PRESENTATION TO
DIRECTOR GENERAL ON-FARM WATER MANAGEMENT PUNJAB
NATIONAL PROGRAM FOR IMPROVEMENT OF WATERCOURSES – PHASE-II
(ME&IE COMPONENT)
15TH JUNE 2021
Federal Project Management Unit (FPMU)
Ministry of National Food Security & Research
The Project
3
• National Program for Improvement of Watercourses in Pakistan
Phase-II (NPIWC-II) was approved by ECNEC on 29th August 2019
• Capital cost of the project is Rs. 154.542 Billion
• Administrative Approval issued on 1st October 2019
• Implementation period: July 2019 – June 2024
• Major activities includes
o Social Mobilization through capacity building of Water User
Associations (WUAs)/FOs
o Improvement of Watercourse (Punjab – Total 10,000)
 Improvement/lining of watercourses/New (2,500)
 Reconstruction of more than 20 years old
watercourses/Additional Lining upto 50% of already
improved watercourses (7,500)
o Construction of Water Storage Tanks (3,000)
o Provision of Laser Land Levelers (9,500)
PUNJAB PROJECT TARGETS
Intervention Punjab
Water Course for Improvement 10,000
Water Storage Tanks 3000
Laser Land Leveling Units 9500
Punjab
COMPONENTS OF THE PROJECT
Procedure for Execution of Project Activities
5
• Project activities/interventions to be identified by the On-farm
Water Management Department of Zone
• Organization of Water User Associations (WUAs) in the
identified Project Intervention area
• Basic design and cost estimates of the interventions to be
prepared by OFWM
• Project Consultant (Technical) to certify, approve design and
cost estimates
• Opening of bank account by the Water User Associations
(WUAs)
• Technical Sanction of the intervention to be issued by OFWM
• Execution of Project Intervention activities
• Monitoring of Project Interventions during execution
The Consultants
6
• G3 Engineering Consultants (Pvt.) Ltd. – Lead Consultants
o JV Consortium
 Ease-Pak Engineering Services (Pvt.) Ltd.
 Center for Social Research and Development (CSRD)
 ADA Inc. (International Canadian Firm)
 S&S Associates
• G3 Engineering Consultants established in 2006
o Member Pakistan Engineering Council
o ISO Certified – ISO 9001:2015
o Member Lahore Chamber of Commerce & Industry
• Work Experience (Design & Consultancy Services)
o 188 Projects completed
o 28 Projects under implementation: Rs. 642 Billion
Consultants Establishment
7
• Project Offices Established
o National Project Office Islamabad
- Dr. Muhammad Abdul Quddus: Team Leader
o Zonal Project Offices
 Punjab
- Mr. Yousaf Bhatti: Deputy Team Leader
 Khyber Pakhtunkhwa
- Dr. Humayun Khan: Deputy Team Leader
 Balochistan
- Mr. Rizwan Ahmed: Deputy Team Leader
 Islamabad Capital Territory (ICT)
- Dr. Sarwar Zahid: Deputy Team Leader
Punjab Zone
First Floor, Orchard Heights, Bahria Orchard, 18 Km Raiwind Road,
Lahore.
G3 Project Office – Punjab Zone
Status of PunjabZone, ME&IE Consultantsas of 14, June 2021
9
No. Activities Current Status
1 Status of Punjab Zonal Office Functional
2 Status of Field Office in Multan Under Process
3 Mobilization of Field Teams All Field Teams are Mobilized
4
Data collection from OFWM Department/NWMC
for Baseline survey/regular monitoring
Being Collected as per need
5
Training Session of Field Staff and Key Staff on
Manual of Monitoring Tools (MTs) and Android
Application
Completed
6
Training on Measurement of Water Flow (Pygmy
Current Meter)
In Progress
(Training session is going on today)
7
Determination of Sample Size on District / Tehsil
Level with assistance of DDA and ADA OFWM
Determined for the year 2019-20
and 2020-21
8 Baseline Survey Field Visits
In Progress
(Teams are ready to visit}
Team-1 Team-2 Team-3
Chiniot Bhakar Bahawalnagar
Faisalabad Gujranwala Bahawalpur
Jhang Gujrat Dera Ghazi Khan
Kasur Hafizabad Khanewal
Lahore Khushab Layyah
NankanaSahib MandiBahauddin Lodhran
Okara Mianwali Multan
Pakpattan Narowal Muzaffargarh
Sahiwal Sargodha Rahim Yar Khan
Sheikhupura Sialkot Rajanpur
Toba Tek Singh Vehari
FIELD TEAMS – PUNJAB
Social &Gender
Specialist
Agricultural
Economist
ICT/Technology
Specialist
Non-Technical
Support Staff
• Manager Admin
& Accounts
• Deputy Manager
Admin
Field Team-1
Zonal Office Lahore
Field Team In-charge
Field Team-3
Field Office Multan
Field Team In-charge
Field Team-2
Camp Station Sargodha
Field Team In-charge
Supporting Staff
•Computer Operator
•Office Assist./Clerk (2)
•Dispatch
Rider/Photocopier
•Peon(3)
•Guard(2)
•Sweeper (2)
•Cook (2)
•Driver (4)
Field
Officer-1
Field
Officer-2
Field
Officer-3
Field
Officer-4
Field
Officer-5
Field
Officer-6
Team Leader
Monitoring & Evaluation Specialist
(National Office)
Deputy Team Leader
Monitoring & Evaluation Specialist
(Punjab-Zone)
Irrigation
Agronomist
Technical Support
Staff
• Data Analyst &
Supervisor
Available as per their requirement (Man months)
TEAM COMPOSITION in PUNJAB ZONE MEI&IE CONSULTANTS
Monitoring, Evaluation & Impact Evaluation
12
ME&IE CONSULTANTS’ SCOPE AND SERVICES
10
 Develop a website containing information on facilities and services, applications,
procedures, watercourses, water storage tanks and laser Levelers database, etc.
(while the project staff will maintain the website).
 Provide technical support for the development of a custom-designed mobile
application (Android Based) to capture on-site project progress and geo-tagged
photos. It should be synchronized with the central MIS/GIS database and application
for instant reporting and feedback to the management. The said requirement is
based on the following functional features:
 Development of a GIS database with all spatial layers related to activities being
undertaken under the project
 Carry out the impact evaluation of the project intervention on the economy and
stakeholders through baseline and end-line, assessing the water saving per annum on
watercourses, water storage tanks and field levels and improvement in water
availability due to the provision of improved conveyance system.
 Economic impact of project interventions.
 Assessing the economic benefits to the agriculture in terms of changes in yields,
irrigated area, cropping pattern, cropping intensity, farm income and employment in
command area of watercourses and water storage tanks.
ME&IE CONSULTANTS’ SCOPE AND SERVICES
Progress Reporting
14
15
Develop NPIWC-II Project Website
• After thorough consultation with stakeholders, the Project
Website has been designed & developed.
• On the approval from NPC office, the National Program official
website will be live on the registered domain (https://npiw2.org)
and will be completely functional.
• The following link for the demo version of the website:
https://web.g3jv.com/
16
• Studied PC-1 and review of relevant literature
• Meetings with management of National Program for
Improvement of Watercourses – Phase-II and concerned zonal
authorities
• Preparation of System Specification Requirements (SRS) and
Functional Specification Requirements (FRS) reports
• Designing of system architecture
• Presentation to the National Project Management Unit
• Development of customized Android based data collection
application
• Development of GIS database
• Development of Integrated GIS based MIS system/Real Time
web-based Dashboard
Development of Web-based GIS integrated MIS
Contd…
17
• Finalization of required outputs of the Dashboard including:
o Status of implementation of each intervention along with
photographs
o GIS representing Dashboard
o Intervention wise analytical infographic dashboards
indicating details of intervention:
 Overall National status
 Zonal status
 Division wise status
 District wise Status
 Tehsil wise status
 Union Council wise status
 Village wise status
 Canal/Branch/Distributary/Minor wise status
Development of Web-based GIS integrated MIS
Contd…
…Contd
18
• Identification of gaps/bottlenecks in execution of activities
• Alert Notification System (SMS, email) for management:
o Monthly targets and achievement alerts
o Execution stuck-ups alerts
o Customized alerts
• Identification of reports to be generated by the client
• Preparation/approval of output templates
• User Manuals of MIS system
• Capacity building of concerned organizations
o Designing of the training module
o Development of reading material
o Nomination of District wise participants for training
o Finalization/approval of District wise training schedule
o Imparting of training
o Evaluation of training program/report writing
Development of Web-based GIS integrated MIS
…Contd
19
Baseline Survey
• Questionnaire for Baseline data developed and discussed with all
stakeholders
• Questionnaires revised/updated based on feedback of the
stakeholders
• Pre-testing of the questionnaire
• Conversion/development of questionnaire for Android based
mobile application
• Draft manual for Baseline Survey
• Tabulation plan for Baseline Survey
• Training of field teams have been carried out for utilization of
Android based tools
Monitoring, Evaluation & Impact Evaluation
Baseline, Midline and End-line Surveys
20
The following information will be collected in Project Interventions area through
• BASELINE & ENDLINE
 A questionnaire has been developed for collection of baseline/end-line
information for following:
o Area under cultivation
o Cropping pattern
o Cropping intensity
o Yield per acre/hectare
o Water Flow (Head to Tail)
o No of persons employed per acre/hectare
o Environment/Plantation
o Socio economic information
• END-LINE
 In addition to above information, the following will be part of End-line.
o Overall/zone wise Physical & financial achievements against PC-1 targets
o Analysis of planned cost, scope of work and implementation period with
actuals Contd…
Baseline, Midline and End-line Surveys
21
• MIDLINE EVALUATION
o Physical & financial achievements against targets
o Comparison of actual expenditure, scope of work and
period of implementation with the technical sanctions of
the interventions
o Zone wise comparison of Project Activities against targets
…Contd
Contd…
22
• Monitoring of interventions
o Meeting held with the following stakeholders:
 Director General OFWM – Govt of Punjab
o The agenda of the kick-off meetings with Zonal DGs/Directors
was as follows:
 Introduction of the Monitoring & Evaluation team with
the respective stakeholders
 Discussed the physical targets as agreed with the client
and the strategy to achieve the targets
 Nomination of focal persons for coordination and
communication of information/data
Progress Reporting
23
• Selection of interventions activities on selective basis
• Collection of data of the intervention sites
o Capital cost of the intervention
o O&M cost of the intervention
o Estimation of taxes and duties
o Output of the area served with intervention
o Border prices of the output
o Economic analysis based on opportunity cost of capital to the
economy
 Net present value
 Benefit cost ratio
 Internal economic rate of return
Economic impact of the project interventions
Develop monitoring strategy, framework and Result-Based
Monitoring (RBM) indicators
24
• Monitoring Strategy
o Information relating to intervention to be:
 Basic certified information to be provided by Technical
Consultant
 Approved by Onfarm Water Management Directorate
(OFWM)
 Share information with the Monitoring & Evaluation
Consultant
o Establishment of National Monitoring Control Room
 Develop Management Information System (MIS)
 Develop Android Application for collection of real-time
data on interventions
 Collection of data including site photographs &
coordinates
o Physical monitoring of intervention on sampling basis
o Analysis & reports generation
Province / Units Population / Units Sample Units
Water Course for
Improvement
10,000
264
Say 300 (3%)
Water Storage Tank 3000 60 (2%)
Laser Land Leveler 9500 300 (3.2%)
Target Units &Sample Size of Different Intervention in Punjab Zone
Sr.
No
Field Team
Area of Sub
zone
Target units
of
Watercourse
1st stage sample
size of Water
Courses for
Monitoring
2nd stage Sample Size of
Beneficiaries of Water
Courses for Baseline
Area to be visited during
Baseline Survey(*)
District Tehsil
1
Sub
Zone-1
(Lahore
Field
Office)
Team-1
Lahore
Faisalabad
Sahiwal
Divisions
523 13 78
Kasur Kasur
Chunian
2
Sahiwal Chichawatni
Sahiwal
3
Okara Okara
Depalpur
Renala Khurd
5
Sub
Zone-2
(
Camp
Sargodha
Office)
Team-2
Gujranwala
Sargodha
Divisions
421 12 72
Gujranwala Kamoke
6
Gujranwala
Wazirabad
M.B Din M.B Din
7
Malikwal
Phalia
Hafizabad Pindi Bhaattian
9
Sub
Zone-3
(Multan
Field
Office)
Team-3
Multan.
Bahawalpur
D.G.Khan
Divisions
793 17
102
Muzaffarga
rh
M.Garh
Kot Addu
10
Khanewal Khanewal
Kabirwala
Mian Channu
Multan Multan
11 Jalalpur pirwala
Shujaabad
Total 1737 42 252
Sample Size of Water Courses in Punjab Zone(NPIWC -2)
INDICATORS FOR BASELINE SURVEY
27
• Increase in area under cultivation
• Agriculture productivity
• Change in cropping pattern
• Increase in cropping intensity
• Increase in yield per Acre
• Level of water usage per acre
• Waterlogging and salinity control
• Data of tube wells in Barani areas
• Plantation
• Increase in employment opportunities
• Reduction in poverty
• Comprehensive questionnaires/ tools were designed to reflect the
certain indicators of all other aspects of field activities.
• Questionnaire was pre tested in the field and were further refined.
• These were converted into android based system on tab to collect
data for field.
• This will directly transmit the data from the field to the Dashboard
without any delay for further processing.
Questionnaires FOR BASELINE SURVEY
Click here to open Questionnaires
for Baseline Survey
ISSUES PROPOSED WAY FORWARD
SUGGESTIO
NS BY
CLIENT?
 District wise data of
each intervention for
the year 2021-22
required from OFWM
Punjab and NWMC .
1. District wise sample to be
drawn from target population
for:
• Baseline Survey – II 2021-22
• Monitoring activities for
2021-22
ISSUES AND WAY FORWARD
30
“An Intervention can not be called
Intervention if it is not progress monitored.
An Intervention with out progress
monitoring is just an activity.”
WE BELIEVE
Thanks for watching
Aggregate Server
DEVELOPMENT OF ANDROID BASED APPLICATION
INFORMATION MODEL
Goal
PDO
1
PDO
2
PDO
3
PDO
4
Output
1.1
Output
1.2...
Output
2.1
Output
2.2...
Output
3.1...
Output
4.1...
Impact
Goal
PDO
Output
Activities
Activity
Activity
Activity
Activity
Activity
Activity
Activity
Activity
Activity
Activity
Activity
Activity
- Expenditures
-Activity status
- Expenditures
-Activity status
Quarterly
Quarterly
Monthly
Monthly
Annually
Annually
Data is aggregated at
each level
Monitoring
Monitoring
Planning
Planning
Immediate
Outcome
Intermediate
Outcome
Ultimate
Outcome
Evaluation
Evaluation
-Quantitative indicators
- Qualitative indicators
- Status of Output
- Out put Indicators
- Narrative reports
DEVELOPMENT OF MIS/GIS SYSTEM
DATA FLOW DIAGRAM
DEVELOPMENT OF MIS/GIS SYSTEM
DEVELOPMENT OF MIS/GIS SYSTEM
GIS Progress Analytical Dashboard Template
DEVELOPMENT OF MIS/GIS SYSTEM
DEVELOPMENT OF MIS/GIS SYSTEM
Query based Statistical Analysis GIS dashboard Template
DEVELOPMENT OF MIS/GIS SYSTEM
DEVELOPMENT OF MIS/GIS SYSTEM
Progress Analytical Dashboard Template
DEVELOPMENT OF MIS/GIS SYSTEM

More Related Content

Similar to Draft Baseline Survey Status (Updated Punjab).pptx

Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...
Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...
Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...'Denish Makvana'
 
Capacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptx
Capacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptxCapacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptx
Capacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptxMinistry of Water and Power
 
Улаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 englishУлаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 englishBayar Tsend
 
CountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATES
CountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATESCountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATES
CountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATESFAO
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)malapatansarangani
 
Agri Assist CPP.pdf
Agri Assist CPP.pdfAgri Assist CPP.pdf
Agri Assist CPP.pdfOdbc1
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...India Water Portal
 
Punjab WATSAN Academy
Punjab WATSAN AcademyPunjab WATSAN Academy
Punjab WATSAN AcademyAbid Hussainy
 
Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaBhavya Patel
 
FAO NextGen Policy Brief Webinar_Christen.pptx
FAO NextGen Policy Brief Webinar_Christen.pptxFAO NextGen Policy Brief Webinar_Christen.pptx
FAO NextGen Policy Brief Webinar_Christen.pptxevanwchristen
 
Usaid project presentation
Usaid project presentationUsaid project presentation
Usaid project presentationSaif Qazzaz
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014hydrologywebsite1
 
Bangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptxBangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptxacumenarchitect
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface waterhydrologywebsite1
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final reporthydrologywebsite1
 
Institutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeriaInstitutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeriaDogara Bashir
 
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGEDESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGEIRJET Journal
 
Torabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_village
Torabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_villageTorabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_village
Torabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_villagegroundwatercop
 

Similar to Draft Baseline Survey Status (Updated Punjab).pptx (20)

Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...
Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...
Rural Infrastructure Development Projects Under MGNREGA, Clean Village : A St...
 
Capacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptx
Capacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptxCapacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptx
Capacity Building on Water Quality Monitoring and SDG Final 4-7-2022.pptx
 
Улаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 englishУлаанбаатар 2014 Ubupi (jfpr project) 1 english
Улаанбаатар 2014 Ubupi (jfpr project) 1 english
 
CountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATES
CountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATESCountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATES
CountrySTAT REGIONAL BASIC ADMINISTRATOR TRAINING for GCC MEMBER STATES
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)
 
Agri Assist CPP.pdf
Agri Assist CPP.pdfAgri Assist CPP.pdf
Agri Assist CPP.pdf
 
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
Enhancing the Implementation of Swachh Bharat Mission (Gramin) in Andhra Prad...
 
Perez adventures in cooperative conservation
Perez   adventures in cooperative conservationPerez   adventures in cooperative conservation
Perez adventures in cooperative conservation
 
Punjab WATSAN Academy
Punjab WATSAN AcademyPunjab WATSAN Academy
Punjab WATSAN Academy
 
Rmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavyaRmtsp 2721303 170900713008_bhavya
Rmtsp 2721303 170900713008_bhavya
 
FAO NextGen Policy Brief Webinar_Christen.pptx
FAO NextGen Policy Brief Webinar_Christen.pptxFAO NextGen Policy Brief Webinar_Christen.pptx
FAO NextGen Policy Brief Webinar_Christen.pptx
 
Usaid project presentation
Usaid project presentationUsaid project presentation
Usaid project presentation
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Bangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptxBangladesh Red Cresent Society presentation.pptx
Bangladesh Red Cresent Society presentation.pptx
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
 
Institutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeriaInstitutional arrangements for implementation of rwss program in nigeria
Institutional arrangements for implementation of rwss program in nigeria
 
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGEDESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
DESIGN OF SOFTWARE BASED WATER DISTRIBUTION SYSTEM FOR A VILLAGE
 
Torabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_village
Torabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_villageTorabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_village
Torabi s menarid-iran-icarda_ex-ante_assessment-kamkouyeh_village
 

Recently uploaded

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Draft Baseline Survey Status (Updated Punjab).pptx

  • 1.
  • 2. PRESENTATION TO DIRECTOR GENERAL ON-FARM WATER MANAGEMENT PUNJAB NATIONAL PROGRAM FOR IMPROVEMENT OF WATERCOURSES – PHASE-II (ME&IE COMPONENT) 15TH JUNE 2021 Federal Project Management Unit (FPMU) Ministry of National Food Security & Research
  • 3. The Project 3 • National Program for Improvement of Watercourses in Pakistan Phase-II (NPIWC-II) was approved by ECNEC on 29th August 2019 • Capital cost of the project is Rs. 154.542 Billion • Administrative Approval issued on 1st October 2019 • Implementation period: July 2019 – June 2024 • Major activities includes o Social Mobilization through capacity building of Water User Associations (WUAs)/FOs o Improvement of Watercourse (Punjab – Total 10,000)  Improvement/lining of watercourses/New (2,500)  Reconstruction of more than 20 years old watercourses/Additional Lining upto 50% of already improved watercourses (7,500) o Construction of Water Storage Tanks (3,000) o Provision of Laser Land Levelers (9,500)
  • 4. PUNJAB PROJECT TARGETS Intervention Punjab Water Course for Improvement 10,000 Water Storage Tanks 3000 Laser Land Leveling Units 9500 Punjab COMPONENTS OF THE PROJECT
  • 5. Procedure for Execution of Project Activities 5 • Project activities/interventions to be identified by the On-farm Water Management Department of Zone • Organization of Water User Associations (WUAs) in the identified Project Intervention area • Basic design and cost estimates of the interventions to be prepared by OFWM • Project Consultant (Technical) to certify, approve design and cost estimates • Opening of bank account by the Water User Associations (WUAs) • Technical Sanction of the intervention to be issued by OFWM • Execution of Project Intervention activities • Monitoring of Project Interventions during execution
  • 6. The Consultants 6 • G3 Engineering Consultants (Pvt.) Ltd. – Lead Consultants o JV Consortium  Ease-Pak Engineering Services (Pvt.) Ltd.  Center for Social Research and Development (CSRD)  ADA Inc. (International Canadian Firm)  S&S Associates • G3 Engineering Consultants established in 2006 o Member Pakistan Engineering Council o ISO Certified – ISO 9001:2015 o Member Lahore Chamber of Commerce & Industry • Work Experience (Design & Consultancy Services) o 188 Projects completed o 28 Projects under implementation: Rs. 642 Billion
  • 7. Consultants Establishment 7 • Project Offices Established o National Project Office Islamabad - Dr. Muhammad Abdul Quddus: Team Leader o Zonal Project Offices  Punjab - Mr. Yousaf Bhatti: Deputy Team Leader  Khyber Pakhtunkhwa - Dr. Humayun Khan: Deputy Team Leader  Balochistan - Mr. Rizwan Ahmed: Deputy Team Leader  Islamabad Capital Territory (ICT) - Dr. Sarwar Zahid: Deputy Team Leader
  • 8. Punjab Zone First Floor, Orchard Heights, Bahria Orchard, 18 Km Raiwind Road, Lahore. G3 Project Office – Punjab Zone
  • 9. Status of PunjabZone, ME&IE Consultantsas of 14, June 2021 9 No. Activities Current Status 1 Status of Punjab Zonal Office Functional 2 Status of Field Office in Multan Under Process 3 Mobilization of Field Teams All Field Teams are Mobilized 4 Data collection from OFWM Department/NWMC for Baseline survey/regular monitoring Being Collected as per need 5 Training Session of Field Staff and Key Staff on Manual of Monitoring Tools (MTs) and Android Application Completed 6 Training on Measurement of Water Flow (Pygmy Current Meter) In Progress (Training session is going on today) 7 Determination of Sample Size on District / Tehsil Level with assistance of DDA and ADA OFWM Determined for the year 2019-20 and 2020-21 8 Baseline Survey Field Visits In Progress (Teams are ready to visit}
  • 10. Team-1 Team-2 Team-3 Chiniot Bhakar Bahawalnagar Faisalabad Gujranwala Bahawalpur Jhang Gujrat Dera Ghazi Khan Kasur Hafizabad Khanewal Lahore Khushab Layyah NankanaSahib MandiBahauddin Lodhran Okara Mianwali Multan Pakpattan Narowal Muzaffargarh Sahiwal Sargodha Rahim Yar Khan Sheikhupura Sialkot Rajanpur Toba Tek Singh Vehari FIELD TEAMS – PUNJAB
  • 11. Social &Gender Specialist Agricultural Economist ICT/Technology Specialist Non-Technical Support Staff • Manager Admin & Accounts • Deputy Manager Admin Field Team-1 Zonal Office Lahore Field Team In-charge Field Team-3 Field Office Multan Field Team In-charge Field Team-2 Camp Station Sargodha Field Team In-charge Supporting Staff •Computer Operator •Office Assist./Clerk (2) •Dispatch Rider/Photocopier •Peon(3) •Guard(2) •Sweeper (2) •Cook (2) •Driver (4) Field Officer-1 Field Officer-2 Field Officer-3 Field Officer-4 Field Officer-5 Field Officer-6 Team Leader Monitoring & Evaluation Specialist (National Office) Deputy Team Leader Monitoring & Evaluation Specialist (Punjab-Zone) Irrigation Agronomist Technical Support Staff • Data Analyst & Supervisor Available as per their requirement (Man months) TEAM COMPOSITION in PUNJAB ZONE MEI&IE CONSULTANTS
  • 12. Monitoring, Evaluation & Impact Evaluation 12
  • 13. ME&IE CONSULTANTS’ SCOPE AND SERVICES 10  Develop a website containing information on facilities and services, applications, procedures, watercourses, water storage tanks and laser Levelers database, etc. (while the project staff will maintain the website).  Provide technical support for the development of a custom-designed mobile application (Android Based) to capture on-site project progress and geo-tagged photos. It should be synchronized with the central MIS/GIS database and application for instant reporting and feedback to the management. The said requirement is based on the following functional features:  Development of a GIS database with all spatial layers related to activities being undertaken under the project  Carry out the impact evaluation of the project intervention on the economy and stakeholders through baseline and end-line, assessing the water saving per annum on watercourses, water storage tanks and field levels and improvement in water availability due to the provision of improved conveyance system.  Economic impact of project interventions.  Assessing the economic benefits to the agriculture in terms of changes in yields, irrigated area, cropping pattern, cropping intensity, farm income and employment in command area of watercourses and water storage tanks. ME&IE CONSULTANTS’ SCOPE AND SERVICES
  • 15. 15 Develop NPIWC-II Project Website • After thorough consultation with stakeholders, the Project Website has been designed & developed. • On the approval from NPC office, the National Program official website will be live on the registered domain (https://npiw2.org) and will be completely functional. • The following link for the demo version of the website: https://web.g3jv.com/
  • 16. 16 • Studied PC-1 and review of relevant literature • Meetings with management of National Program for Improvement of Watercourses – Phase-II and concerned zonal authorities • Preparation of System Specification Requirements (SRS) and Functional Specification Requirements (FRS) reports • Designing of system architecture • Presentation to the National Project Management Unit • Development of customized Android based data collection application • Development of GIS database • Development of Integrated GIS based MIS system/Real Time web-based Dashboard Development of Web-based GIS integrated MIS Contd…
  • 17. 17 • Finalization of required outputs of the Dashboard including: o Status of implementation of each intervention along with photographs o GIS representing Dashboard o Intervention wise analytical infographic dashboards indicating details of intervention:  Overall National status  Zonal status  Division wise status  District wise Status  Tehsil wise status  Union Council wise status  Village wise status  Canal/Branch/Distributary/Minor wise status Development of Web-based GIS integrated MIS Contd… …Contd
  • 18. 18 • Identification of gaps/bottlenecks in execution of activities • Alert Notification System (SMS, email) for management: o Monthly targets and achievement alerts o Execution stuck-ups alerts o Customized alerts • Identification of reports to be generated by the client • Preparation/approval of output templates • User Manuals of MIS system • Capacity building of concerned organizations o Designing of the training module o Development of reading material o Nomination of District wise participants for training o Finalization/approval of District wise training schedule o Imparting of training o Evaluation of training program/report writing Development of Web-based GIS integrated MIS …Contd
  • 19. 19 Baseline Survey • Questionnaire for Baseline data developed and discussed with all stakeholders • Questionnaires revised/updated based on feedback of the stakeholders • Pre-testing of the questionnaire • Conversion/development of questionnaire for Android based mobile application • Draft manual for Baseline Survey • Tabulation plan for Baseline Survey • Training of field teams have been carried out for utilization of Android based tools Monitoring, Evaluation & Impact Evaluation
  • 20. Baseline, Midline and End-line Surveys 20 The following information will be collected in Project Interventions area through • BASELINE & ENDLINE  A questionnaire has been developed for collection of baseline/end-line information for following: o Area under cultivation o Cropping pattern o Cropping intensity o Yield per acre/hectare o Water Flow (Head to Tail) o No of persons employed per acre/hectare o Environment/Plantation o Socio economic information • END-LINE  In addition to above information, the following will be part of End-line. o Overall/zone wise Physical & financial achievements against PC-1 targets o Analysis of planned cost, scope of work and implementation period with actuals Contd…
  • 21. Baseline, Midline and End-line Surveys 21 • MIDLINE EVALUATION o Physical & financial achievements against targets o Comparison of actual expenditure, scope of work and period of implementation with the technical sanctions of the interventions o Zone wise comparison of Project Activities against targets …Contd Contd…
  • 22. 22 • Monitoring of interventions o Meeting held with the following stakeholders:  Director General OFWM – Govt of Punjab o The agenda of the kick-off meetings with Zonal DGs/Directors was as follows:  Introduction of the Monitoring & Evaluation team with the respective stakeholders  Discussed the physical targets as agreed with the client and the strategy to achieve the targets  Nomination of focal persons for coordination and communication of information/data Progress Reporting
  • 23. 23 • Selection of interventions activities on selective basis • Collection of data of the intervention sites o Capital cost of the intervention o O&M cost of the intervention o Estimation of taxes and duties o Output of the area served with intervention o Border prices of the output o Economic analysis based on opportunity cost of capital to the economy  Net present value  Benefit cost ratio  Internal economic rate of return Economic impact of the project interventions
  • 24. Develop monitoring strategy, framework and Result-Based Monitoring (RBM) indicators 24 • Monitoring Strategy o Information relating to intervention to be:  Basic certified information to be provided by Technical Consultant  Approved by Onfarm Water Management Directorate (OFWM)  Share information with the Monitoring & Evaluation Consultant o Establishment of National Monitoring Control Room  Develop Management Information System (MIS)  Develop Android Application for collection of real-time data on interventions  Collection of data including site photographs & coordinates o Physical monitoring of intervention on sampling basis o Analysis & reports generation
  • 25. Province / Units Population / Units Sample Units Water Course for Improvement 10,000 264 Say 300 (3%) Water Storage Tank 3000 60 (2%) Laser Land Leveler 9500 300 (3.2%) Target Units &Sample Size of Different Intervention in Punjab Zone
  • 26. Sr. No Field Team Area of Sub zone Target units of Watercourse 1st stage sample size of Water Courses for Monitoring 2nd stage Sample Size of Beneficiaries of Water Courses for Baseline Area to be visited during Baseline Survey(*) District Tehsil 1 Sub Zone-1 (Lahore Field Office) Team-1 Lahore Faisalabad Sahiwal Divisions 523 13 78 Kasur Kasur Chunian 2 Sahiwal Chichawatni Sahiwal 3 Okara Okara Depalpur Renala Khurd 5 Sub Zone-2 ( Camp Sargodha Office) Team-2 Gujranwala Sargodha Divisions 421 12 72 Gujranwala Kamoke 6 Gujranwala Wazirabad M.B Din M.B Din 7 Malikwal Phalia Hafizabad Pindi Bhaattian 9 Sub Zone-3 (Multan Field Office) Team-3 Multan. Bahawalpur D.G.Khan Divisions 793 17 102 Muzaffarga rh M.Garh Kot Addu 10 Khanewal Khanewal Kabirwala Mian Channu Multan Multan 11 Jalalpur pirwala Shujaabad Total 1737 42 252 Sample Size of Water Courses in Punjab Zone(NPIWC -2)
  • 27. INDICATORS FOR BASELINE SURVEY 27 • Increase in area under cultivation • Agriculture productivity • Change in cropping pattern • Increase in cropping intensity • Increase in yield per Acre • Level of water usage per acre • Waterlogging and salinity control • Data of tube wells in Barani areas • Plantation • Increase in employment opportunities • Reduction in poverty
  • 28. • Comprehensive questionnaires/ tools were designed to reflect the certain indicators of all other aspects of field activities. • Questionnaire was pre tested in the field and were further refined. • These were converted into android based system on tab to collect data for field. • This will directly transmit the data from the field to the Dashboard without any delay for further processing. Questionnaires FOR BASELINE SURVEY Click here to open Questionnaires for Baseline Survey
  • 29. ISSUES PROPOSED WAY FORWARD SUGGESTIO NS BY CLIENT?  District wise data of each intervention for the year 2021-22 required from OFWM Punjab and NWMC . 1. District wise sample to be drawn from target population for: • Baseline Survey – II 2021-22 • Monitoring activities for 2021-22 ISSUES AND WAY FORWARD
  • 30. 30 “An Intervention can not be called Intervention if it is not progress monitored. An Intervention with out progress monitoring is just an activity.” WE BELIEVE
  • 32. Aggregate Server DEVELOPMENT OF ANDROID BASED APPLICATION
  • 33. INFORMATION MODEL Goal PDO 1 PDO 2 PDO 3 PDO 4 Output 1.1 Output 1.2... Output 2.1 Output 2.2... Output 3.1... Output 4.1... Impact Goal PDO Output Activities Activity Activity Activity Activity Activity Activity Activity Activity Activity Activity Activity Activity - Expenditures -Activity status - Expenditures -Activity status Quarterly Quarterly Monthly Monthly Annually Annually Data is aggregated at each level Monitoring Monitoring Planning Planning Immediate Outcome Intermediate Outcome Ultimate Outcome Evaluation Evaluation -Quantitative indicators - Qualitative indicators - Status of Output - Out put Indicators - Narrative reports DEVELOPMENT OF MIS/GIS SYSTEM
  • 34. DATA FLOW DIAGRAM DEVELOPMENT OF MIS/GIS SYSTEM
  • 35. DEVELOPMENT OF MIS/GIS SYSTEM GIS Progress Analytical Dashboard Template DEVELOPMENT OF MIS/GIS SYSTEM
  • 36. DEVELOPMENT OF MIS/GIS SYSTEM Query based Statistical Analysis GIS dashboard Template DEVELOPMENT OF MIS/GIS SYSTEM
  • 37. DEVELOPMENT OF MIS/GIS SYSTEM Progress Analytical Dashboard Template DEVELOPMENT OF MIS/GIS SYSTEM

Editor's Notes

  1. Notes should be here…
  2. Major Activities – Social mobilization of WUA Improvement/reconstruction of 13000 WCs Construction of 5000 WST Provision of 600 LLL
  3. Major Activities – Social mobilization of WUA Improvement/reconstruction of 13000 WCs Construction of 5000 WST Provision of 600 LLL
  4. Table Total Target – Monitoring Target – Actual Achieved District Wise Table as well
  5. Sampling hyperlink from inception report
  6. Sampling hyperlink from inception report
  7. Sampling hyperlink from inception report
  8. Table Total Target – Monitoring Target – Actual Achieved District Wise Table as well
  9. Sampling hyperlink from inception report
  10. Sampling hyperlink from inception report
  11. Sampling hyperlink from inception report
  12. Major Activities – Social mobilization of WUA Improvement/reconstruction of 13000 WCs Construction of 5000 WST Provision of 600 LLL
  13. Sampling hyperlink from inception report