 Bill Of Quantities Item
No.
Item Description Unit Qty.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 47.58 18556.11
Grand Total of BOQ 432669.4
Dr. Haitham El Sharnouby
 Bill Of Quantities Item
No.
Item Description Unit Qty.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 47.58 18556.11
Grand Total of BOQ 432669.4
Dr. Haitham El Sharnouby
 Price Breakdown
Item
No.
Item Description Unit Qty. D. Cost Total D. C.
Mark
Up Pct.
Unit
Price
Total Price
C000 Reinforced Concrete Works
C010
Supply and Pouring Reinforced
Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34
C020
Supply and Pouring Reinforced
Concrete for Combined Slabs &
Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55
D000 Brick Works
D010
Supply and Erect Masonry for
Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85
D020
Supply and Erect Masonry for
External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87
E000 Ceramic Works
E010
Supply and Erect Ceramic for
Floors m2 20 129.68 2593.52 1.25 161.45 3228.93
E020
Supply and Erect Ceramic for
Walls m2 60 135.75 8145.18 1.25 169.01 10140.75
F000 Plastering Works
F010
Supply and Apply Internal Plaster
Works m2 390 38.22 14904.50 1.25 47.58 18556.11
Grand Total of BOQ 347526 432669.4
Dr. Haitham El Sharnouby
 Res. Dictionary
ID Description Unit Price Notes
M Gravel m3 80
M Sand m3 40
M Cement ton 1420
M Water m3 1
M Rein. Steel ton 14000
M Brick 1000 600
M Floor Ceramic Tiles m2 90
M Wall Ceramic Tiles m2 80
M White Mortar Filling / m2 m2 3
M Lime m3 35
L R. C. Pouring Crew day 1200
L Steel Fixer day 180
L Steel Fixer Ass. day 120
L Steel O. Labor day 90
L Formwork Carpentry day 180
L Formwork Carpentry Ass. day 120
L Brick Laying Lab. day 180
L Brick Laying Ass. day 120
L Brick Laying O. Lab. day 90
L Ceramic Fixer day 180
L Ceramic F. Ass. day 120
L Plasterer day 180
L Plasterer Helper day 120
Q Mixer & Vibrator m3 25
Q Fuel & Electric m3 15
Q Small Tools / m3 RC m3 7
Q Formwork Timber m3 80
Q Scaffolding / m2 m2 1
Q Scaffolding / m3 m3 6
Q Small Tools / m2 Brick m2 1
Q Small Tools / m3 Brick m3 5
Q Ceramic Fixing Equipment m2 5
Q Plastering Equipment m2 2
Dr. Haitham El Sharnouby
 Direct Cost Estimate ‫كل‬3‫مساعد‬ ‫ومعهم‬ ‫حدادبن‬
‫أيام‬ ‫تسعة‬ ‫يحتاجون‬ ‫وعامل‬
‫ليثبتوا‬10‫وهذا‬ ‫حديد‬ ‫طن‬
‫قسمة‬ ‫حاصل‬10‫كمية‬ ‫على‬
‫م‬ ‫في‬ ‫الحديد‬3
‫كل‬4‫مساعدي‬ ‫وثالثة‬ ‫نجارين‬‫ن‬
‫عمل‬ ‫أيام‬ ‫عشرة‬ ‫يحتاجون‬
‫لصب‬ ‫نجارة‬ ‫ليثبتوا‬40‫متر‬
‫خرسانة‬ ‫مكعب‬
C010
Supply and Pouring Reinforced
Concrete for Columns
m3 80 Res.
Category
Resource Description Amount Price Rate Losses
Pct. /
Multi.
Direct
Cost
C010 M Gravel 0.800 80 1 1.12 1 71.68
C010 M Sand 0.400 40 1 1.12 1 17.92
C010 M Cement 0.400 1420 1 1.07 1 607.76
C010 M Water 0.150 1 1 1.12 1 0.17
C010 M Rein. Steel 0.105 14000 1 1.1 1 1617.00
Direct Cost of Material 2314.53
C010 L R. C. Pouring Crew 1 1200 40 1 1 30.00
C010 L Steel Fixer 3 180 95.2381 1 9 51.03
C010 L Steel Fixer Ass. 1 120 95.2381 1 9 11.34
C010 L Steel O. Labor 1 90 95.2381 1 9 8.51
C010 (El Bakkary p. 243) L Formwork Carpentry 4 180 40 1 10 180.00
C010 (El Bakkary p. 243) L Formwork Carpentry Ass. 3 120 40 1 10 90.00
Direct Cost of Labor 370.88
C010 Q Mixer & Vibrator 1 25 1 1 1 25.00
C010 Q Fuel & Electric 1 15 1 1 1 15.00
C010 Q Small Tools / m3 RC 1 7 1 1 1 7.00
C010 Q Formwork Timber 1 80 1 1 1 80.00
Direct Cost of Equipment 127.00
Total Direct Cost for Each Item Unit 2812.40

More Related Content

What's hot

45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimateimaduddin91
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of CementPTUT Lahore
 
Aggregate impact value Calculation And uses
Aggregate impact value Calculation And usesAggregate impact value Calculation And uses
Aggregate impact value Calculation And usesShahryar Amin
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 
What is Tungsten Carbide?
What is Tungsten Carbide?What is Tungsten Carbide?
What is Tungsten Carbide?The FBA Broker
 
Fineness test on cement
Fineness test on cementFineness test on cement
Fineness test on cementHARISH B A
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILSReza Bassawon
 
How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...CNC Glass Interlayer(China)
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTIONReza Bassawon
 
Howto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmHowto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmCNC Glass Interlayer(China)
 
checking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimenchecking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimenzeeshan hafeez
 

What's hot (18)

45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimate
 
Kabaddi
KabaddiKabaddi
Kabaddi
 
Setting time test
Setting time testSetting time test
Setting time test
 
Apron feeder pans
Apron feeder pansApron feeder pans
Apron feeder pans
 
Fresh concrete tests
Fresh concrete testsFresh concrete tests
Fresh concrete tests
 
Esite Norton T100
Esite Norton T100Esite Norton T100
Esite Norton T100
 
Fineness test of Cement
Fineness test of CementFineness test of Cement
Fineness test of Cement
 
Normal consistency test
Normal consistency testNormal consistency test
Normal consistency test
 
Aggregate impact value Calculation And uses
Aggregate impact value Calculation And usesAggregate impact value Calculation And uses
Aggregate impact value Calculation And uses
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
What is Tungsten Carbide?
What is Tungsten Carbide?What is Tungsten Carbide?
What is Tungsten Carbide?
 
Fineness test on cement
Fineness test on cementFineness test on cement
Fineness test on cement
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
 
Rz catalogue cn AIKOH 推拉力计
Rz catalogue cn AIKOH 推拉力计Rz catalogue cn AIKOH 推拉力计
Rz catalogue cn AIKOH 推拉力计
 
How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...How many rolls of safety laminated glass interlayer eva film can be loaded in...
How many rolls of safety laminated glass interlayer eva film can be loaded in...
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
 
Howto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer filmHowto test properties of glass laminating eva interlayer film
Howto test properties of glass laminating eva interlayer film
 
checking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimenchecking heat treatment on unspecified steel specimen
checking heat treatment on unspecified steel specimen
 

Similar to Intro. to management lecture 06

Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09Haitham Sharnouby
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08Haitham Sharnouby
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimationimaduddin91
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary ReportNatalie Reid
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal ashleyyeap
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxQAQCGCC
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farmOmar Faruque
 
Builder Sample
Builder SampleBuilder Sample
Builder SampleHai Nguyen
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimationkrkantamneni
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimationkrkantamneni
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notesmanu287448
 

Similar to Intro. to management lecture 06 (20)

Intro. to management lecture 09
Intro. to management lecture 09Intro. to management lecture 09
Intro. to management lecture 09
 
Intro. to management lecture 08
Intro. to management lecture 08Intro. to management lecture 08
Intro. to management lecture 08
 
E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Single storied house
Single storied houseSingle storied house
Single storied house
 
RR Nagar
RR NagarRR Nagar
RR Nagar
 
28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation28725680 qarghayi-anp-estimation
28725680 qarghayi-anp-estimation
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
 
Stilt house
Stilt houseStilt house
Stilt house
 
Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal Building Economics Preliminary Cost Appraisal
Building Economics Preliminary Cost Appraisal
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
SOR DWS 2010
SOR DWS 2010SOR DWS 2010
SOR DWS 2010
 
Cost of breeder farm
Cost of breeder farmCost of breeder farm
Cost of breeder farm
 
Builder Sample
Builder SampleBuilder Sample
Builder Sample
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
 
Boys home shed estimation
Boys home shed estimationBoys home shed estimation
Boys home shed estimation
 
RMC 34 KUMILY - POOPPARA ROAD
RMC 34 KUMILY - POOPPARA ROADRMC 34 KUMILY - POOPPARA ROAD
RMC 34 KUMILY - POOPPARA ROAD
 
Civil standard notes
Civil standard notesCivil standard notes
Civil standard notes
 
Civil book
Civil bookCivil book
Civil book
 

More from Haitham Sharnouby

Intro. to management lecture 05
Intro. to management lecture 05Intro. to management lecture 05
Intro. to management lecture 05Haitham Sharnouby
 
Intro. to management lecture 03
Intro. to management lecture 03Intro. to management lecture 03
Intro. to management lecture 03Haitham Sharnouby
 
Intro. to management lecture 04
Intro. to management lecture 04Intro. to management lecture 04
Intro. to management lecture 04Haitham Sharnouby
 
Intro. to management lecture 02
Intro. to management lecture 02Intro. to management lecture 02
Intro. to management lecture 02Haitham Sharnouby
 
Intro. to management lecture 01
Intro. to management lecture 01Intro. to management lecture 01
Intro. to management lecture 01Haitham Sharnouby
 

More from Haitham Sharnouby (6)

Intro. to management lecture 05
Intro. to management lecture 05Intro. to management lecture 05
Intro. to management lecture 05
 
Intro. to management lecture 03
Intro. to management lecture 03Intro. to management lecture 03
Intro. to management lecture 03
 
Intro. to management lecture 04
Intro. to management lecture 04Intro. to management lecture 04
Intro. to management lecture 04
 
Intro. to management lecture 02
Intro. to management lecture 02Intro. to management lecture 02
Intro. to management lecture 02
 
Intro. to management lecture 01
Intro. to management lecture 01Intro. to management lecture 01
Intro. to management lecture 01
 
Gis lecture #01
Gis lecture #01Gis lecture #01
Gis lecture #01
 

Recently uploaded

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Intro. to management lecture 06

  • 1. Dr. Haitham El Sharnouby Cost Estimate I
  • 2. Dr. Haitham El Sharnouby  Bill Of Quantities Item No. Item Description Unit Qty. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 47.58 18556.11 Grand Total of BOQ 432669.4
  • 3. Dr. Haitham El Sharnouby  Bill Of Quantities Item No. Item Description Unit Qty. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 47.58 18556.11 Grand Total of BOQ 432669.4
  • 4. Dr. Haitham El Sharnouby  Price Breakdown Item No. Item Description Unit Qty. D. Cost Total D. C. Mark Up Pct. Unit Price Total Price C000 Reinforced Concrete Works C010 Supply and Pouring Reinforced Concrete for Columns m3 80 2812.40 224992.24 1.25 3501.44 280115.34 C020 Supply and Pouring Reinforced Concrete for Combined Slabs & Beams m3 20 3026.53 60530.56 1.25 3768.03 75360.55 D000 Brick Works D010 Supply and Erect Masonry for Internal Partitions m2 150 63.42 9512.33 1.25 78.95 11842.85 D020 Supply and Erect Masonry for External Walls m3 50 536.95 26847.28 1.25 668.50 33424.87 E000 Ceramic Works E010 Supply and Erect Ceramic for Floors m2 20 129.68 2593.52 1.25 161.45 3228.93 E020 Supply and Erect Ceramic for Walls m2 60 135.75 8145.18 1.25 169.01 10140.75 F000 Plastering Works F010 Supply and Apply Internal Plaster Works m2 390 38.22 14904.50 1.25 47.58 18556.11 Grand Total of BOQ 347526 432669.4
  • 5. Dr. Haitham El Sharnouby  Res. Dictionary ID Description Unit Price Notes M Gravel m3 80 M Sand m3 40 M Cement ton 1420 M Water m3 1 M Rein. Steel ton 14000 M Brick 1000 600 M Floor Ceramic Tiles m2 90 M Wall Ceramic Tiles m2 80 M White Mortar Filling / m2 m2 3 M Lime m3 35 L R. C. Pouring Crew day 1200 L Steel Fixer day 180 L Steel Fixer Ass. day 120 L Steel O. Labor day 90 L Formwork Carpentry day 180 L Formwork Carpentry Ass. day 120 L Brick Laying Lab. day 180 L Brick Laying Ass. day 120 L Brick Laying O. Lab. day 90 L Ceramic Fixer day 180 L Ceramic F. Ass. day 120 L Plasterer day 180 L Plasterer Helper day 120 Q Mixer & Vibrator m3 25 Q Fuel & Electric m3 15 Q Small Tools / m3 RC m3 7 Q Formwork Timber m3 80 Q Scaffolding / m2 m2 1 Q Scaffolding / m3 m3 6 Q Small Tools / m2 Brick m2 1 Q Small Tools / m3 Brick m3 5 Q Ceramic Fixing Equipment m2 5 Q Plastering Equipment m2 2
  • 6. Dr. Haitham El Sharnouby  Direct Cost Estimate ‫كل‬3‫مساعد‬ ‫ومعهم‬ ‫حدادبن‬ ‫أيام‬ ‫تسعة‬ ‫يحتاجون‬ ‫وعامل‬ ‫ليثبتوا‬10‫وهذا‬ ‫حديد‬ ‫طن‬ ‫قسمة‬ ‫حاصل‬10‫كمية‬ ‫على‬ ‫م‬ ‫في‬ ‫الحديد‬3 ‫كل‬4‫مساعدي‬ ‫وثالثة‬ ‫نجارين‬‫ن‬ ‫عمل‬ ‫أيام‬ ‫عشرة‬ ‫يحتاجون‬ ‫لصب‬ ‫نجارة‬ ‫ليثبتوا‬40‫متر‬ ‫خرسانة‬ ‫مكعب‬ C010 Supply and Pouring Reinforced Concrete for Columns m3 80 Res. Category Resource Description Amount Price Rate Losses Pct. / Multi. Direct Cost C010 M Gravel 0.800 80 1 1.12 1 71.68 C010 M Sand 0.400 40 1 1.12 1 17.92 C010 M Cement 0.400 1420 1 1.07 1 607.76 C010 M Water 0.150 1 1 1.12 1 0.17 C010 M Rein. Steel 0.105 14000 1 1.1 1 1617.00 Direct Cost of Material 2314.53 C010 L R. C. Pouring Crew 1 1200 40 1 1 30.00 C010 L Steel Fixer 3 180 95.2381 1 9 51.03 C010 L Steel Fixer Ass. 1 120 95.2381 1 9 11.34 C010 L Steel O. Labor 1 90 95.2381 1 9 8.51 C010 (El Bakkary p. 243) L Formwork Carpentry 4 180 40 1 10 180.00 C010 (El Bakkary p. 243) L Formwork Carpentry Ass. 3 120 40 1 10 90.00 Direct Cost of Labor 370.88 C010 Q Mixer & Vibrator 1 25 1 1 1 25.00 C010 Q Fuel & Electric 1 15 1 1 1 15.00 C010 Q Small Tools / m3 RC 1 7 1 1 1 7.00 C010 Q Formwork Timber 1 80 1 1 1 80.00 Direct Cost of Equipment 127.00 Total Direct Cost for Each Item Unit 2812.40