4. Capacity
• Implementation of an enhanced locks lighting system;
• Construction of two tie-up stations in Gaillard Cut;
• Widening Gaillard Cut from 192 to 218 metres (630 to 715 ft);
• Improvements to the tugboat fleet;
• Implementation of the carousel lockage system in Gatun locks;
• Development of an improved vessel scheduling system;