PLAXIS version 8
Tutorial manual
Dynamics manual
subject of presentation :
Presented By : Hamed Zarei
The names of God
Geometry of a tunnel
Material properties
Boundary conditions
Mesh generation
Initial conditions
Calculations
Viewing output results
The creation of a geometry model is based on the input of points and lines. This is
done by means of a mouse pointer in the draw area.
Tunnel designer with current tunnel model
The tunnel considered has a diameter of 5.3 m
Space between tunnels is 12m
creation of a horseshoe-shaped tunnel
Click on the Standard fixities button to apply the appropriate boundary
conditions. In addition to the standard displacement fixities
The creation of material data sets is generally done after the input
of boundary conditions. Before the mesh is generated, all material
data sets should have been defined and all clusters and structures
must have an appropriate data set assigned to them.
After the input of boundary conditions, the material properties of
the Rock clusters and other geometry objects are entered in data
sets.
Material properties of Rock in the tunnel project
𝜇
E
( 𝐾𝑁
𝑚2)
𝜑
)Degree(
C
( 𝐾𝑁
𝑚2)
γ
( 𝐾𝑁
𝑚3)
0/235 x1054370030
𝜇
𝑊
( 𝐾𝑁
𝑚
𝑚
)
𝐸𝐼
( 𝐾𝑁 𝑚2
𝑚)
𝐸𝐴
( 𝐾𝑁
𝑚)
0/22/317501/728 x 105
Material properties of the Shotcrete
The properties for those Shotcrete are listed in Table
∅
(𝑚𝑚)
𝐸𝐴
( 𝐾𝑁
𝑚)
251/2x 106
Material properties of the Rock bolt
In this example the 15-node element is used as the basic
element type.
The global coarseness parameter can remain at its default value (Fine).
It can be expected that stress concentrations occur around the tunnel.
Therefore the mesh should be refined in these areas.
The first calculation phase is used to excavate the right tunnel and activate
Shotcrete
Select a Plastic calculation using Staged construction
The second calculation phase is a
plastic calculation, Staged
construction.
The second calculation phase is
used to excavate the left tunnel
and activate Shotcrete
Start the calculations
Select some characteristic points for load-
displacement curves
Standard earthquake boundaries are used at the bottom and at
the right hand boundary to avoid spurious reflections
The earthquake is modelled by imposing a prescribed
displacement at the bottom boundary.
Therefore the input value of the horizontal prescribed
displacements is set to 0.01 m. The vertical component of the
prescribed displacement is kept zero
(ux=0.01m and uy=0.00m).
Change the Rayleigh damping parameters
α and β to 0.001 and 0.01 respectively
Select Dynamic analysis for the calculation type in the
General tab sheet.
Set the Time interval to 0.5 sec in the loading input box
In this phase, a vertical harmonic load, with a frequency of
10 Hz and amplitude of 50 kN/m2
Modeling of twain Tunnel water conveyance

More Related Content

What's hot

Analysis McNeice Slab MSC-Marc
Analysis McNeice Slab MSC-MarcAnalysis McNeice Slab MSC-Marc
Analysis McNeice Slab MSC-MarcDavid Dearth
 
Kachlakev_RC Control Beam MSC-Marc_wAppendix
Kachlakev_RC Control Beam MSC-Marc_wAppendixKachlakev_RC Control Beam MSC-Marc_wAppendix
Kachlakev_RC Control Beam MSC-Marc_wAppendixDavid Dearth
 
FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...
FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...
FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...civej
 
Plaxis bulletin 37 2015
Plaxis bulletin 37 2015Plaxis bulletin 37 2015
Plaxis bulletin 37 2015Plaxis
 
Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...
Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...
Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...Dr.Costas Sachpazis
 
Expert systems for advanced FE modelling of bridges and buildings using OpenSees
Expert systems for advanced FE modelling of bridges and buildings using OpenSeesExpert systems for advanced FE modelling of bridges and buildings using OpenSees
Expert systems for advanced FE modelling of bridges and buildings using OpenSeesopenseesdays
 
Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...
Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...
Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...IRJET Journal
 
Presentazione Master's Degree
Presentazione Master's DegreePresentazione Master's Degree
Presentazione Master's DegreeAntonio Di Felice
 
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...Dr.Costas Sachpazis
 
Single pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.SachpazisSingle pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.SachpazisDr.Costas Sachpazis
 
Geodomisi cantilever retaining_wall_analysis_sachpazis
Geodomisi cantilever retaining_wall_analysis_sachpazisGeodomisi cantilever retaining_wall_analysis_sachpazis
Geodomisi cantilever retaining_wall_analysis_sachpazisDr.Costas Sachpazis
 
BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.
BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.
BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.SunilKumar586753
 
Dynamical modelling of the excavating chain of a ballast cleaning machine
Dynamical modelling of the excavating chain of a ballast cleaning machineDynamical modelling of the excavating chain of a ballast cleaning machine
Dynamical modelling of the excavating chain of a ballast cleaning machineIJERA Editor
 
Prediction of carry over coefficient for fluid flow through teeth on rotor l...
Prediction of carry  over coefficient for fluid flow through teeth on rotor l...Prediction of carry  over coefficient for fluid flow through teeth on rotor l...
Prediction of carry over coefficient for fluid flow through teeth on rotor l...Alexander Decker
 
Technical article reprint turbo-abrasive maching
Technical article reprint turbo-abrasive machingTechnical article reprint turbo-abrasive maching
Technical article reprint turbo-abrasive machingDave Davidson
 
Geotechnical Examples using OpenSees
Geotechnical Examples using OpenSeesGeotechnical Examples using OpenSees
Geotechnical Examples using OpenSeesopenseesdays
 
Development of an OpenSees model for collapse risk assessment of Italian-code...
Development of an OpenSees model for collapse risk assessment of Italian-code...Development of an OpenSees model for collapse risk assessment of Italian-code...
Development of an OpenSees model for collapse risk assessment of Italian-code...openseesdays
 
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Dr.Costas Sachpazis
 
User guide of reservoir geological modeling v2.2.0
User guide of reservoir geological modeling v2.2.0User guide of reservoir geological modeling v2.2.0
User guide of reservoir geological modeling v2.2.0Bo Sun
 

What's hot (19)

Analysis McNeice Slab MSC-Marc
Analysis McNeice Slab MSC-MarcAnalysis McNeice Slab MSC-Marc
Analysis McNeice Slab MSC-Marc
 
Kachlakev_RC Control Beam MSC-Marc_wAppendix
Kachlakev_RC Control Beam MSC-Marc_wAppendixKachlakev_RC Control Beam MSC-Marc_wAppendix
Kachlakev_RC Control Beam MSC-Marc_wAppendix
 
FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...
FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...
FINITE ELEMENT ANALYSIS OF RIGID PAVEMENT USING EVERFE2.24& COMPARISION OF RE...
 
Plaxis bulletin 37 2015
Plaxis bulletin 37 2015Plaxis bulletin 37 2015
Plaxis bulletin 37 2015
 
Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...
Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...
Sachpazis Masonry Column with eccentric vertical Loading Analysis & Design (E...
 
Expert systems for advanced FE modelling of bridges and buildings using OpenSees
Expert systems for advanced FE modelling of bridges and buildings using OpenSeesExpert systems for advanced FE modelling of bridges and buildings using OpenSees
Expert systems for advanced FE modelling of bridges and buildings using OpenSees
 
Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...
Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...
Cost Analysis and Comparison of a Composite Diagrid Frame with Bare Frame und...
 
Presentazione Master's Degree
Presentazione Master's DegreePresentazione Master's Degree
Presentazione Master's Degree
 
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
Sachpazis_Pile Analysis and Design for Acropolis Project According to EN 1997...
 
Single pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.SachpazisSingle pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
Single pile analysis & design, l=18,00m d=1,10m, by C.Sachpazis
 
Geodomisi cantilever retaining_wall_analysis_sachpazis
Geodomisi cantilever retaining_wall_analysis_sachpazisGeodomisi cantilever retaining_wall_analysis_sachpazis
Geodomisi cantilever retaining_wall_analysis_sachpazis
 
BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.
BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.
BEARING CAPACITY OF SQUARE FOOTING RESTING ON STABILIZED SAND DUNES.
 
Dynamical modelling of the excavating chain of a ballast cleaning machine
Dynamical modelling of the excavating chain of a ballast cleaning machineDynamical modelling of the excavating chain of a ballast cleaning machine
Dynamical modelling of the excavating chain of a ballast cleaning machine
 
Prediction of carry over coefficient for fluid flow through teeth on rotor l...
Prediction of carry  over coefficient for fluid flow through teeth on rotor l...Prediction of carry  over coefficient for fluid flow through teeth on rotor l...
Prediction of carry over coefficient for fluid flow through teeth on rotor l...
 
Technical article reprint turbo-abrasive maching
Technical article reprint turbo-abrasive machingTechnical article reprint turbo-abrasive maching
Technical article reprint turbo-abrasive maching
 
Geotechnical Examples using OpenSees
Geotechnical Examples using OpenSeesGeotechnical Examples using OpenSees
Geotechnical Examples using OpenSees
 
Development of an OpenSees model for collapse risk assessment of Italian-code...
Development of an OpenSees model for collapse risk assessment of Italian-code...Development of an OpenSees model for collapse risk assessment of Italian-code...
Development of an OpenSees model for collapse risk assessment of Italian-code...
 
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
Sachpazis_Trapezoid Foundation Analysis & Design. Calculation according to EN...
 
User guide of reservoir geological modeling v2.2.0
User guide of reservoir geological modeling v2.2.0User guide of reservoir geological modeling v2.2.0
User guide of reservoir geological modeling v2.2.0
 

Similar to Modeling of twain Tunnel water conveyance

Flow Modification over Rotor Blade with Suction Boundary Layer Control Technique
Flow Modification over Rotor Blade with Suction Boundary Layer Control TechniqueFlow Modification over Rotor Blade with Suction Boundary Layer Control Technique
Flow Modification over Rotor Blade with Suction Boundary Layer Control TechniqueIJERA Editor
 
Cdd mahesh dasar ijertv2 is120775
Cdd mahesh dasar ijertv2 is120775Cdd mahesh dasar ijertv2 is120775
Cdd mahesh dasar ijertv2 is120775Mahesh Dasar
 
Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...
Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...
Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...Abhishek Jain
 
ME 5720 Fall 2015 - Wind Turbine Project_FINAL
ME 5720 Fall 2015 - Wind Turbine Project_FINALME 5720 Fall 2015 - Wind Turbine Project_FINAL
ME 5720 Fall 2015 - Wind Turbine Project_FINALOmar Latifi
 
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic LoadingIRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic LoadingIRJET Journal
 
Stress Analysis Project 01
Stress Analysis Project 01Stress Analysis Project 01
Stress Analysis Project 01Franco Pezza
 
CFD analysis of commercial vehicle
CFD analysis of commercial vehicleCFD analysis of commercial vehicle
CFD analysis of commercial vehicleShih Cheng Tung
 
Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)Divyesh Mistry
 
Ispiv omni3 d-jin
Ispiv omni3 d-jinIspiv omni3 d-jin
Ispiv omni3 d-jinJinWang135
 
Workshop12 skewplate
Workshop12 skewplateWorkshop12 skewplate
Workshop12 skewplatemmd110
 
Design, Analysis and weight optimization of Crane Hook: A Review
Design, Analysis and weight optimization of Crane Hook: A ReviewDesign, Analysis and weight optimization of Crane Hook: A Review
Design, Analysis and weight optimization of Crane Hook: A Reviewijsrd.com
 

Similar to Modeling of twain Tunnel water conveyance (20)

Flow Modification over Rotor Blade with Suction Boundary Layer Control Technique
Flow Modification over Rotor Blade with Suction Boundary Layer Control TechniqueFlow Modification over Rotor Blade with Suction Boundary Layer Control Technique
Flow Modification over Rotor Blade with Suction Boundary Layer Control Technique
 
Prestress Scia Engineer
Prestress Scia EngineerPrestress Scia Engineer
Prestress Scia Engineer
 
Tutorial ads
Tutorial adsTutorial ads
Tutorial ads
 
Patchantenna
PatchantennaPatchantenna
Patchantenna
 
ME_Thesis_1.pptx
ME_Thesis_1.pptxME_Thesis_1.pptx
ME_Thesis_1.pptx
 
Analysis reference
Analysis referenceAnalysis reference
Analysis reference
 
Cdd mahesh dasar ijertv2 is120775
Cdd mahesh dasar ijertv2 is120775Cdd mahesh dasar ijertv2 is120775
Cdd mahesh dasar ijertv2 is120775
 
Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...
Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...
Simulations Of Unsteady Flow Around A Generic Pickup Truck Using Reynolds Ave...
 
ME 5720 Fall 2015 - Wind Turbine Project_FINAL
ME 5720 Fall 2015 - Wind Turbine Project_FINALME 5720 Fall 2015 - Wind Turbine Project_FINAL
ME 5720 Fall 2015 - Wind Turbine Project_FINAL
 
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic LoadingIRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
IRJET- Parametric Study on Behaviour of RCC Box Culvert for Dynamic Loading
 
Boundary layer
Boundary layerBoundary layer
Boundary layer
 
Stress Analysis Project 01
Stress Analysis Project 01Stress Analysis Project 01
Stress Analysis Project 01
 
CFD analysis of commercial vehicle
CFD analysis of commercial vehicleCFD analysis of commercial vehicle
CFD analysis of commercial vehicle
 
Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)Divyesh_14Me63r02(new)
Divyesh_14Me63r02(new)
 
FEA Report
FEA ReportFEA Report
FEA Report
 
Ispiv omni3 d-jin
Ispiv omni3 d-jinIspiv omni3 d-jin
Ispiv omni3 d-jin
 
I1304015865
I1304015865I1304015865
I1304015865
 
Struds 2010(aug)
Struds 2010(aug)Struds 2010(aug)
Struds 2010(aug)
 
Workshop12 skewplate
Workshop12 skewplateWorkshop12 skewplate
Workshop12 skewplate
 
Design, Analysis and weight optimization of Crane Hook: A Review
Design, Analysis and weight optimization of Crane Hook: A ReviewDesign, Analysis and weight optimization of Crane Hook: A Review
Design, Analysis and weight optimization of Crane Hook: A Review
 

More from Hamed Zarei

دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پیدانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پیHamed Zarei
 
جزوه درس اصول مهندسي سد
جزوه درس اصول مهندسي سدجزوه درس اصول مهندسي سد
جزوه درس اصول مهندسي سدHamed Zarei
 
سدهای لاستیکی
سدهای لاستیکی سدهای لاستیکی
سدهای لاستیکی Hamed Zarei
 
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلیظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلیHamed Zarei
 
numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...Hamed Zarei
 
Intelligent back analysis using data from the instrument (poster)
Intelligent back analysis using data from the instrument (poster)Intelligent back analysis using data from the instrument (poster)
Intelligent back analysis using data from the instrument (poster)Hamed Zarei
 
(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزش(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزشHamed Zarei
 
(جلد اول) SPSS 19 راهنمای آموزش
(جلد اول) SPSS 19 راهنمای آموزش(جلد اول) SPSS 19 راهنمای آموزش
(جلد اول) SPSS 19 راهنمای آموزشHamed Zarei
 
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...Hamed Zarei
 
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن (روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن Hamed Zarei
 
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلبHamed Zarei
 
Tunnelling & underground design (Topic7-brittle failure)
Tunnelling & underground design (Topic7-brittle failure)Tunnelling & underground design (Topic7-brittle failure)
Tunnelling & underground design (Topic7-brittle failure)Hamed Zarei
 
Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)Hamed Zarei
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Hamed Zarei
 
Tunnelling & underground design (Topic4-soft ground tunnelling methods)
Tunnelling & underground design (Topic4-soft ground tunnelling methods)Tunnelling & underground design (Topic4-soft ground tunnelling methods)
Tunnelling & underground design (Topic4-soft ground tunnelling methods)Hamed Zarei
 
Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)Hamed Zarei
 
Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)Hamed Zarei
 
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)Hamed Zarei
 
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبولکنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبولHamed Zarei
 

More from Hamed Zarei (20)

دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پیدانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
دانلود مجموعه مقالات دومین کنفرانس ملی خاک و مهندسی پی
 
Blasting rock
Blasting rockBlasting rock
Blasting rock
 
جزوه درس اصول مهندسي سد
جزوه درس اصول مهندسي سدجزوه درس اصول مهندسي سد
جزوه درس اصول مهندسي سد
 
سدهای لاستیکی
سدهای لاستیکی سدهای لاستیکی
سدهای لاستیکی
 
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلیظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
ظرفیت عرضی و محوری تک شمع برای توربین های بادی ساحلی
 
numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...numerical study and analytical solution of P-wave attenuation insensitive und...
numerical study and analytical solution of P-wave attenuation insensitive und...
 
Intelligent back analysis using data from the instrument (poster)
Intelligent back analysis using data from the instrument (poster)Intelligent back analysis using data from the instrument (poster)
Intelligent back analysis using data from the instrument (poster)
 
(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزش(جلد دوم) SPSS 19 راهنمای آموزش
(جلد دوم) SPSS 19 راهنمای آموزش
 
(جلد اول) SPSS 19 راهنمای آموزش
(جلد اول) SPSS 19 راهنمای آموزش(جلد اول) SPSS 19 راهنمای آموزش
(جلد اول) SPSS 19 راهنمای آموزش
 
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
3DEC برآورد میزان همگرایی تونل انتقال آب چهل‌چای با استفاده از شبکه عصبی مصنو...
 
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن (روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
(روش های بهبود کیفیت بستر طبیعی زمین (راه آهن
 
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
(MATLAB) شبکه‌های عصبی و استفاده از جعبه ابزار آن در محيط متلب
 
Tunnelling & underground design (Topic7-brittle failure)
Tunnelling & underground design (Topic7-brittle failure)Tunnelling & underground design (Topic7-brittle failure)
Tunnelling & underground design (Topic7-brittle failure)
 
Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)Tunnelling & underground design (Topic6-sequential excavation & squeezing)
Tunnelling & underground design (Topic6-sequential excavation & squeezing)
 
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
 
Tunnelling & underground design (Topic4-soft ground tunnelling methods)
Tunnelling & underground design (Topic4-soft ground tunnelling methods)Tunnelling & underground design (Topic4-soft ground tunnelling methods)
Tunnelling & underground design (Topic4-soft ground tunnelling methods)
 
Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)Tunnelling & underground design (Topic3-geotechnical data baseline reports)
Tunnelling & underground design (Topic3-geotechnical data baseline reports)
 
Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)
 
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
 
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبولکنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
کنترل نشست های سطحی با روش قوس چتری در حفاری مرحله ی دوم متروی استانبول
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Modeling of twain Tunnel water conveyance

  • 1. PLAXIS version 8 Tutorial manual Dynamics manual subject of presentation : Presented By : Hamed Zarei The names of God
  • 2. Geometry of a tunnel Material properties Boundary conditions Mesh generation Initial conditions Calculations Viewing output results
  • 3. The creation of a geometry model is based on the input of points and lines. This is done by means of a mouse pointer in the draw area.
  • 4. Tunnel designer with current tunnel model The tunnel considered has a diameter of 5.3 m Space between tunnels is 12m creation of a horseshoe-shaped tunnel
  • 5.
  • 6. Click on the Standard fixities button to apply the appropriate boundary conditions. In addition to the standard displacement fixities
  • 7. The creation of material data sets is generally done after the input of boundary conditions. Before the mesh is generated, all material data sets should have been defined and all clusters and structures must have an appropriate data set assigned to them. After the input of boundary conditions, the material properties of the Rock clusters and other geometry objects are entered in data sets.
  • 8. Material properties of Rock in the tunnel project 𝜇 E ( 𝐾𝑁 𝑚2) 𝜑 )Degree( C ( 𝐾𝑁 𝑚2) γ ( 𝐾𝑁 𝑚3) 0/235 x1054370030
  • 9. 𝜇 𝑊 ( 𝐾𝑁 𝑚 𝑚 ) 𝐸𝐼 ( 𝐾𝑁 𝑚2 𝑚) 𝐸𝐴 ( 𝐾𝑁 𝑚) 0/22/317501/728 x 105 Material properties of the Shotcrete The properties for those Shotcrete are listed in Table
  • 11. In this example the 15-node element is used as the basic element type.
  • 12. The global coarseness parameter can remain at its default value (Fine). It can be expected that stress concentrations occur around the tunnel. Therefore the mesh should be refined in these areas.
  • 13. The first calculation phase is used to excavate the right tunnel and activate Shotcrete Select a Plastic calculation using Staged construction The second calculation phase is a plastic calculation, Staged construction. The second calculation phase is used to excavate the left tunnel and activate Shotcrete
  • 14. Start the calculations Select some characteristic points for load- displacement curves
  • 15. Standard earthquake boundaries are used at the bottom and at the right hand boundary to avoid spurious reflections
  • 16. The earthquake is modelled by imposing a prescribed displacement at the bottom boundary. Therefore the input value of the horizontal prescribed displacements is set to 0.01 m. The vertical component of the prescribed displacement is kept zero (ux=0.01m and uy=0.00m).
  • 17. Change the Rayleigh damping parameters α and β to 0.001 and 0.01 respectively
  • 18. Select Dynamic analysis for the calculation type in the General tab sheet. Set the Time interval to 0.5 sec in the loading input box