Samit Putatunda provides his curriculum vitae, including personal details, education qualifications, professional experience, and expected salary. He holds a Diploma in Civil Engineering and has over 20 years of experience working on road, building, and industrial projects as a site supervisor and quantity surveyor. His most recent role was with Naveen Merico Engineering on a highway project in West Bengal from 2015-2016.
1. CURRICULUM VITAE
Name : SAMIT PUTATUNDA
Mobile : (0) 8697702610 / (0) 7059919097
Email : samit.putatunda@yahoo.com/samitputatunda169
@gmail.com/ samit.putatunda@rediffmail.com
Present Address: 4/4 Samargarh, Paschim Putiary, Panchanantala Road,
Kolkata-700041
Permanent Address: Samit Putatunda
C/O: Santosh kr Putatunda.
59, Banamali Banerjee Road
Kolkata – 700082. P.I.N-700082
WEST BENGAL (INDIA)
Objective : To serve the institution honestly & sincerely to the best of my skill and
abilities..
PROFESSIONAL QUALIFICATION:
Qualification Institution Year
Diploma in Civil
engineering
A.P.C ROY
POLYTECHNIC (Jadavpur
Kolkata) Under S.C.E
&T.E Govt. Of W.B
1992
GENERAL EDUCATION:
Qualification Board/University Year
Higher Secondary(science) W.B.C.H.S.E. 1984
Madhyamik W.B.B.S.E. 1982
EXPERENCE :
1) Working as a site supervisor in M/S Bharat Construction from 27.11. 92 to
01.01.1999.(Roads and building,P.W.D-W.B,K.M.D.A,Indian oil corp)
2) Working as a part time lecturer in Tollygunge I.T.I from Nov 1999 to Feb 2002.
3) Last approx.. 7 years working as a Quantity Surveyor {Billing Engineer} in Simplex
Infrastructures Limited (From 01.06.2007 till June 2013).
4) Self-employed
Scope of Work:
A)Under Bharat Construction
1)Baraipur-kulpi road(single lane) Uder 24-Pargana highway P.W.D Govt of W.B 42.650 km
length From baroipur Estimated Project cost 2600447569/= Under bharat construction from Nov
1992 to july 1995
2)Extension of E.M -Bypass Kolkata single lane Roads Under Calcutta Metropolitan
development Authority Forom Ultadanga to Kasba connector 9.15 km length Project cost
12338750/= Under bharat construction5 Metropolition development Authoiriti,(Govt of W.B)
form Aug 1995 spt-1997
3) Usti-Daimond Harbour Road Project Single Lane From Oct-1997 to dec-1998 Project cost
16,3258965/= under Bharat construction Under
24-Pargana High way P.W.D Govt Of W.B
2. B)Power plant industrial sector And Highway project as a Billing Engineer. Under SIMPLEX
INFRA LTD
1) Sanghi guest house from 01.06.2007 to 23.03.2008) under implex Infra ltd
2)Sanghi cement plant , driven-pile , & power plant Project,
3) Two lane Traffic road project With Truc/Dumper Parking Area Of Length 23.450 Km Rigid
Pavement for Heavy-Vehicles (Estimated cost Rs148,3605674/=) from 01.04.2008 to
20.07,2009.Client Sanghi Industries Ltd
3)Adani road project(West-Port) Two-Lane Traffic Road of Length38.125 km (Estimated Cost
Rs 246,4500894/=),Adani power,Vegitable oil tank,pilling adani port gujarat from july 2009 to
2010 Feb(Client-adani group) Client Mundra sez limited
4)Bhubaneswar- kharagpur road project of length 185.135(Two Lane) from Feb 2010 to July
2010(C.P.W.D) (Estimated cost Rs 645,2235789/=) client C.P.W.D
5)Essar power project Boiler S.T.G E.S.P Housing Project At Chandwa –Torri JharkhandClient
Essar Project Limited,Estimated cost Rs 780,5563210/=
6) Essar Road Project single Lane (length 12.850 kmAt Torri,chandwa,Jhar khand Under
simplex Infra Ltd July-2010 to oAug 2011 Client Essar Project Limited(Estimated cost
Rs30,0456980/=)
6)Avijit Power Project torri Chandwa, Jhar khand Under Simplex Infra ltd From Aug-
2011toFeb-2012(T.G.Boiler and Housing project),Client Avijit Group(Estimated project cost Rs
800,0045625/=)
7)Silvassa polyester project Industrial Building P.T.Y and P.O.Y ,Tank-farm From March 2012
to June 2013 Client Reliance Industries Ltd Estimated cost 9802266441/=
8)IndustrialRoad Project (29.850 Km,Two lane,With Truck perking area, At Silvassa Polyester
plant Client-Reliance industies ltd (Consultant Chemtex) March 2012 to June 2013(Project
cost750,5500687/=)
C)Under Local Building Promoter,Contractor form july 2013 to june 2015.
D)Birohi-Madanpur-Kalyani Highway(client P.W.D,Govt of W.B) under Naveen Merico
engineering Co P.V.T Ltd From Aug-2015 To April-2016,Consultant-Lea Associates P.V.T
Ltd(Single lane, Of Length 21.380 Km(Estimated cost-Rs 48,3004561/=)
Expected salary
12.00 lacs per annum
PERSONAL DETAILS:
Date of Birth : 02/07/1967
Father’s Name : SANTOSH KR PUTATUNDA
Marital Status : Married
Sex : Male
Nationality : Indian
Languages known : Bengali, English, Hindi
Date :12.09.2016
Place: Kolkata
(SAMIT PUTATUNDA)