or force majeure be included in the warranty period, as if the supplier is expected to take on all risk, the agency will certainly overpay for the contract. How many year(s) of warranty are desired?
  • 14. V 1.0 Page 14 Maintenance Period The maintenance period follows the warranty period. During the maintenance period, all equipment failures are generally the responsibility of the agency, as the supplier performs the field work necessary to restore the station. Again, as in the Warranty Period, it is not advisable to include equipment losses and replacement as a requirement of the supplier. The supplier will take the worst case scenario, and need to add to the contract in a way where the contractor will not assume any risk, thus over pricing the offer. Hardware costs during the maintenance period can be offset with a large supply of spare equipment. During the maintenance period, one can assume that 10% of the equipment will need to be replaced annually. If high quality equipment is specified, this can reduce down to less than 5%. It is important that station security be well thought out during the specification and tendering process, as this will certainly save resources during the warranty and maintenance periods. Maintenance contracts should require regular reporting which provides a summary of all maintenance activities. These activities should include the following:  Emergency Maintenance activities, including dates, time, action performed, and number of hours required to resolve the situation  Preventative maintenance activities, including dates, time, actions performed, and number of hours required per site  Status of all hardware components, whether in operation or held in spare. This report should provide the operational readiness of all hardware components, and should identify where all equipment is located, whether it be in the field, in the warehouse, or back at the manufacturers facility for repair or calibration. Equipment identification should be referenced my model and serial number. What length of maintenance period is required? Some entities have specified up to 8 years for the maintenance period.
  • 15. V 1.0 Page 15 Do you have field offices that the maintenance crew can share with your staff? Having the maintenance crew alongside your staff is a good way to learn and manage the maintenance contract. Do you intend to one day having your staff maintain this equipment?
  • 16. V 1.0 Page 16 If you do not intent to maintain your equipment one day, then it is necessary that the outsourced group be subject to a Quality Assurance Program. Quality Assurance means that the outsourced group performing the maintenance will need to be audited at regular intervals to make certain the equipment being operated is within specification, and to also assure the data is of high quality. The Quality Assurance program can also be outsourced or performed in house. Would you prefer to outsource the Quality Assurance program or have it done in house?
  • 17. V 1.0 Page 17 Data Center The hydrologic monitoring network will transmit data to the Data Center in real-time. The Data Center will have the necessary data receivers and a computer system to act as the first level repository of the information. The computer will also be used to validate information and track erroneous measurements, being used to direct the maintenance staff to tend to station outages. The space for the Data Center is required to contain the necessary computer systems under proper environmental conditions. It is suggested that the space for the Data Center be provided with easy access to external data communication facilities, such as radio antenna. Components of a Data Center consist of the following:  A computer for the automatic reception of Data Communication, quality control, and remote station network management  A computer for Data storage  A computer for Data Visualization (Data presented on maps, graphs, tables)  A computer for hosting Web services  A computer for decision Support o Alert and alarms based on evaluation of incoming data o Forecast models o Analytical models The various components can share computers, though the use of multiple computers will help in sharing the load. These computers are usually “Server” grade computers. By no means should a “Server” grade computer be used by the office staff for typical office productivity tasks, such as word processing, browsing the Internet, CAD applications, or other activities normally reserved for a personal work station. A Data Center is normally equipped with the following:  Computer Servers  Computer Workstations with Monitors (Multiple monitors are very useful)  Software (Operating System, Data base, Data Collection, Decision Support, Visualization, Web Services, etc.)  Uninterruptable Power Supply  Backup Power (for outages greater than 30 minutes)  Computer furniture (equipment racks, desks, bookshelves, etc.)
  • 18. V 1.0 Page 18 Do you have a facility that can be used as the Data Center? This area will be modernized through the Tender process to accept the necessary equipment. Describe products or functions that you would like to have as part of your Data Center.