LECTURE 7
SYSTEMSAFETY
Instructor: Engr. Beenish Akbar Khan
Iqra National University (INU)
Occupational Health Safety and
Environment
Btech Civil/Elect.
Department
7th
Semester
Fall 2015
As society becomes more technically advanced, its tools become
more and more sophisticated. In some cases, the machine has
advanced further than the human capacity to control it. Jet
fighters are good examples.
Safety professionals need to be aware of the limits of human
performance.
2
The system life cycle consists of six phases:
1.Concept
2.Definition
3.Development
4.Production
5.Deployment and
6.Disposition
At the end of each phase, a safety review is conducted. A
decision is then made whether to continue the project or place it
on hold, pending further examination.
3
Historical data and technical forecasts are developed for a
system hazard analysis.
A Preliminary Hazard Analysis (PHA) is conducted during this
phase. Risk Analysis (RA) is performed to determine hazard
control and to develop system-safety criteria. Safety
management will be doing the initial work on the System Safety
Program Plan (SSPP).
Three basic questions must be answered by the time the concept
phase is completed:
‘‘Have the hazards associated with the design concept been
discovered and evaluated to establish hazard controls?
Have risk analyses been initiated to establish the means for
hazard control?
Are initial safety requirements established for the concept
phase?’’ (Roland and Moriarty, 1990, p. 23).
4
Definition phase is used to verify the preliminary design and
product engineering.
Reports presented at design review meetings discuss the
technological risks, costs, human engineering, operational and
maintenance suitability, and safety aspects.
In addition subsystems, assemblies, and subassemblies of the
system are defined at this time. The PHA is updated and a
Subsystem Hazard Analysis (SSHA) is initiated so it can later be
integrated into the System Hazard Analysis (SHA).
Safety analysis techniques are used during this phase to identify
safety equipment, specification of safety design requirements,
initial development of safety test plans and requirements, and
prototype testing to verify the type of design selected.
5
Environmental impact, integrated logistics support, producible
engineering, and operational use studies are done during the
development phase.
The SSHA and safety design criteria are also completed during
this phase.
Using the data collected, a go/no-go decision can be made
before production begins.
6
The production phase of the system life cycle involves close
monitoring by the safety department. In addition, the quality-
control department becomes important because of its focus on
inspection and testing of the new product.
Training begins during this phase.
Updating of the analyses started during the definition and
development phases continues.
Finally, all the information collected during this phase is
compiled into the System Safety Engineering Report (SSER).
The SSER identifies and documents the hazards of the final
product.
7
When the system becomes operational, it is in the deployment
phase. Data continues to be collected and training is conducted.
If any problems occur, individuals responsible for system safety
must be available to follow up and decide on possible solutions.
The system safety group in the organization also reviews any
design changes made on the system.
A sixth phase of the system life cycle, the disposition or
termination phase, is the time that a system is removed from
service. A good example is asbestos removal from a building.
Safety professionals monitor these situations so both the worker
and the public are protected.
8

More Related Content

What's hot

Proposed Algorithm for Surveillance Applications
Proposed Algorithm for Surveillance ApplicationsProposed Algorithm for Surveillance Applications
Proposed Algorithm for Surveillance ApplicationsEditor IJCATR
 
Critical systems specification
Critical systems specificationCritical systems specification
Critical systems specificationAryan Ajmer
 
Nonlinear observers: a system approach for the knowledge discovery.
Nonlinear observers: a system approach for the knowledge discovery.Nonlinear observers: a system approach for the knowledge discovery.
Nonlinear observers: a system approach for the knowledge discovery.Massimo Talia
 
Software Security Engineering
Software Security EngineeringSoftware Security Engineering
Software Security EngineeringMuhammad Asim
 
MORT ANALYSIS | with Example I Gaurav Singh Rajput
MORT ANALYSIS | with Example I Gaurav Singh Rajput MORT ANALYSIS | with Example I Gaurav Singh Rajput
MORT ANALYSIS | with Example I Gaurav Singh Rajput Gaurav Singh Rajput
 
Bayesian clinical trials: software and logistics
Bayesian clinical trials: software and logisticsBayesian clinical trials: software and logistics
Bayesian clinical trials: software and logisticsJohn Cook
 
Failure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archiveFailure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archiveDavin Abraham
 
Hardwiring Safety 7 Tips For Changing Culture
Hardwiring Safety 7 Tips For Changing CultureHardwiring Safety 7 Tips For Changing Culture
Hardwiring Safety 7 Tips For Changing CulturePhil La Duke
 

What's hot (11)

Critical Systems
Critical SystemsCritical Systems
Critical Systems
 
Proposed Algorithm for Surveillance Applications
Proposed Algorithm for Surveillance ApplicationsProposed Algorithm for Surveillance Applications
Proposed Algorithm for Surveillance Applications
 
Critical systems specification
Critical systems specificationCritical systems specification
Critical systems specification
 
Nonlinear observers: a system approach for the knowledge discovery.
Nonlinear observers: a system approach for the knowledge discovery.Nonlinear observers: a system approach for the knowledge discovery.
Nonlinear observers: a system approach for the knowledge discovery.
 
Software Security Engineering
Software Security EngineeringSoftware Security Engineering
Software Security Engineering
 
MORT ANALYSIS | with Example I Gaurav Singh Rajput
MORT ANALYSIS | with Example I Gaurav Singh Rajput MORT ANALYSIS | with Example I Gaurav Singh Rajput
MORT ANALYSIS | with Example I Gaurav Singh Rajput
 
Industrial safety unit iv ppt
Industrial safety unit iv pptIndustrial safety unit iv ppt
Industrial safety unit iv ppt
 
Mycin 016
Mycin  016Mycin  016
Mycin 016
 
Bayesian clinical trials: software and logistics
Bayesian clinical trials: software and logisticsBayesian clinical trials: software and logistics
Bayesian clinical trials: software and logistics
 
Failure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archiveFailure analysis buisness impact-backup-archive
Failure analysis buisness impact-backup-archive
 
Hardwiring Safety 7 Tips For Changing Culture
Hardwiring Safety 7 Tips For Changing CultureHardwiring Safety 7 Tips For Changing Culture
Hardwiring Safety 7 Tips For Changing Culture
 

Similar to Lecture 7

Information Assurance And Security - Chapter 1 - Lesson 3
Information Assurance And Security - Chapter 1 - Lesson 3Information Assurance And Security - Chapter 1 - Lesson 3
Information Assurance And Security - Chapter 1 - Lesson 3MLG College of Learning, Inc
 
Management information system
Management information systemManagement information system
Management information systemRoneet Kumar
 
Fundamental of testing
Fundamental of testingFundamental of testing
Fundamental of testingaidul azmi
 
A hybrid reasoning system for the prevention of rail accidents
A hybrid reasoning system for the prevention of rail accidentsA hybrid reasoning system for the prevention of rail accidents
A hybrid reasoning system for the prevention of rail accidentsIJMERJOURNAL
 
Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...
Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...
Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...Editor IJCATR
 
Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...
Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...
Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...IJERDJOURNAL
 
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysisPreliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysisIRJESJOURNAL
 
Understanding the Risk Management Framework & (ISC)2 CAP Module 4: Life Cycle
Understanding the Risk Management Framework & (ISC)2 CAP Module 4: Life CycleUnderstanding the Risk Management Framework & (ISC)2 CAP Module 4: Life Cycle
Understanding the Risk Management Framework & (ISC)2 CAP Module 4: Life CycleDonald E. Hester
 
Providing a model for selecting information security control objectives using...
Providing a model for selecting information security control objectives using...Providing a model for selecting information security control objectives using...
Providing a model for selecting information security control objectives using...ijfcstjournal
 
4-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 20164-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 2016Shivendra Kapoor
 
A REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENT
A REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENTA REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENT
A REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENTijseajournal
 
Application of Q methodology in critical success factors of information secur...
Application of Q methodology in critical success factors of information secur...Application of Q methodology in critical success factors of information secur...
Application of Q methodology in critical success factors of information secur...stuimrozsm
 
AUTOMATED PENETRATION TESTING: AN OVERVIEW
AUTOMATED PENETRATION TESTING: AN OVERVIEWAUTOMATED PENETRATION TESTING: AN OVERVIEW
AUTOMATED PENETRATION TESTING: AN OVERVIEWcscpconf
 
Hpe program rating #5 ops performance feedback
Hpe program rating #5 ops performance feedbackHpe program rating #5 ops performance feedback
Hpe program rating #5 ops performance feedbackPMHaas
 
E’s Data Security Company Strategic Security Plan – 2015.docx
E’s Data Security Company Strategic Security Plan – 2015.docxE’s Data Security Company Strategic Security Plan – 2015.docx
E’s Data Security Company Strategic Security Plan – 2015.docxmydrynan
 
7 Steps to Build a SOC with Limited Resources
7 Steps to Build a SOC with Limited Resources7 Steps to Build a SOC with Limited Resources
7 Steps to Build a SOC with Limited ResourcesLogRhythm
 
is_1_Introduction to Information Security
is_1_Introduction to Information Securityis_1_Introduction to Information Security
is_1_Introduction to Information SecuritySARJERAO Sarju
 
Sia Presentation100808
Sia Presentation100808Sia Presentation100808
Sia Presentation100808baratta44
 
Lecture on Safety Management.pptx
Lecture on Safety Management.pptxLecture on Safety Management.pptx
Lecture on Safety Management.pptxatwine1
 

Similar to Lecture 7 (20)

Information Assurance And Security - Chapter 1 - Lesson 3
Information Assurance And Security - Chapter 1 - Lesson 3Information Assurance And Security - Chapter 1 - Lesson 3
Information Assurance And Security - Chapter 1 - Lesson 3
 
Management information system
Management information systemManagement information system
Management information system
 
Fundamental of testing
Fundamental of testingFundamental of testing
Fundamental of testing
 
A hybrid reasoning system for the prevention of rail accidents
A hybrid reasoning system for the prevention of rail accidentsA hybrid reasoning system for the prevention of rail accidents
A hybrid reasoning system for the prevention of rail accidents
 
Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...
Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...
Suitability of Agile Methods for Safety-Critical Systems Development: A Surve...
 
Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...
Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...
Case-Based Reasoning for the Evaluation of Safety Critical Software. Applicat...
 
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysisPreliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
Preliminary Hazard Analysis (PHA): New hybrid approach to railway risk analysis
 
Understanding the Risk Management Framework & (ISC)2 CAP Module 4: Life Cycle
Understanding the Risk Management Framework & (ISC)2 CAP Module 4: Life CycleUnderstanding the Risk Management Framework & (ISC)2 CAP Module 4: Life Cycle
Understanding the Risk Management Framework & (ISC)2 CAP Module 4: Life Cycle
 
Providing a model for selecting information security control objectives using...
Providing a model for selecting information security control objectives using...Providing a model for selecting information security control objectives using...
Providing a model for selecting information security control objectives using...
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
4-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 20164-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 2016
 
A REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENT
A REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENTA REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENT
A REVIEW OF SECURITY INTEGRATION TECHNIQUE IN AGILE SOFTWARE DEVELOPMENT
 
Application of Q methodology in critical success factors of information secur...
Application of Q methodology in critical success factors of information secur...Application of Q methodology in critical success factors of information secur...
Application of Q methodology in critical success factors of information secur...
 
AUTOMATED PENETRATION TESTING: AN OVERVIEW
AUTOMATED PENETRATION TESTING: AN OVERVIEWAUTOMATED PENETRATION TESTING: AN OVERVIEW
AUTOMATED PENETRATION TESTING: AN OVERVIEW
 
Hpe program rating #5 ops performance feedback
Hpe program rating #5 ops performance feedbackHpe program rating #5 ops performance feedback
Hpe program rating #5 ops performance feedback
 
E’s Data Security Company Strategic Security Plan – 2015.docx
E’s Data Security Company Strategic Security Plan – 2015.docxE’s Data Security Company Strategic Security Plan – 2015.docx
E’s Data Security Company Strategic Security Plan – 2015.docx
 
7 Steps to Build a SOC with Limited Resources
7 Steps to Build a SOC with Limited Resources7 Steps to Build a SOC with Limited Resources
7 Steps to Build a SOC with Limited Resources
 
is_1_Introduction to Information Security
is_1_Introduction to Information Securityis_1_Introduction to Information Security
is_1_Introduction to Information Security
 
Sia Presentation100808
Sia Presentation100808Sia Presentation100808
Sia Presentation100808
 
Lecture on Safety Management.pptx
Lecture on Safety Management.pptxLecture on Safety Management.pptx
Lecture on Safety Management.pptx
 

Recently uploaded

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 

Recently uploaded (20)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 

Lecture 7

  • 1. LECTURE 7 SYSTEMSAFETY Instructor: Engr. Beenish Akbar Khan Iqra National University (INU) Occupational Health Safety and Environment Btech Civil/Elect. Department 7th Semester Fall 2015
  • 2. As society becomes more technically advanced, its tools become more and more sophisticated. In some cases, the machine has advanced further than the human capacity to control it. Jet fighters are good examples. Safety professionals need to be aware of the limits of human performance. 2
  • 3. The system life cycle consists of six phases: 1.Concept 2.Definition 3.Development 4.Production 5.Deployment and 6.Disposition At the end of each phase, a safety review is conducted. A decision is then made whether to continue the project or place it on hold, pending further examination. 3
  • 4. Historical data and technical forecasts are developed for a system hazard analysis. A Preliminary Hazard Analysis (PHA) is conducted during this phase. Risk Analysis (RA) is performed to determine hazard control and to develop system-safety criteria. Safety management will be doing the initial work on the System Safety Program Plan (SSPP). Three basic questions must be answered by the time the concept phase is completed: ‘‘Have the hazards associated with the design concept been discovered and evaluated to establish hazard controls? Have risk analyses been initiated to establish the means for hazard control? Are initial safety requirements established for the concept phase?’’ (Roland and Moriarty, 1990, p. 23). 4
  • 5. Definition phase is used to verify the preliminary design and product engineering. Reports presented at design review meetings discuss the technological risks, costs, human engineering, operational and maintenance suitability, and safety aspects. In addition subsystems, assemblies, and subassemblies of the system are defined at this time. The PHA is updated and a Subsystem Hazard Analysis (SSHA) is initiated so it can later be integrated into the System Hazard Analysis (SHA). Safety analysis techniques are used during this phase to identify safety equipment, specification of safety design requirements, initial development of safety test plans and requirements, and prototype testing to verify the type of design selected. 5
  • 6. Environmental impact, integrated logistics support, producible engineering, and operational use studies are done during the development phase. The SSHA and safety design criteria are also completed during this phase. Using the data collected, a go/no-go decision can be made before production begins. 6
  • 7. The production phase of the system life cycle involves close monitoring by the safety department. In addition, the quality- control department becomes important because of its focus on inspection and testing of the new product. Training begins during this phase. Updating of the analyses started during the definition and development phases continues. Finally, all the information collected during this phase is compiled into the System Safety Engineering Report (SSER). The SSER identifies and documents the hazards of the final product. 7
  • 8. When the system becomes operational, it is in the deployment phase. Data continues to be collected and training is conducted. If any problems occur, individuals responsible for system safety must be available to follow up and decide on possible solutions. The system safety group in the organization also reviews any design changes made on the system. A sixth phase of the system life cycle, the disposition or termination phase, is the time that a system is removed from service. A good example is asbestos removal from a building. Safety professionals monitor these situations so both the worker and the public are protected. 8