Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHIANA.01 year 10 month experiance of maintenance engineer and operation engineer in Sukhbir agro energy pvt ltd,Uttar Pradesh.
Vermeulens Beyond Estimation Market Outlook Q1 2016
Similar to Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHIANA.01 year 10 month experiance of maintenance engineer and operation engineer in Sukhbir agro energy pvt ltd,Uttar Pradesh.
Similar to Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHIANA.01 year 10 month experiance of maintenance engineer and operation engineer in Sukhbir agro energy pvt ltd,Uttar Pradesh. (20)
Now Presently 02 Month working experience in Quality NEW SWAN AUTO COMP.LUDHIANA.01 year 10 month experiance of maintenance engineer and operation engineer in Sukhbir agro energy pvt ltd,Uttar Pradesh.
1. Gurmeet Singh
S/o Gurdev Singh
Vill-basti kesar singh wali
Post-guru har sahai (152022)
Distt-ferozepur
Punjab
Mobile No.08728946116
gurmeetsawna01@gmail.com
Education
2007 Guru Teg Bahadur Sen.Sec Public School(PSEB,Mohali),FZR. 79% Class X
2009 Jawahar Navodaya Vidyalaya(CBSE,Delhi),FZR. 70% Class XII
2013 Yadwindra College Of Engineering Guru Kashi University 76% (b.tech mechanical)
(Punjabi University Patiala) Bathinda.
Objective
To join an organization as Mechanical Engineer where I can give practical approach to my knowledge
and talent as per my job requirement in an efficient manner, which would be helpful in the company
growth and would strengthen my career also.
Professional Explosure
Having 01 month working experiance in NEW SWAN AUTO COMP.LUDHIANA,PUNJAB as a quality
Assurance in welding and Projection Welding shop.
Having 01 years 09 Month Experience in Operation & Maintenance engineering
06 Month Experiance in Project of Rice Plant and E.T.P Plant etc.
Work Experience
From 29 March 2015 to Now Presently working in New Swan Auto Comp.Ludhiana,Punjab as a Quality engineer
in Welding shop Department.
From June 2013 to March 2015 (01year 10 month) worked in Sukhbir Agro Energy Ltd. Shahjahanpur U.P
(Capacity of Plant is 130 tph, Asia largest rice plant).As a Assistant engineer in Operation & Maintenance
engineering Department.
.
General Skills and Strength
F Leadership, Team Building, Negotiation and Man Management.
F Excellent Analytical, Decision Making and Problem Solving.
F Inventory control with technical method.
F Handled the manpowers and make good spirit teams.
F Knowledge about gear box,coupling,pump,bearing,compressor,air rotory valves.
F D.C.S Systems.
F 5’S
F 7 QC Tools
F 6 Sigma
F Kaizen
F Why Why Problems.
F 6 M
Job Responsibility and profile
• Smooth operation of utility system like Boiler, and ETP Plant, Milling Plant and compressor.
• Planning & scheduling of preventive maintenance, breakdown maintenance of Plant Machine.
• Co -ordination of men power planning for preventive & Predictive Maintenance.
• Consumables & Spares consumption data recording, Maintain the critical parts stock level
• Maintain the break down record & history card of different machines year ,month & date wise
• Maintain store inventory for regular consumable item & Quality Check for arrived material.
• Repair & Maintenance of Belt conveyer, Chain Conveyer, Elevator, Pipe line, Air lock, Pump, blower.
2. • Maintenance & Alignment of Coupling, Pulley, Elevator, Motor, Airlock & Conveyor in Milling & Draying
Unit.
• Make plant layout & equipment Drawing. Make purchase & issue indent as per requirement in Projects
Parboiling & Rice processing machine.
• Maintainance the compressor and operation of compressor is smoothly.
• Check the ouality of parts of Honda Car,Suzuki Maruti,Swaraj,Starway etc companies.
• Check the welding penetration of different parts.
• Reduce the materials inventory.
• Reduce the Rejection of parts and maintain the rejection data.
• Knowledge of MIG Welding and Projection Welding.
• Knowledge about POKA-YOKA.
B.tech Training and Projects
6 weeks Industrial Training in Indian Foundry Works, Ferozepur.May to July 2011.
Experienced in all the activities done on the all machine likes lathes, shaper, planer milling, cutting
press, can machine and also know about the various casting and forging etc.
6 Month Industrial Training in R&D (International Sonalika Tractors)
Hoshiarpur,Jalandhar.January To June 2013.
I will know about the different parts of tractors and I am worked in engine testing shops and engine
assembly shops...
Major Project
Worked on the project named ‘To reduce over boiling of water in radiator and engine’.
Worked on the project named ‘Hydraulic system in tractors.
Assembles the tractors in assembly shops.
Engine tested.
Major Equipment Handled
Husk Fired boiler 12tph (working pressure10.2kg/cm3 & 20tph working pressure 15kg/cm3) made by
Savior boiler ltd.
R.O Plant 15m3/hrs and 6m3/hrs capacity.
Total condensate requires system in sella and dryer plant.
Feed Pump, Valve, Dryer. Air dryer, Milling Machines etc.
Lath machine, drilling, welding and gas cutting.
Make purchase& issue indent as per requirement for milling plant, R.O plant, sella plant, E.T.P Plant
and boiler plant.
Fabrication & Erection work of Tanks, Bin, Belt conveyer, Chain Conveyer, Elevator, Pipe line, Air
lock, and blower working plate form & Paddy, Rice machine.
Handled the men power and work with totally spirit of teams.
Compressors (Power Rating 55 kw,2x37 kw, Maximum pressure is 7.5 bar) Made by ATLAS Pvt. Ltd.
E.T.P Plant 800 KL per Days.
Travelling Grate 70 TPH Boiler(Bio-Mass Boiler) made by Thomson.
14.5 MW Turbine (fully Condesing)
Know about the D.C.S(Distributor Circuit System)
Check the parts quality of Honda Car parts,Suzuki-Maruti Parts,Starway Parts etc
Handled the Honda and Suzuki line in welding shop.
Projects
The Project of E.T.P Plant 800 KL per days of Sella water,in which the sella water is treated
with different applied different prosess and last treated water is used for personal works.
Setup ash belt conveyor for 20 tph and 12 tph boiler ,In which my role is to commissioning and
checking the ashs belt conveyor,indent the items as per requirement for ash belt conveyor.
Modify the 120 TPH Rice Plant.in which to increase the capacity of plant and new project
setup 20 tph sella and kacha grader plant and 60 tph silky plant.
Project Under Progress is 420 tonne Drier and blower and steaming line.
3. IT PROFICIENCY
Auto CAD
Drawing
Knowledge about computer hardware
Microsoft Office Word, Microsoft Office Excel, Microsoft Office Power Point
Internet Browsing
Personnel Information
Date of Birth - 2 Sep 1992
Father’s Name - Shri Gurdev Singh
Mother’s Name - Smt. Piaro
Marital status - Unmarried
Permanent Address - Vill-Basti Kesar Singh Wali,Post-Guru Har Sahai(152022),Distt-
Ferozepur,PUNJAB
Blood Group - B-positive
I hereby declare that the information furnished above is true to the best of my knowledge.
Date…………
Place………...
(GURMEET SINGH)