A Road to Development
2
 masum
3
4
Transport and Communications
Sector relates to :
 Roads and Railways Division, M/O. Communication
(RHD, BR, BRTA, BRTC, DTCB)
 Bridges Division, M/O. Communication
 Ministry of Shipping ( IWTA, IWTC)
 Local Government Division (LGED, DCC)
 Ministry of Civil Aviation And Tourism
55
Vision:
 to develop a robust and balanced road network that
can provide a high degree of mobility, accessibility and
safety.
 to establish a modern transport system which is
more safe, affordable, technologically dependable,
environment friendly, and acceptable to all citizens of
the country
To take advantage of country’s geographical position
to trade in transport services
66Source: Revival of Inland Waterways: Strategies and Options, Report, World
Bank 2007
Modal Share of Passenger and Freight Traffic in 2005
Modes of
Transport
Passenger Freight
Billion
ton- km
Share
(%)
Billion
ton- km
Share
(%)
Road 98.4 88 15.7 80
Rail 4.2 4 0.8 4
IWT 8.9 8 3.0 16
Total 111.5 100 19.6 100
 tama
7
8
Share in GDP
Source: Statistical Year Book of Bangladesh 2008
Sectors Name Sub-sector % of GDP
Land Transport 7.53
Bangladesh Railway : 0.08
Road Transport (mechanized) : 5.28
Road Transport (non-mechanized): 2.17
Water 0.64
Air 0.10
Total 8.27
9
Total Transport Network
Category Length in Km
1. Roads 103,536
Highways : 20,948
Rural Roads : 82,588
2. Railways 2,834
3. Inland Waterways 24,000
Navigable:
during monsoon
during dry season
5,968
3,865
1010
Inland Water Transport Network by Category
Class
Indicated
Draft
Length in
Km.
Classification
criteria
I 3.6 meter 683 at least 3.6 m
required to
maintain round the
year.
II 2.1 meter 1000 major inland ports
or place of economic
importance to class
I routes.
III 1.5 meter 1885 seasonal in nature
IV <1.5 meter 2400 in dry season no
navigability
Total 5968
1111
Source: Accident Research Centre (ARC), BUET
Road accident: about 2% of GDP loss per year.
 Fahmida azmin
12
1313
Policy Documents
Approved :
• National Land Transport Policy 2004,
• 20-Year Bangladesh Road Master Plan (RMP) 2007
• 20-Year Strategic Transport Plan (STP) for greater
Dhaka
• 20-Year Rural Road Master Plan
• National Policy for Ports, Ocean Shipping and Inland
Water Transport (2000), and
• Steps Towards Change: National Strategy for
Accelerated Poverty Reduction (NSAPR)- II
1414
Documents awaiting approval:
 Draft Integrated Multi-modal Transport Policy
(IMTP)
 Road Maintenance Fund
 20-year Railway Master Plan
 Inland Water Transport Master Plan Study
(2009)
 Parking Policy
Policy Documents contd.
1515
 construction of the Padma Bridge
 reduction of traffic congestion of Dhaka
City, construction of BRT, MRT and elevated
expressways, flyovers/overpasses etc.
 improve global and regional connectivity
 standardization of road, railway and
waterway networks
 capital dredging of riverine channels
 establish circular rail and waterways in and
around the Dhaka city
 establishment of a Dhaka Mass Transit
Authority (DMTA)
Key Issues Ahead
 masud
16
1717
Milestone Progress
 Padma Multipurpose Bridge (PMB) Final
scheme design already completed
 PQ tender yet to be invited
1818
Salient Features of PMB
Bridge Length : 6.15 km long
Carriageway : 4-lane
Bridge type : Two Level Road-cum-Rail
(Composite Steel Truss) Bridge
Approach Road : 12 Km.
River Training 16 km.
Construction
Duration:
Commencement
Completion
Sep 2009
Dec 2013
1919
Financing of PMB
 Total Cost : About US$ 2.4 billion
Indication from Development Partners:
 World Bank-1200 million
 ADB-550 million
 JICA-300 million
 IDB-130 million
 Abudabi Fund-31.4 million
Total=2211.40 million
GoB-188.60 million
Project Aid
US$ 2211.40
GoB
US$188.6m
(estimated in 2009)
2020
Salient Features of the Proposed 2nd
Padma Bridge
Bridge Length : 6.10 km long
Bridge width : 25.00m.
River Training
Works
: 18.4 Km.
Approach Road : 15.50 Km.
Bridge Type : Pre-stressed Concrete
Box Girder Bridge.
 nosrsat
21
2222
Cost and Financing of the 2nd Padma
Bridge Project
Project Cost
 Total : US$1900.00 million
 GoB : US$ 600.00 million
 PA : US$1300.00 million
(estimated in April. 2009)
68%
32%
Project Aid
(US$ 1300.00m)
68%
32%
GoB
US$ 600.00m)
23
Dhaka Circular Elevated Expressway
 Total Length : 32.2 km (3 Phases: 1st Phase 10.80 km)
 Carriageway : 4 lane
 Design Speed : 80 KPH
 Starting Point : Tongi
 End Point : Jatrabari.
 Estimated Cost : About US$ 2.00 billion
 Financing : Private Investor (BOT/BOOT method)
 Project duration : 2010-2018
 EOI invited on :19.12.2009
 EOI opening : 22.02.2010
2424
 Bangladesh has acceded to the Asian Highway Network and
physical alignment of Asian Highway route in Bangladesh almost
finalized.
 Intergovernmental Agreement on Trans-Asian Railway network
has been accorded by the Cabinet and only awaiting ratification
by the Parliament.
Milestone Progress Contd.
 rafy
25
Mass Rapid Transit System
BRT Line 1
Uttara –Saidabad
BRT Line 2
Gabtoli –Saidabad
BRT Line 3
Uttara –Ramna-Sadarghat
MRT Line 4
Uttara- Saidabad
MRT Line 5
Gulshan 1-2, Mirpur-
Mohammadpur
MRT line 6
Mirpur- Saidabad
2727
DTCB
.
BRT (Bus Rapid Transit)BRT (Bus Rapid Transit)
Circular Waterways around Dhaka
Total Length-110 km.
Already Completed:
 Sadarghat to Ashulia (30 km);
 Dredging: 17.44 lakh m3.
To be Completed:
 Ashulia to Kanchpur (40 km);
 Dredging: 34.73 lakh m3.
Sadarghat
Ashulia
Kanchpur
 arzu
29
3030
Recently Completed Major Projects
Paksey Bridge
(with Financial Assistance from JICA)
Location: Kushtia
Length: 1786 m
3131
Recently Completed Major Projects contd.
Rupsha Bridge
(with Financial Assistance from JICA)
Location: Khulna
Length: 1360 m
3232
Recently Completed Major Projects contd.
3rd Karnaphuli Bridge
(with Financial Assistance from KFAED)
3333
IMPACT OF RURAL ROAD DEVELOPMENT
Increasing agricultural
production
Easy access to service facilities
Poverty reduction through
income generation.
 sanjida
34
3535
Way Forward
 Financing agreements with the Development
Partners for construction of Padma Bridge need to
be expedited.
 Transport infrastructure projects identified by the
transport related agencies need to be financed by
the Development partners
 Sharing experience of other countries on PPP/BOT
model projects
36
Way Forward (Contd.)
Roads & Railway Division Physical Target SFYP and NSAPR-II period
Sl.
No Physical Activities
SFYP target
(2011-15)
NSAPR-II
target
(2009-2011)
i. construction/Widening/Improv
ment of National & Regional
Highways including Asian
Highway Network and Padma
Bridge access road network
and Zila Roads(15 nos.).
13,225 km
( including 320
Km under PPP
project)
5,250 Km
ii. Construction of new
bridges/overpass
45,107 meter 21,100
meter
iii. Construction of Tunnel (2 no.) 3,600 meter -
3737
Description
SFYP
Total target
(2011-2015)
NSAPR-II
Target
(2009-2011)
Construction/Development
of Rural Road
10,000 Km 4000 Km
Development of Union
Road
12,000 Km 4000 Km
Construction of
Bridges/Culverts
455,184 meter 120,000 meter
Construction of Inter
District Bus Termina
4 nos.
LGD Physical Target SFYP and NSAPR-II Period
Way Forward (contd..)
3838
Projects on BOT/PPP Basis
Sl
No
Projects Name Progress so far
1 Dhaka- Chittagong Access
Control Highway
Conceptual Design
completed.
EOI already invited.
2 Elevated Express Way in Dhaka. EOI invited.
3 BRT and MRT System in Dhaka Study going on
3939
Thank you very much

More Related Content

What's hot

SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016
Norma Nun
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
Norma Nun
 
High speed rail 01
High speed rail 01High speed rail 01
High speed rail 01
TedGiras
 
Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAI
Anshuman Jaiswal
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environment
Prabhat Taneja
 

What's hot (20)

ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
ISCN 2015 Dialogue 1: Universities and Cities in the 21st Century, Lincoln Le...
 
SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016SPAD_ASLI_29FEB2016
SPAD_ASLI_29FEB2016
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
 
High speed rail 01
High speed rail 01High speed rail 01
High speed rail 01
 
PPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro OnePPP in Transport - Mumbai Metro One
PPP in Transport - Mumbai Metro One
 
Transpot system in India
Transpot system in IndiaTranspot system in India
Transpot system in India
 
TfL's Approach to Developing a Sustainable Transport System
TfL's Approach to Developing a Sustainable Transport SystemTfL's Approach to Developing a Sustainable Transport System
TfL's Approach to Developing a Sustainable Transport System
 
Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAI
 
Brett herron
Brett herronBrett herron
Brett herron
 
Riyadh Metro Presentation ADA
Riyadh Metro Presentation ADARiyadh Metro Presentation ADA
Riyadh Metro Presentation ADA
 
UIC High Speed Rail Brochure
UIC High Speed Rail BrochureUIC High Speed Rail Brochure
UIC High Speed Rail Brochure
 
Appraising kolkata metro rail project case
Appraising kolkata metro rail project caseAppraising kolkata metro rail project case
Appraising kolkata metro rail project case
 
Bus system reform in India through JnNURM
Bus system reform in India through JnNURMBus system reform in India through JnNURM
Bus system reform in India through JnNURM
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh PrasadRebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
Rebuilding of Railway Infrastructures during the present crisis by Rajesh Prasad
 
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
Engineering for Change... A keynote address on Engineers day- 15th Sep 2019
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environment
 
Sensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & PortsSensible Planning between Road, Rail & Ports
Sensible Planning between Road, Rail & Ports
 
Kalindee Rail Nirman Engineers
Kalindee Rail Nirman EngineersKalindee Rail Nirman Engineers
Kalindee Rail Nirman Engineers
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai Metro
 

Similar to Transport and communications

JKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPADJKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPAD
Norma Nun
 
Transportation Summit08 Tom Prendergast
Transportation Summit08 Tom PrendergastTransportation Summit08 Tom Prendergast
Transportation Summit08 Tom Prendergast
Crooky
 
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Desh Sonyok
 
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness BrochureRampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Pratish Halady
 

Similar to Transport and communications (20)

Frermip presentation navigation in main rivers .ppt v4
Frermip presentation    navigation in main rivers .ppt v4Frermip presentation    navigation in main rivers .ppt v4
Frermip presentation navigation in main rivers .ppt v4
 
Introduction to tranportation
Introduction to tranportationIntroduction to tranportation
Introduction to tranportation
 
Transportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPTTransportation & communication OF PAKISTAN PPT
Transportation & communication OF PAKISTAN PPT
 
JKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPADJKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPAD
 
HIGHWAYS
HIGHWAYS HIGHWAYS
HIGHWAYS
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
 
Project brief updated_aug081
Project brief updated_aug081Project brief updated_aug081
Project brief updated_aug081
 
OVERVIEW OF BANGLORE CMP
OVERVIEW OF BANGLORE CMPOVERVIEW OF BANGLORE CMP
OVERVIEW OF BANGLORE CMP
 
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
The Development of Public Transportation Strategic Plan for Metro Cebu Volume...
 
Transportation Summit08 Tom Prendergast
Transportation Summit08 Tom PrendergastTransportation Summit08 Tom Prendergast
Transportation Summit08 Tom Prendergast
 
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
SMART Seminar Series: A Systems approach to Transport Planning for Revitalizi...
 
RDP Chapter 19
RDP Chapter 19RDP Chapter 19
RDP Chapter 19
 
2.1 Sustainable and inclusive transport - BUET (1).pdf
2.1 Sustainable and inclusive transport - BUET (1).pdf2.1 Sustainable and inclusive transport - BUET (1).pdf
2.1 Sustainable and inclusive transport - BUET (1).pdf
 
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
Diaspora Investment: Opportunities and Challenges in Transport Infrastructure...
 
Kyoto protocol
Kyoto protocol Kyoto protocol
Kyoto protocol
 
The Application of Transit-Oriented Development Approach toward Sustainable D...
The Application of Transit-Oriented Development Approach toward Sustainable D...The Application of Transit-Oriented Development Approach toward Sustainable D...
The Application of Transit-Oriented Development Approach toward Sustainable D...
 
Draft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in KarachiDraft Feasibility report of the railway system in Karachi
Draft Feasibility report of the railway system in Karachi
 
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness BrochureRampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
Rampura-Amulia-Demra Expressway (RAD) Market Awareness Brochure
 
Mjm.infrastructuredevelopmentinindia
Mjm.infrastructuredevelopmentinindiaMjm.infrastructuredevelopmentinindia
Mjm.infrastructuredevelopmentinindia
 
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
Presentation of Cambodian Railway Development & on Costing and Pricing of Rai...
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 

Recently uploaded (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 

Transport and communications

  • 1. 11 Md. Mozammel Haque Khan Secretary Roads and Railways Division Ministry of Communication Transport and Communications A Road to Development
  • 2. 2
  • 4. 4 Transport and Communications Sector relates to :  Roads and Railways Division, M/O. Communication (RHD, BR, BRTA, BRTC, DTCB)  Bridges Division, M/O. Communication  Ministry of Shipping ( IWTA, IWTC)  Local Government Division (LGED, DCC)  Ministry of Civil Aviation And Tourism
  • 5. 55 Vision:  to develop a robust and balanced road network that can provide a high degree of mobility, accessibility and safety.  to establish a modern transport system which is more safe, affordable, technologically dependable, environment friendly, and acceptable to all citizens of the country To take advantage of country’s geographical position to trade in transport services
  • 6. 66Source: Revival of Inland Waterways: Strategies and Options, Report, World Bank 2007 Modal Share of Passenger and Freight Traffic in 2005 Modes of Transport Passenger Freight Billion ton- km Share (%) Billion ton- km Share (%) Road 98.4 88 15.7 80 Rail 4.2 4 0.8 4 IWT 8.9 8 3.0 16 Total 111.5 100 19.6 100
  • 8. 8 Share in GDP Source: Statistical Year Book of Bangladesh 2008 Sectors Name Sub-sector % of GDP Land Transport 7.53 Bangladesh Railway : 0.08 Road Transport (mechanized) : 5.28 Road Transport (non-mechanized): 2.17 Water 0.64 Air 0.10 Total 8.27
  • 9. 9 Total Transport Network Category Length in Km 1. Roads 103,536 Highways : 20,948 Rural Roads : 82,588 2. Railways 2,834 3. Inland Waterways 24,000 Navigable: during monsoon during dry season 5,968 3,865
  • 10. 1010 Inland Water Transport Network by Category Class Indicated Draft Length in Km. Classification criteria I 3.6 meter 683 at least 3.6 m required to maintain round the year. II 2.1 meter 1000 major inland ports or place of economic importance to class I routes. III 1.5 meter 1885 seasonal in nature IV <1.5 meter 2400 in dry season no navigability Total 5968
  • 11. 1111 Source: Accident Research Centre (ARC), BUET Road accident: about 2% of GDP loss per year.
  • 13. 1313 Policy Documents Approved : • National Land Transport Policy 2004, • 20-Year Bangladesh Road Master Plan (RMP) 2007 • 20-Year Strategic Transport Plan (STP) for greater Dhaka • 20-Year Rural Road Master Plan • National Policy for Ports, Ocean Shipping and Inland Water Transport (2000), and • Steps Towards Change: National Strategy for Accelerated Poverty Reduction (NSAPR)- II
  • 14. 1414 Documents awaiting approval:  Draft Integrated Multi-modal Transport Policy (IMTP)  Road Maintenance Fund  20-year Railway Master Plan  Inland Water Transport Master Plan Study (2009)  Parking Policy Policy Documents contd.
  • 15. 1515  construction of the Padma Bridge  reduction of traffic congestion of Dhaka City, construction of BRT, MRT and elevated expressways, flyovers/overpasses etc.  improve global and regional connectivity  standardization of road, railway and waterway networks  capital dredging of riverine channels  establish circular rail and waterways in and around the Dhaka city  establishment of a Dhaka Mass Transit Authority (DMTA) Key Issues Ahead
  • 17. 1717 Milestone Progress  Padma Multipurpose Bridge (PMB) Final scheme design already completed  PQ tender yet to be invited
  • 18. 1818 Salient Features of PMB Bridge Length : 6.15 km long Carriageway : 4-lane Bridge type : Two Level Road-cum-Rail (Composite Steel Truss) Bridge Approach Road : 12 Km. River Training 16 km. Construction Duration: Commencement Completion Sep 2009 Dec 2013
  • 19. 1919 Financing of PMB  Total Cost : About US$ 2.4 billion Indication from Development Partners:  World Bank-1200 million  ADB-550 million  JICA-300 million  IDB-130 million  Abudabi Fund-31.4 million Total=2211.40 million GoB-188.60 million Project Aid US$ 2211.40 GoB US$188.6m (estimated in 2009)
  • 20. 2020 Salient Features of the Proposed 2nd Padma Bridge Bridge Length : 6.10 km long Bridge width : 25.00m. River Training Works : 18.4 Km. Approach Road : 15.50 Km. Bridge Type : Pre-stressed Concrete Box Girder Bridge.
  • 22. 2222 Cost and Financing of the 2nd Padma Bridge Project Project Cost  Total : US$1900.00 million  GoB : US$ 600.00 million  PA : US$1300.00 million (estimated in April. 2009) 68% 32% Project Aid (US$ 1300.00m) 68% 32% GoB US$ 600.00m)
  • 23. 23 Dhaka Circular Elevated Expressway  Total Length : 32.2 km (3 Phases: 1st Phase 10.80 km)  Carriageway : 4 lane  Design Speed : 80 KPH  Starting Point : Tongi  End Point : Jatrabari.  Estimated Cost : About US$ 2.00 billion  Financing : Private Investor (BOT/BOOT method)  Project duration : 2010-2018  EOI invited on :19.12.2009  EOI opening : 22.02.2010
  • 24. 2424  Bangladesh has acceded to the Asian Highway Network and physical alignment of Asian Highway route in Bangladesh almost finalized.  Intergovernmental Agreement on Trans-Asian Railway network has been accorded by the Cabinet and only awaiting ratification by the Parliament. Milestone Progress Contd.
  • 26. Mass Rapid Transit System BRT Line 1 Uttara –Saidabad BRT Line 2 Gabtoli –Saidabad BRT Line 3 Uttara –Ramna-Sadarghat MRT Line 4 Uttara- Saidabad MRT Line 5 Gulshan 1-2, Mirpur- Mohammadpur MRT line 6 Mirpur- Saidabad
  • 27. 2727 DTCB . BRT (Bus Rapid Transit)BRT (Bus Rapid Transit)
  • 28. Circular Waterways around Dhaka Total Length-110 km. Already Completed:  Sadarghat to Ashulia (30 km);  Dredging: 17.44 lakh m3. To be Completed:  Ashulia to Kanchpur (40 km);  Dredging: 34.73 lakh m3. Sadarghat Ashulia Kanchpur
  • 30. 3030 Recently Completed Major Projects Paksey Bridge (with Financial Assistance from JICA) Location: Kushtia Length: 1786 m
  • 31. 3131 Recently Completed Major Projects contd. Rupsha Bridge (with Financial Assistance from JICA) Location: Khulna Length: 1360 m
  • 32. 3232 Recently Completed Major Projects contd. 3rd Karnaphuli Bridge (with Financial Assistance from KFAED)
  • 33. 3333 IMPACT OF RURAL ROAD DEVELOPMENT Increasing agricultural production Easy access to service facilities Poverty reduction through income generation.
  • 35. 3535 Way Forward  Financing agreements with the Development Partners for construction of Padma Bridge need to be expedited.  Transport infrastructure projects identified by the transport related agencies need to be financed by the Development partners  Sharing experience of other countries on PPP/BOT model projects
  • 36. 36 Way Forward (Contd.) Roads & Railway Division Physical Target SFYP and NSAPR-II period Sl. No Physical Activities SFYP target (2011-15) NSAPR-II target (2009-2011) i. construction/Widening/Improv ment of National & Regional Highways including Asian Highway Network and Padma Bridge access road network and Zila Roads(15 nos.). 13,225 km ( including 320 Km under PPP project) 5,250 Km ii. Construction of new bridges/overpass 45,107 meter 21,100 meter iii. Construction of Tunnel (2 no.) 3,600 meter -
  • 37. 3737 Description SFYP Total target (2011-2015) NSAPR-II Target (2009-2011) Construction/Development of Rural Road 10,000 Km 4000 Km Development of Union Road 12,000 Km 4000 Km Construction of Bridges/Culverts 455,184 meter 120,000 meter Construction of Inter District Bus Termina 4 nos. LGD Physical Target SFYP and NSAPR-II Period Way Forward (contd..)
  • 38. 3838 Projects on BOT/PPP Basis Sl No Projects Name Progress so far 1 Dhaka- Chittagong Access Control Highway Conceptual Design completed. EOI already invited. 2 Elevated Express Way in Dhaka. EOI invited. 3 BRT and MRT System in Dhaka Study going on