SlideShare a Scribd company logo
1 of 6
Download to read offline
NOVATEUR PUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
ISSN: 2394-3696
VOLUME 2, ISSUE 9, SEP.-2015
1 | P a g e
MUNICIPAL SOLID WASTE MANAGEMENT IN PIMPRI-
CHINCHWAD CITY, INDIA-AN OVERVIEW
Mrs.S.A.Nikam
Assistant Professor in Civil Engineering,
Pune University, Pune, India.
Dr.N.W.Ingole
Professor in civil Engineering,
PRMIT&R, Badnera, Amravati.
ABSTRACT
The management of municipal solid waste has become anacute problem due to enhanced
economic activities and rapid urbanization.Increased attention has been given by the government
in recent years to handle this problem in a safe and hygienic manner. This paper presents an
overview of current Municipal Solid Waste Management (MSW) in Pimpri-Chinchwad city,
India& provides recommendation in system improvement. The collected data of MSW functional
elements were based on available reports & meeting with responsible persons. Due to increase in
population & changes in life style the quantity & quality of MSW in PCMC city has changed.
Public awareness, suitable planning, infrastructure are the main challenges of MSW management
in PCMC city. However the present situation of MSW management in this city, which generates
500 ton/day, has been improved since the establishment of an organization responsible only for
MSW management. Source separation of waste, Vermi-composting, Mechanical composting &
Bio-diesel are the main activities of PCMC in recent years.
INTRODUCTION
Solid waste generation is a continually growing problem at global, regional and local levels.
Solid wastes are those organic and inorganic waste materials produced by various activities of
the society, which have lost their value to the first user. Improper disposal of solid wastes
pollutes all the vital components of the living environment (i.e., air, land and water) at local and
global levels. The problem is more acute in developing nations than in developed nations, as
their economic growth as well as urbanization is more rapid.
The government of India has taken many initiatives and implemented new technologies and
methods by giving loans for setting up composting plants to encourage proper management of
solid waste since the 1960s (MoEF, 2005). The MSWM problem was compounded with rapid
urbanization. Due to increased public awareness of MSWM, a public litigation was filed in the
Supreme Court, which resulted in the Municipal Solid Wastes (Management and Handling)
Rules, 2000.
The city of Pimpri chinchwad is located in the western part of India with a population of about
21 lakh.The latitude of and longitude of PCMC are 18 37 N,73 48 E respectively. The
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND
manufacturing industries in this province
well as economic growth. With increase in population
changing and increasing continuously.
This paper presents an overview of current MSW management in PCMC. Th
quantity of generation of MSW, collection efficiency of MSW and various methods used in
treatment of MSW.
MSW GENERATION AND COMPOSITION
Since 2006 estimate of MSW generation
scheduling and dumping system in PCMC. The absence of reliable data and statics for waste
generation makes a regional and national evaluation of MSW m
has compiled statics about MSW management since 2006.
MSW generated in PCMC per year
PCMC.Increasing population level, rapid economic growth, and rise in community living
standard will accelerate the future solid waste generation rate in PCMC.
tons MSW was generated.Since
among the peoplesMSW generated in middle years is comparatively less.
Figure 1: Total quantity of MSW generated per year in PCMC
The amount of MSW per capita per day from 2006
per capita per year varies considerably from year to year as in fig.2. MSW generation rate
0.52kg/person/day and 0.31 kg/person/day in 2006 and 2013 respectively. This shows decrease
in MSW per capita per year due to reliable data is not available in 2006 and
initiative to decrease the MSW by awareness among the peoples
221858 223014
0
50000
100000
150000
200000
250000
2006-07 2007-08
NOVATEUR PUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 2, ISSUE 9, SEP.
this province have been developing andaffecting the
. With increase in population,the amount and type of soli
changing and increasing continuously.
This paper presents an overview of current MSW management in PCMC. This paper contents
eneration of MSW, collection efficiency of MSW and various methods used in
ION AND COMPOSITION
Since 2006 estimate of MSW generation was carried out because of there was no proper
scheduling and dumping system in PCMC. The absence of reliable data and statics for waste
generation makes a regional and national evaluation of MSW management difficult.
has compiled statics about MSW management since 2006. Fig 1 shows the total quantity of
MSW generated in PCMC per year. In 2006, 220000 metric ton of MSW was
PCMC.Increasing population level, rapid economic growth, and rise in community living
standard will accelerate the future solid waste generation rate in PCMC. In 2013,236673 metric
tons MSW was generated.Since PCMC takes initiative to decrease the MSW by awareness
MSW generated in middle years is comparatively less.
Total quantity of MSW generated per year in PCMC
The amount of MSW per capita per day from 2006-2013 is given in fig.2. The generation rate
capita per year varies considerably from year to year as in fig.2. MSW generation rate
0.52kg/person/day and 0.31 kg/person/day in 2006 and 2013 respectively. This shows decrease
in MSW per capita per year due to reliable data is not available in 2006 and
initiative to decrease the MSW by awareness among the peoples.
157769
178161 183616 182477
236673
08 2008-09 2009-10 2010-11 2011-12 2012-13
NOVATEUR PUBLICATIONS
TECHNOLOGY [IJIERT]
ISSN: 2394-3696
VOLUME 2, ISSUE 9, SEP.-2015
2 | P a g e
developing andaffecting the population as
,the amount and type of solid wastes are
is paper contents
eneration of MSW, collection efficiency of MSW and various methods used in
was carried out because of there was no proper
scheduling and dumping system in PCMC. The absence of reliable data and statics for waste
anagement difficult. The PCMC
Fig 1 shows the total quantity of
20000 metric ton of MSW was generated in
PCMC.Increasing population level, rapid economic growth, and rise in community living
In 2013,236673 metric
e the MSW by awareness
Total quantity of MSW generated per year in PCMC
2013 is given in fig.2. The generation rate
capita per year varies considerably from year to year as in fig.2. MSW generation rate
0.52kg/person/day and 0.31 kg/person/day in 2006 and 2013 respectively. This shows decrease
in MSW per capita per year due to reliable data is not available in 2006 and PCMC takes
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND
Figure 2: Total quantity of MSW generated per Capita per day in PCMC
The typical composition of MSW in PCMC is as shown in fig.3.As can be seen organic waste is
main component of MSW. About 6% of the material is
construction and demolishing debris and hazardous waste.
Figure
COLLECTION AND TRANSPORTATION OF MSW
Before 2006 there is no proper MSW collection s
40% of MSW per year collected. This shows improper collection system. As we seen in fig from
2006-2013 considerably increase in collection efficiency up to 100% is achieved because of well
organized system. The PCMC spend all their efforts and budget for this services.
steps adopted for collection system in PCMC. In 1
vehicles stop at each building to pick up the waste and transported in bin box. This system is
operated daily. In 2nd
step, collection and transport of MSW from bin box to garbage centre.
Medical waste from health care establishment to other hazardous waste are generally collected
and transported separately and for this waste separate
agency “swacha” use for MSW collection and transportation
0
0.1
0.2
0.3
0.4
0.5
0.6
2006-07
Quantity
(Kg/PERSON/DAY)
NOVATEUR PUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 2, ISSUE 9, SEP.
Total quantity of MSW generated per Capita per day in PCMC
The typical composition of MSW in PCMC is as shown in fig.3.As can be seen organic waste is
SW. About 6% of the material is denoted as “other”, which
construction and demolishing debris and hazardous waste.
Figure 3: Composition of MSW in PCMC
CTION AND TRANSPORTATION OF MSW
Before 2006 there is no proper MSW collection system in PCMC.As seen in fig.4.
collected. This shows improper collection system. As we seen in fig from
2013 considerably increase in collection efficiency up to 100% is achieved because of well
C spend all their efforts and budget for this services.
collection system in PCMC. In 1st
step collection system, solid waste collection
vehicles stop at each building to pick up the waste and transported in bin box. This system is
step, collection and transport of MSW from bin box to garbage centre.
ealth care establishment to other hazardous waste are generally collected
and transported separately and for this waste separate disposal treatment is adopted. Private
agency “swacha” use for MSW collection and transportation.
2007-08 2008-09 2009-10 2010-11 2011-12 2012
Year
Paper
9% Plastic
12%
Glass
3%
Organic
63%
Metal
8%
Other
6%
NOVATEUR PUBLICATIONS
TECHNOLOGY [IJIERT]
ISSN: 2394-3696
VOLUME 2, ISSUE 9, SEP.-2015
3 | P a g e
Total quantity of MSW generated per Capita per day in PCMC
The typical composition of MSW in PCMC is as shown in fig.3.As can be seen organic waste is
denoted as “other”, which mainly include
ystem in PCMC.As seen in fig.4.only about
collected. This shows improper collection system. As we seen in fig from
2013 considerably increase in collection efficiency up to 100% is achieved because of well
C spend all their efforts and budget for this services. There are two
step collection system, solid waste collection
vehicles stop at each building to pick up the waste and transported in bin box. This system is
step, collection and transport of MSW from bin box to garbage centre.
ealth care establishment to other hazardous waste are generally collected
disposal treatment is adopted. Private
2012-13
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND
Figure 4: Efficiency of co
TREATMENT & DISPOSAL
Steps followed by the PCMC for waste
• After the waste has been collected it is dumped at Moshi site, then it is kept for seven days for
removal of leachate and odour.
• After the odour has been removed then the solid waste is sent for segregation.
• After segregation solid waste is treated in various ways like landfill, compo
fuel generation.
Many cities in India, deficiencies in the provision of waste disposes are the
finance resources management and technical skills of government authors to deal with the rap
growth in demand of services. Pimpari
like landfilling, plastic recycling
methods for sustainable MSW treatment
in India because of that previous year open dump solid waste
2010 open dumping is totally avoided and recycling techniques used by PCMC
treatment on MSW.
CONCLUSION
The amount of solid waste collected in PCMC in 2013 was 235000 metri
about 70% of total MSW is recycled
plant,and Mechanicalcomposter.
management system and the collection facilities do not fit the present requirements. Municipal
0
20
40
60
80
100
120
2006-07
RateofcollectionofMSW(%)
NOVATEUR PUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
VOLUME 2, ISSUE 9, SEP.
Efficiency of collection of MSW per year in PCMC
TREATMENT & DISPOSAL OF MSW
Steps followed by the PCMC for waste treatment:
After the waste has been collected it is dumped at Moshi site, then it is kept for seven days for
has been removed then the solid waste is sent for segregation.
After segregation solid waste is treated in various ways like landfill, composting, recycling and
ndia, deficiencies in the provision of waste disposes are the result of inadequate
finance resources management and technical skills of government authors to deal with the rap
Pimpari-Chinchawad Municipal Corporation adopted treatments
lastic recycling,Mechanical composter, Bio-diesel plant and vermicomposting
methods for sustainable MSW treatment. As per the High court open dumping is totally banned
ndia because of that previous year open dump solid waste converted into landfilling.
dumping is totally avoided and recycling techniques used by PCMC
The amount of solid waste collected in PCMC in 2013 was 235000 metric ton per year. In that
is recycled by various treatments like vermicomposting
composter. But current regulation system is not sufficient. T
management system and the collection facilities do not fit the present requirements. Municipal
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
Year
NOVATEUR PUBLICATIONS
TECHNOLOGY [IJIERT]
ISSN: 2394-3696
VOLUME 2, ISSUE 9, SEP.-2015
4 | P a g e
llection of MSW per year in PCMC
After the waste has been collected it is dumped at Moshi site, then it is kept for seven days for
sting, recycling and
result of inadequate
finance resources management and technical skills of government authors to deal with the rapid
Chinchawad Municipal Corporation adopted treatments
plant and vermicomposting
n dumping is totally banned
converted into landfilling. Since
dumping is totally avoided and recycling techniques used by PCMC to achieve 100%
c ton per year. In that
composting,Bio-diesel
regulation system is not sufficient. The existing
management system and the collection facilities do not fit the present requirements. Municipal
13
NOVATEUR PUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
ISSN: 2394-3696
VOLUME 2, ISSUE 9, SEP.-2015
5 | P a g e
solid wastes are still collected without separation at the source, treatment facilities are limited
and the collected wastes are mostly dumped haphazardly in open areas.
In India there is lack of organization and planning in MSW management due to insufficient
information about regulations and due to financial restrictions. In the short term, the best policy
might be to leave disposal methods without any controls, and use the resources available to
upgrade them with environmental protection system. In the long term, construction of new
treatment units could be planned. Public participation and awareness are also important issues in
achieving the goals of the suggested management system but it is difficult and takes a long time
to make people aware of the importance.
REFERENCES
1. Bartone, C.R., L. Leite, T. Triche, and R. Schertenleib (2000), ‘Private sector participation in
municipal solid waste service: experiences in Latin America’, WasteManagement and Research
9(6): 495–509.
2. Beukering, P. V. (1997), ‘Waste recovery in Bombay: a socio-economic and environmental
assessment of different waste management options’, Third World PlanningReview 19(2): 163–
187.
3. City development plan for Pimpri-Chinchawad Muncipal Corporation (2006-2012)
4. CIWMB (California IntegratedWaste Management Board) (1999), ‘Disposal cost fee study,
final report’, 90 – 131, Tellus Institute.
5. Coad, Adrian (ed.) (1997), Lessons from India in Solid Waste Management, Water,
Engineering and Development Center (WEDC).
6. CPCB (Central Pollution Control Board) (2000), Management of MSW, Ministry of
Environment and Forests, Government of India. Environment and Development Economics.
7. Chikarmane P, Narayan L (2000). ‘Formalizing livelihood: case of waste pickers in Pune’
Economic and political weekly, October 7, 2000, pp. 3639- 3462.
8. Darnay, A., and W.E. Franklin. Salvage Markets for Materials in Solid Wastes.
Environmental Protection Publication SW-29c. U.S. Government Printing Office. 1972.
9. Director of Census Operations (2001), ‘Provisional population totals, rural urban distribution
of population’, Census of India, series 28, Maharashtra, Mumbai.
10. Dhere AM, Pawar CB, Pardeshi PB, Patil DA (2008). ‘Municipal solid waste disposal in
Pune city-An analysis of air and ground water pollution” Current Sci., 95(6,25): 773-777,
September 2008.
NOVATEUR PUBLICATIONS
INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT]
ISSN: 2394-3696
VOLUME 2, ISSUE 9, SEP.-2015
6 | P a g e
11. Gerlagh, R., P.V. Beukering, M. Verma, P.P. Yadav, and P. Pandey (1999), ‘Integrated
modeling of solid waste in India’, CREED working paper no. 26, International Institute of
Environment and Development, London.
12. Greene WH (2003). ‘Econometric Analysis’ fifth edition, Pearson Education Private, Ltd,
Indian branch, Delhi, India.
13. Li, Y. P., and Huang, G. H. (2010). “Identification of optimal municipal solid waste
management strategies through an interval-parameter scenario-based probabilistic
programming approach.” J. Air WasteManage. Assoc., 60(4), 439–453.
14. Liu, Z. F., Huang, G. H., Liao, R. F., and He, L. (2009). “DIPIP: Dual interval probabilistic
integer programming for solid waste management.” J. Environ. Inform., 14(1), 66–73.
15. Manandhar, R. (2002), ‘Private sector participation in solid waste management in
Kathmandu’, Directory: Successful and transferable practise, Kitakyushu Initiative Network.
16. S.M. Al-Salem(2009) ‘Life Cycle Assessment (LCA) of Municipal Solid Waste Management
in the State of Kuwait’ European Journal of Scientific Research.

More Related Content

What's hot

Integrated solid waste management model
Integrated solid waste management modelIntegrated solid waste management model
Integrated solid waste management model
Bhanupriya Vaishnaw
 
Solid Waste Management Challengies for Cities in Developing Countries
 Solid Waste Management Challengies  for Cities in Developing Countries Solid Waste Management Challengies  for Cities in Developing Countries
Solid Waste Management Challengies for Cities in Developing Countries
shuaibumusa2012
 

What's hot (20)

Solid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City CorporationSolid Waste Management of Dhaka City Corporation
Solid Waste Management of Dhaka City Corporation
 
MUNICIPAL SOLID WASTE MANAGEMENT STATUS IN PATNA - Weaknesses and Opportunities
MUNICIPAL SOLID WASTE MANAGEMENT STATUS IN PATNA -  Weaknesses and OpportunitiesMUNICIPAL SOLID WASTE MANAGEMENT STATUS IN PATNA -  Weaknesses and Opportunities
MUNICIPAL SOLID WASTE MANAGEMENT STATUS IN PATNA - Weaknesses and Opportunities
 
solid waste management garbage recycling waste water treatment specialized wa...
solid waste management garbage recycling waste water treatment specialized wa...solid waste management garbage recycling waste water treatment specialized wa...
solid waste management garbage recycling waste water treatment specialized wa...
 
Integrated solid waste management model
Integrated solid waste management modelIntegrated solid waste management model
Integrated solid waste management model
 
Smart city report
Smart city reportSmart city report
Smart city report
 
Solid Waste Management BENGALURU
Solid  Waste Management  BENGALURUSolid  Waste Management  BENGALURU
Solid Waste Management BENGALURU
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
Route optimization for collection of municipal solid waste in Katpadi, Vellore
Route optimization for collection of municipal solid waste in Katpadi, VelloreRoute optimization for collection of municipal solid waste in Katpadi, Vellore
Route optimization for collection of municipal solid waste in Katpadi, Vellore
 
Smart city
Smart citySmart city
Smart city
 
What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...
 
SOLID WASTE MANAGEMENT ON DUMPING GROUND IN MUMBAI REGION
SOLID WASTE MANAGEMENT ON DUMPING GROUND IN MUMBAI REGIONSOLID WASTE MANAGEMENT ON DUMPING GROUND IN MUMBAI REGION
SOLID WASTE MANAGEMENT ON DUMPING GROUND IN MUMBAI REGION
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
Land-use transport planning
Land-use transport planning Land-use transport planning
Land-use transport planning
 
SEWAGE TREATMENT PLANT mini project report
SEWAGE TREATMENT PLANT mini project reportSEWAGE TREATMENT PLANT mini project report
SEWAGE TREATMENT PLANT mini project report
 
Waste free indore
Waste free indoreWaste free indore
Waste free indore
 
SMART CITIES DEVELOPMENT.pptx
SMART CITIES DEVELOPMENT.pptxSMART CITIES DEVELOPMENT.pptx
SMART CITIES DEVELOPMENT.pptx
 
Solid Waste Management Challengies for Cities in Developing Countries
 Solid Waste Management Challengies  for Cities in Developing Countries Solid Waste Management Challengies  for Cities in Developing Countries
Solid Waste Management Challengies for Cities in Developing Countries
 
Urban transport - Kolkata
Urban transport - KolkataUrban transport - Kolkata
Urban transport - Kolkata
 
Micromobility Explorer - how to make it sustainable
Micromobility Explorer - how to make it sustainableMicromobility Explorer - how to make it sustainable
Micromobility Explorer - how to make it sustainable
 
Smart Waste Management
Smart Waste ManagementSmart Waste Management
Smart Waste Management
 

Similar to MUNICIPAL SOLID WASTE MANAGEMENT IN PIMPRI-CHINCHWAD CITY, INDIA-AN OVERVIEW

Municipal solid waste: A strategic resource
Municipal solid waste: A strategic resource Municipal solid waste: A strategic resource
Municipal solid waste: A strategic resource
sajjalp
 
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SyedNadeemGillANi
 

Similar to MUNICIPAL SOLID WASTE MANAGEMENT IN PIMPRI-CHINCHWAD CITY, INDIA-AN OVERVIEW (20)

Implementing Integrated Solid Waste Management: A Case Study of Domestic Wast...
Implementing Integrated Solid Waste Management: A Case Study of Domestic Wast...Implementing Integrated Solid Waste Management: A Case Study of Domestic Wast...
Implementing Integrated Solid Waste Management: A Case Study of Domestic Wast...
 
20320140502001 2-3
20320140502001 2-320320140502001 2-3
20320140502001 2-3
 
RECYCLING SIGNIFICANCE OF WASTE MANAGEMENT
RECYCLING SIGNIFICANCE OF WASTE MANAGEMENTRECYCLING SIGNIFICANCE OF WASTE MANAGEMENT
RECYCLING SIGNIFICANCE OF WASTE MANAGEMENT
 
Municipal solid waste: A strategic resource
Municipal solid waste: A strategic resource Municipal solid waste: A strategic resource
Municipal solid waste: A strategic resource
 
Collection of-organic-and-inorganic-garbage-in-smart-city-in-pakistan-for-ren...
Collection of-organic-and-inorganic-garbage-in-smart-city-in-pakistan-for-ren...Collection of-organic-and-inorganic-garbage-in-smart-city-in-pakistan-for-ren...
Collection of-organic-and-inorganic-garbage-in-smart-city-in-pakistan-for-ren...
 
IRJET- Energy Generation from Municipal Solid Waste of Kabul City; Creating O...
IRJET- Energy Generation from Municipal Solid Waste of Kabul City; Creating O...IRJET- Energy Generation from Municipal Solid Waste of Kabul City; Creating O...
IRJET- Energy Generation from Municipal Solid Waste of Kabul City; Creating O...
 
Integrated Municipal Solid Waste Management System (IMSWMS)
Integrated Municipal Solid Waste Management System (IMSWMS)Integrated Municipal Solid Waste Management System (IMSWMS)
Integrated Municipal Solid Waste Management System (IMSWMS)
 
IRJET- Analyzing Constraints for Practising Solid Waste Management in Slums- ...
IRJET- Analyzing Constraints for Practising Solid Waste Management in Slums- ...IRJET- Analyzing Constraints for Practising Solid Waste Management in Slums- ...
IRJET- Analyzing Constraints for Practising Solid Waste Management in Slums- ...
 
IRJET- Solid Waste Management Efficiency in Kabul City
IRJET- Solid Waste Management Efficiency in Kabul CityIRJET- Solid Waste Management Efficiency in Kabul City
IRJET- Solid Waste Management Efficiency in Kabul City
 
THERMAL PROPERTIES OF INDIAN MUNICIPAL SOLID WASTE OVER THE PAST, PRESENT AND...
THERMAL PROPERTIES OF INDIAN MUNICIPAL SOLID WASTE OVER THE PAST, PRESENT AND...THERMAL PROPERTIES OF INDIAN MUNICIPAL SOLID WASTE OVER THE PAST, PRESENT AND...
THERMAL PROPERTIES OF INDIAN MUNICIPAL SOLID WASTE OVER THE PAST, PRESENT AND...
 
Solid waste management bin allocation and relocation by using remote sensing ...
Solid waste management bin allocation and relocation by using remote sensing ...Solid waste management bin allocation and relocation by using remote sensing ...
Solid waste management bin allocation and relocation by using remote sensing ...
 
IRJET- Sustainable Approach for Development of an Ecocity
IRJET- Sustainable Approach for Development of an EcocityIRJET- Sustainable Approach for Development of an Ecocity
IRJET- Sustainable Approach for Development of an Ecocity
 
A MULTI–STAGE, MULTI CRITERIA APPROACH FOR SOLID WASTE DISPOSAL SITE DESIGN A...
A MULTI–STAGE, MULTI CRITERIA APPROACH FOR SOLID WASTE DISPOSAL SITE DESIGN A...A MULTI–STAGE, MULTI CRITERIA APPROACH FOR SOLID WASTE DISPOSAL SITE DESIGN A...
A MULTI–STAGE, MULTI CRITERIA APPROACH FOR SOLID WASTE DISPOSAL SITE DESIGN A...
 
MGN231 Community Development Project Report
MGN231 Community Development Project ReportMGN231 Community Development Project Report
MGN231 Community Development Project Report
 
Cloud computing, Identity-based cryptography, Proxy public key cryptography, ...
Cloud computing, Identity-based cryptography, Proxy public key cryptography, ...Cloud computing, Identity-based cryptography, Proxy public key cryptography, ...
Cloud computing, Identity-based cryptography, Proxy public key cryptography, ...
 
Analysis of the Potential MSW to Energy Generation in the State of Sikkim
Analysis of the Potential MSW to Energy Generation in the State of SikkimAnalysis of the Potential MSW to Energy Generation in the State of Sikkim
Analysis of the Potential MSW to Energy Generation in the State of Sikkim
 
IRJET- Sustainable Solid Waste Management: A Decentralized Waste Management A...
IRJET- Sustainable Solid Waste Management: A Decentralized Waste Management A...IRJET- Sustainable Solid Waste Management: A Decentralized Waste Management A...
IRJET- Sustainable Solid Waste Management: A Decentralized Waste Management A...
 
IRJET-Decentralized Waste Management: Analysis for Residential Localities of ...
IRJET-Decentralized Waste Management: Analysis for Residential Localities of ...IRJET-Decentralized Waste Management: Analysis for Residential Localities of ...
IRJET-Decentralized Waste Management: Analysis for Residential Localities of ...
 
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptxSOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
SOLIDE WASTE in Cameroon,,,,,,,,,,,,,,,,,,,,,,,,,,,.pptx
 
Municipal Solid Waste Management; Air Pollution and its’ Impact
Municipal Solid Waste Management; Air Pollution and its’ ImpactMunicipal Solid Waste Management; Air Pollution and its’ Impact
Municipal Solid Waste Management; Air Pollution and its’ Impact
 

More from ijiert bestjournal

STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
ijiert bestjournal
 
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
ijiert bestjournal
 

More from ijiert bestjournal (20)

CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
CRACKS IN STEEL CASTING FOR VOLUTE CASING OF A PUMP
 
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
A COMPARATIVE STUDY OF DESIGN OF SIMPLE SPUR GEAR TRAIN AND HELICAL GEAR TRAI...
 
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAFCOMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
COMPARATIVE ANALYSIS OF CONVENTIONAL LEAF SPRING AND COMPOSITE LEAF
 
POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
 POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
POWER GENERATION BY DIFFUSER AUGMENTED WIND TURBINE
 
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
FINITE ELEMENT ANALYSIS OF CONNECTING ROD OF MG-ALLOY
 
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAINREVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
REVIEW ON CRITICAL SPEED IMPROVEMENT IN SINGLE CYLINDER ENGINE VALVE TRAIN
 
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
ENERGY CONVERSION PHENOMENON IN IMPLEMENTATION OF WATER LIFTING BY USING PEND...
 
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
SCUDERI SPLIT CYCLE ENGINE: REVOLUTIONARY TECHNOLOGY & EVOLUTIONARY DESIGN RE...
 
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
EXPERIMENTAL EVALUATION OF TEMPERATURE DISTRIBUTION IN JOURNAL BEARING OPERAT...
 
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
STUDY OF SOLAR THERMAL CAVITY RECEIVER FOR PARABOLIC CONCENTRATING COLLECTOR
 
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFTDESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
DESIGN, OPTIMIZATION AND FINITE ELEMENT ANALYSIS OF CRANKSHAFT
 
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
ELECTRO CHEMICAL MACHINING AND ELECTRICAL DISCHARGE MACHINING PROCESSES MICRO...
 
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENTHEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
HEAT TRANSFER ENHANCEMENT BY USING NANOFLUID JET IMPINGEMENT
 
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
MODIFICATION AND OPTIMIZATION IN STEEL SANDWICH PANELS USING ANSYS WORKBENCH
 
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
IMPACT ANALYSIS OF ALUMINUM HONEYCOMB SANDWICH PANEL BUMPER BEAM: A REVIEW
 
DESIGN OF WELDING FIXTURES AND POSITIONERS
DESIGN OF WELDING FIXTURES AND POSITIONERSDESIGN OF WELDING FIXTURES AND POSITIONERS
DESIGN OF WELDING FIXTURES AND POSITIONERS
 
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
ADVANCED TRANSIENT THERMAL AND STRUCTURAL ANALYSIS OF DISC BRAKE BY USING ANS...
 
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
REVIEW ON MECHANICAL PROPERTIES OF NON-ASBESTOS COMPOSITE MATERIAL USED IN BR...
 
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
PERFORMANCE EVALUATION OF TRIBOLOGICAL PROPERTIES OF COTTON SEED OIL FOR MULT...
 
MAGNETIC ABRASIVE FINISHING
MAGNETIC ABRASIVE FINISHINGMAGNETIC ABRASIVE FINISHING
MAGNETIC ABRASIVE FINISHING
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 

MUNICIPAL SOLID WASTE MANAGEMENT IN PIMPRI-CHINCHWAD CITY, INDIA-AN OVERVIEW

  • 1. NOVATEUR PUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 2, ISSUE 9, SEP.-2015 1 | P a g e MUNICIPAL SOLID WASTE MANAGEMENT IN PIMPRI- CHINCHWAD CITY, INDIA-AN OVERVIEW Mrs.S.A.Nikam Assistant Professor in Civil Engineering, Pune University, Pune, India. Dr.N.W.Ingole Professor in civil Engineering, PRMIT&R, Badnera, Amravati. ABSTRACT The management of municipal solid waste has become anacute problem due to enhanced economic activities and rapid urbanization.Increased attention has been given by the government in recent years to handle this problem in a safe and hygienic manner. This paper presents an overview of current Municipal Solid Waste Management (MSW) in Pimpri-Chinchwad city, India& provides recommendation in system improvement. The collected data of MSW functional elements were based on available reports & meeting with responsible persons. Due to increase in population & changes in life style the quantity & quality of MSW in PCMC city has changed. Public awareness, suitable planning, infrastructure are the main challenges of MSW management in PCMC city. However the present situation of MSW management in this city, which generates 500 ton/day, has been improved since the establishment of an organization responsible only for MSW management. Source separation of waste, Vermi-composting, Mechanical composting & Bio-diesel are the main activities of PCMC in recent years. INTRODUCTION Solid waste generation is a continually growing problem at global, regional and local levels. Solid wastes are those organic and inorganic waste materials produced by various activities of the society, which have lost their value to the first user. Improper disposal of solid wastes pollutes all the vital components of the living environment (i.e., air, land and water) at local and global levels. The problem is more acute in developing nations than in developed nations, as their economic growth as well as urbanization is more rapid. The government of India has taken many initiatives and implemented new technologies and methods by giving loans for setting up composting plants to encourage proper management of solid waste since the 1960s (MoEF, 2005). The MSWM problem was compounded with rapid urbanization. Due to increased public awareness of MSWM, a public litigation was filed in the Supreme Court, which resulted in the Municipal Solid Wastes (Management and Handling) Rules, 2000. The city of Pimpri chinchwad is located in the western part of India with a population of about 21 lakh.The latitude of and longitude of PCMC are 18 37 N,73 48 E respectively. The
  • 2. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND manufacturing industries in this province well as economic growth. With increase in population changing and increasing continuously. This paper presents an overview of current MSW management in PCMC. Th quantity of generation of MSW, collection efficiency of MSW and various methods used in treatment of MSW. MSW GENERATION AND COMPOSITION Since 2006 estimate of MSW generation scheduling and dumping system in PCMC. The absence of reliable data and statics for waste generation makes a regional and national evaluation of MSW m has compiled statics about MSW management since 2006. MSW generated in PCMC per year PCMC.Increasing population level, rapid economic growth, and rise in community living standard will accelerate the future solid waste generation rate in PCMC. tons MSW was generated.Since among the peoplesMSW generated in middle years is comparatively less. Figure 1: Total quantity of MSW generated per year in PCMC The amount of MSW per capita per day from 2006 per capita per year varies considerably from year to year as in fig.2. MSW generation rate 0.52kg/person/day and 0.31 kg/person/day in 2006 and 2013 respectively. This shows decrease in MSW per capita per year due to reliable data is not available in 2006 and initiative to decrease the MSW by awareness among the peoples 221858 223014 0 50000 100000 150000 200000 250000 2006-07 2007-08 NOVATEUR PUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 2, ISSUE 9, SEP. this province have been developing andaffecting the . With increase in population,the amount and type of soli changing and increasing continuously. This paper presents an overview of current MSW management in PCMC. This paper contents eneration of MSW, collection efficiency of MSW and various methods used in ION AND COMPOSITION Since 2006 estimate of MSW generation was carried out because of there was no proper scheduling and dumping system in PCMC. The absence of reliable data and statics for waste generation makes a regional and national evaluation of MSW management difficult. has compiled statics about MSW management since 2006. Fig 1 shows the total quantity of MSW generated in PCMC per year. In 2006, 220000 metric ton of MSW was PCMC.Increasing population level, rapid economic growth, and rise in community living standard will accelerate the future solid waste generation rate in PCMC. In 2013,236673 metric tons MSW was generated.Since PCMC takes initiative to decrease the MSW by awareness MSW generated in middle years is comparatively less. Total quantity of MSW generated per year in PCMC The amount of MSW per capita per day from 2006-2013 is given in fig.2. The generation rate capita per year varies considerably from year to year as in fig.2. MSW generation rate 0.52kg/person/day and 0.31 kg/person/day in 2006 and 2013 respectively. This shows decrease in MSW per capita per year due to reliable data is not available in 2006 and initiative to decrease the MSW by awareness among the peoples. 157769 178161 183616 182477 236673 08 2008-09 2009-10 2010-11 2011-12 2012-13 NOVATEUR PUBLICATIONS TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 2, ISSUE 9, SEP.-2015 2 | P a g e developing andaffecting the population as ,the amount and type of solid wastes are is paper contents eneration of MSW, collection efficiency of MSW and various methods used in was carried out because of there was no proper scheduling and dumping system in PCMC. The absence of reliable data and statics for waste anagement difficult. The PCMC Fig 1 shows the total quantity of 20000 metric ton of MSW was generated in PCMC.Increasing population level, rapid economic growth, and rise in community living In 2013,236673 metric e the MSW by awareness Total quantity of MSW generated per year in PCMC 2013 is given in fig.2. The generation rate capita per year varies considerably from year to year as in fig.2. MSW generation rate 0.52kg/person/day and 0.31 kg/person/day in 2006 and 2013 respectively. This shows decrease in MSW per capita per year due to reliable data is not available in 2006 and PCMC takes
  • 3. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND Figure 2: Total quantity of MSW generated per Capita per day in PCMC The typical composition of MSW in PCMC is as shown in fig.3.As can be seen organic waste is main component of MSW. About 6% of the material is construction and demolishing debris and hazardous waste. Figure COLLECTION AND TRANSPORTATION OF MSW Before 2006 there is no proper MSW collection s 40% of MSW per year collected. This shows improper collection system. As we seen in fig from 2006-2013 considerably increase in collection efficiency up to 100% is achieved because of well organized system. The PCMC spend all their efforts and budget for this services. steps adopted for collection system in PCMC. In 1 vehicles stop at each building to pick up the waste and transported in bin box. This system is operated daily. In 2nd step, collection and transport of MSW from bin box to garbage centre. Medical waste from health care establishment to other hazardous waste are generally collected and transported separately and for this waste separate agency “swacha” use for MSW collection and transportation 0 0.1 0.2 0.3 0.4 0.5 0.6 2006-07 Quantity (Kg/PERSON/DAY) NOVATEUR PUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 2, ISSUE 9, SEP. Total quantity of MSW generated per Capita per day in PCMC The typical composition of MSW in PCMC is as shown in fig.3.As can be seen organic waste is SW. About 6% of the material is denoted as “other”, which construction and demolishing debris and hazardous waste. Figure 3: Composition of MSW in PCMC CTION AND TRANSPORTATION OF MSW Before 2006 there is no proper MSW collection system in PCMC.As seen in fig.4. collected. This shows improper collection system. As we seen in fig from 2013 considerably increase in collection efficiency up to 100% is achieved because of well C spend all their efforts and budget for this services. collection system in PCMC. In 1st step collection system, solid waste collection vehicles stop at each building to pick up the waste and transported in bin box. This system is step, collection and transport of MSW from bin box to garbage centre. ealth care establishment to other hazardous waste are generally collected and transported separately and for this waste separate disposal treatment is adopted. Private agency “swacha” use for MSW collection and transportation. 2007-08 2008-09 2009-10 2010-11 2011-12 2012 Year Paper 9% Plastic 12% Glass 3% Organic 63% Metal 8% Other 6% NOVATEUR PUBLICATIONS TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 2, ISSUE 9, SEP.-2015 3 | P a g e Total quantity of MSW generated per Capita per day in PCMC The typical composition of MSW in PCMC is as shown in fig.3.As can be seen organic waste is denoted as “other”, which mainly include ystem in PCMC.As seen in fig.4.only about collected. This shows improper collection system. As we seen in fig from 2013 considerably increase in collection efficiency up to 100% is achieved because of well C spend all their efforts and budget for this services. There are two step collection system, solid waste collection vehicles stop at each building to pick up the waste and transported in bin box. This system is step, collection and transport of MSW from bin box to garbage centre. ealth care establishment to other hazardous waste are generally collected disposal treatment is adopted. Private 2012-13
  • 4. INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND Figure 4: Efficiency of co TREATMENT & DISPOSAL Steps followed by the PCMC for waste • After the waste has been collected it is dumped at Moshi site, then it is kept for seven days for removal of leachate and odour. • After the odour has been removed then the solid waste is sent for segregation. • After segregation solid waste is treated in various ways like landfill, compo fuel generation. Many cities in India, deficiencies in the provision of waste disposes are the finance resources management and technical skills of government authors to deal with the rap growth in demand of services. Pimpari like landfilling, plastic recycling methods for sustainable MSW treatment in India because of that previous year open dump solid waste 2010 open dumping is totally avoided and recycling techniques used by PCMC treatment on MSW. CONCLUSION The amount of solid waste collected in PCMC in 2013 was 235000 metri about 70% of total MSW is recycled plant,and Mechanicalcomposter. management system and the collection facilities do not fit the present requirements. Municipal 0 20 40 60 80 100 120 2006-07 RateofcollectionofMSW(%) NOVATEUR PUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] VOLUME 2, ISSUE 9, SEP. Efficiency of collection of MSW per year in PCMC TREATMENT & DISPOSAL OF MSW Steps followed by the PCMC for waste treatment: After the waste has been collected it is dumped at Moshi site, then it is kept for seven days for has been removed then the solid waste is sent for segregation. After segregation solid waste is treated in various ways like landfill, composting, recycling and ndia, deficiencies in the provision of waste disposes are the result of inadequate finance resources management and technical skills of government authors to deal with the rap Pimpari-Chinchawad Municipal Corporation adopted treatments lastic recycling,Mechanical composter, Bio-diesel plant and vermicomposting methods for sustainable MSW treatment. As per the High court open dumping is totally banned ndia because of that previous year open dump solid waste converted into landfilling. dumping is totally avoided and recycling techniques used by PCMC The amount of solid waste collected in PCMC in 2013 was 235000 metric ton per year. In that is recycled by various treatments like vermicomposting composter. But current regulation system is not sufficient. T management system and the collection facilities do not fit the present requirements. Municipal 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 Year NOVATEUR PUBLICATIONS TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 2, ISSUE 9, SEP.-2015 4 | P a g e llection of MSW per year in PCMC After the waste has been collected it is dumped at Moshi site, then it is kept for seven days for sting, recycling and result of inadequate finance resources management and technical skills of government authors to deal with the rapid Chinchawad Municipal Corporation adopted treatments plant and vermicomposting n dumping is totally banned converted into landfilling. Since dumping is totally avoided and recycling techniques used by PCMC to achieve 100% c ton per year. In that composting,Bio-diesel regulation system is not sufficient. The existing management system and the collection facilities do not fit the present requirements. Municipal 13
  • 5. NOVATEUR PUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 2, ISSUE 9, SEP.-2015 5 | P a g e solid wastes are still collected without separation at the source, treatment facilities are limited and the collected wastes are mostly dumped haphazardly in open areas. In India there is lack of organization and planning in MSW management due to insufficient information about regulations and due to financial restrictions. In the short term, the best policy might be to leave disposal methods without any controls, and use the resources available to upgrade them with environmental protection system. In the long term, construction of new treatment units could be planned. Public participation and awareness are also important issues in achieving the goals of the suggested management system but it is difficult and takes a long time to make people aware of the importance. REFERENCES 1. Bartone, C.R., L. Leite, T. Triche, and R. Schertenleib (2000), ‘Private sector participation in municipal solid waste service: experiences in Latin America’, WasteManagement and Research 9(6): 495–509. 2. Beukering, P. V. (1997), ‘Waste recovery in Bombay: a socio-economic and environmental assessment of different waste management options’, Third World PlanningReview 19(2): 163– 187. 3. City development plan for Pimpri-Chinchawad Muncipal Corporation (2006-2012) 4. CIWMB (California IntegratedWaste Management Board) (1999), ‘Disposal cost fee study, final report’, 90 – 131, Tellus Institute. 5. Coad, Adrian (ed.) (1997), Lessons from India in Solid Waste Management, Water, Engineering and Development Center (WEDC). 6. CPCB (Central Pollution Control Board) (2000), Management of MSW, Ministry of Environment and Forests, Government of India. Environment and Development Economics. 7. Chikarmane P, Narayan L (2000). ‘Formalizing livelihood: case of waste pickers in Pune’ Economic and political weekly, October 7, 2000, pp. 3639- 3462. 8. Darnay, A., and W.E. Franklin. Salvage Markets for Materials in Solid Wastes. Environmental Protection Publication SW-29c. U.S. Government Printing Office. 1972. 9. Director of Census Operations (2001), ‘Provisional population totals, rural urban distribution of population’, Census of India, series 28, Maharashtra, Mumbai. 10. Dhere AM, Pawar CB, Pardeshi PB, Patil DA (2008). ‘Municipal solid waste disposal in Pune city-An analysis of air and ground water pollution” Current Sci., 95(6,25): 773-777, September 2008.
  • 6. NOVATEUR PUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] ISSN: 2394-3696 VOLUME 2, ISSUE 9, SEP.-2015 6 | P a g e 11. Gerlagh, R., P.V. Beukering, M. Verma, P.P. Yadav, and P. Pandey (1999), ‘Integrated modeling of solid waste in India’, CREED working paper no. 26, International Institute of Environment and Development, London. 12. Greene WH (2003). ‘Econometric Analysis’ fifth edition, Pearson Education Private, Ltd, Indian branch, Delhi, India. 13. Li, Y. P., and Huang, G. H. (2010). “Identification of optimal municipal solid waste management strategies through an interval-parameter scenario-based probabilistic programming approach.” J. Air WasteManage. Assoc., 60(4), 439–453. 14. Liu, Z. F., Huang, G. H., Liao, R. F., and He, L. (2009). “DIPIP: Dual interval probabilistic integer programming for solid waste management.” J. Environ. Inform., 14(1), 66–73. 15. Manandhar, R. (2002), ‘Private sector participation in solid waste management in Kathmandu’, Directory: Successful and transferable practise, Kitakyushu Initiative Network. 16. S.M. Al-Salem(2009) ‘Life Cycle Assessment (LCA) of Municipal Solid Waste Management in the State of Kuwait’ European Journal of Scientific Research.