http://www.iaeme.com/IJEET/index.asp 26 editor@iaeme.com
International Journal of Electrical Engineering & Technology (IJEET)
Volume 6, Issue 8, Sep-Oct, 2015, pp.26-36, Article ID: IJEET_06_08_003
Available online at
http://www.iaeme.com/IJEETissues.asp?JType=IJEET&VType=6&IType=8
ISSN Print: 0976-6545 and ISSN Online: 0976-6553
© IAEME Publication
___________________________________________________________________________
TURBINE RUNNER HEALTH AND THE
EXIGENCIES OF PRODUCTION UNDER
POWER MARKET REFORMS
Prof. Marialis ÇELO
Faculty of Electrical Engineering,
Polytechnic University of Tirana, Albania
ABSTRACT
The reforms undertaken on the Albanian Power Sector strated in 2004
with the unbundling process of Public Utility -KESH focused on functional
unbundling as per the three core activities: generation, transmission and
distribution & retail supply, accounting unbundling, i.e. identification of costs
for each service/function and Legal unbundling (corporatization). As a result
of this process the Transmission System Operator was registered firstly as
Joint Stock Company on 2004 and in 2005 the Transmission System Operator
was legally unbundled. In 2008 the Distribution System Operator (performing
the retail service as well) was legally unbundled. The privatization of the
Distribution System Operator (DSO) started in 2008 and was finalized in mid-
2009 but in 10/27/2014, the distribution company moved again from private to
government administration, known as "Distribution Network Operator"
(OSHEE).The liberalization of generation sector started in 2002 – the small
hydro power plants (up to 15 MW) were given by concession or privatized. It
is a fact that in now days, the hydro generation units are more and more
called for commercial operation due to the exigency of production, necessity
to supply ancillary services as spinning reserve etc.
In this paper we will treat technical problems faced with hydro mechanical
equipment, i.e. runner blade cracking of the units of one of the major HPP in
Albania as a consequence of operation conditions changed.
Key words: Hydroelectric Power Plant, Hydro Mechanical Equipment, Tail
Water, Vibration Measure, Runner Blade, Cavitation Damages, Market Power.
Cite this Article: Prof. Marialis ÇELOTurbine Runner Health and the
Exigencies of Production under Power Market Reforms. International Journal
of Electrical Engineering & Technology, 6(8), 2015, pp. 26-36.
http://www.iaeme.com/IJEET/issues.asp?JType=IJEET&VType=6&IType=8
Turbine Runner Health and The Exigencies of Production Under Power Market Reforms
http://www.iaeme.com/IJEET/index.asp 27 editor@iaeme.com
1. INTRODUCTION
The total installed capacity of all power plants in Albania is around 1,878 MW. The
total installed capacity of private producers is around 347 MW. Installed generation
capacity that is owned by public company, KESH Generation (Drin Cascade),
represents 81.5% of total installed generation capacity in Albania and accounts for
1,450 MW (hydro generation capacity is 1,350 MW and 98 MW is by thermo power
plants-TPP). Production of electricity, in Albania in 2013, was realized 100% by
hydroelectric power plants (HPP).
The country’s power sector relies heavily on hydropower. Fierza Hydroelectric
Power Plant is the first in a cascade series of hydro plants on the Drin River in
Albania. The other stations in the cascade are, in downstream descending order,
Komani, Vau i Dejes and Ashta. While the first three HPP’s on the cascade are state
owned and managed by Albanian power Corporation (KESH), Ashta is a private
hydropower plans recently commissioned, owned and managed by Verbund
Company. Active storage capacity of the Fierza reservoir is 2,700 million m3. The
Fierza powerhouse containing four 127.6 MW Francis vertical generating units is
located at the toe of the earth filled dam. Rated head of the turbines is 118 m and
annual energy production is 1,328 GWh(Fig.1).
The generating units and the majority of the electrical equipment at Fierza HPP
originally were manufactured in China. The generating units were commissioned
between 1978 and 1982.
The hydropower plants of Fierza had been subject of an entire rehabilitation
Project, concerning replacement and or refurbishment of hydro mechanical
equipment, electrical equipment and installation of a new control monitoring system.
The implementation of the rehabilitation Project started in 2002 and was finalized in
2006. The major technical aspects of the intervention done are treated in different
articles published as listed in the references [1-7]. Since our focused in the paper are
the runner blade cracking identified on the rehabilitated runners four years after the
rehabilitation of the HPP, we will detail the work done during the rehabilitation on the
runner, as well as the operation condition after rehabilitation which have been subject
of changes, following the philosophy adopted during the establishment of the Market
Model in Albania.
2. SHORT DESCRIPTION OF REHABILITATION PROJECT
AND OUTCOMES FOR FIERZA HPP
As a result of rehabilitation Project, the power generation is increased by about 4%
per unit (8% for two units) mainly as a result of the two new turbines with a new
profile. The results of the intervention are proved by the index tests carried out after
the completion of the rehabilitation. The overall rehabilitation is very good and the
quality of the work on the mechanical, electrical equipment and CMS equipment is
excellent, Fig.2.
Prof. Marialis ÇELO
http://www.iaeme.com/IJEET/index.asp 28 editor@iaeme.com
Figure 1 Fierza Hydropower Station (Power Generation Building and Dam)
Figure 2 Generator Units (Fierza Machine Hall after finalization of rehabilitation Project)
The plant is more reliable and there is an increase of energy production due to
reduction of the repair time and for non interruption of turbine running compared with
the period prior the rehabilitation as per table Nr.1.Unplanned outage hours totaled
about 1,456 hours before the commencement of rehabilitation (2001), whilst as shown
in Table 1, unplanned outage hours after the rehabilitation (2008–2009) were
dramatically reduced to around 52–44 hours. This is because the frequency of
failures/malfunctions was significantly reduced after rehabilitation of all generator
units as it was expected from the original objective of the Project.
Table Nr.1 Unplanned Outage Hours at Fierza Hydropower Plants (Unit: hours/year)
2001 2008 2009
Unplanned Outage Hours 1456 44 52
Outage Hours by Human Error 0 0 0
Outage Hours by Machine trouble 1456 44 52
3. OPERATING CONDITIONS – FIERZA HPP
Typically before year 2000, (before start of the implementation of rehabilitation
Project) two units only were operated for base load during the day, the other two units
being employed for short term peaking operation. The station having a big reservoir
with annual regulation is typically shut down or on very low output overnight. It was
planned to operate the units with the new runners replaces during rehabilitation at
point of best efficiency using the other two units for part load and peaking. Hence,
based upon previous operation both the units with the new runners it was supposed to
operate for about 7 hours per day as close as possible to load for best efficiency at the
Turbine Runner Health and The Exigencies of Production Under Power Market Reforms
http://www.iaeme.com/IJEET/index.asp 29 editor@iaeme.com
prevailing head, being subject to approximately two start/stops per day. Table Nr.2
shows the operating heads and levels of the reservoir
Table Nr.2 Operating heads and levels of Fierza reservoir
Heads and levels Unit [m]
Flood level EL 297 m
Maximum Normal Reservoir level EL 296 m
Normal Minimum Reservoir level EL 240 m
Minimum Reservoir level EL 237 m
Design net head 99 m
Maximum net head 128 m
Minimum net head 70 m
Rated net head 118 m
Minimum tail water level for operation of a single unit and establishment of the
model test cavitations guarantees is EL 169m. Maximum tail water level with
spillway operation is EL 177m. This is established by Koman reservoir (which is the
second on the descending order on the cascade and was constructed after Fierza).
4. REHABILITATION OF RUNNERS AND WICKET GATES AT
FIERZA HPP (UNIT 1 AND UNIT 3)
The runner of unit 3 is one of the original runners as supplied by Dongfang of China.
These original runners have always had a cracking problem and, to a lesser extent, a
cavitation problem. Before the implementation of the rehabilitation Project they had
been extensively weld repaired by KESH and were further weld repaired by the
Contractor selected during the rehabilitation Project.
As part of the rehabilitation the original runners of Units 2 and 4 were replaced
with new ones manufactured by Vatech (now Andritz) Fig. 3. The design of the new
runners were model tested for improved performance compared to the original
runners and subjected to extensive Finite Element (FEM) stress analysis to guard
against any possibility of cracking in service. The new runners carried a stringent
cracking and cavitation guarantee.
Figure 3 New and old runner
Prof. Marialis ÇELO
http://www.iaeme.com/IJEET/index.asp 30 editor@iaeme.com
Because of lack of funds when letting the rehabilitation Project and the mode of
operation of Fierza at that time replacement runners were proposed for only two of the
Fierza units. Accordingly the two original runners of Units 1 to 4 with the least
history of weld repair were weld repaired by the Contractor and used for Units 1 and
3.
The units have been dismantled and the existing runner were removed from the
unit and transported to the erection bay. There, all 4 runners have been non
destructively tested for cracks using ultrasonic, magna flux and dye penetrant
methods. Any cracks or defects in excess of those permitted by the standards
stipulated on the Contract have been weld repaired according the approved
Contractual procedure. The existing runners are a hybrid construction of carbon steel
crown and band and stainless steel blades. A lot of cracks have been identified. The
testing and repair activities, such as welding, gridding and testing again are shown in
the following photographs in Fig. 4 and Fig.5.
Figure 4 Testing, welding of the runner
Turbine Runner Health and The Exigencies of Production Under Power Market Reforms
http://www.iaeme.com/IJEET/index.asp 31 editor@iaeme.com
Figure 5 Repair and NTD test Fierza runner Unit 3
The wicket gates have been also damaged and erosion can be seen in the
following photographs in Fig.6 (a,b,c).
Figure 6(a) Erosion, damages
Prof. Marialis ÇELO
http://www.iaeme.com/IJEET/index.asp 32 editor@iaeme.com
Figure 6 (b) Welding, repair activities
Figure 6 (c) PT Test on wicket gates
5. VIBRATION TESTS ON THE FOUR UNITSOF FIERZA
Before rehabilitation of the Fierza units the Contractor conducted vibration tests on all
four units. The results of these tests are summarised in the curves of Figure 7.
Figure 7 Results of vibration tests
As is evident in this figure, draft tube vibrations become seriously high at low
loads. The Unit 3 & 4 tests were conducted at a maximum net head of 114 m but
Turbine Runner Health and The Exigencies of Production Under Power Market Reforms
http://www.iaeme.com/IJEET/index.asp 33 editor@iaeme.com
other tests were conducted at lower net heads. The report concluded that part load
draft tube pressure fluctuations increased considerably with increase of net head.
As it was mentioned in the Introduction, the power production in Albania is 100
% based on hydrogeneration and consequently is heavily depended on the hydrologic
condition, rain fall and precipitation, as well as on the upstream leavel of Fierza
reservoir.
In the period between the commissioning of Unit 3 and May 2008 the net heads
were very low and ranged between about 80m and 105m, compare with maximum net
head of 128 m and rated net head of 118 m. Late 2009 up to and including 2010 the
head increased considerably and throughout most of 2010 has been at about 118m. In
the meantime is worth to mention that Transmission System Operator, which has in its
own organization also the Dispatching Center, responsible for the regime of the units,
was since 2005 an Independent Operator, legally unbundled from KESH – Generation
Company.
Besides the power market demands, system operator must satisfy the following
technical demands:
 Regulate the frequency;
 Ensure power balance (maintaining the appropriate spinning reserve and ready-
reserve);
 Compensate power losses;
 Ensure the generation for de-loading of overloaded lines;
 Regulate the voltage, ensuring an adequate voltage profile;
 Ensure power system restoration and the start up of the generation without a
external voltage, that is, ensure black start capabilities.
Ancillary services depend on the power reserve. Taking this into account, the
ancillary service in power market can be divided in two categories:
 The active power ancillary service;
 The reactive power ancillary service.
In the Albanian Market Model, it is Albanian Power Corporation responsible to
gurantee the ancilliary services for TSO. Scheduling of the units production, start/stop
sequences defined by Dispatching Center to gurantee also the stady state stability of
the system are an evidence that the philosophy of the operation of the units is
changed. The operation records and statistics has shown that now the number of
start/stop sequences of the units are much more higher than originally foreseen and it
is evident that the units subject of the investigation (Unit 1 and Unit 3) have been in
operation with low loads at high heads as well as some times with high loads at low
heads, accelerating in this way the deterioration process of the runner blades,
createing cracks and cavitations damages.
During the reforming process of the power sector, it is essential an harmonize
coordination between all market operators and especially between Transmission
System operator – TSO and KESH Gen in order to adress the following issues:
Organizative aspects of power system functioning;
Technical aspects of power system functioning;
Study aspects for an harmonize and efficient development of the system and
market power.
Prof. Marialis ÇELO
http://www.iaeme.com/IJEET/index.asp 34 editor@iaeme.com
All the Fierza units are equipped with vibration measuring equipment. According
to statistics, about 80% of the hydropower units failt will be reflected in the vibrating
signal [8].
The curves of Fig.8 are plotted from operation records and clearly demonstrate
that at net heads above 115m part load vibrations become extremely high especially at
118m at which the units operated for most of 2010.
Figure 8 Head Cover Vibrations
The most pertinent vibration measure to the problem of runner blade cracking is
head cover vibration. Accordingly the Hydro-Mechanical Specialist considers that the
cracking currently seen in the original runners of Unit 3 are a result of operation at
part load at high heads. This borne out by the appearance of cavitation damage on the
crown between blades which is a typical location of the origin of the part load vortex
[2].
6. CRACKING OF THE RUNNER OF UNIT 3 FOUR YEARS
AFTER REHABILITATION PROJECT
As the runners of Units 1 and 3 are the original they are still prone to cracking. It was
envisaged by the expert of hydromechanical works at the time of the rehabilitation
Project that Units 2 and 4 with the new runners would be operated for the majority of
the time and Units 1 and 3 only occasionally. As a matter of fact the record of data
operation had shown that due to the exigencies of production and regime of operation
of the Drin River Cascade (Hydropower plants which are managed by Albanian
Power Corporation) defined from the Dispatching Center -TSO, such philosophy is
changed.
The first inspection after finalization of the rehabilitation Project was carried out
in May 2008. When inspected at that time the runner of Unit 3 was found to be crack
and cavitation damage free. Another inspection was carried out on August 2010 and
were identified that four blades exhibited cracks with Blade 4 having two cracks.
Most of the cracks were in the crown to blade weld however those of Blade 4 were in
the centre of the runner blade. The photographs of Fig.9 and 10 demonstrate the type
Unit 3 Head Cover Vibrations
0
2
4
6
8
10
12
14
16
0 20 40 60 80 100 120 140
MW
mm/s
Hg=118m Hg=115m Hg=104m Hg=80
Turbine Runner Health and The Exigencies of Production Under Power Market Reforms
http://www.iaeme.com/IJEET/index.asp 35 editor@iaeme.com
and extent of the cracks which in most cases were up to approximately 500mm long.
There was also some evidence of cavitation damage on the crown between blades as
can be seen in the photograph of Fig.11. As guaranteed, the new runners of Units 2
and 4 have been crack free.
Figure 9 Cracks on blade Nr.4 Figure10 Craks on welding part og blade Nr.1
Figure 11 Cavitation damage on the crown between blades
Referring to the fact that two years after rehabilitation, at the end of guarantee
period, when inspected in May 2008, the runner of Unit 3 was crack free, the
operating conditions have been checked verified and evaluated, if they have changed
considerably post that date, when compared with those before. The yearly statistics of
2009 and 2010 of power values and the corresponding data of the net head and
vibration measurements obviously show that the unit was not operated in the best way
to minimize cavitations. Hydraulic turbine runners, which operate under a wide range
of heads and outputs, are subjected to considerable dynamic forces at off design
conditions.
It is crucial to follow the recommended operation condition for both Units 1 and 3
to be restricted between 95MW and 118MW at net heads above 105m, in order to
reduce the propensity for cracking, until a new runner is installed. Furthemore a better
coordination between Dispatching Center – Transmission System Operator and KESH
Generation Company should be established in respect of power set point and its
frequency of changes in order to mimize cavitations and erosions damages on runner
blade and wicket gates, but not limitted too.
Prof. Marialis ÇELO
http://www.iaeme.com/IJEET/index.asp 36 editor@iaeme.com
7. CONCLUSIONS
1. Coordination between Generation Company and Transmission System Operation
is very important and crucial with the aim to satisfy the obligations borned from
the Market Model for all partecipants and to guarantee optimal operation
conditions for the units in order to avoid possible damages.
2. A new concept should be established for Maintenance and Operation philosophy
in order to guarantee the sustainability of the invetsment done. Special attention
should be given to the structural aspects of operation and maintenance moving
towards preventive maintenance and condition based preventive maintenance.
3. The Department of Operation in charge of operations related to the
starting/stopping of generator units, where the data of various instruments and
equipments including generator units and transformers are measured and relevant
operations are monitored should be trained and qualified.
4. Continous monitoring of head cover vibration measuring and interpretation of the
results should be done by the staff of HPP.
5. The other rehabilitated runner of Unit 1 should be be non destructively tested in
order to verify the situation.
6. Periodic maintenance on generators and auxiliaries facilities should be done in
time and with an allocated budget, in order to guarantee the expected life time of
the equipment.
REFERENCES
[1] J. H. Gummer, H. Obermoser and M. Çelo, Fierza Station hydro-mechanical
rehabilitation onthe Drin River in Albania, Porto Conference Hydro 2004,
Portugal, November 2004.
[2] J. H. Gummer, Stay vane vibrations in the Nkula Falls turbines, International
Journal for Hydropower and Dams, January 1994.
[3] J. H. Gummer, H. Obermoser, Vau i Dejes hydro-mechanical rehabilitation on the
Drin River inAlbania,Villach Conference Hydro 2005, Austria, October 2005.
[4] M. Çelo and H. Obermoser, Revitalization of the Generator at the Fierza HPP,
Albania, MedPower Conference 2004, Cyprus November 2004
[5] J.H. Gummer, D. M. Barr and G. P. Sims, Evaluation criteria for upgrading
hydro-powerplant, Water Power and Dam Construction, December 1993.
[6] M.Çelo, R.Bualoti , M. Kullolli, The Implementation of Rehabilitation Project of
Main Hydropower Plants in Albania, a way for Improvement of Operational
Reliability, Safety and Environmental Standard, MedPower΄08 – 6th
Mediterranean Conference and Exhibition on Power Generation, Transmission
and Distribution, Thessaloniki, Greece, November 2 – 5, 2008.
[7] M.ÇELO, Hydropower Infrastructure Rehabilitation, Energy, Development and
Climate Change, ENERGY WEEK 2009 THE WORLD BANK GROUP,
March 31- April 2, 2009 Washington, DC 20433
[8] Bide, Z.; Yuan, T.; Ping, Z.J. Vibration fault diagnosis of hydropower units based
on Choquet fuzzy integral. J. Vibr. Shock 2013, 32, 61-66.
[9] P Sridhar and K Bhanu Prasad, Fault Analysis in Hydro Power Plants Using
Matlab/Simulink. International Journal of Electrical Engineering & Technology,
5(5), 2015, pp. 89-99.
[10] Shambhu Ratan Awasthi, Vishnu Prasad and Saroj Rangnekar, Demand Based
Optimal Performance of A Hydroelectric Power Plant, International Journal of
Advanced Research in Engineering & Technology, 4(7), 2013, pp. 109-119.

More Related Content

What's hot

Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Design and development of autotransformer motor starter for induced draft fan...
Design and development of autotransformer motor starter for induced draft fan...Design and development of autotransformer motor starter for induced draft fan...
Design and development of autotransformer motor starter for induced draft fan...Alexander Decker
 
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEEDDEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEEDIngeteam Wind Energy
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301Shubham Yadav
 
Offshore Wind Farm Training
Offshore Wind Farm TrainingOffshore Wind Farm Training
Offshore Wind Farm TrainingTonex
 
IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...
IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...
IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...IRJET Journal
 
IRJET- Design, Implementation & Analysis of Three Phase Asynchronous Indu...
IRJET-  	  Design, Implementation & Analysis of Three Phase Asynchronous Indu...IRJET-  	  Design, Implementation & Analysis of Three Phase Asynchronous Indu...
IRJET- Design, Implementation & Analysis of Three Phase Asynchronous Indu...IRJET Journal
 
Wind farm planning and commissioning
Wind farm planning and commissioningWind farm planning and commissioning
Wind farm planning and commissioningPreet_patel
 
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICALPROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICALRohitsen21
 
Microgrids and energy storage system: An overview and control aspects
Microgrids and energy storage system: An overview and control aspectsMicrogrids and energy storage system: An overview and control aspects
Microgrids and energy storage system: An overview and control aspectsKrishnakumar R. Vasudevan
 
Bhel haridwar new turbine shop
Bhel haridwar new turbine shopBhel haridwar new turbine shop
Bhel haridwar new turbine shopAnuj Gupta
 
IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...
IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...
IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...IRJET Journal
 
IRJET- Design and Fabrication of a Self Balancing Mono Wheel Vehicle
IRJET- Design and Fabrication of a Self Balancing Mono Wheel VehicleIRJET- Design and Fabrication of a Self Balancing Mono Wheel Vehicle
IRJET- Design and Fabrication of a Self Balancing Mono Wheel VehicleIRJET Journal
 
EcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An OverviewEcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An Overviewquonseteer
 
Electric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 IntroductionElectric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 IntroductionDr.Raja R
 
Design and Control of the Pitch of Wind Turbine through PID
Design and Control of the Pitch of Wind Turbine through PIDDesign and Control of the Pitch of Wind Turbine through PID
Design and Control of the Pitch of Wind Turbine through PIDIRJET Journal
 

What's hot (20)

Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Design and development of autotransformer motor starter for induced draft fan...
Design and development of autotransformer motor starter for induced draft fan...Design and development of autotransformer motor starter for induced draft fan...
Design and development of autotransformer motor starter for induced draft fan...
 
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEEDDEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
DEWI Magazin49_Ingeteam_INGECON WIND FIX2VAR SPEED
 
Bhel vocational training report_1301
Bhel vocational training report_1301Bhel vocational training report_1301
Bhel vocational training report_1301
 
1 q05 ch_one-shotbalancing
1 q05 ch_one-shotbalancing1 q05 ch_one-shotbalancing
1 q05 ch_one-shotbalancing
 
Offshore Wind Farm Training
Offshore Wind Farm TrainingOffshore Wind Farm Training
Offshore Wind Farm Training
 
IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...
IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...
IRJET- Solar Radiation Tracking using Pneumatic System to Increase the Effici...
 
IRJET- Design, Implementation & Analysis of Three Phase Asynchronous Indu...
IRJET-  	  Design, Implementation & Analysis of Three Phase Asynchronous Indu...IRJET-  	  Design, Implementation & Analysis of Three Phase Asynchronous Indu...
IRJET- Design, Implementation & Analysis of Three Phase Asynchronous Indu...
 
Mf3620902095
Mf3620902095Mf3620902095
Mf3620902095
 
Wind farm planning and commissioning
Wind farm planning and commissioningWind farm planning and commissioning
Wind farm planning and commissioning
 
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICALPROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
PROJECT REPORT ON BHEL BHOPAL FOR MECHANICAL
 
IJETR041579
IJETR041579IJETR041579
IJETR041579
 
Microgrids and energy storage system: An overview and control aspects
Microgrids and energy storage system: An overview and control aspectsMicrogrids and energy storage system: An overview and control aspects
Microgrids and energy storage system: An overview and control aspects
 
Bhel haridwar new turbine shop
Bhel haridwar new turbine shopBhel haridwar new turbine shop
Bhel haridwar new turbine shop
 
IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...
IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...
IRJET- Hydrochemetic Converter Coupled to Axial-Flux Generator in Floating Sy...
 
IRJET- Design and Fabrication of a Self Balancing Mono Wheel Vehicle
IRJET- Design and Fabrication of a Self Balancing Mono Wheel VehicleIRJET- Design and Fabrication of a Self Balancing Mono Wheel Vehicle
IRJET- Design and Fabrication of a Self Balancing Mono Wheel Vehicle
 
EcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An OverviewEcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An Overview
 
Electric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 IntroductionElectric Drives and Controls Unit 1 Introduction
Electric Drives and Controls Unit 1 Introduction
 
Design and Control of the Pitch of Wind Turbine through PID
Design and Control of the Pitch of Wind Turbine through PIDDesign and Control of the Pitch of Wind Turbine through PID
Design and Control of the Pitch of Wind Turbine through PID
 
APR 1400 Presentation
APR 1400 PresentationAPR 1400 Presentation
APR 1400 Presentation
 

Viewers also liked (19)

Ijmet 06 09_013
Ijmet 06 09_013Ijmet 06 09_013
Ijmet 06 09_013
 
Ijciet 06 09_014
Ijciet 06 09_014Ijciet 06 09_014
Ijciet 06 09_014
 
Oer basics-nov.2015
Oer basics-nov.2015Oer basics-nov.2015
Oer basics-nov.2015
 
Sqoony Solution by MVP Canada_Internal
Sqoony Solution by MVP Canada_InternalSqoony Solution by MVP Canada_Internal
Sqoony Solution by MVP Canada_Internal
 
Miembro inferior
Miembro inferiorMiembro inferior
Miembro inferior
 
#CPAF15 WS3: Nutrition challenges in the Caribbean (Christine Bocage, Caribbe...
#CPAF15 WS3: Nutrition challenges in the Caribbean (Christine Bocage, Caribbe...#CPAF15 WS3: Nutrition challenges in the Caribbean (Christine Bocage, Caribbe...
#CPAF15 WS3: Nutrition challenges in the Caribbean (Christine Bocage, Caribbe...
 
Digital graphics file formats
Digital graphics file formats  Digital graphics file formats
Digital graphics file formats
 
Powerpoint presentation
Powerpoint presentationPowerpoint presentation
Powerpoint presentation
 
A Successful Academic Medical Center Must be a Truly Digital Enterprise
A Successful Academic Medical Center Must be a Truly Digital EnterpriseA Successful Academic Medical Center Must be a Truly Digital Enterprise
A Successful Academic Medical Center Must be a Truly Digital Enterprise
 
ITIKADI assigno
ITIKADI assignoITIKADI assigno
ITIKADI assigno
 
Sakeena presentation
Sakeena presentationSakeena presentation
Sakeena presentation
 
Whiringa a nuku 25
Whiringa a nuku 25Whiringa a nuku 25
Whiringa a nuku 25
 
Viber
ViberViber
Viber
 
Business research Method
Business research MethodBusiness research Method
Business research Method
 
Ijmet 06 09_014
Ijmet 06 09_014Ijmet 06 09_014
Ijmet 06 09_014
 
Family Dynamics and BPD
 Family Dynamics and BPD  Family Dynamics and BPD
Family Dynamics and BPD
 
Pt marine mammals v3
Pt marine mammals v3Pt marine mammals v3
Pt marine mammals v3
 
History of the music industry
History of the music industryHistory of the music industry
History of the music industry
 
Ijaret 06 10_014
Ijaret 06 10_014Ijaret 06 10_014
Ijaret 06 10_014
 

Similar to Ijeet 06 08_003

ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1dashdeepak33
 
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVESIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVEEditor IJMTER
 
IRJET- Solar Vehicle
IRJET- Solar VehicleIRJET- Solar Vehicle
IRJET- Solar VehicleIRJET Journal
 
3.1 turbine and governing
3.1 turbine and governing3.1 turbine and governing
3.1 turbine and governingkomalkishor123
 
IRJET- Power Generation using GYM Equipment (Lat Pull Down)
IRJET- Power Generation using GYM Equipment (Lat Pull Down)IRJET- Power Generation using GYM Equipment (Lat Pull Down)
IRJET- Power Generation using GYM Equipment (Lat Pull Down)IRJET Journal
 
IRJET- Harnessing the Energy Generated from Staircase using Piezoelectric...
IRJET-  	  Harnessing the Energy Generated from Staircase using Piezoelectric...IRJET-  	  Harnessing the Energy Generated from Staircase using Piezoelectric...
IRJET- Harnessing the Energy Generated from Staircase using Piezoelectric...IRJET Journal
 
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...IRJET Journal
 
Development and Performance of Electro Hydraulic Excavator
Development and Performance of Electro Hydraulic ExcavatorDevelopment and Performance of Electro Hydraulic Excavator
Development and Performance of Electro Hydraulic ExcavatorYogeshIJTSRD
 
IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...
IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...
IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...IRJET Journal
 
A Markov model of generator performance at the Kainji hydro-power station in...
A Markov model of generator performance at the Kainji  hydro-power station in...A Markov model of generator performance at the Kainji  hydro-power station in...
A Markov model of generator performance at the Kainji hydro-power station in...IJECEIAES
 
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...IRJET Journal
 
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) LtdBelihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) LtdSandeepa Edirisooriya
 
A Review on Electric Vehicle Powertrain System Components and the Challenges ...
A Review on Electric Vehicle Powertrain System Components and the Challenges ...A Review on Electric Vehicle Powertrain System Components and the Challenges ...
A Review on Electric Vehicle Powertrain System Components and the Challenges ...IRJET Journal
 
IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...
IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...
IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...IRJET Journal
 
IRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power GenerationIRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power GenerationIRJET Journal
 
IRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
IRJET- Power Generation at Speed Bumper by Pneumatic MechanismIRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
IRJET- Power Generation at Speed Bumper by Pneumatic MechanismIRJET Journal
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at CheeyapparaIRJET Journal
 

Similar to Ijeet 06 08_003 (20)

ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1ADANI COMPLETE PROJECT 1
ADANI COMPLETE PROJECT 1
 
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVESIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
SIMULATION AND ANALYSIS OF TIBC FOR INDUCTION MOTOR DRIVE
 
IRJET- Solar Vehicle
IRJET- Solar VehicleIRJET- Solar Vehicle
IRJET- Solar Vehicle
 
3.1 turbine and governing
3.1 turbine and governing3.1 turbine and governing
3.1 turbine and governing
 
IRJET- Power Generation using GYM Equipment (Lat Pull Down)
IRJET- Power Generation using GYM Equipment (Lat Pull Down)IRJET- Power Generation using GYM Equipment (Lat Pull Down)
IRJET- Power Generation using GYM Equipment (Lat Pull Down)
 
IRJET- Harnessing the Energy Generated from Staircase using Piezoelectric...
IRJET-  	  Harnessing the Energy Generated from Staircase using Piezoelectric...IRJET-  	  Harnessing the Energy Generated from Staircase using Piezoelectric...
IRJET- Harnessing the Energy Generated from Staircase using Piezoelectric...
 
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
IRJET- Frequency Control of Distributed Generators in Microgrid with ANFIS Co...
 
Development and Performance of Electro Hydraulic Excavator
Development and Performance of Electro Hydraulic ExcavatorDevelopment and Performance of Electro Hydraulic Excavator
Development and Performance of Electro Hydraulic Excavator
 
IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...
IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...
IRJET - Design of Power Converters for Renewable Energy Sources and Electric ...
 
Az Zour EPP08
Az Zour EPP08Az Zour EPP08
Az Zour EPP08
 
A Markov model of generator performance at the Kainji hydro-power station in...
A Markov model of generator performance at the Kainji  hydro-power station in...A Markov model of generator performance at the Kainji  hydro-power station in...
A Markov model of generator performance at the Kainji hydro-power station in...
 
Manoj
ManojManoj
Manoj
 
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
IRJET- Vortex Bledless Wind Turbine “A New Approach to More Efficient Wind En...
 
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) LtdBelihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
Belihul Oya Mini Hydropower Plant project under LTL holdings (Pvt) Ltd
 
A Review on Electric Vehicle Powertrain System Components and the Challenges ...
A Review on Electric Vehicle Powertrain System Components and the Challenges ...A Review on Electric Vehicle Powertrain System Components and the Challenges ...
A Review on Electric Vehicle Powertrain System Components and the Challenges ...
 
IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...
IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...
IRJET - Design & Construction of Combined Axis Wind Turbine with Solar Power ...
 
IRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power GenerationIRJET- Residential Hydro Power Generation
IRJET- Residential Hydro Power Generation
 
IRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
IRJET- Power Generation at Speed Bumper by Pneumatic MechanismIRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
IRJET- Power Generation at Speed Bumper by Pneumatic Mechanism
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
 
E lne technical document
E lne technical documentE lne technical document
E lne technical document
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Ijeet 06 08_003

  • 1. http://www.iaeme.com/IJEET/index.asp 26 editor@iaeme.com International Journal of Electrical Engineering & Technology (IJEET) Volume 6, Issue 8, Sep-Oct, 2015, pp.26-36, Article ID: IJEET_06_08_003 Available online at http://www.iaeme.com/IJEETissues.asp?JType=IJEET&VType=6&IType=8 ISSN Print: 0976-6545 and ISSN Online: 0976-6553 © IAEME Publication ___________________________________________________________________________ TURBINE RUNNER HEALTH AND THE EXIGENCIES OF PRODUCTION UNDER POWER MARKET REFORMS Prof. Marialis ÇELO Faculty of Electrical Engineering, Polytechnic University of Tirana, Albania ABSTRACT The reforms undertaken on the Albanian Power Sector strated in 2004 with the unbundling process of Public Utility -KESH focused on functional unbundling as per the three core activities: generation, transmission and distribution & retail supply, accounting unbundling, i.e. identification of costs for each service/function and Legal unbundling (corporatization). As a result of this process the Transmission System Operator was registered firstly as Joint Stock Company on 2004 and in 2005 the Transmission System Operator was legally unbundled. In 2008 the Distribution System Operator (performing the retail service as well) was legally unbundled. The privatization of the Distribution System Operator (DSO) started in 2008 and was finalized in mid- 2009 but in 10/27/2014, the distribution company moved again from private to government administration, known as "Distribution Network Operator" (OSHEE).The liberalization of generation sector started in 2002 – the small hydro power plants (up to 15 MW) were given by concession or privatized. It is a fact that in now days, the hydro generation units are more and more called for commercial operation due to the exigency of production, necessity to supply ancillary services as spinning reserve etc. In this paper we will treat technical problems faced with hydro mechanical equipment, i.e. runner blade cracking of the units of one of the major HPP in Albania as a consequence of operation conditions changed. Key words: Hydroelectric Power Plant, Hydro Mechanical Equipment, Tail Water, Vibration Measure, Runner Blade, Cavitation Damages, Market Power. Cite this Article: Prof. Marialis ÇELOTurbine Runner Health and the Exigencies of Production under Power Market Reforms. International Journal of Electrical Engineering & Technology, 6(8), 2015, pp. 26-36. http://www.iaeme.com/IJEET/issues.asp?JType=IJEET&VType=6&IType=8
  • 2. Turbine Runner Health and The Exigencies of Production Under Power Market Reforms http://www.iaeme.com/IJEET/index.asp 27 editor@iaeme.com 1. INTRODUCTION The total installed capacity of all power plants in Albania is around 1,878 MW. The total installed capacity of private producers is around 347 MW. Installed generation capacity that is owned by public company, KESH Generation (Drin Cascade), represents 81.5% of total installed generation capacity in Albania and accounts for 1,450 MW (hydro generation capacity is 1,350 MW and 98 MW is by thermo power plants-TPP). Production of electricity, in Albania in 2013, was realized 100% by hydroelectric power plants (HPP). The country’s power sector relies heavily on hydropower. Fierza Hydroelectric Power Plant is the first in a cascade series of hydro plants on the Drin River in Albania. The other stations in the cascade are, in downstream descending order, Komani, Vau i Dejes and Ashta. While the first three HPP’s on the cascade are state owned and managed by Albanian power Corporation (KESH), Ashta is a private hydropower plans recently commissioned, owned and managed by Verbund Company. Active storage capacity of the Fierza reservoir is 2,700 million m3. The Fierza powerhouse containing four 127.6 MW Francis vertical generating units is located at the toe of the earth filled dam. Rated head of the turbines is 118 m and annual energy production is 1,328 GWh(Fig.1). The generating units and the majority of the electrical equipment at Fierza HPP originally were manufactured in China. The generating units were commissioned between 1978 and 1982. The hydropower plants of Fierza had been subject of an entire rehabilitation Project, concerning replacement and or refurbishment of hydro mechanical equipment, electrical equipment and installation of a new control monitoring system. The implementation of the rehabilitation Project started in 2002 and was finalized in 2006. The major technical aspects of the intervention done are treated in different articles published as listed in the references [1-7]. Since our focused in the paper are the runner blade cracking identified on the rehabilitated runners four years after the rehabilitation of the HPP, we will detail the work done during the rehabilitation on the runner, as well as the operation condition after rehabilitation which have been subject of changes, following the philosophy adopted during the establishment of the Market Model in Albania. 2. SHORT DESCRIPTION OF REHABILITATION PROJECT AND OUTCOMES FOR FIERZA HPP As a result of rehabilitation Project, the power generation is increased by about 4% per unit (8% for two units) mainly as a result of the two new turbines with a new profile. The results of the intervention are proved by the index tests carried out after the completion of the rehabilitation. The overall rehabilitation is very good and the quality of the work on the mechanical, electrical equipment and CMS equipment is excellent, Fig.2.
  • 3. Prof. Marialis ÇELO http://www.iaeme.com/IJEET/index.asp 28 editor@iaeme.com Figure 1 Fierza Hydropower Station (Power Generation Building and Dam) Figure 2 Generator Units (Fierza Machine Hall after finalization of rehabilitation Project) The plant is more reliable and there is an increase of energy production due to reduction of the repair time and for non interruption of turbine running compared with the period prior the rehabilitation as per table Nr.1.Unplanned outage hours totaled about 1,456 hours before the commencement of rehabilitation (2001), whilst as shown in Table 1, unplanned outage hours after the rehabilitation (2008–2009) were dramatically reduced to around 52–44 hours. This is because the frequency of failures/malfunctions was significantly reduced after rehabilitation of all generator units as it was expected from the original objective of the Project. Table Nr.1 Unplanned Outage Hours at Fierza Hydropower Plants (Unit: hours/year) 2001 2008 2009 Unplanned Outage Hours 1456 44 52 Outage Hours by Human Error 0 0 0 Outage Hours by Machine trouble 1456 44 52 3. OPERATING CONDITIONS – FIERZA HPP Typically before year 2000, (before start of the implementation of rehabilitation Project) two units only were operated for base load during the day, the other two units being employed for short term peaking operation. The station having a big reservoir with annual regulation is typically shut down or on very low output overnight. It was planned to operate the units with the new runners replaces during rehabilitation at point of best efficiency using the other two units for part load and peaking. Hence, based upon previous operation both the units with the new runners it was supposed to operate for about 7 hours per day as close as possible to load for best efficiency at the
  • 4. Turbine Runner Health and The Exigencies of Production Under Power Market Reforms http://www.iaeme.com/IJEET/index.asp 29 editor@iaeme.com prevailing head, being subject to approximately two start/stops per day. Table Nr.2 shows the operating heads and levels of the reservoir Table Nr.2 Operating heads and levels of Fierza reservoir Heads and levels Unit [m] Flood level EL 297 m Maximum Normal Reservoir level EL 296 m Normal Minimum Reservoir level EL 240 m Minimum Reservoir level EL 237 m Design net head 99 m Maximum net head 128 m Minimum net head 70 m Rated net head 118 m Minimum tail water level for operation of a single unit and establishment of the model test cavitations guarantees is EL 169m. Maximum tail water level with spillway operation is EL 177m. This is established by Koman reservoir (which is the second on the descending order on the cascade and was constructed after Fierza). 4. REHABILITATION OF RUNNERS AND WICKET GATES AT FIERZA HPP (UNIT 1 AND UNIT 3) The runner of unit 3 is one of the original runners as supplied by Dongfang of China. These original runners have always had a cracking problem and, to a lesser extent, a cavitation problem. Before the implementation of the rehabilitation Project they had been extensively weld repaired by KESH and were further weld repaired by the Contractor selected during the rehabilitation Project. As part of the rehabilitation the original runners of Units 2 and 4 were replaced with new ones manufactured by Vatech (now Andritz) Fig. 3. The design of the new runners were model tested for improved performance compared to the original runners and subjected to extensive Finite Element (FEM) stress analysis to guard against any possibility of cracking in service. The new runners carried a stringent cracking and cavitation guarantee. Figure 3 New and old runner
  • 5. Prof. Marialis ÇELO http://www.iaeme.com/IJEET/index.asp 30 editor@iaeme.com Because of lack of funds when letting the rehabilitation Project and the mode of operation of Fierza at that time replacement runners were proposed for only two of the Fierza units. Accordingly the two original runners of Units 1 to 4 with the least history of weld repair were weld repaired by the Contractor and used for Units 1 and 3. The units have been dismantled and the existing runner were removed from the unit and transported to the erection bay. There, all 4 runners have been non destructively tested for cracks using ultrasonic, magna flux and dye penetrant methods. Any cracks or defects in excess of those permitted by the standards stipulated on the Contract have been weld repaired according the approved Contractual procedure. The existing runners are a hybrid construction of carbon steel crown and band and stainless steel blades. A lot of cracks have been identified. The testing and repair activities, such as welding, gridding and testing again are shown in the following photographs in Fig. 4 and Fig.5. Figure 4 Testing, welding of the runner
  • 6. Turbine Runner Health and The Exigencies of Production Under Power Market Reforms http://www.iaeme.com/IJEET/index.asp 31 editor@iaeme.com Figure 5 Repair and NTD test Fierza runner Unit 3 The wicket gates have been also damaged and erosion can be seen in the following photographs in Fig.6 (a,b,c). Figure 6(a) Erosion, damages
  • 7. Prof. Marialis ÇELO http://www.iaeme.com/IJEET/index.asp 32 editor@iaeme.com Figure 6 (b) Welding, repair activities Figure 6 (c) PT Test on wicket gates 5. VIBRATION TESTS ON THE FOUR UNITSOF FIERZA Before rehabilitation of the Fierza units the Contractor conducted vibration tests on all four units. The results of these tests are summarised in the curves of Figure 7. Figure 7 Results of vibration tests As is evident in this figure, draft tube vibrations become seriously high at low loads. The Unit 3 & 4 tests were conducted at a maximum net head of 114 m but
  • 8. Turbine Runner Health and The Exigencies of Production Under Power Market Reforms http://www.iaeme.com/IJEET/index.asp 33 editor@iaeme.com other tests were conducted at lower net heads. The report concluded that part load draft tube pressure fluctuations increased considerably with increase of net head. As it was mentioned in the Introduction, the power production in Albania is 100 % based on hydrogeneration and consequently is heavily depended on the hydrologic condition, rain fall and precipitation, as well as on the upstream leavel of Fierza reservoir. In the period between the commissioning of Unit 3 and May 2008 the net heads were very low and ranged between about 80m and 105m, compare with maximum net head of 128 m and rated net head of 118 m. Late 2009 up to and including 2010 the head increased considerably and throughout most of 2010 has been at about 118m. In the meantime is worth to mention that Transmission System Operator, which has in its own organization also the Dispatching Center, responsible for the regime of the units, was since 2005 an Independent Operator, legally unbundled from KESH – Generation Company. Besides the power market demands, system operator must satisfy the following technical demands:  Regulate the frequency;  Ensure power balance (maintaining the appropriate spinning reserve and ready- reserve);  Compensate power losses;  Ensure the generation for de-loading of overloaded lines;  Regulate the voltage, ensuring an adequate voltage profile;  Ensure power system restoration and the start up of the generation without a external voltage, that is, ensure black start capabilities. Ancillary services depend on the power reserve. Taking this into account, the ancillary service in power market can be divided in two categories:  The active power ancillary service;  The reactive power ancillary service. In the Albanian Market Model, it is Albanian Power Corporation responsible to gurantee the ancilliary services for TSO. Scheduling of the units production, start/stop sequences defined by Dispatching Center to gurantee also the stady state stability of the system are an evidence that the philosophy of the operation of the units is changed. The operation records and statistics has shown that now the number of start/stop sequences of the units are much more higher than originally foreseen and it is evident that the units subject of the investigation (Unit 1 and Unit 3) have been in operation with low loads at high heads as well as some times with high loads at low heads, accelerating in this way the deterioration process of the runner blades, createing cracks and cavitations damages. During the reforming process of the power sector, it is essential an harmonize coordination between all market operators and especially between Transmission System operator – TSO and KESH Gen in order to adress the following issues: Organizative aspects of power system functioning; Technical aspects of power system functioning; Study aspects for an harmonize and efficient development of the system and market power.
  • 9. Prof. Marialis ÇELO http://www.iaeme.com/IJEET/index.asp 34 editor@iaeme.com All the Fierza units are equipped with vibration measuring equipment. According to statistics, about 80% of the hydropower units failt will be reflected in the vibrating signal [8]. The curves of Fig.8 are plotted from operation records and clearly demonstrate that at net heads above 115m part load vibrations become extremely high especially at 118m at which the units operated for most of 2010. Figure 8 Head Cover Vibrations The most pertinent vibration measure to the problem of runner blade cracking is head cover vibration. Accordingly the Hydro-Mechanical Specialist considers that the cracking currently seen in the original runners of Unit 3 are a result of operation at part load at high heads. This borne out by the appearance of cavitation damage on the crown between blades which is a typical location of the origin of the part load vortex [2]. 6. CRACKING OF THE RUNNER OF UNIT 3 FOUR YEARS AFTER REHABILITATION PROJECT As the runners of Units 1 and 3 are the original they are still prone to cracking. It was envisaged by the expert of hydromechanical works at the time of the rehabilitation Project that Units 2 and 4 with the new runners would be operated for the majority of the time and Units 1 and 3 only occasionally. As a matter of fact the record of data operation had shown that due to the exigencies of production and regime of operation of the Drin River Cascade (Hydropower plants which are managed by Albanian Power Corporation) defined from the Dispatching Center -TSO, such philosophy is changed. The first inspection after finalization of the rehabilitation Project was carried out in May 2008. When inspected at that time the runner of Unit 3 was found to be crack and cavitation damage free. Another inspection was carried out on August 2010 and were identified that four blades exhibited cracks with Blade 4 having two cracks. Most of the cracks were in the crown to blade weld however those of Blade 4 were in the centre of the runner blade. The photographs of Fig.9 and 10 demonstrate the type Unit 3 Head Cover Vibrations 0 2 4 6 8 10 12 14 16 0 20 40 60 80 100 120 140 MW mm/s Hg=118m Hg=115m Hg=104m Hg=80
  • 10. Turbine Runner Health and The Exigencies of Production Under Power Market Reforms http://www.iaeme.com/IJEET/index.asp 35 editor@iaeme.com and extent of the cracks which in most cases were up to approximately 500mm long. There was also some evidence of cavitation damage on the crown between blades as can be seen in the photograph of Fig.11. As guaranteed, the new runners of Units 2 and 4 have been crack free. Figure 9 Cracks on blade Nr.4 Figure10 Craks on welding part og blade Nr.1 Figure 11 Cavitation damage on the crown between blades Referring to the fact that two years after rehabilitation, at the end of guarantee period, when inspected in May 2008, the runner of Unit 3 was crack free, the operating conditions have been checked verified and evaluated, if they have changed considerably post that date, when compared with those before. The yearly statistics of 2009 and 2010 of power values and the corresponding data of the net head and vibration measurements obviously show that the unit was not operated in the best way to minimize cavitations. Hydraulic turbine runners, which operate under a wide range of heads and outputs, are subjected to considerable dynamic forces at off design conditions. It is crucial to follow the recommended operation condition for both Units 1 and 3 to be restricted between 95MW and 118MW at net heads above 105m, in order to reduce the propensity for cracking, until a new runner is installed. Furthemore a better coordination between Dispatching Center – Transmission System Operator and KESH Generation Company should be established in respect of power set point and its frequency of changes in order to mimize cavitations and erosions damages on runner blade and wicket gates, but not limitted too.
  • 11. Prof. Marialis ÇELO http://www.iaeme.com/IJEET/index.asp 36 editor@iaeme.com 7. CONCLUSIONS 1. Coordination between Generation Company and Transmission System Operation is very important and crucial with the aim to satisfy the obligations borned from the Market Model for all partecipants and to guarantee optimal operation conditions for the units in order to avoid possible damages. 2. A new concept should be established for Maintenance and Operation philosophy in order to guarantee the sustainability of the invetsment done. Special attention should be given to the structural aspects of operation and maintenance moving towards preventive maintenance and condition based preventive maintenance. 3. The Department of Operation in charge of operations related to the starting/stopping of generator units, where the data of various instruments and equipments including generator units and transformers are measured and relevant operations are monitored should be trained and qualified. 4. Continous monitoring of head cover vibration measuring and interpretation of the results should be done by the staff of HPP. 5. The other rehabilitated runner of Unit 1 should be be non destructively tested in order to verify the situation. 6. Periodic maintenance on generators and auxiliaries facilities should be done in time and with an allocated budget, in order to guarantee the expected life time of the equipment. REFERENCES [1] J. H. Gummer, H. Obermoser and M. Çelo, Fierza Station hydro-mechanical rehabilitation onthe Drin River in Albania, Porto Conference Hydro 2004, Portugal, November 2004. [2] J. H. Gummer, Stay vane vibrations in the Nkula Falls turbines, International Journal for Hydropower and Dams, January 1994. [3] J. H. Gummer, H. Obermoser, Vau i Dejes hydro-mechanical rehabilitation on the Drin River inAlbania,Villach Conference Hydro 2005, Austria, October 2005. [4] M. Çelo and H. Obermoser, Revitalization of the Generator at the Fierza HPP, Albania, MedPower Conference 2004, Cyprus November 2004 [5] J.H. Gummer, D. M. Barr and G. P. Sims, Evaluation criteria for upgrading hydro-powerplant, Water Power and Dam Construction, December 1993. [6] M.Çelo, R.Bualoti , M. Kullolli, The Implementation of Rehabilitation Project of Main Hydropower Plants in Albania, a way for Improvement of Operational Reliability, Safety and Environmental Standard, MedPower΄08 – 6th Mediterranean Conference and Exhibition on Power Generation, Transmission and Distribution, Thessaloniki, Greece, November 2 – 5, 2008. [7] M.ÇELO, Hydropower Infrastructure Rehabilitation, Energy, Development and Climate Change, ENERGY WEEK 2009 THE WORLD BANK GROUP, March 31- April 2, 2009 Washington, DC 20433 [8] Bide, Z.; Yuan, T.; Ping, Z.J. Vibration fault diagnosis of hydropower units based on Choquet fuzzy integral. J. Vibr. Shock 2013, 32, 61-66. [9] P Sridhar and K Bhanu Prasad, Fault Analysis in Hydro Power Plants Using Matlab/Simulink. International Journal of Electrical Engineering & Technology, 5(5), 2015, pp. 89-99. [10] Shambhu Ratan Awasthi, Vishnu Prasad and Saroj Rangnekar, Demand Based Optimal Performance of A Hydroelectric Power Plant, International Journal of Advanced Research in Engineering & Technology, 4(7), 2013, pp. 109-119.