KKKZ 4014 POWER SYSTEM PROTECTION AND SAFETY
1. A 132 kV system is connected with 10 MVA, 132/11 kV transformer as shown in
Figure 1.
The transformer percentage reactance is 10%. The breaking capacity of the switchgear
to be installed.
Calculate
a) Short circuit MVA on the LV side of the transformer
b) Fault current
c) Source impedance
Solution:
We know, short circuit MVA =
%
100
X
P
,
=
10
10100
= 100 MVA
b) fault current at short circuit MVA on the LV side, IF =
kV3
Acircuit MVshort
IF = kA
kV
MVA
248.5
113
100


c) source impedance =
FI
kV
3
= 

21.1
248.53
11
kA
kV
Transformer rated power, P = 10 MVA
Transformer percentage reactance, X% = 10%
Short circuit MVA = 100 MVA
kV = 11 kV
2. A 132 kV system is connected with 10 μVA, 132/11 kV transformer as shown in
Figure 2. The percentage reactance of the transformer is 10%.
Calculate
a) Short circuit MVA on the LV side
b) Fault current, IF
c) Source impedance
d) Fault current downstream at the particular distance far from the transformer with
the line impedance of 1Ω
Solution:
a) Short circuit MVA =
10
10100
%
100 VA
X
P 

= 100 μVA
b) Fault current, IF = kA
kV
248.5
113
100
3
Acircuit MVshort



c) Source impedance = 



21.1
248.53
11
3 kI
kV
F
d) Fault current, IF =
 
kA
kV
874.2
)21.2(3
11
121.13


New total source impedance => (1.21+1) = 2.21Ω
Source impedance = kA
I
kV
F
874.2
21.23
11
3




IF = kA
kV
874.2
21.23
11
)impedancesource(3



P = 10 μVA
X = 10%
3. The impedance of a 1250 kVA transformer is 5.5% of 11 kV system. The high
voltage fault of the 11 kV system is 2.5 kA as shown in Figure 3.
Calculate
a) Total impedance in Ω at 1,000 V
b) Fault current at 1,000 V
Solution:
Based on ohmic method
Z Ω source = 



54.2
5.23
11
currentfaultHV3
kV
Again in impedance of the transformer,
Z Ω transformer = 





324.5
25.1100
115.5
100
% 22
MVA
kVZ
Z Ω total = (Z Ω source + Z Ω transformer) = 2.54 + 5.324 = 7.86 Ω
a) total impedance at LV = 2
2
HV
x LVHVinZtotal
= 

065.0
121
86.7
11
186.7
2
2
b) Fault current at 1000 V
IF 1000V = kA883.8
065.03
1
at LVtotalz3
LV




Data given
kV = 11 kV
HV fault current = 2.5 kA
kV = 11 kV
MVA = 1.250 MVA
Z = 5.5%
4. The impedance of a 1250 kVA transformer is 5.5% of 11kV system. The high
voltage fault current of the 11kV system is 2.5 kA. Using percentage reactance
method
Determine
a) Total impedance in Ω at 1,000 V
b) Fault current at 1,000 V
Solution:
Based on percentage reactance method
Fault MVA at system = 3 x kV x IF
= 3 x kV x 2.5
= 47.63 MVA
Again source percentage impedance of the base MVA
= %
systematFault MVA
ratingx MVA1000
= %
63.47
250.1100
= 2.624%
a) total percentage impedance at 1000 V
= transformer percentage impedance + source percentage impedance kV
= 5.5% + 2.624% = 8.124%
b) fault MVA at 1000V = kA
kV
883.8
1013
10386.15
3
Fault MVA
3
6





Fault MVA at the transformer
= MVA386.15
124.8
250.1100
impedancepercentageTotal
Ratingx MVA100



IF = 2.5 kA
kV = 11 kV
5. The impedance of a 1250 kVA transformer is 5.5% of 11kV system. The high
voltage fault current of the 11kV system is 2.5 kA. Using per unit method
Determine
a) Total impedance in Ω at 1,000 V
b) Fault current at 1,000 V
Solution:
Based on per unit method
Short circuit MVA = 3 x kV x IF
= 3 x kV x 2.5
= 47.63 MVA
Per unit source impedance = ..026.0%
63.47
25.1
Acircuit MVShort
MVABase
up
a) Total impedance at 1000 V = source impedance + transformer impedance
= 0.026 + 0.055
= 0.08124 p.u.
b) Fault current at 1000V = kA
upkV
883.8
1008124.013
1025.1
..3
MVABase
3
6





kV = 11 kV
IF = 2.5 kA
Base MVA = 1.25 MVA
6. A 20 MVA generator is connected to a 20 MVA, 13.8/115 kV system as shown in
Figure 4. The 87 differential relays are connected to the generator neutral and the
circuit breaker. The CT ratio is 1000:5
Determine
a) Maxm
load current at 13.8 kV
b) Internal 3 phase fault current at F
c) 3 phase fault current in the 87 relay operating coil
d) 3 phase fault current before the generator synchronization to the power system
Solution:
a) Maxm
load current at 13.8 kV
IMAX LOAD 2ND = A74.836
108.133
1020
3
6



b) On a 20 MVA base, the equivalent reactance,
Xeq = ..04.0
100
2.020
MVAsystem
reactancesystemxMVA
up


Transformer reactance, XT = 10% = 0.1
Generator sub-transient reactance, X’’
d = 0.32
Total reactance to the fault, Xtotal = ..097.0
46.0
14.032.0
XXX
)X(XX
eqTd
''
eqTd
''
up




Per unit 3 phase fault at 20 MVA, I3PHASE = ..27.10
097.0
1
up
Internal 3 phase fault current, I3PHASE = A85935
108.133
102027.10
3
6



c) Maxm
load current at secondary of the CT is
IMAX LOAD 2ND =
1000
574.836 
= 4.18 A
Fault current following in the (87 operating coil)
I3PHASE 87 = 10.27 x 4.18 = 42.96
d) If 3 phase fault current occured before the generator synchronisation
I3PHASE = ..13.3
X
1
d
"
up I3PHASE before synchronisation = 99.2618
108.133
102013.3
3
6



at 13.8 kV
Current following in 87 operating coil
I3PHASE 87 = A1.13
1000
599.2618


7. 60 MW distributed generator connected to 20 miles radial 69 kV lines as shown in
Figure 5. The generation output at transformer higher side 60 MW and 19.9 MVar, the
operating at 95% power factor. The system impedance is (3.8 + j14.4) ohms
Calculate
a) The voltage that exist on the utility line at generator location
b) Percentage of voltage rise across the line impedance
c) Give your reason/decision whether the power quality protection operate or not
Solution:
cos = 0.95
 = cos-1
0.95 = 18.2o
MVar = 60 MW x tan = 60 x tan 18.2o
= 19.7 MVar
Approximate current at transformer higher side
I = Ampj
j
HV
kVarjkW
)165502(
693
1970060000
3
107.191060 33





a) Voltage that exist in generator location
VG = 69000 + (3.8 + j14.4) x (502 - j165)
VG = 73 580 V
b) Voltage raise across the linear impedance
= %6.6%100
73580
6900073580
%100 




 





 
G
LG
V
VV
c) As we know, voltage regulation is considered about 5% according to the IEEE
standard. The 6.6% of voltage raise to is a little bit problem. However, if the load is
sensitive then raise voltage level could more problematic. So protection must need to
operate.
8. A three phase, 11 kV, 15 kW generator of power factor 0.8 is operating at full load
prior to fault. The reactance, transient reactance, sub-transient reactance and time
constant at nominal voltage 1 p.u. and constant 1 p.u. are as follows.
Xd = 2.0 p.u. T’
d = 5.0 sec
X’
d = 0.25 p.u. T’’
d = 0.15 sec
X’’
d = 0.12 p.u.
Determine
a) Fault current
b) EMF of the generator at reactance, transient reactance and sub-transient reactance
c) Current, transient current and sub-transient current (I, I’
, I”
)
Solution:
MVA of the power factor = MVA75.18
8.0
15
factorpower
MV

a) We know, fault current, IFC = A
kV
MVA
984
10113
1075.18
113 3
6





b) We know, EMF, E =    22
cossin  IXIXV dd  =    22
8.0126.0121 
= 2.72 p.u.
E’
=    2'2'
cossin  IXIXV dd  =    22
8.0125.06.0125.01 
= 1.67 p.u.
E’’
=    2''2''
cossin  IXIXV dd  =    22
8.0112.06.0112.01 
= 1.076 p.u.
c) Current I =
Reactance
EMF
x fault current
Reactance current, I =
2
72.2
 F
d
I
X
E
x 984 = 8823.23A
Transient current, I’
=
25.0
67.1
'
'
 F
d
I
X
E
x 984 = 4593.43A
Sub-transient current, I’’
=
12.0
076.1
''
''
 F
d
I
X
E
x 984 = 1338.29A
Data given;
V = 1 p.u. at nominal voltage
I = 1 p.u. at nominal voltage
Xd = 2.0 p.u.
cos = 0.8
sin = 0.6
9. A 11 kV, 15 kW generator is running with 0.8 power factor. The generator has an
impedance of 1.61 Ω per phase
Determine
a) Fault MVA of the generator
b) Percentage impedance of the generator
Solution:
Phase voltage =
3
1011
3
voltagetime 3

 = 6350 V
Fault current =
61.1
6350
impedancephase
voltagephase
 = 3940 A
a) Fault MVA = 3 x kV x IF = 3 x 11 kV x 3940 = 75 MVA
b) We know, the percentage impedance, Z %
Z % =
 2
voltageline
ratingMVA
x phase impedance x 100%
MVA =
8.0
15
factorpower
MW
 = 18.75 MVA
Z % = 2
11
75.18
x 1.61 x 100% = 25%
10. Primary fault current is 9 kA with 300:1 CT connected transformer restricted earth
fault protection system as shown in Figure 6. The secondary winding resistance, RCT
of CT is 3 Ω and the lead resistance, R1 is 1 Ω. The relay type is CAG 14, 1 A,
10-40%, burden 1.0 VA
Calculate
a) The stabilizing voltage
b) Minimum knee-point voltage
c) The stabilizing resistance of the restricted earth fault protection
Solution:
Secondary fault current =
300
1x9000
= 30 A
Relay operating current,
Choose 10% tap on CAG 14
I = 10% x 1 = 0.1 A
Relay operating voltage =
1.0
1

I
VA
= 10 V
a) Stabilizing voltage, V = I (RCT + R1) = 30 (3 + 1) = 120 V
b) We know current transformer minimum knee-point voltage is twice of the
stabilizing voltage
Knee-point voltage = 2 x stabilizing voltage
= 2 x 120
= 240 V
c) Stabilizing reactance =
resistortheroughcurrent th
resistoracrossvoltage
Voltage across the resistor = stabilizing voltage - relay voltage
= 120 - 10
= 110 V
Stabilizing reactance =
1.0
110
= 1100 Ω
Given
Relay voltage = 10 V
RCT = 3 Ω
R1 = 1 Ω
I = 30 A
11. A distribution or similar facility served by a 7500 kVA, 115:12 kV transformer
with 7.8% of impedance as shown in Figure 7.
Determine
a) Secondary fault current
b) Fuse settling current
c) Justify your fuse design
Solution:
We know, short circuit MVA =
8.7
7500100
X%
100P 
 = 96.153 kVA
a) Fault current at secondary, IF = short circuit MVA = 4.626 A
b) Primary current, I primary =
1153
7500
1153 


kVA
= 37.65 A at 15k
3 phase fault current = 3 x I primary fault current
= 3 x 37.65
= 65 Ampere
Fuse current setting = 65 Ampere
c) Yes, the calculated fuse setting current is same with the fuse used. So, the design
parameter is satisfied.

More Related Content

What's hot

Solución de magnitudes eléctricas
Solución de magnitudes eléctricasSolución de magnitudes eléctricas
Solución de magnitudes eléctricas
CaRlos MaRio
 
AP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 PowerpointAP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 Powerpoint
Mrreynon
 

What's hot (20)

T8 1 ph-tr
T8 1 ph-trT8 1 ph-tr
T8 1 ph-tr
 
Electrical machines solved objective
Electrical machines solved objectiveElectrical machines solved objective
Electrical machines solved objective
 
Solución de magnitudes eléctricas
Solución de magnitudes eléctricasSolución de magnitudes eléctricas
Solución de magnitudes eléctricas
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
ce~cb cascode amplifier
ce~cb cascode amplifierce~cb cascode amplifier
ce~cb cascode amplifier
 
Eet3082 binod kumar sahu lecture_36
Eet3082 binod kumar sahu lecture_36Eet3082 binod kumar sahu lecture_36
Eet3082 binod kumar sahu lecture_36
 
Eet3082 binod kumar sahu lecture_33
Eet3082 binod kumar sahu lecture_33Eet3082 binod kumar sahu lecture_33
Eet3082 binod kumar sahu lecture_33
 
Lecture 9
Lecture 9Lecture 9
Lecture 9
 
#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations#Solar mooc voltage drop calculations
#Solar mooc voltage drop calculations
 
ECNG 3013 A
ECNG 3013 AECNG 3013 A
ECNG 3013 A
 
Electrical circuits & fields
Electrical circuits & fieldsElectrical circuits & fields
Electrical circuits & fields
 
INDUKSI ELEKTROMAGNETIK
INDUKSI ELEKTROMAGNETIKINDUKSI ELEKTROMAGNETIK
INDUKSI ELEKTROMAGNETIK
 
Chapter19 giancoli edisi 5 jawaban fisika
Chapter19 giancoli edisi 5 jawaban fisikaChapter19 giancoli edisi 5 jawaban fisika
Chapter19 giancoli edisi 5 jawaban fisika
 
Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12Changes to 2014 NEC Interconnection Rule 705.12
Changes to 2014 NEC Interconnection Rule 705.12
 
3.3.3 Example
3.3.3 Example3.3.3 Example
3.3.3 Example
 
LISTRIK
LISTRIKLISTRIK
LISTRIK
 
Parcial asincrona
Parcial asincronaParcial asincrona
Parcial asincrona
 
Voltage induced in a conductor
Voltage induced in a conductorVoltage induced in a conductor
Voltage induced in a conductor
 
CM1000E4C-66R Datasheet (English)
CM1000E4C-66R Datasheet (English)CM1000E4C-66R Datasheet (English)
CM1000E4C-66R Datasheet (English)
 
AP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 PowerpointAP Physics - Chapter 20 Powerpoint
AP Physics - Chapter 20 Powerpoint
 

Viewers also liked

ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
J. FR
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
Prateek Agarwal
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
Towfiqur Rahman
 

Viewers also liked (8)

Energypac Engineering New Corporate Presentation
Energypac Engineering New Corporate PresentationEnergypac Engineering New Corporate Presentation
Energypac Engineering New Corporate Presentation
 
Protection of transmission lines (distance)
Protection of transmission lines (distance)Protection of transmission lines (distance)
Protection of transmission lines (distance)
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
ABB - TRANSFORMERS-PROTECTION-COURSE (2001)
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
Typical layout of a Sub-Station
Typical layout of a Sub-StationTypical layout of a Sub-Station
Typical layout of a Sub-Station
 

Similar to Power system safety and protection

Solved problems to_chapter_09
Solved problems to_chapter_09Solved problems to_chapter_09
Solved problems to_chapter_09
Shah Zaib
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
michaeljmack
 
Sample calculation-for-differential-relays-170330122259
Sample calculation-for-differential-relays-170330122259Sample calculation-for-differential-relays-170330122259
Sample calculation-for-differential-relays-170330122259
DunaFlaviu
 

Similar to Power system safety and protection (20)

147110756 march-2005
147110756 march-2005147110756 march-2005
147110756 march-2005
 
Three phase balanced load circuits and synchronous generators
Three phase balanced load circuits and synchronous generatorsThree phase balanced load circuits and synchronous generators
Three phase balanced load circuits and synchronous generators
 
Unit 2
Unit 2Unit 2
Unit 2
 
Line Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relayLine Differential - Test report for Alstom make Micom P546 relay
Line Differential - Test report for Alstom make Micom P546 relay
 
Solved problems to_chapter_09
Solved problems to_chapter_09Solved problems to_chapter_09
Solved problems to_chapter_09
 
Symmetrical Fault Analysis
Symmetrical Fault AnalysisSymmetrical Fault Analysis
Symmetrical Fault Analysis
 
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptxCHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
CHAPTER 3 Voltage Drop and Short Circuit Analysis.pptx
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
 
Sample calculation-for-differential-relays-170330122259
Sample calculation-for-differential-relays-170330122259Sample calculation-for-differential-relays-170330122259
Sample calculation-for-differential-relays-170330122259
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 
Lecture 8
Lecture 8Lecture 8
Lecture 8
 
Practice questions
Practice questionsPractice questions
Practice questions
 
Ac wave forms theroy
Ac wave forms theroyAc wave forms theroy
Ac wave forms theroy
 
Chapter32A.ppt
Chapter32A.pptChapter32A.ppt
Chapter32A.ppt
 
Report_AKbar_PDF
Report_AKbar_PDFReport_AKbar_PDF
Report_AKbar_PDF
 
Questions practice unit iv
Questions practice unit ivQuestions practice unit iv
Questions practice unit iv
 
Short And Medium Lines
Short And Medium LinesShort And Medium Lines
Short And Medium Lines
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
Generator Protection Relay Setting Calculations
Generator Protection Relay Setting CalculationsGenerator Protection Relay Setting Calculations
Generator Protection Relay Setting Calculations
 
project.pptx
project.pptxproject.pptx
project.pptx
 

Recently uploaded

Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 

Recently uploaded (20)

School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Power system safety and protection

  • 1. KKKZ 4014 POWER SYSTEM PROTECTION AND SAFETY 1. A 132 kV system is connected with 10 MVA, 132/11 kV transformer as shown in Figure 1. The transformer percentage reactance is 10%. The breaking capacity of the switchgear to be installed. Calculate a) Short circuit MVA on the LV side of the transformer b) Fault current c) Source impedance Solution: We know, short circuit MVA = % 100 X P , = 10 10100 = 100 MVA b) fault current at short circuit MVA on the LV side, IF = kV3 Acircuit MVshort IF = kA kV MVA 248.5 113 100   c) source impedance = FI kV 3 =   21.1 248.53 11 kA kV Transformer rated power, P = 10 MVA Transformer percentage reactance, X% = 10% Short circuit MVA = 100 MVA kV = 11 kV
  • 2. 2. A 132 kV system is connected with 10 μVA, 132/11 kV transformer as shown in Figure 2. The percentage reactance of the transformer is 10%. Calculate a) Short circuit MVA on the LV side b) Fault current, IF c) Source impedance d) Fault current downstream at the particular distance far from the transformer with the line impedance of 1Ω Solution: a) Short circuit MVA = 10 10100 % 100 VA X P   = 100 μVA b) Fault current, IF = kA kV 248.5 113 100 3 Acircuit MVshort    c) Source impedance =     21.1 248.53 11 3 kI kV F d) Fault current, IF =   kA kV 874.2 )21.2(3 11 121.13   New total source impedance => (1.21+1) = 2.21Ω Source impedance = kA I kV F 874.2 21.23 11 3     IF = kA kV 874.2 21.23 11 )impedancesource(3    P = 10 μVA X = 10%
  • 3. 3. The impedance of a 1250 kVA transformer is 5.5% of 11 kV system. The high voltage fault of the 11 kV system is 2.5 kA as shown in Figure 3. Calculate a) Total impedance in Ω at 1,000 V b) Fault current at 1,000 V Solution: Based on ohmic method Z Ω source =     54.2 5.23 11 currentfaultHV3 kV Again in impedance of the transformer, Z Ω transformer =       324.5 25.1100 115.5 100 % 22 MVA kVZ Z Ω total = (Z Ω source + Z Ω transformer) = 2.54 + 5.324 = 7.86 Ω a) total impedance at LV = 2 2 HV x LVHVinZtotal =   065.0 121 86.7 11 186.7 2 2 b) Fault current at 1000 V IF 1000V = kA883.8 065.03 1 at LVtotalz3 LV     Data given kV = 11 kV HV fault current = 2.5 kA kV = 11 kV MVA = 1.250 MVA Z = 5.5%
  • 4. 4. The impedance of a 1250 kVA transformer is 5.5% of 11kV system. The high voltage fault current of the 11kV system is 2.5 kA. Using percentage reactance method Determine a) Total impedance in Ω at 1,000 V b) Fault current at 1,000 V Solution: Based on percentage reactance method Fault MVA at system = 3 x kV x IF = 3 x kV x 2.5 = 47.63 MVA Again source percentage impedance of the base MVA = % systematFault MVA ratingx MVA1000 = % 63.47 250.1100 = 2.624% a) total percentage impedance at 1000 V = transformer percentage impedance + source percentage impedance kV = 5.5% + 2.624% = 8.124% b) fault MVA at 1000V = kA kV 883.8 1013 10386.15 3 Fault MVA 3 6      Fault MVA at the transformer = MVA386.15 124.8 250.1100 impedancepercentageTotal Ratingx MVA100    IF = 2.5 kA kV = 11 kV
  • 5. 5. The impedance of a 1250 kVA transformer is 5.5% of 11kV system. The high voltage fault current of the 11kV system is 2.5 kA. Using per unit method Determine a) Total impedance in Ω at 1,000 V b) Fault current at 1,000 V Solution: Based on per unit method Short circuit MVA = 3 x kV x IF = 3 x kV x 2.5 = 47.63 MVA Per unit source impedance = ..026.0% 63.47 25.1 Acircuit MVShort MVABase up a) Total impedance at 1000 V = source impedance + transformer impedance = 0.026 + 0.055 = 0.08124 p.u. b) Fault current at 1000V = kA upkV 883.8 1008124.013 1025.1 ..3 MVABase 3 6      kV = 11 kV IF = 2.5 kA Base MVA = 1.25 MVA
  • 6. 6. A 20 MVA generator is connected to a 20 MVA, 13.8/115 kV system as shown in Figure 4. The 87 differential relays are connected to the generator neutral and the circuit breaker. The CT ratio is 1000:5 Determine a) Maxm load current at 13.8 kV b) Internal 3 phase fault current at F c) 3 phase fault current in the 87 relay operating coil d) 3 phase fault current before the generator synchronization to the power system Solution: a) Maxm load current at 13.8 kV IMAX LOAD 2ND = A74.836 108.133 1020 3 6    b) On a 20 MVA base, the equivalent reactance, Xeq = ..04.0 100 2.020 MVAsystem reactancesystemxMVA up   Transformer reactance, XT = 10% = 0.1 Generator sub-transient reactance, X’’ d = 0.32 Total reactance to the fault, Xtotal = ..097.0 46.0 14.032.0 XXX )X(XX eqTd '' eqTd '' up     Per unit 3 phase fault at 20 MVA, I3PHASE = ..27.10 097.0 1 up Internal 3 phase fault current, I3PHASE = A85935 108.133 102027.10 3 6    c) Maxm load current at secondary of the CT is IMAX LOAD 2ND = 1000 574.836  = 4.18 A Fault current following in the (87 operating coil) I3PHASE 87 = 10.27 x 4.18 = 42.96 d) If 3 phase fault current occured before the generator synchronisation I3PHASE = ..13.3 X 1 d " up I3PHASE before synchronisation = 99.2618 108.133 102013.3 3 6    at 13.8 kV Current following in 87 operating coil I3PHASE 87 = A1.13 1000 599.2618  
  • 7. 7. 60 MW distributed generator connected to 20 miles radial 69 kV lines as shown in Figure 5. The generation output at transformer higher side 60 MW and 19.9 MVar, the operating at 95% power factor. The system impedance is (3.8 + j14.4) ohms Calculate a) The voltage that exist on the utility line at generator location b) Percentage of voltage rise across the line impedance c) Give your reason/decision whether the power quality protection operate or not Solution: cos = 0.95  = cos-1 0.95 = 18.2o MVar = 60 MW x tan = 60 x tan 18.2o = 19.7 MVar Approximate current at transformer higher side I = Ampj j HV kVarjkW )165502( 693 1970060000 3 107.191060 33      a) Voltage that exist in generator location VG = 69000 + (3.8 + j14.4) x (502 - j165) VG = 73 580 V b) Voltage raise across the linear impedance = %6.6%100 73580 6900073580 %100               G LG V VV c) As we know, voltage regulation is considered about 5% according to the IEEE standard. The 6.6% of voltage raise to is a little bit problem. However, if the load is sensitive then raise voltage level could more problematic. So protection must need to operate.
  • 8. 8. A three phase, 11 kV, 15 kW generator of power factor 0.8 is operating at full load prior to fault. The reactance, transient reactance, sub-transient reactance and time constant at nominal voltage 1 p.u. and constant 1 p.u. are as follows. Xd = 2.0 p.u. T’ d = 5.0 sec X’ d = 0.25 p.u. T’’ d = 0.15 sec X’’ d = 0.12 p.u. Determine a) Fault current b) EMF of the generator at reactance, transient reactance and sub-transient reactance c) Current, transient current and sub-transient current (I, I’ , I” ) Solution: MVA of the power factor = MVA75.18 8.0 15 factorpower MV  a) We know, fault current, IFC = A kV MVA 984 10113 1075.18 113 3 6      b) We know, EMF, E =    22 cossin  IXIXV dd  =    22 8.0126.0121  = 2.72 p.u. E’ =    2'2' cossin  IXIXV dd  =    22 8.0125.06.0125.01  = 1.67 p.u. E’’ =    2''2'' cossin  IXIXV dd  =    22 8.0112.06.0112.01  = 1.076 p.u. c) Current I = Reactance EMF x fault current Reactance current, I = 2 72.2  F d I X E x 984 = 8823.23A Transient current, I’ = 25.0 67.1 ' '  F d I X E x 984 = 4593.43A Sub-transient current, I’’ = 12.0 076.1 '' ''  F d I X E x 984 = 1338.29A Data given; V = 1 p.u. at nominal voltage I = 1 p.u. at nominal voltage Xd = 2.0 p.u. cos = 0.8 sin = 0.6
  • 9. 9. A 11 kV, 15 kW generator is running with 0.8 power factor. The generator has an impedance of 1.61 Ω per phase Determine a) Fault MVA of the generator b) Percentage impedance of the generator Solution: Phase voltage = 3 1011 3 voltagetime 3   = 6350 V Fault current = 61.1 6350 impedancephase voltagephase  = 3940 A a) Fault MVA = 3 x kV x IF = 3 x 11 kV x 3940 = 75 MVA b) We know, the percentage impedance, Z % Z % =  2 voltageline ratingMVA x phase impedance x 100% MVA = 8.0 15 factorpower MW  = 18.75 MVA Z % = 2 11 75.18 x 1.61 x 100% = 25%
  • 10. 10. Primary fault current is 9 kA with 300:1 CT connected transformer restricted earth fault protection system as shown in Figure 6. The secondary winding resistance, RCT of CT is 3 Ω and the lead resistance, R1 is 1 Ω. The relay type is CAG 14, 1 A, 10-40%, burden 1.0 VA Calculate a) The stabilizing voltage b) Minimum knee-point voltage c) The stabilizing resistance of the restricted earth fault protection Solution: Secondary fault current = 300 1x9000 = 30 A Relay operating current, Choose 10% tap on CAG 14 I = 10% x 1 = 0.1 A Relay operating voltage = 1.0 1  I VA = 10 V a) Stabilizing voltage, V = I (RCT + R1) = 30 (3 + 1) = 120 V b) We know current transformer minimum knee-point voltage is twice of the stabilizing voltage Knee-point voltage = 2 x stabilizing voltage = 2 x 120 = 240 V c) Stabilizing reactance = resistortheroughcurrent th resistoracrossvoltage Voltage across the resistor = stabilizing voltage - relay voltage = 120 - 10 = 110 V Stabilizing reactance = 1.0 110 = 1100 Ω Given Relay voltage = 10 V RCT = 3 Ω R1 = 1 Ω I = 30 A
  • 11. 11. A distribution or similar facility served by a 7500 kVA, 115:12 kV transformer with 7.8% of impedance as shown in Figure 7. Determine a) Secondary fault current b) Fuse settling current c) Justify your fuse design Solution: We know, short circuit MVA = 8.7 7500100 X% 100P   = 96.153 kVA a) Fault current at secondary, IF = short circuit MVA = 4.626 A b) Primary current, I primary = 1153 7500 1153    kVA = 37.65 A at 15k 3 phase fault current = 3 x I primary fault current = 3 x 37.65 = 65 Ampere Fuse current setting = 65 Ampere c) Yes, the calculated fuse setting current is same with the fuse used. So, the design parameter is satisfied.