HIGHWAY DRAWINGS
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE)
NATIONAL HIGHWAYS AUTHORITY OF INDIA
UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
RIGHT SLIP/SERVICE ROAD PLAN AND PROFILE DRAWINGS
(FROM CH: 0+000 TO CH: 23+350)
CONSULTING ENGINEERS PVT LTD
Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072.
# MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments,
INDEPENDENT ENGINEER:
EPC CONTRACTORS:
CONCESSIONAIRE:
NERALURU THORAPALLI ROADWAYS PRIVATE LIMITED,
DESIGN ENGINEER:
Infrastructure Private Limited
scc
AHMEDABAD
SCC House, Opp. Nirma University,
S.G. Highway, Chharodi, Ahmedabad.
START OF THE PROJECT
CH: 0+000
END OF THE PROJECT
CH: 23+350
GENERAL DRAWINGS
2 LEGEND
SL.
TITLE OF DRAWINGS DRAWING NO.
PAGE
NOS.
NO.
A.
03
01
02
1 INDEX
3
4
5
6
7
8
9
04
08
06
10
09
1
2
11
10
12
11
12
07
LIST OF DRAWINGS
13
14
15
NH844/LEGEND
NH844/INDEX
NH844/RSR/P&P/01
NH844/RSR/P&P/02
NH844/RSR/P&P/03
NH844/RSR/P&P/04
NH844/RSR/P&P/05
NH844/RSR/P&P/06
NH844/RSR/P&P/07
NH844/RSR/P&P/08
NH844/RSR/P&P/09
13
NH844/RSR/P&P/10
NH844/RSR/P&P/11
NH844/RSR/P&P/12
NH844/RSR/P&P/13
05
PLAN AND PROFILE DRAWING OF LEFT SLIP/SERVICE ROAD KM 0+000 TO 23+350
B.
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 0+580 TO CH: 1+000)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 1+000 TO CH: 2+000)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 2+000 TO CH: 3+000)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 3+000 TO CH: 3+650)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 5+275 TO CH: 6+300)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 9+930 TO CH: 10+325)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 13+100 TO CH: 13+680)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 15+200 TO CH: 16+000)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 16+000 TO CH: 17+000)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 17+000 TO CH: 18+000)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 18+000 TO CH: 18+780)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 19+720 TO CH: 19+950)
PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 21+290 TO CH: 21+400)
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/INDEX
22-11-2022 N.T.S
0 FIRST SUBMISSION 22.11.2022
EXISTING FEATURES:
PROPOSED CENTER LINE
PROPOSED MEDIAN
PROPOSED PAVED SHOULDER LINE
PROPOSED EARTHEN SHOULDER LINE
FOOTPATH LEFT
PIPE CULVERT
SLAB CULVERT
PROW PROPOSED PROW
HORIZONTAL ALIGNMENT
SUPER ELEVATION
PIPE CULVERT
BOX / SLAB CULVERT
MINOR / MAJOR BRIDGE
LHS
RHS
MINOR / MAJOR BRIDGE
VEHICULAR UNDERPASS
RETAINING WALL
VOP
MH
TF
T
Bridge/Culvert
Electrical poles,
Telephone,
Transformer
Electrical Box
Wire fence
Railway:Metre gauge
Broad gauge with KM Stone
Drain
Borewell
Lamp Post
Hut
Manhole
Pump House
Temple.Mosque,Graves.
Km Pillar, Sub Km Pillar
Embankment
Stream
Pipeline with Gate Valve
Cultivation limit
Cutting
Telephone Box
well
Pit.Hedge
Boulders
Rocky ground
Relative height.
-
KM S FS
km stone, safe guard
stone,furlong stone
Hand pump,tap,Row
Name board,single post,sign
board,ofc stone,flag pole
Roads:Metalled,Unmetalled.
Cart track.Foot path.
Buildings:Permanent,
Temporary;Under Construction.
Trees:Ordinary,
Coconut;Arecanut.
FOOTPATH RIGHT
SEPARATORS
LEFT SERVICE ROAD
RIGHT SERVICE ROAD
UTILITY
OGL AT LEFT MEDIAN EDGE
OGL AT RIGHT MEDIAN EDGE
OGL AT 30M FROM LEFT
OGL AT 30M FROM RIGHT
FRL AT CENTER
ABBREVIATIONS
BS - Beginning of Spiral Curve
BC - Beginning of Circular Curve
EC - End of Circular Curve
ES - End of Spiral Curve
R - Radius of Circular Curve
D - Deviation Angle
Ls - Length of Spiral Curve
Lc - Length of Circular Curve
e - Super-elevation
V - Design Speed
We - Extra Widening
PROPOSED CARRIAGE WAY LINE
LEGEND
LVUP
BOX CULVERT
DESIGN ALIGNMENT VERTICAL PROFILE
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
0 FIRST SUBMISSION 10.09.2022
R0
NH844/LEGEND
10-09-2022 N.T.S
TF
TF
TF
TF
TF
MA
TC
HL
IN
E
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
1/2
0+525
0+525
1x3x2.5 - Box Culvert
1x3x2.5 - Box Culvert
-
New 4-Lane
CA
CHAINAGE
CA
PROP. SPAN
(M
):
DESIGN
CH:
DES. PROP. SPAN
(M
):
CD
NO:
SKEW
PROPOSAL
-
New
4-Lane
SLIP
ROAD
START
CH
:
0+580
CH
:
0+580
SLIP
ROAD
END
CURVE NO
R
(m)
0+300
0+400
0+500
0+600
0+700
0+800
0+900
1+0
00
BS:
0+944
B
C
:
1
+
0
6
4
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW
ROW
ROW
580
590
600
610
620
630
640
650
660
670
680
690
700
710
720
730
740
750
760
770
780
790
800
810
820
830
840
850
860
870
880
890
900
910
920
930
940
950
960
970
980
990
1000
TCS-VIA
899.337
899.522
899.706
899.891
900.075
900.260
900.444
900.629
900.813
900.998
901.182
901.367
901.551
901.736
901.920
902.105
902.289
902.474
902.658
902.843
903.027
903.212
903.396
903.581
903.765
903.950
904.133
904.308
904.475
904.632
904.779
904.918
905.047
905.167
905.278
905.380
905.472
905.555
905.629
905.694
905.750
905.796
905.833
G=1.845
L=255.186m
R=-10841.242m
L=200.000m
580.000
835.186
R=-10841.242m
L=200.000m
943.644
L=120.000m
A=49200.000
L=943.644m
Straight
899.363
899.588
899.838
900.088
900.338
900.588
900.838
901.088
901.338
901.588
901.838
902.088
902.338
902.588
902.838
903.088
903.338
903.588
903.838
904.088
904.338
904.588
904.838
905.088
905.338
905.588
905.838
906.088
906.338
906.588
906.838
907.116
907.404
907.692
907.980
908.268
908.556
908.854
909.142
909.428
909.707
909.978
910.242
896.870
896.870
897.855
898.545
899.202
898.625
899.002
899.305
899.670
899.917
898.945
899.334
899.729
900.048
900.417
900.789
901.167
901.506
901.843
902.191
902.562
902.700
902.818
902.931
903.104
903.288
903.471
903.654
903.911
904.199
904.670
904.934
905.186
905.438
905.684
905.901
906.088
906.184
906.286
906.400
906.517
906.684
906.832
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
ELEV.=905.890m
PVI.
CH=935.186m
22-11-2022
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/01
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=895.000m
NERALURU THORAPALLI AGRAHARAM
T
F
T
F
T
F
T
F
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
2/1
1+055
1+055
1x7.0x4.0 - SVUP
1x7.0x4.0 - SVUP
-
New 4-Lane
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
2/2
1+859
1+859
1x12.0x4.0 - LVUP
1x12.0x4.0 - LVUP
-
New 4-Lane
SLI
P
RO
AD
EN
D
SE
RV
ICE
RO
AD
ST
AR
T
CH
:
1+2
50
SLI
P
RO
AD
ST
AR
T
SE
RV
ICE
RO
AD
EN
D
CH
:
1+2
50
S
L
I
P
R
O
A
D
S
T
A
R
T
S
E
R
V
I
C
E
R
O
A
D
E
N
D
C
H
:
2
+
0
3
0
S
E
R
V
I
C
E
R
O
A
D
E
N
D
S
L
I
P
R
O
A
D
S
T
A
R
T
C
H
:
1
+
5
2
5
S
E
R
V
I
C
E
R
O
A
D
S
T
A
R
T
S
L
I
P
R
O
A
D
E
N
D
C
H
:
1
+
5
2
5
CURVE NO 1
R (m)
-410.000
Lc
326.764
V
100 Kmph
e (%)
D
62° 26' 0.3"
CURVE NO 2
R (m) 415.000
Lc 299.792
Ls
120.0
V 100 Kmph
e (%)
D 57° 57' 26.6"
1
+
0
0
0
1
+
1
0
0
1
+
2
0
0
1+
30
0
1
+
4
0
0
1
+
5
0
0
1
+
6
0
0
1
+
7
0
0
1+
80
0
1
+
9
0
0
2
+
0
0
0
B
S
:
0
+
9
4
4
B
C
:
1
+
0
6
4
E
C
:
1
+
3
9
0
E
S
:
1
+
5
1
0
B
S
:
1
+
5
3
7
B
C
:
1
+
6
5
7
E
C
:
1
+
9
5
7
E
S
:
2
+
0
7
7
Ls
120.0
5.0
5.0
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
1000
1010
1020
1030
1040
1050
1060
1070
1080
1090
1100
1110
1120
1130
1140
1150
1160
1170
1180
1190
1200
1210
1220
1230
1240
1250
1260
1270
1280
1290
1300
1310
1320
1330
1340
1350
1360
1370
1380
1390
1400
1410
1420
1430
1440
1450
1460
1470
1480
1490
1500
1510
1520
1530
1540
1550
1560
1570
1580
1590
1600
1610
1620
1630
1640
1650
1660
1670
1680
1690
1700
1710
1720
1730
1740
1750
1760
1770
1780
1790
1800
1810
1820
1830
1840
1850
1860
1870
1880
1890
1900
1910
1920
1930
1940
1950
1960
1970
1980
1990
2000
TCS-VIA TCS-II TCS-VIA
TCS-VIA
905.833
905.861
905.879
905.889
905.890
905.890
905.890
905.890
905.912
906.014
906.198
906.465
906.792
907.122
907.452
907.782
908.112
908.442
908.772
909.102
909.429
909.742
910.040
910.324
910.592
910.846
911.085
911.310
911.520
911.714
911.895
912.060
912.211
912.347
912.468
912.574
912.666
912.743
912.805
912.852
912.885
912.903
912.906
912.894
912.868
912.827
912.771
912.700
912.614
912.514
912.402
912.290
912.177
912.064
911.952
911.839
911.726
911.614
911.494
911.355
911.193
911.011
910.808
910.583
910.343
910.103
909.863
909.623
909.383
909.143
908.903
908.663
908.423
908.183
907.943
907.703
907.463
907.223
906.983
906.743
906.503
906.263
906.023
905.784
905.575
905.415
905.305
905.245
905.234
905.272
905.330
905.388
905.445
905.503
905.561
905.618
905.676
905.734
905.791
905.849
905.907
G=0.000
G=3.300
G=-1.127 G=-2.400
G=0.577
L=37.480m
L=80.807m
L=78.721m L=196.594m
L=149.411m
R=1212.140m
R=-6776.675m R=-4713.276m
R=2015.656m
L=40.000m
L=300.000m L=60.000m
L=60.000m
1035.186
1072.666
1112.666
1193.473
1493.473
1572.195
1632.195
1828.788
1888.788
R=-10841.242m
L=200.000m
L=26.746m
L=326.764m
L=299.792m
L=120.000m L=120.000m
L=120.000m
R=-410.000m
R=415.000m
A=49200.000 A=49200.000
A=49800.000
Straight
1063.644
1390.408
1510.408
1537.154
1657.154
1956.946
L=120.000m
A=49800.000
910.242
910.508
910.757
910.998
911.233
911.460
911.679
911.872
912.039
912.198
912.350
912.495
912.632
912.761
912.884
912.998
913.106
913.206
913.299
913.384
913.462
913.532
913.595
913.651
913.699
913.740
913.748
913.774
913.795
913.815
913.835
913.856
913.876
913.897
913.913
913.922
913.924
913.918
913.905
913.884
913.820
913.749
913.670
913.584
913.481
913.380
913.272
913.156
913.033
912.902
912.755
912.610
912.461
912.309
912.158
912.007
911.847
911.697
911.591
911.506
911.433
911.353
911.287
911.251
911.230
911.210
911.199
911.216
911.229
911.235
911.233
911.224
911.208
911.184
911.152
911.114
911.068
911.014
910.953
910.885
910.809
910.726
910.636
910.538
910.433
910.320
910.200
910.073
909.938
909.796
909.646
909.489
909.325
909.153
908.974
908.787
908.603
908.440
908.278
908.100
907.915
906.832
906.917
906.980
907.078
907.289
907.605
907.582
907.332
907.173
907.393
906.782
906.792
906.852
906.945
907.182
907.421
907.850
908.103
908.370
908.823
908.853
909.512
910.327
910.948
911.508
912.204
912.403
912.690
913.000
913.271
913.335
913.364
913.388
913.410
913.412
913.407
913.409
913.417
913.431
913.397
913.344
913.301
913.274
913.247
913.207
913.146
913.099
913.050
912.978
912.843
912.717
912.605
912.585
912.516
912.289
912.053
911.863
911.619
911.363
911.174
910.989
910.808
910.630
910.360
910.175
909.987
909.713
909.570
909.259
908.969
908.618
908.336
908.125
908.059
907.994
907.833
907.437
907.087
906.933
906.786
906.574
906.446
906.324
906.288
906.373
906.360
906.479
906.288
906.066
906.338
906.080
905.762
905.624
905.634
905.682
905.608
905.505
905.665
905.873
906.069
906.167
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
SVUP CH:1+055
LVUP CH:1+859
ELEV.=905.890m
ELEV.=914.167m
ELEV.=911.251m
ELEV.=905.092m
PVI.
CH=1092.666m
PVI.
CH=1343.473m
PVI.
CH=1602.195m
PVI.
CH=1858.788m
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/02
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=903.000m
THORAPALLI AGRAHARAM
NERALURU
TF
TF
TF
TF
TF
TF
M
A
TC
H
LI
N
E
MAT
CHL
INE
N
1+859
1+859
1x12.0x4.0 - LVUP
1x12.0x4.0 - LVUP
-
New 4-Lane
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
3/1
2+881
2+881
1x7.0x4.0 - SVUP
1x7.0x4.0 - SVUP
-
New 4-Lane
SLIP
ROAD
END
SERV
ICE
ROAD
STAR
T
CH
:
2+030
SLIP
ROAD
STAR
T
SERV
ICE
ROAD
END
CH
:
2+030
SERVICE
ROAD
END
SLIP
ROAD
START
CH
:
2+460
SERVICE
ROAD
START
SLIP
ROAD
END
CH
:
2+460
2+
00
0
2+100
2+200
2+300
2+400
2+500
2+600
2+700
2+800
2+900
3+000
E
C
:
1
+
9
5
7
ES:
2+077
BS:
2+949
BC:
2+999
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
2000
2010
2020
2030
2040
2050
2060
2070
2080
2090
2100
2110
2120
2130
2140
2150
2160
2170
2180
2190
2200
2210
2220
2230
2240
2250
2260
2270
2280
2290
2300
2310
2320
2330
2340
2350
2360
2370
2380
2390
2400
2410
2420
2430
2440
2450
2460
2470
2480
2490
2500
2510
2520
2530
2540
2550
2560
2570
2580
2590
2600
2610
2620
2630
2640
2650
2660
2670
2680
2690
2700
2710
2720
2730
2740
2750
2760
2770
2780
2790
2800
2810
2820
2830
2840
2850
2860
2870
2880
2890
2900
2910
2920
2930
2940
2950
2960
2970
2980
2990
3000
TCS-VIA TCS-II TCS-VIA
905.907
905.965
906.022
906.080
906.137
906.186
906.220
906.241
906.248
906.241
906.221
906.196
906.171
906.146
906.121
906.096
906.071
906.046
906.021
905.996
905.971
905.946
905.921
905.896
905.871
905.846
905.821
905.796
905.771
905.746
905.721
905.696
905.671
905.646
905.621
905.596
905.571
905.546
905.521
905.496
905.471
905.446
905.421
905.396
905.365
905.325
905.276
905.217
905.149
905.071
904.990
904.908
904.827
904.745
904.664
904.583
904.501
904.420
904.339
904.257
904.176
904.094
904.013
903.932
903.850
903.769
903.688
903.606
903.525
903.443
903.362
903.281
903.199
903.118
903.037
902.955
902.874
902.792
902.711
902.630
902.548
902.467
902.389
902.321
902.263
902.214
902.174
902.144
902.123
902.112
902.110
902.118
902.135
902.162
902.198
902.244
902.295
902.346
902.398
902.449
902.500
G=-0.250 G=-0.814
G=0.514
L=330.702m L=322.099m
L=94.000m
R=-7259.172m R=-10640.270m
R=10548.149m
L=60.000m L=60.000m
L=140.000m
2038.199
2098.199
2428.901
2488.901
2811.000
2951.000
G=0.577
L=149.411m
L=94.000m
L=871.554m
L=120.000m
L=50.000m
A=49800.000
A=60500.000
Straight
2076.946
2948.500
2998.500
907.915
907.722
907.516
907.286
907.091
906.907
906.746
906.608
906.494
906.403
906.336
906.292
906.266
906.241
906.216
906.191
906.166
906.141
906.116
906.091
906.066
906.041
906.016
905.991
905.966
905.941
905.916
905.891
905.866
905.841
905.816
905.791
905.766
905.741
905.716
905.691
905.666
905.641
905.616
905.591
905.566
905.541
905.516
905.500
905.496
905.507
905.531
905.556
905.607
905.671
905.749
905.833
905.916
905.999
906.083
906.166
906.249
906.333
906.416
906.499
906.583
906.666
906.749
906.833
906.916
906.998
907.075
907.144
907.205
907.259
907.306
907.345
907.377
907.401
907.418
907.428
907.430
907.424
907.412
907.392
907.364
907.329
907.287
907.237
907.180
907.116
907.044
906.965
906.878
906.784
906.682
906.573
906.457
906.390
906.354
906.310
906.259
906.201
906.135
906.062
905.971
906.167
906.202
906.276
906.315
906.323
906.478
906.521
906.703
907.146
907.195
907.096
906.926
906.955
906.944
906.843
906.789
906.732
906.686
906.666
906.691
906.678
906.729
906.487
905.798
905.826
905.864
905.878
905.885
905.911
905.936
905.939
905.931
905.965
905.943
905.940
905.771
905.727
905.730
905.786
905.799
905.830
905.842
905.845
905.860
905.896
906.001
905.923
905.875
905.877
905.875
905.913
905.914
905.817
905.491
905.467
905.481
905.245
905.322
905.089
905.170
905.290
905.340
905.386
905.385
905.091
904.871
904.691
904.456
904.342
904.240
904.222
904.096
904.046
903.952
903.865
903.749
903.752
903.703
903.568
903.387
903.180
902.911
902.795
902.734
902.878
903.039
902.981
902.811
902.467
902.134
901.941
901.792
901.690
901.487
901.262
901.082
900.925
900.733
900.564
900.412
900.262
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
SVUP CH:2+881
ELEV.=906.300m
ELEV.=905.324m
ELEV.=901.889m
PVI.
CH=2068.199m
PVI.
CH=2458.901m
PVI.
CH=2881.000m
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/03
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=899.000m
THORAPALLI AGRAHARAM
NERALURU
M
A
T
C
H
L
I
N
E
N
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
4/1
3+100
3+100
1x3x2.5 - Box Culvert
1x3x2.5 - Box Culvert
-
New 4-Lane
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
4/2
3+519
3+525
1x10-Minor Bridge(MCW&SR)
1x10-Minor Bridge(MCW&SR)
-
New 4-Lane
S
L
IP
R
O
A
D
E
N
D
S
L
IP
R
O
A
D
T
A
P
E
R
S
T
A
R
T
C
H
:
3
+
6
5
0
S
L
IP
R
O
A
D
S
T
A
R
T
S
L
IP
R
O
A
D
T
A
P
E
R
E
N
D
C
H
:
3
+
6
5
0
C
H
:
3
+
8
0
0
S
L
IP
R
O
A
D
T
A
P
E
R
E
N
D
C
H
:
3
+
8
0
0
S
L
IP
R
O
A
D
T
A
P
E
R
S
T
A
R
T
CURVE NO
3
R (m)
-1210.000
Lc
655.269
Ls
50.0
V
100 Kmph
e (%)
D
33° 23' 45.0"
3
+
0
0
0
3
+
1
0
0
3
+
2
0
0
3
+
3
0
0
3+
40
0
3+
50
0
3
+
6
0
0
3
+
7
0
0
3
+
8
0
0
3
+
9
0
0
B
S
:
2
+
9
4
9
B
C
:
2
+
9
9
9
E
C
:
3
+
6
5
4
E
S
:
3
+
7
0
4
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
3.70
3000
3010
3020
3030
3040
3050
3060
3070
3080
3090
3100
3110
3120
3130
3140
3150
3160
3170
3180
3190
3200
3210
3220
3230
3240
3250
3260
3270
3280
3290
3300
3310
3320
3330
3340
3350
3360
3370
3380
3390
3400
3410
3420
3430
3440
3450
3460
3470
3480
3490
3500
3510
3520
3530
3540
3550
3560
3570
3580
3590
3600
3610
3620
3630
3640
3650
TCS-VIA
902.500
902.552
902.603
902.654
902.706
902.754
902.778
902.774
902.743
902.685
902.599
902.486
902.346
902.178
901.983
901.760
901.514
901.264
901.014
900.764
900.514
900.264
900.014
899.764
899.514
899.259
898.998
898.729
898.453
898.169
897.879
897.581
897.275
896.963
896.643
896.316
895.986
895.656
895.326
894.996
894.666
894.336
894.006
893.676
893.346
893.016
892.686
892.356
892.027
891.717
891.430
891.165
890.924
890.706
890.511
890.339
890.191
890.065
889.962
889.882
889.826
889.793
889.782
889.795
889.822
889.850
G=-2.500 G=-3.300
G=0.277
L=94.000m
L=84.024m L=127.476m
L=18.500m
R=-3650.230m R=-13749.998m
R=4333.134m
L=110.000m L=110.000m
L=155.000m
3045.000
3155.000
3239.024
3349.024
3476.500
3631.500
3650.000
G=0.514
L=94.000m
L=655.269m
R=-1210.000m
2998.500
3653.769
905.971
905.788
905.598
905.400
905.195
904.982
904.762
904.535
904.300
904.058
903.809
903.559
903.309
903.059
902.809
902.559
902.309
902.059
901.809
901.559
901.309
901.059
900.809
900.559
900.309
900.054
899.793
899.524
899.248
898.964
898.674
898.376
898.070
897.758
897.438
897.111
896.781
896.451
896.121
895.791
895.461
895.131
894.801
894.471
894.141
893.811
893.481
893.151
892.822
892.512
892.225
891.961
891.721
891.503
891.309
891.138
890.991
890.866
890.765
890.687
890.632
890.601
890.592
890.607
890.637
890.667
900.262
900.239
900.297
900.144
900.030
899.954
899.911
899.838
899.768
899.717
899.707
899.700
899.761
899.563
899.316
899.041
898.784
898.614
898.541
898.438
898.325
898.129
897.963
897.761
897.527
897.325
897.123
896.920
896.717
896.517
896.315
896.127
895.995
895.778
895.299
895.203
894.960
894.621
894.278
893.934
893.621
893.326
892.889
892.299
891.809
891.333
890.861
890.390
889.904
889.497
888.059
888.262
886.353
886.942
887.459
888.061
888.506
888.724
888.742
888.748
888.751
888.806
888.869
888.995
889.054
888.924
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
Box Culvert CH:3+100
ELEV.=903.014m
ELEV.=898.163m
ELEV.=889.584m
PVI.
CH=3100.000m
PVI.
CH=3294.024m
PVI.
CH=3554.000m
Minor Bridge CH:3+525
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/04
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=887.000m
THORAPALLI AGRAHARAM
NERALURU
TF
TF
TF
TF
TF
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
M
A
T
C
H
L
IN
E
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
6/1
5+370
5+374
1x3x2.5 - Box Culvert
1x3x2.5 - Box Culvert
12.4
NEW CONSTRUCTION
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
6/3
5+900
5+900
1x2x2 - Box Culvert
1x2x2 - Box Culvert
-
NEW CONSTRUCTION
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
7/1
6+205
6+205
1x3x2 - Box Culvert
1x3x2 - Box Culvert
-
NEW CONSTRUCTION
S
L
IP
R
O
A
D
T
A
P
E
R
E
N
D
S
L
IP
R
O
A
D
S
T
A
R
T
C
H
:
5
+
2
7
5
S
L
IP
R
O
A
D
T
A
P
E
R
S
T
A
R
T
S
L
IP
R
O
A
D
E
N
D
C
H
:
5
+
2
7
5
S
L
I
P
R
O
A
D
E
N
D
S
L
I
P
R
O
A
D
T
A
P
E
R
S
T
A
R
T
C
H
:
6
+
3
0
0
S
L
I
P
R
O
A
D
S
T
A
R
T
S
L
I
P
R
O
A
D
T
A
P
E
R
E
N
D
C
H
:
6
+
3
0
0
SL
IP
RO
AD
EN
D
SE
RV
ICE
RO
AD
ST
AR
T
CH
:
6+
02
5
SL
IP
RO
AD
ST
AR
T
SE
RV
ICE
RO
AD
EN
D
CH
:
6+
02
5
CA CHAINAGE
MCW
DESIGN CH:
CD NO:
CA PROP. SPAN (M):
DES. PROP. SPAN (M):
LHS
PROPOSAL:
SR
CA PROP. SPAN (M):
DES. PROP. SPAN (M):
PROPOSAL:
TYPE OF STRUCTURE:
RHS
6/2
5+760
5+760
Major Bridge
1x30+5x20
1x30+5x20
New 3-Lane
1x30+5x20
1x30+5x20
New 3-Lane
5 x 20
5 x 20
New 2-Lane
5 x 20
5 x 20
New 2-Lane
CURVE NO
5
R (m)
900.000
Lc
472.828
Ls
70.0
V
100 Kmph
e (%)
D
34° 33' 27.0"
CURVE NO 6
R (m) -800.000
Lc 253.675
Ls 75.0
V 100 Kmph
e (%)
D 23° 32' 22.6"
5
+
2
0
0
5
+
3
0
0
5+400
5
+
5
0
0
5
+
6
0
0
5
+
7
0
0
5
+
8
0
0
5
+
9
0
0
6
+
0
0
0
6+
10
0
6
+
2
0
0
6
+
3
0
0
E
C
:
5
+
5
0
4
E
S
:
5
+
5
7
4
B
S
:
5
+
8
9
9
B
C
:
5
+
9
7
4
E
C
:
6
+
2
2
8
E
S
:
6
+
3
0
3
4.90
5.0
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW ROW
ROW
ROW
ROW
ROW
5270
5280
5290
5300
5310
5320
5330
5340
5350
5360
5370
5380
5390
5400
5410
5420
5430
5440
5450
5460
5470
5480
5490
5500
5510
5520
5530
5540
5550
5560
5570
5580
5590
5600
5610
5620
5630
5640
5650
5660
5670
5680
5690
5700
5710
5720
5730
5740
5750
5760
5770
5780
5790
5800
5810
5820
5830
5840
5850
5860
5870
5880
5890
5900
5910
5920
5930
5940
5950
5960
5970
5980
5990
6000
6010
6020
6030
6040
6050
6060
6070
6080
6090
6100
6110
6120
6130
6140
6150
6160
6170
6180
6190
6200
6210
6220
6230
6240
6250
6260
6270
6280
6290
6300
TCS-VIA TCS-IX TCS-VIA TCS-II
TCS-VIA
880.043
880.201
880.195
880.188
880.182
880.176
880.169
880.165
880.172
880.192
880.225
880.270
880.327
880.397
880.480
880.573
880.666
880.760
880.854
880.948
881.042
881.135
881.229
881.323
881.417
881.511
881.605
881.698
881.792
881.886
881.980
882.074
882.167
882.261
882.355
882.444
882.519
882.577
882.620
882.648
882.660
883.572
883.900
884.230
884.560
884.890
885.192
885.449
885.660
885.825
885.945
886.020
886.049
886.061
886.072
886.083
886.095
886.106
886.117
886.129
886.140
886.151
886.162
886.174
886.185
886.196
886.208
886.219
886.230
886.242
886.253
886.264
886.276
886.287
886.298
886.314
886.339
886.374
886.418
886.468
886.517
886.566
886.615
886.664
886.713
G=3.234
G=-0.064
G=0.938 G=3.300 G=0.113 G=0.491
L=30.785m
L=59.000m
L=198.508m L=36.470m L=221.266m L=59.841m
R=7981.724m
R=-6395.577m R=-2196.504m
R=10585.965m
L=80.000m
L=60.000m L=70.000m
L=40.000m
5275.000
5334.000
5414.000
5612.508
5672.508
5872.423
5908.893
5978.893
6200.159
6240.159
6300.000
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.660
882.676
882.745
882.869
883.048
883.282
G=0.000
L=139.916m
R=1818.182m
L=60.000m
5812.423
L=324.771m
L=472.828m
L=253.675m
L=70.000m
L=75.000m L=75.000m
R=900.000m
R=-800.000m
A=63000.000
A=60000.000 A=60000.000
Straight
5504.144
5574.144
5898.916
5973.916
6227.591
6302.591
L=253.675m
R=-800.000m
880.034
880.364
880.694
881.024
881.354
881.684
882.014
882.344
882.674
883.004
883.334
883.664
883.994
884.324
884.654
884.984
885.314
885.639
885.951
886.250
886.535
886.807
887.065
887.310
887.579
887.864
888.135
888.392
888.570
888.734
888.884
889.022
889.145
889.255
889.352
889.435
889.505
889.561
889.604
889.633
889.649
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.652
889.641
889.618
889.580
889.530
889.523
889.502
889.477
889.440
889.379
889.314
889.236
889.135
889.029
888.911
888.769
888.585
888.360
888.138
887.938
887.763
887.611
887.458
887.353
887.272
887.215
887.181
887.171
887.180
887.192
887.203
887.214
887.225
887.236
887.248
887.259
887.270
887.281
887.292
887.304
887.315
887.308
887.265
887.213
887.162
887.119
887.067
887.010
886.956
877.197
877.276
877.334
877.329
877.304
877.270
877.241
876.773
876.323
875.851
876.549
878.029
877.768
877.839
877.876
877.819
877.573
877.687
877.780
877.779
877.795
877.792
878.082
878.430
878.760
878.962
878.858
878.680
878.774
878.882
878.839
878.837
878.979
879.109
879.235
879.306
879.438
879.442
879.422
879.619
879.845
880.127
880.458
882.636
881.520
882.376
882.280
882.185
882.089
881.993
881.898
881.802
881.706
881.610
881.515
881.447
881.465
881.652
881.951
882.106
882.220
882.485
882.746
883.031
882.822
882.549
882.518
882.559
882.603
882.722
882.901
882.946
883.069
883.167
883.264
883.340
883.538
883.521
883.254
883.277
883.308
883.406
883.545
883.561
883.527
883.559
883.696
883.815
883.942
884.082
884.132
884.174
884.285
884.385
884.389
884.504
884.674
884.653
884.637
884.615
884.586
884.885
885.090
885.042
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
Box Culvert CH:5+374
Major Bridge CH:5+760
Box Culvert CH:5+900
Box Culvert CH:6+205
ELEV.=880.141m
ELEV.=882.660m
ELEV.=882.660m
ELEV.=886.008m
ELEV.=886.321m
PVI.
CH=5374.000m
PVI.
CH=5642.508m
PVI.
CH=5842.423m
PVI.
CH=5943.893m
PVI.
CH=6220.159m
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/05
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=875.000m
THORAPALLI AGRAHARAM
NERALURU
9930
9940
9950
9960
9970
9980
9990
10000
10010
10020
10030
10040
10050
10060
10070
10080
10090
10100
10110
10120
10130
10140
10150
10160
10170
10180
10190
10200
10210
10220
10230
10240
10250
10260
10270
10280
10290
10300
10310
10325
10330
L=509.064m
10020.200
R=3000.000m
TCS-VIA TCS-II
L=406.827m
Straight
TCS-VIA
906.000
906.330
906.660
906.990
907.320
907.650
907.980
908.310
908.640
908.970
909.300
909.630
909.960
910.290
910.620
910.950
911.280
911.610
911.940
912.264
912.571
912.860
913.131
913.384
913.619
913.837
914.037
914.219
914.383
914.530
914.659
914.769
914.863
914.944
915.025
915.106
915.187
915.268
915.349
915.375
G=3.300 G=0.809
L=181.862m L=73.138m
R=-5621.138m
L=140.000m
9930.000
10111.862
10251.862
10325.000
L=406.827m
Straight
905.614
905.255
904.784
905.255
906.792
908.235
909.378
910.451
910.752
910.784
910.955
911.203
912.151
912.694
913.201
913.719
913.912
914.261
915.309
915.513
915.550
915.015
914.579
914.451
914.891
915.433
915.946
916.395
916.694
916.824
916.979
917.271
917.449
917.498
917.595
917.681
918.133
917.888
917.947
918.224
918.407
10320
915.430
918.040
915.470
912.388
912.388
912.388
912.388
912.388
912.388
912.388
912.388
912.388
912.388
912.396
912.423
912.467
912.529
912.609
912.708
912.836
912.970
913.123
913.293
913.471
913.641
913.804
913.960
914.109
914.250
914.384
914.510
914.629
914.741
914.845
914.942
915.032
915.114
915.189
915.257
915.317
915.370
915.415
915.454
915.485
915.470
ELEV.=914.311m
PVI.
CH=10181.862m
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
W
W
W
W
W
W
W
W
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW PROW PROW
PROW
B
C
:
1
0
+
0
2
0
EC
:
10+
529
M
A
T
C
H
L
IN
E
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
10/2
9+847
9+851
1x76+1x64 - ROB
1x76+1x64 - ROB
24
New 4-Lane
CURVE NO 9
R (m) 3000.000
Lc 509.064
Ls 0.0
V 100 Kmph
e (%)
D 9° 43' 20.7"
9
+
7
0
0
9
+
8
0
0
9
+
9
0
0
1
0
+
0
0
0
1
0
+
1
0
0
10
+2
00
10+
300
10+400
10+
500
N.C.
C
H
:
9
+
9
3
0
S
L
IP
R
O
A
D
S
T
A
R
T
C
H
:
9
+
9
3
0
S
L
IP
R
O
A
D
E
N
D
SLIP
ROAD
END
SLIP
ROAD
TAPER
STAR
T
CH
:
10+325
SLIP
ROAD
STAR
T
SLIP
ROAD
TAPER
END
CH
:
10+325
CH
:
10+4
75
SLIP
ROA
D
TAPE
R
END
CH
:
10+4
75
SLIP
ROA
D
TAPE
R
STAR
T
S
L
IP
R
O
A
D
E
N
D
S
E
R
V
IC
E
R
O
A
D
S
T
A
R
T
C
H
:
1
0
+
0
7
5
S
L
IP
R
O
A
D
S
T
A
R
T
S
E
R
V
IC
E
R
O
A
D
E
N
D
C
H
:
1
0
+
0
7
5
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/06
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=903.000m
THORAPALLI AGRAHARAM
NERALURU
13100
13110
13120
13130
13140
13150
13160
13170
13180
13190
13200
13210
13220
13230
13240
13250
13260
13270
13280
13290
13300
13310
13320
13330
13340
13350
13360
13370
13380
13390
13400
13410
13420
13430
13440
13450
13460
13470
13480
13490
13500
13510
13520
13530
13540
13550
13560
13570
13580
13590
13600
13610
13620
13630
13640
13650
13660
13670
13680
TCS-VIA TCS-VII
L=2275.900m
Straight
911.711
911.818
911.925
912.031
912.138
912.244
912.351
912.457
912.564
912.663
912.708
912.691
912.612
912.472
912.271
912.007
911.690
911.365
911.040
910.715
910.390
910.065
909.740
909.415
909.090
908.765
908.440
908.114
907.789
907.464
907.139
906.814
906.489
906.164
905.839
905.514
905.205
904.973
904.827
904.766
904.790
904.900
905.079
905.265
905.451
905.637
905.823
906.009
906.196
906.382
906.568
906.754
906.940
907.126
907.312
907.498
907.684
907.870
908.056
G=1.065
G=-3.250
G=1.861
L=85.000m
L=199.000m
L=166.000m
R=-1621.964m
R=1173.880m
L=70.000m
L=60.000m
13100.000
13185.000
13255.000
13454.000
13514.000
13680.000
913.190
913.248
913.340
913.370
913.394
913.415
913.444
913.476
913.502
913.542
913.508
913.435
913.317
913.192
913.046
912.768
912.426
912.147
911.918
911.522
911.138
911.013
910.855
910.753
910.377
909.502
909.862
909.676
909.559
909.355
909.194
908.983
908.765
908.633
908.142
907.735
907.463
907.038
906.800
906.456
906.171
905.833
905.557
905.104
904.826
904.550
904.304
904.071
903.825
903.583
903.332
903.132
902.887
902.506
902.167
901.879
901.574
901.326
901.086
911.724
911.848
911.979
912.105
912.225
912.340
912.449
912.555
912.661
912.767
912.873
912.979
913.085
913.191
913.297
913.404
913.510
913.616
913.722
913.828
913.928
914.014
914.087
914.146
914.193
914.225
914.244
914.250
914.243
914.222
914.187
914.139
914.078
914.004
913.915
913.814
913.699
913.571
913.429
913.274
913.105
912.923
912.728
912.519
912.296
912.061
911.812
911.549
911.273
910.984
910.681
910.365
910.037
909.707
909.377
909.047
908.717
908.387
908.057
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
Box Culvert CH:13+440
VUP CH:13+483
ELEV.=912.990m
ELEV.=904.409m
PVI.
CH=13220.000m
PVI.
CH=13484.000m
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW PROW PROW PROW
BC:
13+939
MATCHLINE
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
14/1
13+450
13+440
1x4x3 - Box Culvert
1x4x3 - Box Culvert
-
NEW CONSTRUCTION
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
14/2
13+484
13+483
1x15x5.5+1x20x5.5+1x15x5.5 - VUP
1x15x5.5+1x20x5.5+1x15x5.5 - VUP
30
New 4-Lane
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
14/3
13+926
13+934
1x3x2.5 - Box Culvert
1x3x2.5 - Box Culvert
-
NEW CONSTRUCTION
13+000
13+100
13+200
13+300
13+400
13+500
13+600
13+700
13+800
13+900
CH
:
12+950
SLIP
ROAD
TAPER
START
CH
:
12+950
SLIP
ROAD
TAPER
END
SLIP
ROAD
TAPER
END
SLIP
ROAD
START
CH
:
13+100
SLIP
ROAD
TAPER
START
SLIP
ROAD
END
CH
:
13+100
SLIP
ROAD
END
SLIP
ROAD
TAPER
START
CH
:
13+680
SLIP
ROAD
START
SLIP
ROAD
TAPER
END
CH
:
13+680
CH
:
13+830
SLIP
ROAD
TAPER
END
CH
:
13+830
SLIP
ROAD
TAPER
START
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/07
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=900.000m
THORAPALLI AGRAHARAM
NERALURU
15200
15210
15220
15230
15240
15250
15260
15270
15280
15290
15300
15310
15320
15330
15340
15350
15360
15370
15380
15390
15400
15410
15420
15430
15440
15450
15460
15470
15480
15490
15500
15510
15520
15530
15540
15550
15560
15570
15580
15590
15600
15610
15620
15630
15640
15650
15660
15670
15680
15690
15700
15710
15720
15730
15740
15750
15760
15770
15780
15790
15800
15810
15820
15830
15840
15850
15860
15870
15880
15890
15900
15910
15920
15930
15940
15950
15960
15970
15980
15990
16000
L=442.122m
L=79.531m
L=75.000m L=75.000m
15371.331
15813.454
15888.454
15967.985
R=800.000m
Straight
TCS-VIA TCS-VII TCS-III
L=1432.600m
R=2500.000m
892.800
892.846
892.892
892.938
892.984
893.030
893.076
893.122
893.168
893.214
893.260
893.306
893.352
893.398
893.444
893.490
893.536
893.582
893.628
893.674
893.720
893.766
893.812
893.858
893.904
893.950
893.996
894.042
894.088
894.134
894.180
894.226
894.272
894.318
894.364
894.410
894.456
894.502
894.548
894.594
894.640
894.686
894.732
894.778
894.824
894.879
894.947
895.030
895.126
895.236
895.359
895.497
895.648
895.812
895.991
896.180
896.370
896.560
896.750
896.940
897.130
897.321
897.511
897.701
897.891
898.081
898.271
898.461
898.651
898.841
899.030
899.199
899.345
899.466
899.564
899.637
899.687
899.712
899.713
899.691
899.646
G=0.460 G=1.901
G=-0.500
L=438.478m L=152.926m
L=38.986m
R=7285.708m
R=-4164.975m
L=105.000m
L=100.000m
15200.000
15638.478
15743.478
15896.404
15996.404
L=1432.600m
R=2500.000m
889.577
889.666
889.757
889.841
889.932
890.021
890.086
890.182
889.976
889.768
890.127
890.354
890.445
890.553
890.601
890.716
890.794
890.819
890.900
890.905
891.007
891.128
891.296
891.573
891.632
891.629
891.546
891.648
891.999
892.291
892.462
892.562
892.587
892.581
892.600
892.982
893.335
893.698
893.924
894.146
894.348
894.537
894.574
894.498
894.437
894.590
895.026
895.427
895.490
895.651
895.543
895.231
895.234
895.336
895.377
895.485
895.702
896.041
896.430
896.509
896.672
896.771
896.881
897.116
897.640
898.160
898.278
898.331
898.466
898.618
898.510
898.275
898.163
898.334
898.429
898.591
898.633
898.713
898.783
898.812
899.109
892.801
892.995
893.193
893.395
893.601
893.812
894.026
894.244
894.467
894.693
894.924
895.158
895.397
895.640
895.887
896.138
896.393
896.652
896.915
897.182
897.454
897.729
898.009
898.292
898.580
898.871
899.167
899.467
899.767
900.067
900.358
900.636
900.901
901.152
901.390
901.615
901.826
902.025
902.210
902.381
902.539
902.684
902.816
902.934
903.040
903.131
903.210
903.275
903.327
903.365
903.391
903.403
903.401
903.387
903.359
903.317
903.263
903.195
903.114
903.019
902.911
902.790
902.656
902.508
902.347
902.173
901.985
901.765
901.503
901.238
901.000
900.762
900.544
900.349
900.178
900.030
899.924
899.832
899.800
899.791
899.741
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
VUP CH:15+691
Box Culvert CH:15+725
ELEV.=895.058m
ELEV.=899.914m
PVI.
CH=15690.978m
PVI.
CH=15946.404m
T
T
TF
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW
PROW
PROW
EC:
15+371
BS:
15+813
BC:
15+8
88
E
C
:
1
5
+
9
6
8
E
S
:
1
6
+
0
4
3
B
S
:
1
6
+
0
9
6
M
A
T
C
H
L
I
N
E
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
16/1
15+150
15+151
1x4x3 - Box Culvert
1x4x3 - Box Culvert
-
NEW CONSTRUCTION
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
16/2
15+700
15+691
1x30x5.5 - VUP
1x30x5.5 - VUP
-
New 4-Lane
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
16/3
15+725
15+725
1x2x2 - Box Culvert
1x2x2 - Box Culvert
-
NEW CONSTRUCTION
CURVE NO 12
R (m)
800.000
Lc
79.531
Ls
75.0
V
100 Kmph
e (%)
D
11° 4' 3.0"
1
5
+
1
0
0
1
5
+
2
0
0
15+
300
15+400
15+500
15+600
15+700
15+800
15
+9
00
1
6
+
0
0
0
1
6
+
1
0
0
5.0
C
H
:
1
5
+
0
5
0
S
L
IP
R
O
A
D
T
A
P
E
R
S
T
A
R
T
C
H
:
1
5
+
0
5
0
S
L
IP
R
O
A
D
T
A
P
E
R
E
N
D
SL
IP
RO
AD
TA
PE
R
EN
D
SL
IP
RO
AD
ST
AR
T
CH
:
15
+2
00
SL
IP
RO
AD
TA
PE
R
ST
AR
T
SL
IP
RO
AD
EN
D
CH
:
15
+2
00
S
L
IP
R
O
A
D
E
N
D
S
E
R
V
IC
E
R
O
A
D
S
T
A
R
T
C
H
:
1
5
+
9
5
0
S
L
IP
R
O
A
D
S
T
A
R
T
S
E
R
V
IC
E
R
O
A
D
E
N
D
C
H
:
1
5
+
9
5
0
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/08
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=889.000m
THORAPALLI AGRAHARAM
NERALURU
PROW
PROW
PROW
PROW PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW
PROW
PROW
PROW
PROW
PROW
ES
:
16
+0
43
BS
:
16
+0
96
BC:
16+
146
EC
:
16
+2
79
ES
:
16
+3
29
BS
:
16
+6
38
BC:
16+733
EC
:
16+
753
E
S
:
1
6
+
8
4
8
B
S
:
1
6
+
8
9
4
BC:
17+014
MA
TC
HL
IN
E
MATCHLINE
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
17/1
16+480
16+479
1x2x2 - Box Culvert
1x2x2 - Box Culvert
-
RECONSTRUCTION
CURVE NO
13
R (m) -1200.000
Lc 132.783
Ls 50.0
V 100 Kmph
e (%)
D 8° 43' 38.1"
CURVE NO 14
R (m) 500.000
Lc 19.993
Ls 95.0
V 100 Kmph
e (%)
D 13° 10' 37.9"
16
+0
00
16
+1
00
16+200
1
6
+
3
0
0
1
6
+
4
0
0
1
6
+
5
0
0
1
6
+
6
0
0
16
+7
00
1
6
+
8
0
0
1
6
+
9
0
0
17+0
00
5.0
3.70
16000
16010
16020
16030
16040
16050
16060
16070
16080
16090
16100
16110
16120
16130
16140
16150
16160
16170
16180
16190
16200
16210
16220
16230
16240
16250
16260
16270
16280
16290
16300
16310
16320
16330
16340
16350
16360
16370
16380
16390
16400
16410
16420
16430
16440
16450
16460
16470
16480
16490
16500
16510
16520
16530
16540
16550
16560
16570
16580
16590
16600
16610
16620
16630
16640
16650
16660
16670
16680
16690
16700
16710
16720
16730
16740
16750
16760
16770
16780
16790
16800
16810
16820
16830
16840
16850
16860
16870
16880
16890
16900
16910
16920
16930
16940
16950
16960
16970
16980
16990
17000
L=53.272m L=308.854m L=45.656m
L=132.783m
L=19.993m
L=75.000m
L=50.000m L=50.000m
L=95.000m
L=95.000m
L=120.000m
16042.985
16096.257
16146.257
16279.040
16329.040
16637.894
16732.894
16752.887
16847.887
16893.543
R=-1200.000m
R=500.000m
Straight Straight Straight
TCS-IV TCS-V
TCS-III TCS-IV
899.646
899.596
899.546
899.496
899.445
899.388
899.324
899.253
899.174
899.088
898.995
898.895
898.788
898.674
898.552
898.423
898.287
898.144
897.994
897.843
897.693
897.542
897.391
897.240
897.090
896.941
896.804
896.682
896.574
896.481
896.402
896.337
896.286
896.250
896.229
896.221
896.228
896.249
896.285
896.335
896.399
896.478
896.571
896.678
896.800
896.936
897.086
897.251
897.430
897.622
897.815
898.009
898.202
898.396
898.588
898.774
898.953
899.124
899.288
899.445
899.594
899.736
899.870
899.997
900.117
900.229
900.334
900.431
900.521
900.604
900.679
900.747
900.807
900.860
900.906
900.944
900.975
900.999
901.015
901.023
901.025
901.019
901.005
900.984
900.956
900.921
900.878
900.827
900.769
900.704
900.631
900.551
900.464
900.369
900.267
900.158
900.041
899.922
899.813
899.728
899.668
G=-0.500 G=-1.507
G=1.935
G=-1.192
L=38.986m L=69.662m
L=50.018m
L=12.372m
R=-13897.278m
R=6972.759m
R=-13528.324m
L=140.000m
L=240.000m
L=423.000m
15996.404
16035.390
16175.390
16245.052
16485.052
16535.070
16958.070
16970.442
R=4215.264m
L=95.000m
899.109
899.038
899.133
899.226
899.319
899.173
899.112
899.012
899.065
898.824
898.727
898.880
898.875
898.501
898.119
898.054
898.032
897.926
897.803
897.699
897.643
897.549
897.645
897.609
897.546
897.377
897.487
897.706
897.464
897.267
897.591
897.516
897.600
897.897
898.041
898.184
898.295
898.167
897.932
898.223
897.551
897.505
897.590
897.603
897.688
897.537
897.577
897.447
898.153
898.755
898.972
899.190
898.285
898.141
898.589
898.798
899.053
899.407
899.664
899.796
899.967
900.255
900.484
900.503
900.402
900.819
901.183
901.235
901.325
901.320
901.460
901.544
902.142
902.289
902.242
902.304
902.290
901.782
901.543
901.122
901.572
902.177
901.318
901.168
900.910
900.586
900.009
899.228
899.033
898.915
898.764
898.259
897.685
896.780
896.460
896.190
895.903
895.612
895.402
895.231
895.379
899.741
899.691
899.641
899.591
899.540
899.483
899.419
899.375
899.377
899.363
899.342
899.314
899.279
899.246
899.196
899.112
898.976
898.833
898.683
898.532
898.382
898.231
898.080
897.929
897.779
897.630
897.493
897.371
897.254
897.089
896.938
896.801
896.669
896.561
896.468
896.388
896.323
896.344
896.380
896.430
896.494
896.573
896.666
896.773
896.895
897.031
897.181
897.346
897.525
897.717
897.910
898.104
898.297
898.491
898.683
898.869
899.048
899.219
899.383
899.540
899.689
899.831
899.965
900.092
900.212
900.324
900.429
900.526
900.616
900.681
900.702
900.725
900.740
900.748
900.776
900.814
900.881
900.950
901.011
901.073
901.120
901.114
901.100
901.079
901.078
901.079
901.072
901.057
901.035
901.015
900.978
900.934
900.883
900.824
900.758
900.694
900.613
900.530
900.457
900.408
900.384
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
Box Culvert CH:16+479
ELEV.=899.119m
ELEV.=895.205m
ELEV.=902.585m
PVI.
CH=16105.390m
PVI.
CH=16365.052m
PVI.
CH=16746.570m
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/09
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=894.000m
THORAPALLI AGRAHARAM
NERALURU
TF
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW
BC
:
17
+0
14
EC:
17+0
61
E
S
:
1
7
+
1
8
1
B
S
:
1
7
+
2
8
6
B
C
:
1
7
+
3
6
1
EC
:
17
+5
21
E
S
:
17
+
59
6
B
S
:
17
+
90
8
BC:
18+003
M
A
T
C
H
L
IN
E
MATC
HLINE
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
18/1
17+043
17+041
1x2x2 - Box Culvert
1x2x2 - Box Culvert
-
RECONSTRUCTION
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
18/2
17+935
17+931
1x2x2 - Box Culvert
1x2x2 - Box Culvert
-
RECONSTRUCTION
CURVE NO 15
R (m) -400.000
Lc 47.727
Ls 120.0
V 100 Kmph
e (%)
D 24° 1' 30.4"
CURVE NO 16
R (m) 800.000
Lc 160.331
Ls 75.0
V 100 Kmph
e (%)
D 16° 51' 15.6"
1
7
+
0
0
0
1
7
+
1
0
0
1
7
+
2
0
0
1
7
+
3
0
0
1
7
+
4
0
0
17
+5
00
1
7
+
6
0
0
1
7
+
7
0
0
1
7
+
8
0
0
1
7
+
9
0
0
18+0
00
5.0
S
E
R
V
IC
E
R
O
A
D
E
N
D
S
L
IP
R
O
A
D
S
T
A
R
T
C
H
:
1
7
+
8
2
5
S
E
R
V
IC
E
R
O
A
D
S
T
A
R
T
S
L
IP
R
O
A
D
E
N
D
C
H
:
1
7
+
8
2
5
5.0
17000
17010
17020
17030
17040
17050
17060
17070
17080
17090
17100
17110
17120
17130
17140
17150
17160
17170
17180
17190
17200
17210
17220
17230
17240
17250
17260
17270
17280
17290
17300
17310
17320
17330
17340
17350
17360
17370
17380
17390
17400
17410
17420
17430
17440
17450
17460
17470
17480
17490
17500
17510
17520
17530
17540
17550
17560
17570
17580
17590
17600
17610
17620
17630
17640
17650
17660
17670
17680
17690
17700
17710
17720
17730
17740
17750
17760
17770
17780
17790
17800
17810
17820
17830
17840
17850
17860
17870
17880
17890
17900
17910
17920
17930
17940
17950
17960
17970
17980
17990
18000
L=104.376m L=312.370m
L=47.727m
L=160.331m
L=120.000m
L=75.000m L=75.000m
L=95.000m
17013.543
17061.269
17181.269
17285.646
17360.646
17520.976
17595.976
17908.346
18003.346
R=-400.000m
R=800.000m
Straight Straight
TCS-IV TCS-III TCS-IV TCS-VIA
899.668
899.630
899.617
899.627
899.661
899.719
899.800
899.903
900.009
900.110
900.204
900.290
900.369
900.441
900.506
900.563
900.612
900.654
900.689
900.717
900.737
900.750
900.755
900.753
900.743
900.727
900.702
900.671
900.632
900.586
900.532
900.471
900.402
900.326
900.243
900.153
900.055
899.949
899.837
899.716
899.589
899.459
899.329
899.199
899.069
898.939
898.809
898.679
898.549
898.419
898.289
898.159
898.029
897.899
897.769
897.639
897.509
897.379
897.249
897.119
896.989
896.859
896.729
896.599
896.469
896.339
896.209
896.079
895.949
895.819
895.689
895.559
895.429
895.299
895.169
895.039
894.909
894.779
894.649
894.519
894.389
894.259
894.129
893.999
893.869
893.739
893.609
893.479
893.349
893.219
893.101
893.006
892.935
892.887
892.862
892.861
892.883
892.928
892.997
893.078
893.158
G=1.062
G=-1.300
L=12.942m
L=491.543m
R=4215.264m
R=-13550.621m
R=4277.750m
L=95.000m
L=320.000m
L=90.050m
17065.442
17078.384
17398.384
17889.927
17979.976
R=4215.264m
L=95.000m
G=0.805
L=103.337m
895.379
895.613
896.173
896.607
894.921
894.980
895.149
895.334
895.540
896.100
897.185
897.069
897.221
897.407
897.617
897.811
897.953
898.098
898.418
899.335
899.168
899.365
899.541
899.651
899.767
899.894
899.929
899.873
899.767
899.563
899.287
899.006
898.912
898.939
898.923
898.727
898.506
898.167
897.923
897.599
897.904
898.278
897.951
897.195
896.773
896.543
896.313
896.109
896.009
895.189
894.027
894.085
893.923
893.413
893.422
893.534
893.866
894.228
893.840
893.352
893.693
893.498
894.158
894.217
894.316
894.387
894.230
894.355
894.131
893.871
893.834
893.793
893.860
893.804
893.509
893.488
893.359
893.262
892.917
893.415
893.450
893.427
893.495
893.392
893.273
893.340
893.335
893.466
893.249
893.051
893.058
892.983
892.801
892.924
892.986
892.921
892.854
892.866
893.408
893.071
900.384
900.391
900.387
900.397
900.431
900.489
900.570
900.637
900.707
900.772
900.830
900.880
900.923
900.950
900.979
901.000
901.013
901.019
901.018
901.001
900.985
900.962
900.931
900.893
900.847
900.822
900.797
900.766
900.727
900.681
900.627
900.566
900.497
900.376
900.239
900.086
899.925
899.819
899.707
899.586
899.459
899.329
899.199
899.069
898.939
898.809
898.679
898.549
898.419
898.289
898.159
898.029
897.899
897.823
897.756
897.680
897.604
897.474
897.344
897.214
897.084
896.954
896.824
896.694
896.564
896.434
896.304
896.174
896.044
895.914
895.784
895.654
895.524
895.394
895.264
895.134
895.004
894.874
894.744
894.614
894.484
894.354
894.233
894.120
894.009
893.907
893.806
893.704
893.593
893.493
893.408
893.338
893.302
893.288
893.298
893.321
893.377
893.457
893.560
893.671
893.792
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
Box Culvert CH:17+041
Box Culvert CH:17+931
ELEV.=899.350m
ELEV.=901.690m
ELEV.=892.635m
PVI.
CH=17017.942m
PVI.
CH=17238.384m
PVI.
CH=17934.951m
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/10
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=889.000m
THORAPALLI AGRAHARAM
NERALURU
TF
PRO
W
PRO
W
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW
PROW
PROW
PROW
PRO
W
PRO
W
PRO
W
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PR
OW
PROW
PROW
PROW
B
S
:
1
7
+
9
0
8
B
C
:
1
8
+
0
0
3
EC
:
18
+3
44
E
S
:
1
8
+
4
3
9
B
S
:
1
8
+
8
8
3
B
C
:
1
8
+
9
3
3
M
A
T
C
H
L
I
N
E
N
1x2x2
- Box
Culvert
1x2x2
- Box
Culvert
-
RECO
NSTRUCTIO
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
19/1
18+438
18+450
1x15x5.5+1x20x5.5+1x15x5.5 - VUP
1x15x5.5+1x20x5.5+1x15x5.5 - VUP
-
New 4-Lane
CURVE NO
17
R (m)
-500.000
Lc
341.135
Ls
95.0
V
100 Kmph
e (%)
D
49° 58' 38.4"
1
7
+
9
0
0
1
8
+
0
0
0
1
8
+
1
0
0
1
8
+
2
0
0
18+
300
1
8
+
4
0
0
1
8
+
5
0
0
1
8
+
6
0
0
1
8
+
7
0
0
1
8
+
8
0
0
1
8
+
9
0
0
5.0
S
L
IP
R
O
A
D
E
N
D
S
L
IP
R
O
A
D
T
A
P
E
R
S
T
A
R
T
C
H
:
1
8
+
7
8
0
S
L
IP
R
O
A
D
S
T
A
R
T
S
L
IP
R
O
A
D
T
A
P
E
R
E
N
D
C
H
:
1
8
+
7
8
0
C
H
:
1
8
+
9
3
0
S
L
IP
R
O
A
D
T
A
P
E
R
E
N
D
C
H
:
1
8
+
9
3
0
S
L
IP
R
O
A
D
T
A
P
E
R
S
T
A
R
T
18000
18010
18020
18030
18040
18050
18060
18070
18080
18090
18100
18110
18120
18130
18140
18150
18160
18170
18180
18190
18200
18210
18220
18230
18240
18250
18260
18270
18280
18290
18300
18310
18320
18330
18340
18350
18360
18370
18380
18390
18400
18410
18420
18430
18440
18450
18460
18470
18480
18490
18500
18510
18520
18530
18540
18550
18560
18570
18580
18590
18600
18610
18620
18630
18640
18650
18660
18670
18680
18690
18700
18710
18720
18730
18740
18750
18760
18770
18780
L=443.983m
L=341.135m
L=95.000m
18003.346
18344.481
18439.481
R=-500.000m
Straight
TCS-VII
TCS-VIA
893.158
893.239
893.319
893.400
893.480
893.561
893.641
893.722
893.802
893.878
893.931
893.960
893.966
893.948
893.907
893.842
893.754
893.642
893.507
893.348
893.165
892.959
892.730
892.492
892.255
892.017
891.780
891.542
891.305
891.068
890.830
890.593
890.355
890.118
889.880
889.643
889.406
889.168
888.931
888.693
888.456
888.218
887.981
887.743
887.506
887.269
887.040
886.846
886.689
886.568
886.484
886.436
886.415
886.396
886.378
886.359
886.340
886.321
886.302
886.283
886.264
886.246
886.227
886.208
886.189
886.170
886.151
886.132
886.114
886.095
886.076
886.057
886.038
886.019
886.000
885.982
885.963
885.944
885.925
G=0.805
G=-2.374 G=-0.189
L=103.337m
L=234.687m L=267.000m
R=-4245.978m
R=2744.916m
L=135.000m
L=60.000m
18083.313
18218.313
18453.000
18513.000
18780.000
893.071
893.022
893.032
893.041
893.085
893.130
893.170
893.594
893.242
893.294
893.346
893.380
893.451
893.467
893.479
893.517
893.349
893.213
893.126
893.032
892.897
892.765
892.388
891.838
890.433
889.852
889.856
889.240
888.320
888.426
888.693
888.279
888.156
888.034
887.894
887.784
887.970
888.268
888.399
888.413
888.224
888.384
888.592
889.055
889.245
889.015
888.664
889.674
890.186
889.668
890.300
890.281
890.553
891.424
891.173
890.796
890.335
890.040
889.807
889.568
889.312
888.993
888.644
888.286
887.867
887.443
886.975
886.375
885.578
884.918
884.397
883.938
883.173
882.396
881.583
881.239
880.807
880.565
880.185
893.792
893.893
893.985
894.077
894.169
894.261
894.353
894.445
894.537
894.629
894.721
894.813
894.906
894.998
895.090
895.182
895.274
895.366
895.458
895.550
895.642
895.734
895.826
895.918
896.011
896.103
896.195
896.287
896.378
896.460
896.528
896.583
896.625
896.653
896.667
896.649
896.618
896.565
896.497
896.426
896.332
896.224
896.103
895.978
895.830
895.669
895.494
895.315
895.114
894.899
894.671
894.439
894.184
893.916
893.662
893.396
893.116
892.822
892.515
892.195
891.865
891.535
891.205
890.875
890.545
890.215
889.885
889.555
889.225
888.895
888.565
888.235
887.905
887.575
887.245
886.915
886.585
886.255
885.925
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
ELEV.=894.372m
ELEV.=886.485m
PVI.
CH=18150.813m
PVI.
CH=18483.000m
VUP CH:18+450
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/11
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=879.000m
THORAPALLI AGRAHARAM
NERALURU
CH-153-600
CH-153-700
CH-153-500
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW PROW
PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW
PROW
MATCHLINE
TEMPLE
N
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
20/2
19+701
19+700
1x15+1x45.44+1x15 - ROB
1x15+1x45.44+1x15 - ROB
16
New 4-Lane
19+500
19+600
19+700
19+800
19+900
20+000
SLIP
ROAD
TAPER
END
SLIP
ROAD
START
CH
:
19+720
SLIP
ROAD
TAPER
START
SLIP
ROAD
END
CH
:
19+720
CH
:
19+950
SLIP
ROAD
END
CH
:
19+950
SLIP
ROAD
START
19720
19730
19740
19750
19760
19770
19780
19790
19800
19810
19820
19830
19840
19850
19860
19870
19880
19890
19900
19910
19920
19930
19940
19950
TCS-VIII
864.528
864.198
863.868
863.538
863.208
862.878
862.548
862.218
861.888
861.558
861.228
860.898
860.568
860.238
859.908
859.578
859.248
858.918
858.588
858.258
857.928
857.598
857.268
856.938
G=-3.300
L=230.000m
19720.000
19950.000
L=1499.521m
Straight
864.644
864.330
864.168
864.011
863.694
863.262
863.239
863.324
862.758
861.887
861.799
861.485
860.877
860.373
859.877
859.428
858.999
858.726
857.882
857.612
857.535
857.208
856.734
856.283
872.207
872.207
872.207
872.202
872.184
872.152
872.107
872.049
871.977
871.891
871.792
871.680
871.554
871.414
871.261
871.095
870.915
870.722
870.515
870.295
870.061
869.814
869.553
869.279
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/12
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=855.000m
THORAPALLI AGRAHARAM
NERALURU
TF
PROW
PROW
PROW
PROW
PROW PROW PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW
PROW PROW PROW
PROW PROW
PROW
CA CHAINAGE
CA PROP. SPAN (M):
DESIGN CH:
DES. PROP. SPAN (M):
CD NO:
SKEW
PROPOSAL
22/1
21+400
21+408
1x7.0x4.0 - SVUP
1x7.0x4.0 - SVUP
-
New 4-Lane
CURVE NO
19
R (m)
1200.000
Lc
961.768
Ls
50.0
V
100 Kmph
e (%)
D
48° 18' 30.0"
2
1
+
2
0
0
2
1
+
3
0
0
21+400
2
1
+
5
0
0
2
1
+
6
0
0
3.70
C
H
:
2
1
+
2
7
0
CH
:
21+420
21290
21300
21310
21320
21330
21340
21350
21360
21370
21380
21390
21400
21410
TCS-VI
844.744
843.767
842.790
841.814
840.837
839.860
838.883
837.906
836.929
835.953
834.976
833.999
834.078
G=-9.768
L=110.000m
21290.000
21400.000
L=961.768m
R=1200.000m
844.495
843.356
842.168
840.963
839.914
839.470
838.827
838.142
837.805
837.041
836.459
836.171
836.083
841.214
841.036
840.851
840.659
840.460
840.253
840.038
839.817
839.588
839.352
839.109
838.865
838.621
TCS TYPE
PROPOSED CHAINAGE
HORIZONTAL ALIGNMENT
FINISHED ROAD LEVEL
VERTICAL ALIGNMENT
@ RSR INNER EDGE
RIGHT MAIN CARRIAGEWAY
EDGE LEVELS
GROUND LEVELS
@ RSR INNER EDGE
SVUP CH:21+408
OGL AT RSR INNER EDGE
RMCW EDGE LEVEL
FRL AT RSR INNER EDGE
CONSULTING ENGINEERS PVT LTD
# MIG 192 & 193, Flat No. 301, 3rd Floor,
Krishna Apartments, Road No.1, KPHB Colony,
Kukatpally, Hyderabad, Telangana-500072.
PVR CONSULTING ENGINEERS PVT. LTD.
FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844
NATIONAL HIGHWAYS
AUTHORITY OF INDIA
FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA
PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE
IN THE STATES OF KARNATAKA & TAMIL NADU.
SCC House, Opp. Nirma University,
Infrastructure Private Limited
PRIVATE LIMITED, AHMEDABAD
NERALURU THORAPALLI ROADWAYS scc
S.G. Highway, Chharodi, Ahmedabad.
R0
NH844/RSR/P&P/13
22-11-2022
0 FIRST SUBMISSION 22.11.2022
VERTICAL 1:200
HORIZONTAL 1:2000
DATUM=833.000m
THORAPALLI AGRAHARAM
NERALURU

More Related Content

What's hot

What's hot (20)

Criterios básicos de una vía
Criterios básicos de una víaCriterios básicos de una vía
Criterios básicos de una vía
 
1-Fiber-Modeling-Approach.pdf
1-Fiber-Modeling-Approach.pdf1-Fiber-Modeling-Approach.pdf
1-Fiber-Modeling-Approach.pdf
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
دراسة التقاطعات والسلامة المرورية
دراسة التقاطعات والسلامة المروريةدراسة التقاطعات والسلامة المرورية
دراسة التقاطعات والسلامة المرورية
 
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
 
Albañileria confinada
Albañileria confinadaAlbañileria confinada
Albañileria confinada
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
 
Report on insertion of br. approach sleeper to standardised the approach slee...
Report on insertion of br. approach sleeper to standardised the approach slee...Report on insertion of br. approach sleeper to standardised the approach slee...
Report on insertion of br. approach sleeper to standardised the approach slee...
 
36 trivino 2012 barrera nj 41812545
36 trivino 2012 barrera nj 4181254536 trivino 2012 barrera nj 41812545
36 trivino 2012 barrera nj 41812545
 
3. Highway Drainage.pdf
3. Highway Drainage.pdf3. Highway Drainage.pdf
3. Highway Drainage.pdf
 
Cross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdfCross Section of Permanent Way.pdf
Cross Section of Permanent Way.pdf
 
7. Traffic Engineering.pdf
7. Traffic Engineering.pdf7. Traffic Engineering.pdf
7. Traffic Engineering.pdf
 
10.01.03.049-One Way Slab
10.01.03.049-One Way Slab10.01.03.049-One Way Slab
10.01.03.049-One Way Slab
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Columna
ColumnaColumna
Columna
 
Pier & bridge guide
Pier & bridge guidePier & bridge guide
Pier & bridge guide
 
Unit 1. introduction to Railway Engineering
Unit 1. introduction to Railway EngineeringUnit 1. introduction to Railway Engineering
Unit 1. introduction to Railway Engineering
 
Microscopic traffic stream model
Microscopic traffic stream modelMicroscopic traffic stream model
Microscopic traffic stream model
 
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURESAPPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
APPLIED USE OF PVC & RUBBER WATER-STOPS ON CONCRETE STRUCTURES
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 

Similar to RSR P&P_Neraluru Thorapalli Agraharam_NH844_0+000-23+340_2022_12_22.pdf

CURRICULUM VITAE Samit Putatunda
CURRICULUM VITAE Samit PutatundaCURRICULUM VITAE Samit Putatunda
CURRICULUM VITAE Samit Putatunda
samit putatunda
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
SURENDRA BABU
 
vaithilingam RESUME (1)
vaithilingam RESUME (1)vaithilingam RESUME (1)
vaithilingam RESUME (1)
Vaithi Lingam
 

Similar to RSR P&P_Neraluru Thorapalli Agraharam_NH844_0+000-23+340_2022_12_22.pdf (20)

Admin Building.pdf
Admin Building.pdfAdmin Building.pdf
Admin Building.pdf
 
sudarshan mukhopadhyay C.V.
sudarshan mukhopadhyay C.V.sudarshan mukhopadhyay C.V.
sudarshan mukhopadhyay C.V.
 
DPS - Copy
DPS - CopyDPS - Copy
DPS - Copy
 
RevisedPlanandProfile.pdf
RevisedPlanandProfile.pdfRevisedPlanandProfile.pdf
RevisedPlanandProfile.pdf
 
AddendumtoscheduleBPkg_II.pdf
AddendumtoscheduleBPkg_II.pdfAddendumtoscheduleBPkg_II.pdf
AddendumtoscheduleBPkg_II.pdf
 
Vaibhav Dhumal-Resume
Vaibhav Dhumal-ResumeVaibhav Dhumal-Resume
Vaibhav Dhumal-Resume
 
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdfPR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
PR-10055-ALI-DGN-P&P-CH19270-CH20960-I00-D00- R00 (1).pdf
 
CURRICULUM VITAE Samit Putatunda
CURRICULUM VITAE Samit PutatundaCURRICULUM VITAE Samit Putatunda
CURRICULUM VITAE Samit Putatunda
 
MCS Reddy 22.05.16
MCS Reddy 22.05.16MCS Reddy 22.05.16
MCS Reddy 22.05.16
 
Irc.gov.in.sp.063.2004 (1)
Irc.gov.in.sp.063.2004 (1)Irc.gov.in.sp.063.2004 (1)
Irc.gov.in.sp.063.2004 (1)
 
Ravik-Profile
Ravik-ProfileRavik-Profile
Ravik-Profile
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
pdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPANpdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPAN
 
CV
CVCV
CV
 
gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800gammon report by priyanshu kumar, 9608684800
gammon report by priyanshu kumar, 9608684800
 
JITENDER CV
JITENDER CVJITENDER CV
JITENDER CV
 
Civil - Structural Designer CV
Civil - Structural Designer CVCivil - Structural Designer CV
Civil - Structural Designer CV
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
vaithilingam RESUME (1)
vaithilingam RESUME (1)vaithilingam RESUME (1)
vaithilingam RESUME (1)
 

More from hemachandra59

More from hemachandra59 (20)

Electroconvulsive therapy.pptx
Electroconvulsive therapy.pptxElectroconvulsive therapy.pptx
Electroconvulsive therapy.pptx
 
Principles of break investigation.pptx
Principles of break investigation.pptxPrinciples of break investigation.pptx
Principles of break investigation.pptx
 
fistula.pptx
fistula.pptxfistula.pptx
fistula.pptx
 
Anal fissure.pptx
Anal fissure.pptxAnal fissure.pptx
Anal fissure.pptx
 
presentationgdp-160429072820.pdf
presentationgdp-160429072820.pdfpresentationgdp-160429072820.pdf
presentationgdp-160429072820.pdf
 
Investigation of out break 1.pptx
Investigation of out break 1.pptxInvestigation of out break 1.pptx
Investigation of out break 1.pptx
 
appendicitis.pptx
appendicitis.pptxappendicitis.pptx
appendicitis.pptx
 
biofeedback.pptx
biofeedback.pptxbiofeedback.pptx
biofeedback.pptx
 
National programme for blindness control.pptx
National programme for blindness control.pptxNational programme for blindness control.pptx
National programme for blindness control.pptx
 
cookery rules and preservation of nutrientsnagamani-210927112249.pptx
cookery rules and preservation of nutrientsnagamani-210927112249.pptxcookery rules and preservation of nutrientsnagamani-210927112249.pptx
cookery rules and preservation of nutrientsnagamani-210927112249.pptx
 
foodlaws-200417172115.pptx
foodlaws-200417172115.pptxfoodlaws-200417172115.pptx
foodlaws-200417172115.pptx
 
nationaliodinedeficiencydisordercontrolprogramme 01.pdf
nationaliodinedeficiencydisordercontrolprogramme 01.pdfnationaliodinedeficiencydisordercontrolprogramme 01.pdf
nationaliodinedeficiencydisordercontrolprogramme 01.pdf
 
Protein Energies and malnutrition 01.pptx
Protein Energies and malnutrition  01.pptxProtein Energies and malnutrition  01.pptx
Protein Energies and malnutrition 01.pptx
 
occupational therapy 01.pptx
occupational therapy 01.pptxoccupational therapy 01.pptx
occupational therapy 01.pptx
 
cooking rules and preservatives.pptx
cooking rules and preservatives.pptxcooking rules and preservatives.pptx
cooking rules and preservatives.pptx
 
foodhygieneandcontrol-150909060115-lva1-app6891.pptx
foodhygieneandcontrol-150909060115-lva1-app6891.pptxfoodhygieneandcontrol-150909060115-lva1-app6891.pptx
foodhygieneandcontrol-150909060115-lva1-app6891.pptx
 
cooking.pptx
cooking.pptxcooking.pptx
cooking.pptx
 
occupational therapy.pptx
occupational therapy.pptxoccupational therapy.pptx
occupational therapy.pptx
 
Pem.pptx
Pem.pptxPem.pptx
Pem.pptx
 
Handing Over documents.pdf
Handing Over documents.pdfHanding Over documents.pdf
Handing Over documents.pdf
 

Recently uploaded

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

RSR P&P_Neraluru Thorapalli Agraharam_NH844_0+000-23+340_2022_12_22.pdf

  • 1. HIGHWAY DRAWINGS FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) NATIONAL HIGHWAYS AUTHORITY OF INDIA UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. RIGHT SLIP/SERVICE ROAD PLAN AND PROFILE DRAWINGS (FROM CH: 0+000 TO CH: 23+350) CONSULTING ENGINEERS PVT LTD Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, INDEPENDENT ENGINEER: EPC CONTRACTORS: CONCESSIONAIRE: NERALURU THORAPALLI ROADWAYS PRIVATE LIMITED, DESIGN ENGINEER: Infrastructure Private Limited scc AHMEDABAD SCC House, Opp. Nirma University, S.G. Highway, Chharodi, Ahmedabad. START OF THE PROJECT CH: 0+000 END OF THE PROJECT CH: 23+350
  • 2. GENERAL DRAWINGS 2 LEGEND SL. TITLE OF DRAWINGS DRAWING NO. PAGE NOS. NO. A. 03 01 02 1 INDEX 3 4 5 6 7 8 9 04 08 06 10 09 1 2 11 10 12 11 12 07 LIST OF DRAWINGS 13 14 15 NH844/LEGEND NH844/INDEX NH844/RSR/P&P/01 NH844/RSR/P&P/02 NH844/RSR/P&P/03 NH844/RSR/P&P/04 NH844/RSR/P&P/05 NH844/RSR/P&P/06 NH844/RSR/P&P/07 NH844/RSR/P&P/08 NH844/RSR/P&P/09 13 NH844/RSR/P&P/10 NH844/RSR/P&P/11 NH844/RSR/P&P/12 NH844/RSR/P&P/13 05 PLAN AND PROFILE DRAWING OF LEFT SLIP/SERVICE ROAD KM 0+000 TO 23+350 B. PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 0+580 TO CH: 1+000) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 1+000 TO CH: 2+000) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 2+000 TO CH: 3+000) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 3+000 TO CH: 3+650) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 5+275 TO CH: 6+300) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 9+930 TO CH: 10+325) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 13+100 TO CH: 13+680) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 15+200 TO CH: 16+000) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 16+000 TO CH: 17+000) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 17+000 TO CH: 18+000) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 18+000 TO CH: 18+780) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 19+720 TO CH: 19+950) PLAN AND PROFILE DRAWING OF RIGHT SLIP/SERVICE ROAD (CH: 21+290 TO CH: 21+400) CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/INDEX 22-11-2022 N.T.S 0 FIRST SUBMISSION 22.11.2022
  • 3. EXISTING FEATURES: PROPOSED CENTER LINE PROPOSED MEDIAN PROPOSED PAVED SHOULDER LINE PROPOSED EARTHEN SHOULDER LINE FOOTPATH LEFT PIPE CULVERT SLAB CULVERT PROW PROPOSED PROW HORIZONTAL ALIGNMENT SUPER ELEVATION PIPE CULVERT BOX / SLAB CULVERT MINOR / MAJOR BRIDGE LHS RHS MINOR / MAJOR BRIDGE VEHICULAR UNDERPASS RETAINING WALL VOP MH TF T Bridge/Culvert Electrical poles, Telephone, Transformer Electrical Box Wire fence Railway:Metre gauge Broad gauge with KM Stone Drain Borewell Lamp Post Hut Manhole Pump House Temple.Mosque,Graves. Km Pillar, Sub Km Pillar Embankment Stream Pipeline with Gate Valve Cultivation limit Cutting Telephone Box well Pit.Hedge Boulders Rocky ground Relative height. - KM S FS km stone, safe guard stone,furlong stone Hand pump,tap,Row Name board,single post,sign board,ofc stone,flag pole Roads:Metalled,Unmetalled. Cart track.Foot path. Buildings:Permanent, Temporary;Under Construction. Trees:Ordinary, Coconut;Arecanut. FOOTPATH RIGHT SEPARATORS LEFT SERVICE ROAD RIGHT SERVICE ROAD UTILITY OGL AT LEFT MEDIAN EDGE OGL AT RIGHT MEDIAN EDGE OGL AT 30M FROM LEFT OGL AT 30M FROM RIGHT FRL AT CENTER ABBREVIATIONS BS - Beginning of Spiral Curve BC - Beginning of Circular Curve EC - End of Circular Curve ES - End of Spiral Curve R - Radius of Circular Curve D - Deviation Angle Ls - Length of Spiral Curve Lc - Length of Circular Curve e - Super-elevation V - Design Speed We - Extra Widening PROPOSED CARRIAGE WAY LINE LEGEND LVUP BOX CULVERT DESIGN ALIGNMENT VERTICAL PROFILE CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. 0 FIRST SUBMISSION 10.09.2022 R0 NH844/LEGEND 10-09-2022 N.T.S
  • 4. TF TF TF TF TF MA TC HL IN E N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 1/2 0+525 0+525 1x3x2.5 - Box Culvert 1x3x2.5 - Box Culvert - New 4-Lane CA CHAINAGE CA PROP. SPAN (M ): DESIGN CH: DES. PROP. SPAN (M ): CD NO: SKEW PROPOSAL - New 4-Lane SLIP ROAD START CH : 0+580 CH : 0+580 SLIP ROAD END CURVE NO R (m) 0+300 0+400 0+500 0+600 0+700 0+800 0+900 1+0 00 BS: 0+944 B C : 1 + 0 6 4 ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW 580 590 600 610 620 630 640 650 660 670 680 690 700 710 720 730 740 750 760 770 780 790 800 810 820 830 840 850 860 870 880 890 900 910 920 930 940 950 960 970 980 990 1000 TCS-VIA 899.337 899.522 899.706 899.891 900.075 900.260 900.444 900.629 900.813 900.998 901.182 901.367 901.551 901.736 901.920 902.105 902.289 902.474 902.658 902.843 903.027 903.212 903.396 903.581 903.765 903.950 904.133 904.308 904.475 904.632 904.779 904.918 905.047 905.167 905.278 905.380 905.472 905.555 905.629 905.694 905.750 905.796 905.833 G=1.845 L=255.186m R=-10841.242m L=200.000m 580.000 835.186 R=-10841.242m L=200.000m 943.644 L=120.000m A=49200.000 L=943.644m Straight 899.363 899.588 899.838 900.088 900.338 900.588 900.838 901.088 901.338 901.588 901.838 902.088 902.338 902.588 902.838 903.088 903.338 903.588 903.838 904.088 904.338 904.588 904.838 905.088 905.338 905.588 905.838 906.088 906.338 906.588 906.838 907.116 907.404 907.692 907.980 908.268 908.556 908.854 909.142 909.428 909.707 909.978 910.242 896.870 896.870 897.855 898.545 899.202 898.625 899.002 899.305 899.670 899.917 898.945 899.334 899.729 900.048 900.417 900.789 901.167 901.506 901.843 902.191 902.562 902.700 902.818 902.931 903.104 903.288 903.471 903.654 903.911 904.199 904.670 904.934 905.186 905.438 905.684 905.901 906.088 906.184 906.286 906.400 906.517 906.684 906.832 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE ELEV.=905.890m PVI. CH=935.186m 22-11-2022 CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/01 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=895.000m NERALURU THORAPALLI AGRAHARAM
  • 5. T F T F T F T F M A T C H L I N E M A T C H L I N E N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 2/1 1+055 1+055 1x7.0x4.0 - SVUP 1x7.0x4.0 - SVUP - New 4-Lane CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 2/2 1+859 1+859 1x12.0x4.0 - LVUP 1x12.0x4.0 - LVUP - New 4-Lane SLI P RO AD EN D SE RV ICE RO AD ST AR T CH : 1+2 50 SLI P RO AD ST AR T SE RV ICE RO AD EN D CH : 1+2 50 S L I P R O A D S T A R T S E R V I C E R O A D E N D C H : 2 + 0 3 0 S E R V I C E R O A D E N D S L I P R O A D S T A R T C H : 1 + 5 2 5 S E R V I C E R O A D S T A R T S L I P R O A D E N D C H : 1 + 5 2 5 CURVE NO 1 R (m) -410.000 Lc 326.764 V 100 Kmph e (%) D 62° 26' 0.3" CURVE NO 2 R (m) 415.000 Lc 299.792 Ls 120.0 V 100 Kmph e (%) D 57° 57' 26.6" 1 + 0 0 0 1 + 1 0 0 1 + 2 0 0 1+ 30 0 1 + 4 0 0 1 + 5 0 0 1 + 6 0 0 1 + 7 0 0 1+ 80 0 1 + 9 0 0 2 + 0 0 0 B S : 0 + 9 4 4 B C : 1 + 0 6 4 E C : 1 + 3 9 0 E S : 1 + 5 1 0 B S : 1 + 5 3 7 B C : 1 + 6 5 7 E C : 1 + 9 5 7 E S : 2 + 0 7 7 Ls 120.0 5.0 5.0 ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW 1000 1010 1020 1030 1040 1050 1060 1070 1080 1090 1100 1110 1120 1130 1140 1150 1160 1170 1180 1190 1200 1210 1220 1230 1240 1250 1260 1270 1280 1290 1300 1310 1320 1330 1340 1350 1360 1370 1380 1390 1400 1410 1420 1430 1440 1450 1460 1470 1480 1490 1500 1510 1520 1530 1540 1550 1560 1570 1580 1590 1600 1610 1620 1630 1640 1650 1660 1670 1680 1690 1700 1710 1720 1730 1740 1750 1760 1770 1780 1790 1800 1810 1820 1830 1840 1850 1860 1870 1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 TCS-VIA TCS-II TCS-VIA TCS-VIA 905.833 905.861 905.879 905.889 905.890 905.890 905.890 905.890 905.912 906.014 906.198 906.465 906.792 907.122 907.452 907.782 908.112 908.442 908.772 909.102 909.429 909.742 910.040 910.324 910.592 910.846 911.085 911.310 911.520 911.714 911.895 912.060 912.211 912.347 912.468 912.574 912.666 912.743 912.805 912.852 912.885 912.903 912.906 912.894 912.868 912.827 912.771 912.700 912.614 912.514 912.402 912.290 912.177 912.064 911.952 911.839 911.726 911.614 911.494 911.355 911.193 911.011 910.808 910.583 910.343 910.103 909.863 909.623 909.383 909.143 908.903 908.663 908.423 908.183 907.943 907.703 907.463 907.223 906.983 906.743 906.503 906.263 906.023 905.784 905.575 905.415 905.305 905.245 905.234 905.272 905.330 905.388 905.445 905.503 905.561 905.618 905.676 905.734 905.791 905.849 905.907 G=0.000 G=3.300 G=-1.127 G=-2.400 G=0.577 L=37.480m L=80.807m L=78.721m L=196.594m L=149.411m R=1212.140m R=-6776.675m R=-4713.276m R=2015.656m L=40.000m L=300.000m L=60.000m L=60.000m 1035.186 1072.666 1112.666 1193.473 1493.473 1572.195 1632.195 1828.788 1888.788 R=-10841.242m L=200.000m L=26.746m L=326.764m L=299.792m L=120.000m L=120.000m L=120.000m R=-410.000m R=415.000m A=49200.000 A=49200.000 A=49800.000 Straight 1063.644 1390.408 1510.408 1537.154 1657.154 1956.946 L=120.000m A=49800.000 910.242 910.508 910.757 910.998 911.233 911.460 911.679 911.872 912.039 912.198 912.350 912.495 912.632 912.761 912.884 912.998 913.106 913.206 913.299 913.384 913.462 913.532 913.595 913.651 913.699 913.740 913.748 913.774 913.795 913.815 913.835 913.856 913.876 913.897 913.913 913.922 913.924 913.918 913.905 913.884 913.820 913.749 913.670 913.584 913.481 913.380 913.272 913.156 913.033 912.902 912.755 912.610 912.461 912.309 912.158 912.007 911.847 911.697 911.591 911.506 911.433 911.353 911.287 911.251 911.230 911.210 911.199 911.216 911.229 911.235 911.233 911.224 911.208 911.184 911.152 911.114 911.068 911.014 910.953 910.885 910.809 910.726 910.636 910.538 910.433 910.320 910.200 910.073 909.938 909.796 909.646 909.489 909.325 909.153 908.974 908.787 908.603 908.440 908.278 908.100 907.915 906.832 906.917 906.980 907.078 907.289 907.605 907.582 907.332 907.173 907.393 906.782 906.792 906.852 906.945 907.182 907.421 907.850 908.103 908.370 908.823 908.853 909.512 910.327 910.948 911.508 912.204 912.403 912.690 913.000 913.271 913.335 913.364 913.388 913.410 913.412 913.407 913.409 913.417 913.431 913.397 913.344 913.301 913.274 913.247 913.207 913.146 913.099 913.050 912.978 912.843 912.717 912.605 912.585 912.516 912.289 912.053 911.863 911.619 911.363 911.174 910.989 910.808 910.630 910.360 910.175 909.987 909.713 909.570 909.259 908.969 908.618 908.336 908.125 908.059 907.994 907.833 907.437 907.087 906.933 906.786 906.574 906.446 906.324 906.288 906.373 906.360 906.479 906.288 906.066 906.338 906.080 905.762 905.624 905.634 905.682 905.608 905.505 905.665 905.873 906.069 906.167 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE SVUP CH:1+055 LVUP CH:1+859 ELEV.=905.890m ELEV.=914.167m ELEV.=911.251m ELEV.=905.092m PVI. CH=1092.666m PVI. CH=1343.473m PVI. CH=1602.195m PVI. CH=1858.788m CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/02 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=903.000m THORAPALLI AGRAHARAM NERALURU
  • 6. TF TF TF TF TF TF M A TC H LI N E MAT CHL INE N 1+859 1+859 1x12.0x4.0 - LVUP 1x12.0x4.0 - LVUP - New 4-Lane CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 3/1 2+881 2+881 1x7.0x4.0 - SVUP 1x7.0x4.0 - SVUP - New 4-Lane SLIP ROAD END SERV ICE ROAD STAR T CH : 2+030 SLIP ROAD STAR T SERV ICE ROAD END CH : 2+030 SERVICE ROAD END SLIP ROAD START CH : 2+460 SERVICE ROAD START SLIP ROAD END CH : 2+460 2+ 00 0 2+100 2+200 2+300 2+400 2+500 2+600 2+700 2+800 2+900 3+000 E C : 1 + 9 5 7 ES: 2+077 BS: 2+949 BC: 2+999 ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW 2000 2010 2020 2030 2040 2050 2060 2070 2080 2090 2100 2110 2120 2130 2140 2150 2160 2170 2180 2190 2200 2210 2220 2230 2240 2250 2260 2270 2280 2290 2300 2310 2320 2330 2340 2350 2360 2370 2380 2390 2400 2410 2420 2430 2440 2450 2460 2470 2480 2490 2500 2510 2520 2530 2540 2550 2560 2570 2580 2590 2600 2610 2620 2630 2640 2650 2660 2670 2680 2690 2700 2710 2720 2730 2740 2750 2760 2770 2780 2790 2800 2810 2820 2830 2840 2850 2860 2870 2880 2890 2900 2910 2920 2930 2940 2950 2960 2970 2980 2990 3000 TCS-VIA TCS-II TCS-VIA 905.907 905.965 906.022 906.080 906.137 906.186 906.220 906.241 906.248 906.241 906.221 906.196 906.171 906.146 906.121 906.096 906.071 906.046 906.021 905.996 905.971 905.946 905.921 905.896 905.871 905.846 905.821 905.796 905.771 905.746 905.721 905.696 905.671 905.646 905.621 905.596 905.571 905.546 905.521 905.496 905.471 905.446 905.421 905.396 905.365 905.325 905.276 905.217 905.149 905.071 904.990 904.908 904.827 904.745 904.664 904.583 904.501 904.420 904.339 904.257 904.176 904.094 904.013 903.932 903.850 903.769 903.688 903.606 903.525 903.443 903.362 903.281 903.199 903.118 903.037 902.955 902.874 902.792 902.711 902.630 902.548 902.467 902.389 902.321 902.263 902.214 902.174 902.144 902.123 902.112 902.110 902.118 902.135 902.162 902.198 902.244 902.295 902.346 902.398 902.449 902.500 G=-0.250 G=-0.814 G=0.514 L=330.702m L=322.099m L=94.000m R=-7259.172m R=-10640.270m R=10548.149m L=60.000m L=60.000m L=140.000m 2038.199 2098.199 2428.901 2488.901 2811.000 2951.000 G=0.577 L=149.411m L=94.000m L=871.554m L=120.000m L=50.000m A=49800.000 A=60500.000 Straight 2076.946 2948.500 2998.500 907.915 907.722 907.516 907.286 907.091 906.907 906.746 906.608 906.494 906.403 906.336 906.292 906.266 906.241 906.216 906.191 906.166 906.141 906.116 906.091 906.066 906.041 906.016 905.991 905.966 905.941 905.916 905.891 905.866 905.841 905.816 905.791 905.766 905.741 905.716 905.691 905.666 905.641 905.616 905.591 905.566 905.541 905.516 905.500 905.496 905.507 905.531 905.556 905.607 905.671 905.749 905.833 905.916 905.999 906.083 906.166 906.249 906.333 906.416 906.499 906.583 906.666 906.749 906.833 906.916 906.998 907.075 907.144 907.205 907.259 907.306 907.345 907.377 907.401 907.418 907.428 907.430 907.424 907.412 907.392 907.364 907.329 907.287 907.237 907.180 907.116 907.044 906.965 906.878 906.784 906.682 906.573 906.457 906.390 906.354 906.310 906.259 906.201 906.135 906.062 905.971 906.167 906.202 906.276 906.315 906.323 906.478 906.521 906.703 907.146 907.195 907.096 906.926 906.955 906.944 906.843 906.789 906.732 906.686 906.666 906.691 906.678 906.729 906.487 905.798 905.826 905.864 905.878 905.885 905.911 905.936 905.939 905.931 905.965 905.943 905.940 905.771 905.727 905.730 905.786 905.799 905.830 905.842 905.845 905.860 905.896 906.001 905.923 905.875 905.877 905.875 905.913 905.914 905.817 905.491 905.467 905.481 905.245 905.322 905.089 905.170 905.290 905.340 905.386 905.385 905.091 904.871 904.691 904.456 904.342 904.240 904.222 904.096 904.046 903.952 903.865 903.749 903.752 903.703 903.568 903.387 903.180 902.911 902.795 902.734 902.878 903.039 902.981 902.811 902.467 902.134 901.941 901.792 901.690 901.487 901.262 901.082 900.925 900.733 900.564 900.412 900.262 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE SVUP CH:2+881 ELEV.=906.300m ELEV.=905.324m ELEV.=901.889m PVI. CH=2068.199m PVI. CH=2458.901m PVI. CH=2881.000m CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/03 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=899.000m THORAPALLI AGRAHARAM NERALURU
  • 7. M A T C H L I N E N N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 4/1 3+100 3+100 1x3x2.5 - Box Culvert 1x3x2.5 - Box Culvert - New 4-Lane CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 4/2 3+519 3+525 1x10-Minor Bridge(MCW&SR) 1x10-Minor Bridge(MCW&SR) - New 4-Lane S L IP R O A D E N D S L IP R O A D T A P E R S T A R T C H : 3 + 6 5 0 S L IP R O A D S T A R T S L IP R O A D T A P E R E N D C H : 3 + 6 5 0 C H : 3 + 8 0 0 S L IP R O A D T A P E R E N D C H : 3 + 8 0 0 S L IP R O A D T A P E R S T A R T CURVE NO 3 R (m) -1210.000 Lc 655.269 Ls 50.0 V 100 Kmph e (%) D 33° 23' 45.0" 3 + 0 0 0 3 + 1 0 0 3 + 2 0 0 3 + 3 0 0 3+ 40 0 3+ 50 0 3 + 6 0 0 3 + 7 0 0 3 + 8 0 0 3 + 9 0 0 B S : 2 + 9 4 9 B C : 2 + 9 9 9 E C : 3 + 6 5 4 E S : 3 + 7 0 4 ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW 3.70 3000 3010 3020 3030 3040 3050 3060 3070 3080 3090 3100 3110 3120 3130 3140 3150 3160 3170 3180 3190 3200 3210 3220 3230 3240 3250 3260 3270 3280 3290 3300 3310 3320 3330 3340 3350 3360 3370 3380 3390 3400 3410 3420 3430 3440 3450 3460 3470 3480 3490 3500 3510 3520 3530 3540 3550 3560 3570 3580 3590 3600 3610 3620 3630 3640 3650 TCS-VIA 902.500 902.552 902.603 902.654 902.706 902.754 902.778 902.774 902.743 902.685 902.599 902.486 902.346 902.178 901.983 901.760 901.514 901.264 901.014 900.764 900.514 900.264 900.014 899.764 899.514 899.259 898.998 898.729 898.453 898.169 897.879 897.581 897.275 896.963 896.643 896.316 895.986 895.656 895.326 894.996 894.666 894.336 894.006 893.676 893.346 893.016 892.686 892.356 892.027 891.717 891.430 891.165 890.924 890.706 890.511 890.339 890.191 890.065 889.962 889.882 889.826 889.793 889.782 889.795 889.822 889.850 G=-2.500 G=-3.300 G=0.277 L=94.000m L=84.024m L=127.476m L=18.500m R=-3650.230m R=-13749.998m R=4333.134m L=110.000m L=110.000m L=155.000m 3045.000 3155.000 3239.024 3349.024 3476.500 3631.500 3650.000 G=0.514 L=94.000m L=655.269m R=-1210.000m 2998.500 3653.769 905.971 905.788 905.598 905.400 905.195 904.982 904.762 904.535 904.300 904.058 903.809 903.559 903.309 903.059 902.809 902.559 902.309 902.059 901.809 901.559 901.309 901.059 900.809 900.559 900.309 900.054 899.793 899.524 899.248 898.964 898.674 898.376 898.070 897.758 897.438 897.111 896.781 896.451 896.121 895.791 895.461 895.131 894.801 894.471 894.141 893.811 893.481 893.151 892.822 892.512 892.225 891.961 891.721 891.503 891.309 891.138 890.991 890.866 890.765 890.687 890.632 890.601 890.592 890.607 890.637 890.667 900.262 900.239 900.297 900.144 900.030 899.954 899.911 899.838 899.768 899.717 899.707 899.700 899.761 899.563 899.316 899.041 898.784 898.614 898.541 898.438 898.325 898.129 897.963 897.761 897.527 897.325 897.123 896.920 896.717 896.517 896.315 896.127 895.995 895.778 895.299 895.203 894.960 894.621 894.278 893.934 893.621 893.326 892.889 892.299 891.809 891.333 890.861 890.390 889.904 889.497 888.059 888.262 886.353 886.942 887.459 888.061 888.506 888.724 888.742 888.748 888.751 888.806 888.869 888.995 889.054 888.924 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE Box Culvert CH:3+100 ELEV.=903.014m ELEV.=898.163m ELEV.=889.584m PVI. CH=3100.000m PVI. CH=3294.024m PVI. CH=3554.000m Minor Bridge CH:3+525 CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/04 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=887.000m THORAPALLI AGRAHARAM NERALURU
  • 8. TF TF TF TF TF W W W W W W W W W W W W W W W W W W W W W W M A T C H L IN E N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 6/1 5+370 5+374 1x3x2.5 - Box Culvert 1x3x2.5 - Box Culvert 12.4 NEW CONSTRUCTION CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 6/3 5+900 5+900 1x2x2 - Box Culvert 1x2x2 - Box Culvert - NEW CONSTRUCTION CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 7/1 6+205 6+205 1x3x2 - Box Culvert 1x3x2 - Box Culvert - NEW CONSTRUCTION S L IP R O A D T A P E R E N D S L IP R O A D S T A R T C H : 5 + 2 7 5 S L IP R O A D T A P E R S T A R T S L IP R O A D E N D C H : 5 + 2 7 5 S L I P R O A D E N D S L I P R O A D T A P E R S T A R T C H : 6 + 3 0 0 S L I P R O A D S T A R T S L I P R O A D T A P E R E N D C H : 6 + 3 0 0 SL IP RO AD EN D SE RV ICE RO AD ST AR T CH : 6+ 02 5 SL IP RO AD ST AR T SE RV ICE RO AD EN D CH : 6+ 02 5 CA CHAINAGE MCW DESIGN CH: CD NO: CA PROP. SPAN (M): DES. PROP. SPAN (M): LHS PROPOSAL: SR CA PROP. SPAN (M): DES. PROP. SPAN (M): PROPOSAL: TYPE OF STRUCTURE: RHS 6/2 5+760 5+760 Major Bridge 1x30+5x20 1x30+5x20 New 3-Lane 1x30+5x20 1x30+5x20 New 3-Lane 5 x 20 5 x 20 New 2-Lane 5 x 20 5 x 20 New 2-Lane CURVE NO 5 R (m) 900.000 Lc 472.828 Ls 70.0 V 100 Kmph e (%) D 34° 33' 27.0" CURVE NO 6 R (m) -800.000 Lc 253.675 Ls 75.0 V 100 Kmph e (%) D 23° 32' 22.6" 5 + 2 0 0 5 + 3 0 0 5+400 5 + 5 0 0 5 + 6 0 0 5 + 7 0 0 5 + 8 0 0 5 + 9 0 0 6 + 0 0 0 6+ 10 0 6 + 2 0 0 6 + 3 0 0 E C : 5 + 5 0 4 E S : 5 + 5 7 4 B S : 5 + 8 9 9 B C : 5 + 9 7 4 E C : 6 + 2 2 8 E S : 6 + 3 0 3 4.90 5.0 ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW 5270 5280 5290 5300 5310 5320 5330 5340 5350 5360 5370 5380 5390 5400 5410 5420 5430 5440 5450 5460 5470 5480 5490 5500 5510 5520 5530 5540 5550 5560 5570 5580 5590 5600 5610 5620 5630 5640 5650 5660 5670 5680 5690 5700 5710 5720 5730 5740 5750 5760 5770 5780 5790 5800 5810 5820 5830 5840 5850 5860 5870 5880 5890 5900 5910 5920 5930 5940 5950 5960 5970 5980 5990 6000 6010 6020 6030 6040 6050 6060 6070 6080 6090 6100 6110 6120 6130 6140 6150 6160 6170 6180 6190 6200 6210 6220 6230 6240 6250 6260 6270 6280 6290 6300 TCS-VIA TCS-IX TCS-VIA TCS-II TCS-VIA 880.043 880.201 880.195 880.188 880.182 880.176 880.169 880.165 880.172 880.192 880.225 880.270 880.327 880.397 880.480 880.573 880.666 880.760 880.854 880.948 881.042 881.135 881.229 881.323 881.417 881.511 881.605 881.698 881.792 881.886 881.980 882.074 882.167 882.261 882.355 882.444 882.519 882.577 882.620 882.648 882.660 883.572 883.900 884.230 884.560 884.890 885.192 885.449 885.660 885.825 885.945 886.020 886.049 886.061 886.072 886.083 886.095 886.106 886.117 886.129 886.140 886.151 886.162 886.174 886.185 886.196 886.208 886.219 886.230 886.242 886.253 886.264 886.276 886.287 886.298 886.314 886.339 886.374 886.418 886.468 886.517 886.566 886.615 886.664 886.713 G=3.234 G=-0.064 G=0.938 G=3.300 G=0.113 G=0.491 L=30.785m L=59.000m L=198.508m L=36.470m L=221.266m L=59.841m R=7981.724m R=-6395.577m R=-2196.504m R=10585.965m L=80.000m L=60.000m L=70.000m L=40.000m 5275.000 5334.000 5414.000 5612.508 5672.508 5872.423 5908.893 5978.893 6200.159 6240.159 6300.000 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.660 882.676 882.745 882.869 883.048 883.282 G=0.000 L=139.916m R=1818.182m L=60.000m 5812.423 L=324.771m L=472.828m L=253.675m L=70.000m L=75.000m L=75.000m R=900.000m R=-800.000m A=63000.000 A=60000.000 A=60000.000 Straight 5504.144 5574.144 5898.916 5973.916 6227.591 6302.591 L=253.675m R=-800.000m 880.034 880.364 880.694 881.024 881.354 881.684 882.014 882.344 882.674 883.004 883.334 883.664 883.994 884.324 884.654 884.984 885.314 885.639 885.951 886.250 886.535 886.807 887.065 887.310 887.579 887.864 888.135 888.392 888.570 888.734 888.884 889.022 889.145 889.255 889.352 889.435 889.505 889.561 889.604 889.633 889.649 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.652 889.641 889.618 889.580 889.530 889.523 889.502 889.477 889.440 889.379 889.314 889.236 889.135 889.029 888.911 888.769 888.585 888.360 888.138 887.938 887.763 887.611 887.458 887.353 887.272 887.215 887.181 887.171 887.180 887.192 887.203 887.214 887.225 887.236 887.248 887.259 887.270 887.281 887.292 887.304 887.315 887.308 887.265 887.213 887.162 887.119 887.067 887.010 886.956 877.197 877.276 877.334 877.329 877.304 877.270 877.241 876.773 876.323 875.851 876.549 878.029 877.768 877.839 877.876 877.819 877.573 877.687 877.780 877.779 877.795 877.792 878.082 878.430 878.760 878.962 878.858 878.680 878.774 878.882 878.839 878.837 878.979 879.109 879.235 879.306 879.438 879.442 879.422 879.619 879.845 880.127 880.458 882.636 881.520 882.376 882.280 882.185 882.089 881.993 881.898 881.802 881.706 881.610 881.515 881.447 881.465 881.652 881.951 882.106 882.220 882.485 882.746 883.031 882.822 882.549 882.518 882.559 882.603 882.722 882.901 882.946 883.069 883.167 883.264 883.340 883.538 883.521 883.254 883.277 883.308 883.406 883.545 883.561 883.527 883.559 883.696 883.815 883.942 884.082 884.132 884.174 884.285 884.385 884.389 884.504 884.674 884.653 884.637 884.615 884.586 884.885 885.090 885.042 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE Box Culvert CH:5+374 Major Bridge CH:5+760 Box Culvert CH:5+900 Box Culvert CH:6+205 ELEV.=880.141m ELEV.=882.660m ELEV.=882.660m ELEV.=886.008m ELEV.=886.321m PVI. CH=5374.000m PVI. CH=5642.508m PVI. CH=5842.423m PVI. CH=5943.893m PVI. CH=6220.159m OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/05 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=875.000m THORAPALLI AGRAHARAM NERALURU
  • 9. 9930 9940 9950 9960 9970 9980 9990 10000 10010 10020 10030 10040 10050 10060 10070 10080 10090 10100 10110 10120 10130 10140 10150 10160 10170 10180 10190 10200 10210 10220 10230 10240 10250 10260 10270 10280 10290 10300 10310 10325 10330 L=509.064m 10020.200 R=3000.000m TCS-VIA TCS-II L=406.827m Straight TCS-VIA 906.000 906.330 906.660 906.990 907.320 907.650 907.980 908.310 908.640 908.970 909.300 909.630 909.960 910.290 910.620 910.950 911.280 911.610 911.940 912.264 912.571 912.860 913.131 913.384 913.619 913.837 914.037 914.219 914.383 914.530 914.659 914.769 914.863 914.944 915.025 915.106 915.187 915.268 915.349 915.375 G=3.300 G=0.809 L=181.862m L=73.138m R=-5621.138m L=140.000m 9930.000 10111.862 10251.862 10325.000 L=406.827m Straight 905.614 905.255 904.784 905.255 906.792 908.235 909.378 910.451 910.752 910.784 910.955 911.203 912.151 912.694 913.201 913.719 913.912 914.261 915.309 915.513 915.550 915.015 914.579 914.451 914.891 915.433 915.946 916.395 916.694 916.824 916.979 917.271 917.449 917.498 917.595 917.681 918.133 917.888 917.947 918.224 918.407 10320 915.430 918.040 915.470 912.388 912.388 912.388 912.388 912.388 912.388 912.388 912.388 912.388 912.388 912.396 912.423 912.467 912.529 912.609 912.708 912.836 912.970 913.123 913.293 913.471 913.641 913.804 913.960 914.109 914.250 914.384 914.510 914.629 914.741 914.845 914.942 915.032 915.114 915.189 915.257 915.317 915.370 915.415 915.454 915.485 915.470 ELEV.=914.311m PVI. CH=10181.862m OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE W W W W W W W W PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW B C : 1 0 + 0 2 0 EC : 10+ 529 M A T C H L IN E N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 10/2 9+847 9+851 1x76+1x64 - ROB 1x76+1x64 - ROB 24 New 4-Lane CURVE NO 9 R (m) 3000.000 Lc 509.064 Ls 0.0 V 100 Kmph e (%) D 9° 43' 20.7" 9 + 7 0 0 9 + 8 0 0 9 + 9 0 0 1 0 + 0 0 0 1 0 + 1 0 0 10 +2 00 10+ 300 10+400 10+ 500 N.C. C H : 9 + 9 3 0 S L IP R O A D S T A R T C H : 9 + 9 3 0 S L IP R O A D E N D SLIP ROAD END SLIP ROAD TAPER STAR T CH : 10+325 SLIP ROAD STAR T SLIP ROAD TAPER END CH : 10+325 CH : 10+4 75 SLIP ROA D TAPE R END CH : 10+4 75 SLIP ROA D TAPE R STAR T S L IP R O A D E N D S E R V IC E R O A D S T A R T C H : 1 0 + 0 7 5 S L IP R O A D S T A R T S E R V IC E R O A D E N D C H : 1 0 + 0 7 5 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/06 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=903.000m THORAPALLI AGRAHARAM NERALURU
  • 10. 13100 13110 13120 13130 13140 13150 13160 13170 13180 13190 13200 13210 13220 13230 13240 13250 13260 13270 13280 13290 13300 13310 13320 13330 13340 13350 13360 13370 13380 13390 13400 13410 13420 13430 13440 13450 13460 13470 13480 13490 13500 13510 13520 13530 13540 13550 13560 13570 13580 13590 13600 13610 13620 13630 13640 13650 13660 13670 13680 TCS-VIA TCS-VII L=2275.900m Straight 911.711 911.818 911.925 912.031 912.138 912.244 912.351 912.457 912.564 912.663 912.708 912.691 912.612 912.472 912.271 912.007 911.690 911.365 911.040 910.715 910.390 910.065 909.740 909.415 909.090 908.765 908.440 908.114 907.789 907.464 907.139 906.814 906.489 906.164 905.839 905.514 905.205 904.973 904.827 904.766 904.790 904.900 905.079 905.265 905.451 905.637 905.823 906.009 906.196 906.382 906.568 906.754 906.940 907.126 907.312 907.498 907.684 907.870 908.056 G=1.065 G=-3.250 G=1.861 L=85.000m L=199.000m L=166.000m R=-1621.964m R=1173.880m L=70.000m L=60.000m 13100.000 13185.000 13255.000 13454.000 13514.000 13680.000 913.190 913.248 913.340 913.370 913.394 913.415 913.444 913.476 913.502 913.542 913.508 913.435 913.317 913.192 913.046 912.768 912.426 912.147 911.918 911.522 911.138 911.013 910.855 910.753 910.377 909.502 909.862 909.676 909.559 909.355 909.194 908.983 908.765 908.633 908.142 907.735 907.463 907.038 906.800 906.456 906.171 905.833 905.557 905.104 904.826 904.550 904.304 904.071 903.825 903.583 903.332 903.132 902.887 902.506 902.167 901.879 901.574 901.326 901.086 911.724 911.848 911.979 912.105 912.225 912.340 912.449 912.555 912.661 912.767 912.873 912.979 913.085 913.191 913.297 913.404 913.510 913.616 913.722 913.828 913.928 914.014 914.087 914.146 914.193 914.225 914.244 914.250 914.243 914.222 914.187 914.139 914.078 914.004 913.915 913.814 913.699 913.571 913.429 913.274 913.105 912.923 912.728 912.519 912.296 912.061 911.812 911.549 911.273 910.984 910.681 910.365 910.037 909.707 909.377 909.047 908.717 908.387 908.057 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE Box Culvert CH:13+440 VUP CH:13+483 ELEV.=912.990m ELEV.=904.409m PVI. CH=13220.000m PVI. CH=13484.000m OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW BC: 13+939 MATCHLINE N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 14/1 13+450 13+440 1x4x3 - Box Culvert 1x4x3 - Box Culvert - NEW CONSTRUCTION CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 14/2 13+484 13+483 1x15x5.5+1x20x5.5+1x15x5.5 - VUP 1x15x5.5+1x20x5.5+1x15x5.5 - VUP 30 New 4-Lane CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 14/3 13+926 13+934 1x3x2.5 - Box Culvert 1x3x2.5 - Box Culvert - NEW CONSTRUCTION 13+000 13+100 13+200 13+300 13+400 13+500 13+600 13+700 13+800 13+900 CH : 12+950 SLIP ROAD TAPER START CH : 12+950 SLIP ROAD TAPER END SLIP ROAD TAPER END SLIP ROAD START CH : 13+100 SLIP ROAD TAPER START SLIP ROAD END CH : 13+100 SLIP ROAD END SLIP ROAD TAPER START CH : 13+680 SLIP ROAD START SLIP ROAD TAPER END CH : 13+680 CH : 13+830 SLIP ROAD TAPER END CH : 13+830 SLIP ROAD TAPER START CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/07 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=900.000m THORAPALLI AGRAHARAM NERALURU
  • 11. 15200 15210 15220 15230 15240 15250 15260 15270 15280 15290 15300 15310 15320 15330 15340 15350 15360 15370 15380 15390 15400 15410 15420 15430 15440 15450 15460 15470 15480 15490 15500 15510 15520 15530 15540 15550 15560 15570 15580 15590 15600 15610 15620 15630 15640 15650 15660 15670 15680 15690 15700 15710 15720 15730 15740 15750 15760 15770 15780 15790 15800 15810 15820 15830 15840 15850 15860 15870 15880 15890 15900 15910 15920 15930 15940 15950 15960 15970 15980 15990 16000 L=442.122m L=79.531m L=75.000m L=75.000m 15371.331 15813.454 15888.454 15967.985 R=800.000m Straight TCS-VIA TCS-VII TCS-III L=1432.600m R=2500.000m 892.800 892.846 892.892 892.938 892.984 893.030 893.076 893.122 893.168 893.214 893.260 893.306 893.352 893.398 893.444 893.490 893.536 893.582 893.628 893.674 893.720 893.766 893.812 893.858 893.904 893.950 893.996 894.042 894.088 894.134 894.180 894.226 894.272 894.318 894.364 894.410 894.456 894.502 894.548 894.594 894.640 894.686 894.732 894.778 894.824 894.879 894.947 895.030 895.126 895.236 895.359 895.497 895.648 895.812 895.991 896.180 896.370 896.560 896.750 896.940 897.130 897.321 897.511 897.701 897.891 898.081 898.271 898.461 898.651 898.841 899.030 899.199 899.345 899.466 899.564 899.637 899.687 899.712 899.713 899.691 899.646 G=0.460 G=1.901 G=-0.500 L=438.478m L=152.926m L=38.986m R=7285.708m R=-4164.975m L=105.000m L=100.000m 15200.000 15638.478 15743.478 15896.404 15996.404 L=1432.600m R=2500.000m 889.577 889.666 889.757 889.841 889.932 890.021 890.086 890.182 889.976 889.768 890.127 890.354 890.445 890.553 890.601 890.716 890.794 890.819 890.900 890.905 891.007 891.128 891.296 891.573 891.632 891.629 891.546 891.648 891.999 892.291 892.462 892.562 892.587 892.581 892.600 892.982 893.335 893.698 893.924 894.146 894.348 894.537 894.574 894.498 894.437 894.590 895.026 895.427 895.490 895.651 895.543 895.231 895.234 895.336 895.377 895.485 895.702 896.041 896.430 896.509 896.672 896.771 896.881 897.116 897.640 898.160 898.278 898.331 898.466 898.618 898.510 898.275 898.163 898.334 898.429 898.591 898.633 898.713 898.783 898.812 899.109 892.801 892.995 893.193 893.395 893.601 893.812 894.026 894.244 894.467 894.693 894.924 895.158 895.397 895.640 895.887 896.138 896.393 896.652 896.915 897.182 897.454 897.729 898.009 898.292 898.580 898.871 899.167 899.467 899.767 900.067 900.358 900.636 900.901 901.152 901.390 901.615 901.826 902.025 902.210 902.381 902.539 902.684 902.816 902.934 903.040 903.131 903.210 903.275 903.327 903.365 903.391 903.403 903.401 903.387 903.359 903.317 903.263 903.195 903.114 903.019 902.911 902.790 902.656 902.508 902.347 902.173 901.985 901.765 901.503 901.238 901.000 900.762 900.544 900.349 900.178 900.030 899.924 899.832 899.800 899.791 899.741 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE VUP CH:15+691 Box Culvert CH:15+725 ELEV.=895.058m ELEV.=899.914m PVI. CH=15690.978m PVI. CH=15946.404m T T TF PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW EC: 15+371 BS: 15+813 BC: 15+8 88 E C : 1 5 + 9 6 8 E S : 1 6 + 0 4 3 B S : 1 6 + 0 9 6 M A T C H L I N E N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 16/1 15+150 15+151 1x4x3 - Box Culvert 1x4x3 - Box Culvert - NEW CONSTRUCTION CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 16/2 15+700 15+691 1x30x5.5 - VUP 1x30x5.5 - VUP - New 4-Lane CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 16/3 15+725 15+725 1x2x2 - Box Culvert 1x2x2 - Box Culvert - NEW CONSTRUCTION CURVE NO 12 R (m) 800.000 Lc 79.531 Ls 75.0 V 100 Kmph e (%) D 11° 4' 3.0" 1 5 + 1 0 0 1 5 + 2 0 0 15+ 300 15+400 15+500 15+600 15+700 15+800 15 +9 00 1 6 + 0 0 0 1 6 + 1 0 0 5.0 C H : 1 5 + 0 5 0 S L IP R O A D T A P E R S T A R T C H : 1 5 + 0 5 0 S L IP R O A D T A P E R E N D SL IP RO AD TA PE R EN D SL IP RO AD ST AR T CH : 15 +2 00 SL IP RO AD TA PE R ST AR T SL IP RO AD EN D CH : 15 +2 00 S L IP R O A D E N D S E R V IC E R O A D S T A R T C H : 1 5 + 9 5 0 S L IP R O A D S T A R T S E R V IC E R O A D E N D C H : 1 5 + 9 5 0 CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/08 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=889.000m THORAPALLI AGRAHARAM NERALURU
  • 12. PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW ES : 16 +0 43 BS : 16 +0 96 BC: 16+ 146 EC : 16 +2 79 ES : 16 +3 29 BS : 16 +6 38 BC: 16+733 EC : 16+ 753 E S : 1 6 + 8 4 8 B S : 1 6 + 8 9 4 BC: 17+014 MA TC HL IN E MATCHLINE N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 17/1 16+480 16+479 1x2x2 - Box Culvert 1x2x2 - Box Culvert - RECONSTRUCTION CURVE NO 13 R (m) -1200.000 Lc 132.783 Ls 50.0 V 100 Kmph e (%) D 8° 43' 38.1" CURVE NO 14 R (m) 500.000 Lc 19.993 Ls 95.0 V 100 Kmph e (%) D 13° 10' 37.9" 16 +0 00 16 +1 00 16+200 1 6 + 3 0 0 1 6 + 4 0 0 1 6 + 5 0 0 1 6 + 6 0 0 16 +7 00 1 6 + 8 0 0 1 6 + 9 0 0 17+0 00 5.0 3.70 16000 16010 16020 16030 16040 16050 16060 16070 16080 16090 16100 16110 16120 16130 16140 16150 16160 16170 16180 16190 16200 16210 16220 16230 16240 16250 16260 16270 16280 16290 16300 16310 16320 16330 16340 16350 16360 16370 16380 16390 16400 16410 16420 16430 16440 16450 16460 16470 16480 16490 16500 16510 16520 16530 16540 16550 16560 16570 16580 16590 16600 16610 16620 16630 16640 16650 16660 16670 16680 16690 16700 16710 16720 16730 16740 16750 16760 16770 16780 16790 16800 16810 16820 16830 16840 16850 16860 16870 16880 16890 16900 16910 16920 16930 16940 16950 16960 16970 16980 16990 17000 L=53.272m L=308.854m L=45.656m L=132.783m L=19.993m L=75.000m L=50.000m L=50.000m L=95.000m L=95.000m L=120.000m 16042.985 16096.257 16146.257 16279.040 16329.040 16637.894 16732.894 16752.887 16847.887 16893.543 R=-1200.000m R=500.000m Straight Straight Straight TCS-IV TCS-V TCS-III TCS-IV 899.646 899.596 899.546 899.496 899.445 899.388 899.324 899.253 899.174 899.088 898.995 898.895 898.788 898.674 898.552 898.423 898.287 898.144 897.994 897.843 897.693 897.542 897.391 897.240 897.090 896.941 896.804 896.682 896.574 896.481 896.402 896.337 896.286 896.250 896.229 896.221 896.228 896.249 896.285 896.335 896.399 896.478 896.571 896.678 896.800 896.936 897.086 897.251 897.430 897.622 897.815 898.009 898.202 898.396 898.588 898.774 898.953 899.124 899.288 899.445 899.594 899.736 899.870 899.997 900.117 900.229 900.334 900.431 900.521 900.604 900.679 900.747 900.807 900.860 900.906 900.944 900.975 900.999 901.015 901.023 901.025 901.019 901.005 900.984 900.956 900.921 900.878 900.827 900.769 900.704 900.631 900.551 900.464 900.369 900.267 900.158 900.041 899.922 899.813 899.728 899.668 G=-0.500 G=-1.507 G=1.935 G=-1.192 L=38.986m L=69.662m L=50.018m L=12.372m R=-13897.278m R=6972.759m R=-13528.324m L=140.000m L=240.000m L=423.000m 15996.404 16035.390 16175.390 16245.052 16485.052 16535.070 16958.070 16970.442 R=4215.264m L=95.000m 899.109 899.038 899.133 899.226 899.319 899.173 899.112 899.012 899.065 898.824 898.727 898.880 898.875 898.501 898.119 898.054 898.032 897.926 897.803 897.699 897.643 897.549 897.645 897.609 897.546 897.377 897.487 897.706 897.464 897.267 897.591 897.516 897.600 897.897 898.041 898.184 898.295 898.167 897.932 898.223 897.551 897.505 897.590 897.603 897.688 897.537 897.577 897.447 898.153 898.755 898.972 899.190 898.285 898.141 898.589 898.798 899.053 899.407 899.664 899.796 899.967 900.255 900.484 900.503 900.402 900.819 901.183 901.235 901.325 901.320 901.460 901.544 902.142 902.289 902.242 902.304 902.290 901.782 901.543 901.122 901.572 902.177 901.318 901.168 900.910 900.586 900.009 899.228 899.033 898.915 898.764 898.259 897.685 896.780 896.460 896.190 895.903 895.612 895.402 895.231 895.379 899.741 899.691 899.641 899.591 899.540 899.483 899.419 899.375 899.377 899.363 899.342 899.314 899.279 899.246 899.196 899.112 898.976 898.833 898.683 898.532 898.382 898.231 898.080 897.929 897.779 897.630 897.493 897.371 897.254 897.089 896.938 896.801 896.669 896.561 896.468 896.388 896.323 896.344 896.380 896.430 896.494 896.573 896.666 896.773 896.895 897.031 897.181 897.346 897.525 897.717 897.910 898.104 898.297 898.491 898.683 898.869 899.048 899.219 899.383 899.540 899.689 899.831 899.965 900.092 900.212 900.324 900.429 900.526 900.616 900.681 900.702 900.725 900.740 900.748 900.776 900.814 900.881 900.950 901.011 901.073 901.120 901.114 901.100 901.079 901.078 901.079 901.072 901.057 901.035 901.015 900.978 900.934 900.883 900.824 900.758 900.694 900.613 900.530 900.457 900.408 900.384 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE Box Culvert CH:16+479 ELEV.=899.119m ELEV.=895.205m ELEV.=902.585m PVI. CH=16105.390m PVI. CH=16365.052m PVI. CH=16746.570m CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/09 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=894.000m THORAPALLI AGRAHARAM NERALURU
  • 13. TF PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW BC : 17 +0 14 EC: 17+0 61 E S : 1 7 + 1 8 1 B S : 1 7 + 2 8 6 B C : 1 7 + 3 6 1 EC : 17 +5 21 E S : 17 + 59 6 B S : 17 + 90 8 BC: 18+003 M A T C H L IN E MATC HLINE N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 18/1 17+043 17+041 1x2x2 - Box Culvert 1x2x2 - Box Culvert - RECONSTRUCTION CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 18/2 17+935 17+931 1x2x2 - Box Culvert 1x2x2 - Box Culvert - RECONSTRUCTION CURVE NO 15 R (m) -400.000 Lc 47.727 Ls 120.0 V 100 Kmph e (%) D 24° 1' 30.4" CURVE NO 16 R (m) 800.000 Lc 160.331 Ls 75.0 V 100 Kmph e (%) D 16° 51' 15.6" 1 7 + 0 0 0 1 7 + 1 0 0 1 7 + 2 0 0 1 7 + 3 0 0 1 7 + 4 0 0 17 +5 00 1 7 + 6 0 0 1 7 + 7 0 0 1 7 + 8 0 0 1 7 + 9 0 0 18+0 00 5.0 S E R V IC E R O A D E N D S L IP R O A D S T A R T C H : 1 7 + 8 2 5 S E R V IC E R O A D S T A R T S L IP R O A D E N D C H : 1 7 + 8 2 5 5.0 17000 17010 17020 17030 17040 17050 17060 17070 17080 17090 17100 17110 17120 17130 17140 17150 17160 17170 17180 17190 17200 17210 17220 17230 17240 17250 17260 17270 17280 17290 17300 17310 17320 17330 17340 17350 17360 17370 17380 17390 17400 17410 17420 17430 17440 17450 17460 17470 17480 17490 17500 17510 17520 17530 17540 17550 17560 17570 17580 17590 17600 17610 17620 17630 17640 17650 17660 17670 17680 17690 17700 17710 17720 17730 17740 17750 17760 17770 17780 17790 17800 17810 17820 17830 17840 17850 17860 17870 17880 17890 17900 17910 17920 17930 17940 17950 17960 17970 17980 17990 18000 L=104.376m L=312.370m L=47.727m L=160.331m L=120.000m L=75.000m L=75.000m L=95.000m 17013.543 17061.269 17181.269 17285.646 17360.646 17520.976 17595.976 17908.346 18003.346 R=-400.000m R=800.000m Straight Straight TCS-IV TCS-III TCS-IV TCS-VIA 899.668 899.630 899.617 899.627 899.661 899.719 899.800 899.903 900.009 900.110 900.204 900.290 900.369 900.441 900.506 900.563 900.612 900.654 900.689 900.717 900.737 900.750 900.755 900.753 900.743 900.727 900.702 900.671 900.632 900.586 900.532 900.471 900.402 900.326 900.243 900.153 900.055 899.949 899.837 899.716 899.589 899.459 899.329 899.199 899.069 898.939 898.809 898.679 898.549 898.419 898.289 898.159 898.029 897.899 897.769 897.639 897.509 897.379 897.249 897.119 896.989 896.859 896.729 896.599 896.469 896.339 896.209 896.079 895.949 895.819 895.689 895.559 895.429 895.299 895.169 895.039 894.909 894.779 894.649 894.519 894.389 894.259 894.129 893.999 893.869 893.739 893.609 893.479 893.349 893.219 893.101 893.006 892.935 892.887 892.862 892.861 892.883 892.928 892.997 893.078 893.158 G=1.062 G=-1.300 L=12.942m L=491.543m R=4215.264m R=-13550.621m R=4277.750m L=95.000m L=320.000m L=90.050m 17065.442 17078.384 17398.384 17889.927 17979.976 R=4215.264m L=95.000m G=0.805 L=103.337m 895.379 895.613 896.173 896.607 894.921 894.980 895.149 895.334 895.540 896.100 897.185 897.069 897.221 897.407 897.617 897.811 897.953 898.098 898.418 899.335 899.168 899.365 899.541 899.651 899.767 899.894 899.929 899.873 899.767 899.563 899.287 899.006 898.912 898.939 898.923 898.727 898.506 898.167 897.923 897.599 897.904 898.278 897.951 897.195 896.773 896.543 896.313 896.109 896.009 895.189 894.027 894.085 893.923 893.413 893.422 893.534 893.866 894.228 893.840 893.352 893.693 893.498 894.158 894.217 894.316 894.387 894.230 894.355 894.131 893.871 893.834 893.793 893.860 893.804 893.509 893.488 893.359 893.262 892.917 893.415 893.450 893.427 893.495 893.392 893.273 893.340 893.335 893.466 893.249 893.051 893.058 892.983 892.801 892.924 892.986 892.921 892.854 892.866 893.408 893.071 900.384 900.391 900.387 900.397 900.431 900.489 900.570 900.637 900.707 900.772 900.830 900.880 900.923 900.950 900.979 901.000 901.013 901.019 901.018 901.001 900.985 900.962 900.931 900.893 900.847 900.822 900.797 900.766 900.727 900.681 900.627 900.566 900.497 900.376 900.239 900.086 899.925 899.819 899.707 899.586 899.459 899.329 899.199 899.069 898.939 898.809 898.679 898.549 898.419 898.289 898.159 898.029 897.899 897.823 897.756 897.680 897.604 897.474 897.344 897.214 897.084 896.954 896.824 896.694 896.564 896.434 896.304 896.174 896.044 895.914 895.784 895.654 895.524 895.394 895.264 895.134 895.004 894.874 894.744 894.614 894.484 894.354 894.233 894.120 894.009 893.907 893.806 893.704 893.593 893.493 893.408 893.338 893.302 893.288 893.298 893.321 893.377 893.457 893.560 893.671 893.792 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE Box Culvert CH:17+041 Box Culvert CH:17+931 ELEV.=899.350m ELEV.=901.690m ELEV.=892.635m PVI. CH=17017.942m PVI. CH=17238.384m PVI. CH=17934.951m CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/10 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=889.000m THORAPALLI AGRAHARAM NERALURU
  • 14. TF PRO W PRO W PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PRO W PRO W PRO W PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PR OW PROW PROW PROW B S : 1 7 + 9 0 8 B C : 1 8 + 0 0 3 EC : 18 +3 44 E S : 1 8 + 4 3 9 B S : 1 8 + 8 8 3 B C : 1 8 + 9 3 3 M A T C H L I N E N 1x2x2 - Box Culvert 1x2x2 - Box Culvert - RECO NSTRUCTIO N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 19/1 18+438 18+450 1x15x5.5+1x20x5.5+1x15x5.5 - VUP 1x15x5.5+1x20x5.5+1x15x5.5 - VUP - New 4-Lane CURVE NO 17 R (m) -500.000 Lc 341.135 Ls 95.0 V 100 Kmph e (%) D 49° 58' 38.4" 1 7 + 9 0 0 1 8 + 0 0 0 1 8 + 1 0 0 1 8 + 2 0 0 18+ 300 1 8 + 4 0 0 1 8 + 5 0 0 1 8 + 6 0 0 1 8 + 7 0 0 1 8 + 8 0 0 1 8 + 9 0 0 5.0 S L IP R O A D E N D S L IP R O A D T A P E R S T A R T C H : 1 8 + 7 8 0 S L IP R O A D S T A R T S L IP R O A D T A P E R E N D C H : 1 8 + 7 8 0 C H : 1 8 + 9 3 0 S L IP R O A D T A P E R E N D C H : 1 8 + 9 3 0 S L IP R O A D T A P E R S T A R T 18000 18010 18020 18030 18040 18050 18060 18070 18080 18090 18100 18110 18120 18130 18140 18150 18160 18170 18180 18190 18200 18210 18220 18230 18240 18250 18260 18270 18280 18290 18300 18310 18320 18330 18340 18350 18360 18370 18380 18390 18400 18410 18420 18430 18440 18450 18460 18470 18480 18490 18500 18510 18520 18530 18540 18550 18560 18570 18580 18590 18600 18610 18620 18630 18640 18650 18660 18670 18680 18690 18700 18710 18720 18730 18740 18750 18760 18770 18780 L=443.983m L=341.135m L=95.000m 18003.346 18344.481 18439.481 R=-500.000m Straight TCS-VII TCS-VIA 893.158 893.239 893.319 893.400 893.480 893.561 893.641 893.722 893.802 893.878 893.931 893.960 893.966 893.948 893.907 893.842 893.754 893.642 893.507 893.348 893.165 892.959 892.730 892.492 892.255 892.017 891.780 891.542 891.305 891.068 890.830 890.593 890.355 890.118 889.880 889.643 889.406 889.168 888.931 888.693 888.456 888.218 887.981 887.743 887.506 887.269 887.040 886.846 886.689 886.568 886.484 886.436 886.415 886.396 886.378 886.359 886.340 886.321 886.302 886.283 886.264 886.246 886.227 886.208 886.189 886.170 886.151 886.132 886.114 886.095 886.076 886.057 886.038 886.019 886.000 885.982 885.963 885.944 885.925 G=0.805 G=-2.374 G=-0.189 L=103.337m L=234.687m L=267.000m R=-4245.978m R=2744.916m L=135.000m L=60.000m 18083.313 18218.313 18453.000 18513.000 18780.000 893.071 893.022 893.032 893.041 893.085 893.130 893.170 893.594 893.242 893.294 893.346 893.380 893.451 893.467 893.479 893.517 893.349 893.213 893.126 893.032 892.897 892.765 892.388 891.838 890.433 889.852 889.856 889.240 888.320 888.426 888.693 888.279 888.156 888.034 887.894 887.784 887.970 888.268 888.399 888.413 888.224 888.384 888.592 889.055 889.245 889.015 888.664 889.674 890.186 889.668 890.300 890.281 890.553 891.424 891.173 890.796 890.335 890.040 889.807 889.568 889.312 888.993 888.644 888.286 887.867 887.443 886.975 886.375 885.578 884.918 884.397 883.938 883.173 882.396 881.583 881.239 880.807 880.565 880.185 893.792 893.893 893.985 894.077 894.169 894.261 894.353 894.445 894.537 894.629 894.721 894.813 894.906 894.998 895.090 895.182 895.274 895.366 895.458 895.550 895.642 895.734 895.826 895.918 896.011 896.103 896.195 896.287 896.378 896.460 896.528 896.583 896.625 896.653 896.667 896.649 896.618 896.565 896.497 896.426 896.332 896.224 896.103 895.978 895.830 895.669 895.494 895.315 895.114 894.899 894.671 894.439 894.184 893.916 893.662 893.396 893.116 892.822 892.515 892.195 891.865 891.535 891.205 890.875 890.545 890.215 889.885 889.555 889.225 888.895 888.565 888.235 887.905 887.575 887.245 886.915 886.585 886.255 885.925 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE ELEV.=894.372m ELEV.=886.485m PVI. CH=18150.813m PVI. CH=18483.000m VUP CH:18+450 CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/11 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=879.000m THORAPALLI AGRAHARAM NERALURU
  • 15. CH-153-600 CH-153-700 CH-153-500 PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW MATCHLINE TEMPLE N CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 20/2 19+701 19+700 1x15+1x45.44+1x15 - ROB 1x15+1x45.44+1x15 - ROB 16 New 4-Lane 19+500 19+600 19+700 19+800 19+900 20+000 SLIP ROAD TAPER END SLIP ROAD START CH : 19+720 SLIP ROAD TAPER START SLIP ROAD END CH : 19+720 CH : 19+950 SLIP ROAD END CH : 19+950 SLIP ROAD START 19720 19730 19740 19750 19760 19770 19780 19790 19800 19810 19820 19830 19840 19850 19860 19870 19880 19890 19900 19910 19920 19930 19940 19950 TCS-VIII 864.528 864.198 863.868 863.538 863.208 862.878 862.548 862.218 861.888 861.558 861.228 860.898 860.568 860.238 859.908 859.578 859.248 858.918 858.588 858.258 857.928 857.598 857.268 856.938 G=-3.300 L=230.000m 19720.000 19950.000 L=1499.521m Straight 864.644 864.330 864.168 864.011 863.694 863.262 863.239 863.324 862.758 861.887 861.799 861.485 860.877 860.373 859.877 859.428 858.999 858.726 857.882 857.612 857.535 857.208 856.734 856.283 872.207 872.207 872.207 872.202 872.184 872.152 872.107 872.049 871.977 871.891 871.792 871.680 871.554 871.414 871.261 871.095 870.915 870.722 870.515 870.295 870.061 869.814 869.553 869.279 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/12 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=855.000m THORAPALLI AGRAHARAM NERALURU
  • 16. TF PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW PROW CA CHAINAGE CA PROP. SPAN (M): DESIGN CH: DES. PROP. SPAN (M): CD NO: SKEW PROPOSAL 22/1 21+400 21+408 1x7.0x4.0 - SVUP 1x7.0x4.0 - SVUP - New 4-Lane CURVE NO 19 R (m) 1200.000 Lc 961.768 Ls 50.0 V 100 Kmph e (%) D 48° 18' 30.0" 2 1 + 2 0 0 2 1 + 3 0 0 21+400 2 1 + 5 0 0 2 1 + 6 0 0 3.70 C H : 2 1 + 2 7 0 CH : 21+420 21290 21300 21310 21320 21330 21340 21350 21360 21370 21380 21390 21400 21410 TCS-VI 844.744 843.767 842.790 841.814 840.837 839.860 838.883 837.906 836.929 835.953 834.976 833.999 834.078 G=-9.768 L=110.000m 21290.000 21400.000 L=961.768m R=1200.000m 844.495 843.356 842.168 840.963 839.914 839.470 838.827 838.142 837.805 837.041 836.459 836.171 836.083 841.214 841.036 840.851 840.659 840.460 840.253 840.038 839.817 839.588 839.352 839.109 838.865 838.621 TCS TYPE PROPOSED CHAINAGE HORIZONTAL ALIGNMENT FINISHED ROAD LEVEL VERTICAL ALIGNMENT @ RSR INNER EDGE RIGHT MAIN CARRIAGEWAY EDGE LEVELS GROUND LEVELS @ RSR INNER EDGE SVUP CH:21+408 OGL AT RSR INNER EDGE RMCW EDGE LEVEL FRL AT RSR INNER EDGE CONSULTING ENGINEERS PVT LTD # MIG 192 & 193, Flat No. 301, 3rd Floor, Krishna Apartments, Road No.1, KPHB Colony, Kukatpally, Hyderabad, Telangana-500072. PVR CONSULTING ENGINEERS PVT. LTD. FOUR LANING OF NERALURU–THORAPALLI AGRAHARAM SECTION OF NH-844 NATIONAL HIGHWAYS AUTHORITY OF INDIA FROM KM 0+000 TO KM 23+350 (DESIGN CHAINAGE) UNDER BHARATMALA PARIYOJANA, PHASE I (NATIONAL CORRIDOR) ON HYBRID ANNUITY MODE IN THE STATES OF KARNATAKA & TAMIL NADU. SCC House, Opp. Nirma University, Infrastructure Private Limited PRIVATE LIMITED, AHMEDABAD NERALURU THORAPALLI ROADWAYS scc S.G. Highway, Chharodi, Ahmedabad. R0 NH844/RSR/P&P/13 22-11-2022 0 FIRST SUBMISSION 22.11.2022 VERTICAL 1:200 HORIZONTAL 1:2000 DATUM=833.000m THORAPALLI AGRAHARAM NERALURU