1. Hydro Power Projects
Irrigation Projects including Lift Irrigation Schemes
Thermal Power Plants
Water Recourses Projects
Water Supply Projects
Outdoor Electrical Switchyards
Gas Insulated Sub Stations
Electrical Sub Stations
ExStream Engineering DESIGN GROUP, making a beginning way back in the year 1979 as a Consultancy Firm to
cater to the Design Engineering needs of small Civil Engineering and Electrical Engineering projects, has now
growth into a full fledged Consultancy Organization, providing its Design Engineering Consultancy services in
various fields of Engineering related to very large projects.
Energy Audit and modernization of Electricity Supply Installations.
Structural design of Civil & Mechanical installations.
Transmission Line Projects upto 400kV Capacity.
Pre bid & post bid services for bid preparation and analysis.
Preparation & Review of bid documents for package wise or EPC implementation of Projects.
Preparation & Review of Feasibility and Detail Project Reports for various projects.
Due-Diligence study of proposed and operating projects.
Financial analysis for Project implementation.
Formulation of Implementation and PPA agreements.
Assistance in carbon credit proposal processing of CDM projects
2. Content
Sl. No. Description Page No.
1 Design Group – A Profile 1
2 ISO Certificate 4
3 Certificate of Consulting Engineers Association of India 5
4 Certificate of Incorporation 6
5 Empanelment with BHEL 7
6 Empanelment with Construction Industry Development 8
Council
7 Merger of M/s. Subhadra Consulting Engineers with M/s. 9
Design Group Project Consultants Pvt Ltd
8 Experience ‐ write up on Sample Projects 11
9 List of Project on Hand 26
10 Organization Structure
A. Panel of Consultants / Advisors 30
B. Technical Personnel 32
11 List of Project /Assignments Successfully Completed
A. Desk Study Report 34
B. Detailed Engineering of Projects 36
C. Preparation of Detailed Project Reports 43
D. Pre‐Feasibility Studies of Power Projects 50
E. Pre‐ Tender Services 59
F. Due Diligence Report 67
12 A few Certificates for Successfully Completed Projects 72
13 Brief Profile of Advisor / Consultants
a) Advisor
H.V. Eswaraiah, Hydro Power Projects 89
Shankar V. Nesargi, Wind Energy 90
P.R. Balasubramanian, Gas Based Power Plant 91
B.V Ramakrishnaiah, Gates & Penstocks 92
Balachandran. V, Engineering Geology 93
C.R. Venkatesh , Hydro Power Projects 94
Content
3. Sl. No. Description Page No.
M.C. Rangarajan, E & M Works 95
S. Ramanan, Hydro Power Projects 96
Umashankar, Steel Structure 97
Narayanan V, Transmission Line 98
Channakeshava C, Computer aided designs 99
Shridhar Prabhu, Legal Advisor, PPA 100
Srinath. N, Environmental Engineering 101
b) Consultants
C.S. Hebli, Chairman 102
B.L Lakshminarasimha, Chief Executive Officer 103
P.R Mallikarjuna, Executive Director (Design Head) 104
P.K. Rupangudi , Director (Gates, Dams design) 105
Chikkaguddappa Director (Project Development 106
Raghavendra Rao H, Director (Electrical Generation) 107
M.M. Reddy, Director (Transmission line, 108
Switchyard & Sub‐Station)
R .Vasudevan, Deputy Director (Water & Waste 109
Water)
U.R. Raghotham , Director (Tunnel and Dam design) 111
G. Penchalaiah, Irrigation Project – Investigation 112
Suryanarayana, Engineering Geology 113
K. T. Sreedhara, Deputy Director (Irrigation) 114
Achutha Narayana, Deputy Director (Hydro civil 116
design)
T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based 117
Power Plant)
P Sudarshan Rao, Manager (Electrical Generation) 118
Content
4.
1. DESIGN GROUP –A PROFILE
was established in 1979 to offer consultancy
DESIGN GROUP
services for civil and electrical engineering
projects. Having completed over 100 prestigious and varied assignments in the last 5
years, DG is a leading consultancy firm, offering full‐fledged consultancy services
across various fields of engineering in India and Abroad.
Equipped to provide design consultancy on very large engineering projects, DG has
been providing technical consultancy services to various organizations and
companies for planning, detailed design, and implementation of Hydel, thermal,
and other power projects. These services include analysis of financial aspects, design
engineering for electrical installation of substations, switchyards and transmission
lines, design engineering for civil engineering structures including large dams,
tunnels , canals, power canals, cross drainage works, surge tanks, penstock , and
power houses. DG also provides services related to other civil engineering fields of
Irrigation, Water Supply, and Waste Water Treatment.
DG, which has an annual turnover of over Rs.400 lakhs, provides consultancy
services required for the implementation of projects, right from concept to
completion, commissioning, operation and maintenance, thereafter. DG’s services
have been utilized by Large Industrial Houses, Firms, and Independent Power
Producers in India, and elsewhere, for the planning and design engineering of their
projects. In year 2004, DG was honored with an ISO 9001:2008 certification for its
design engineering services and continues to hold the certification.
DG have entered into MOU/ JV with number of large institution to name a few
Messers:
1) WAPCO New Delhi.
2) ILF Consulting Engineer, Austria
A Profile
1
5. 3) GEM Engineering Company Ltd., Uganda
4) IL&FS Ltd., Hyderabad
5) NihamShand Cape town South Africa
6) Land Mark Holding Ltd. Nairobi, Kenya
7) SSDC Damam KSA
Corporate Office
DG has been empanelled in a few public sector undertakings.
1) BHEL for extending design engineering services in Hydro Power projects
2) Karnataka Neeravari Nigam Limited for engineering services for Water
Resources Projects.
3) PFC consulting Limited, New Delhi for Power Projects.
Our clients include Messers
1) Nuclear Power Corporation Limited.
2) Gammon India Limited.
3) Fichtner Limited.
A Profile
2
6. 4) GMR Energy Limited.
5) ILFS Infra Limited.
6) WAPCO
7) NTPC
8) BHEL
9) Ritwik Energy Limited Hyderabad
10) Greenko Energy Limited Hyderabad
11) AMR Mitra JV Ltd., Hyderabad
More than 100 engineering software’s have been developed in house over a period
of 20 years. In addition, more than a dozen engineering design softwares have been
acquired and are in use for day to day work .State of Art facilities have been created
to take up large Water Resources Projects.
Presently the major Detailed Engineering works on hand are
1. Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in
Saudi Arabia.
2. Balance Plant for Rafha Gas based 2 x 55/70 MW + 2 x 35 MW Power Plant at
Rafha Saudi Arabia.
3. Two Irrigation Projects in Afghanistan namely
a. Machalgho Multipurpose Project, near Kabul
b. Pashdan Multipurpose Project in Herat region.
4. 81 MW Tinget HEP in Himachal Pradesh, India.
5. 75 MW Trishuli Galachhi HEP in Nepal, India.
6. 25 MW Mahan‐3 HEP in Chhattisgarh, India.
7. 12 MW Gatambe HEP in Kandy Sri Lanka.
8. Balance of Plant for 32 MW wind mill under phase II near Chikkodi near
Belgaum, Karnataka, India.
In addition 31 assignments are in different stages of implementation
A Profile
3
7.
A Profile
4
8.
A Profile
5
9.
A Profile
6
10. A Profile
7
11.
A Profile
8
12.
A Profile
9
13.
A Profile
10
14.
8. EXPERIENCE IN DESIGN ENGINEERING OF A FEW IMPORTANT
PROJECTS
8.1 Balance of Plant of Hail – 2 Power Plant
M/s. Alfanar one of the leading EPC contractors in Kingdom Saudi Arabia was
awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi
Electric Company. M/s ILF Abu Dubai, UAE, were the principal consultants, M/s.
DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and
to issue all construction drawings and designs for complete plan except GTG.
Siemens were the GTG equipment suppliers.
This was a fast track project, involving issue of more than 600 drawings in a short
span of 4 months. The project was successfully commissioned on schedule in the
month of July 2011. The assignment included interaction with clients / SEC (Owners)
during approval stage.
The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/70 MW
output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132
kV GIS and 380 kV AIS. The extension project consisted of –
1. 132 kV, 220MVA Generator Transformer, 13.8kV / 4.16kV 15MVA unit
auxiliary transformers, 10 nos. service transformers, MV & LV Switchgears
and other BOP.
2. Crude oil / Distillate oil fired Gas Turbine Generator units of 55/70MW
output – 2nos.
3. Crude oil treatment and forwarding and distillate oil forwarding system for
new units.
4. Associated piping, cabling & services
A Profile
11
15.
GTG Building under Construction
The Engineering services for the project consisted of –
• Civil Engineering involving structural designs, Architectural layouts,
equipment foundations, for GTG Building, FOTP Building & Switchgear
Building, etc,.
• Mechanical Engineering involving plant Layouts, piping, equipment sizing,
fire fighting system, HVAC, etc,.
• Process Engineering involving overall process flow discussions, P & ID’s, etc,.
• Electrical Engineering involving system studies, development of SLD’s,
equipment sizing, for transformers, MV & LV, Switchgears, DC & UPS
Systems, Cable & inter connection schedules.
• IAC illumination Engineering involving interfacing new unit & BOP to
existing CLR.
A Profile
12
16.
8. 2 Sea Water Intake for PFBR Plant Systems:
Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling
Water System under ambitious plan of generating power through Plutonium Fast
Breeder Reactor Project (PFBR) to M/s. Gammon India Limited. The major
components of the scheme were off‐shore intake shaft, on‐shore outlet shaft, and a
submarine tunnel connecting the two structures at about 45m below sea level. M/s.
Design Group Project Consultants Pvt Limited, were involved in detailed
engineering services for the sub marine tunnel and shafts. The project is since been
successfully completed.
The total length of the sub marine tunnel is 565m, Horse shoe shaped with 3600 mm
dia finished diameter. The outer diameter varied from 4300mm to 4600mm,
thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate
rock cover region, using M‐45 grade cement concrete. The tunnel passes through
Charnockyte type II rock medium having modulas of elasticity is 0.46 to 3.34 x 106
tons per square meter. The poisons’ ratio adopted ranged between 0.14 to 0.25 in
A Profile
13
18.
the PFBR Plant, with a bed gradient of 1 in 96.4. The density of Sea Water found to
be 1.024 ton per cum.
In addition, inlet shaft (4250 / 5250 mm dia) and outlet shaft (6000 / 7000 mm dia)
were sunk in both ends with 500mm, thick cement concrete lining using M‐45 grade
concrete.
8.3 Varahi Tail Race Mini Hydel Scheme:
River Varahi is an important West flowing river of Karnataka State with large
Hydel power potential. Power development in the Varahi Valley with an installed
capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x
115= 230 MW at Varahi Underground Power House was completed by Karnataka
Power Corporation Ltd. in the year 1989. The Varahi Tail Race Mini Hydel scheme
has been planned and engineered by Design Group for M/s. Sandur Power Co. Ltd.
Varahi Tail Race Mini Hydel Scheme utilizes the tailrace discharges of Varahi
Underground Power house and the available level difference between the point of
confluence of tailrace of Under round Power House with Varahi River and the FRL
of Varahi Irrigation Dam proposed downstream, for generation of power. The
proposed scheme comprises of the construction of a diversion weir across Varahi
river just downstream of the confluence of tail race of VUGPH with Varahi River, a
gravity type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m
Dia simple type surge tank, 7m dia penstock tunnel, 3 Nos. steel penstocks and a
power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW
capacity each under phase I and a tail race joining the Varahi River on its right flank.
Under Phase II, two more units of similar capacity have been added.
A Profile
15
19.
View of Diversion Weir Structure with radial gates
Power House under Construction
Overview of Power House
A Profile
16
20.
The cost of the project inclusive of escalation in costs during construction and
financial charges is placed at Rs. 13,439 lakhs. The project is under advance stage of
completion and is to be commissioned during the year 2005.
Penstock Tunnel, Concrete Lining under Construction
22m dia Shaft
A Profile
17
21.
8.4 AMR/ SHAMBURI Mini Hydel Scheme
M/s. AMR Power Pvt. Ltd. Implemented the 24 MW (5 x4.8 MW) Mini Hydel
Scheme across river Nethravathi, a major west flowing river in Karnataka. The
design flood at the barrage is 11500 cumecs. The plant is situated 35 km from
Mangalore, a major costal city in west Karnataka. The project has a low head
fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a
large flow. The design discharges utilized for power draft is 78.47 cumecs per unit.
The units are capable of running at 15% continuous overload. ‘S’ type Kaplan
turbine coupled to 4800 KW synchronous generator through the gear box are
adopted. During the construction, another developer M/s. Rithwik Energy
Generation proposed a 24 MW capacity power plant on the other bank. After mutual
discussion, it was agreed to utilize the existing facilities of M/s. AMR Power.
Thus, a power house accommodating 10 x 4.8 MW was planned and developed,
with a combined annual generation of 115.14 GWHr. The scheme comprises of, a
barrage across river Nethravathi with 30 radial gates to safely pass the 11500 cumecs
flood, non‐overflow sections, a power block on the left bank, a surface power house,
and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river.
A Profile
18
22.
The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110
KV rating. The construction took 27 months and the plant was synchronized. DG
provided the design engineering services.
8.5 Modernisation of Shivanasamudram Power Channel.
Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company, owned by
earstwhile Karnataka Electricity Board, as a part of the Modernisation programme of
the existing Shivanasamudram Hydro Power Project, had proposed to increase the
water carrying capacity of the power channel upto the Shivanasamudram Balancing
Reservoir and also increasing the live capacity of the Shivanasamudram Balancing
Reservoir to cater to the increased needs of the power channel and also the increased
needs of the drinking water supply for Bangalore City. VVNL entrusted the work of
planning for the improvements and the detailed engineering for the same to
Shivanasamudram Power Project is the earliest of the power projects constructed in
India, way back in the year 1902, to supply electrical power to Kolar Gold Mines
situated 85 kms away.
Divider wall under Construction
Originally a 2000m long power channel connecting Shiva head works and the Shiva
Balancing Reservoir had been constructed with a central earthen divider wall and
side slopes lined with stone pitching.
A Profile
19
23.
The central divider wall was an earthen bund with stone pitching on the side slopes
the overall dimensions of the divider wall has been 3.7m at the top and 8.2m at the
bottom.
Over a period of the last 100 years, the water carrying capacity of the channel had
been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting,
vegetation growth, etc. In order to increase the discharge carrying capacity of the
channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of
the side slopes was reset and covered with RCC lining. The vegetation growth was
completely removed. After modernization, discharge carrying capacity of the power
channel has increased to 59.5 cumecs. The live capacity of Shiva Balancing Reservoir
has been substantially increased by desilting the reservoir and removal of weed
growth. In addition, DG was asked to suggest simple method of desilting of the
Balancing Reservoir. A simple technique of using a shovel mounted on a raft made
out of a battery of empty steel drums was suggested and used along with ejection of
the silt by a mud pump and a pipe line supported on empty floating drums, and
taken to the shores.
8.6 Link Canal Mini Hydel Scheme:
Karnataka Irrigation Department, as a part of the modernization of K.R. Sagar
project irrigation Canal System, took up the scheme to construct a link canal taking
off from the Visveswaraya canal before Hulikere tunnel and joining the Cauvery
Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District. At the tail
end of this link canal, there is a difference in level of about 8.3m between the bed of
the link canal and the bed of the Cauvery branch canal and is negotiated by the
construction of a drop structure. Link Canal Mini Hydel Scheme was formulated to
utilize the water flow of the link Canal and the head available at the drop at the end
of Link Canal, for power generation.
A Profile
20
24.
View of Power House as seen from Downstream
Karnataka Irrigation Department, as a part of the modernization of K.R. Sagar
project irrigation Canal System, took up the scheme to construct a link canal taking
off from the Visveswaraya canal before Hulikere tunnel and joining the Cauvery
Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District. At the tail
end of this link canal, there is a difference in level of about 8.3m between the bed of
the link canal and he bed of the Cauvery branch canal and is negotiated by the
construction of a drop structure. Link Canal Mini Hydel Scheme was formulated to
utilize the water flow of the link Canal and the head available at the drop at the end
of Link Canal, for power generation.
The scheme is simple with minimum civil engineering works. The civil engineering
components comprise of a 70m long approach channel, intake structure, gated
bypass weir with provision of automatic falling shutters, surface power house, tail
channel leading the water back to the branch canal. The installed capacity of the
scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The
A Profile
21
25.
average annual energy generation is 10.10 GWHr. The cost of the scheme is Rs. 80
Million. The Project was completed in the year 2003 by the Developers M/s Graphite
India Ltd., Bangalore, The civil engineering works were contracted to M/s Mysore
Construction Co., Bangalore. The Planning and Detailed Design Engineering was
handled by Design Group.
8.7 Captive Power Plant of 5.8 MW capacity at John Welch Research Centre,
Whitefield, Bangalore for M/s General Electric:
Overall view of DG Plant
Inside view of Generator Room
Design Group was associated as a major leader for the Planning, Detailed
Engineering and construction co‐ordination of the 5.8 MW Diesel Engine based
A Profile
22
26.
Captive Thermal Station of the GE India Technology Centre at Bangalore, which has
been completed on a time bound schedule of 6 months.
8.8 Windmill Power
M/s. Doddanavar Brothers, who have Plan to develop 100MW Wind Farm in
Chikkodi, Belgaum district of Karnataka, India, availed our technical support for
Engineering of balance of a plant. Critical main equipment of capacity 10 x 1.5 MW
was sourced from M/s. Sinovel, China, while the rest was sourced locally.
Foundation of Wind Mill
DG assisted the developers by drafting technical specifications, preparing data
sheets, floating tender for fabrication of towers, tower internals and electrical
right from 690 volts to the grid connection. In addition, assistance was extended
for procurement activities. The Civil Raft Foundation drawings were provided
after detail designs, for local sub‐surface soil conditions. The entire assignment
was completed in 9 months.
A Profile
23
27. Wind Turbine Generator Hub
1. DG designed 33 kV outdoor yard sub‐station at Wind farm, 33 kV transmission
line from Wind farm to pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard
pooling station and 110 kV transmission line from pooling station to KPTCL
evacuating 110 kV sub‐station.
2. DG prepared technical specification for 33 kV substation at Wind farm, 33 kV
transmission line, 33 / 110 kV pooling station and floated enquiry for the
procurement and scrutinized the Vendor offers and finalized the orders on
suppliers.
3. Vendor drawings and specification scrutinized.
4. Assisted in commissioning the sub‐station and transmission line.
The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x
1.6 MW GE machines have been selected, the civil foundation is under
construction.
8.9 Design of Vacuum Chambers
M/s. Hind High Vacuum Co. Pvt. Ltd., specializing in manufacture of Pressure
Vessels and Vacuum Chambers for defence, pharmaceuticals, and solar panels,
entrusted to DG, design and preparation of fabrication drawings for a Robotic TIG
A Profile
24
28.
Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for
negative pressure of 1 kg per sq.cm, with a rider that the defection of internal
structural members must be limited to 0.5 mm.
The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit
chambers, tool chambers, etc. The robotic arm moves on rails. The welding will be
carried out under Argon gas atmosphere. The chamber were analysed using NISA
Software package and the analysis has been validated by Indian Institute of Science,
Bangalore, the pioneer research institute, by using ETAB software. The analysis,
design, and fabrication drawings have been forwarded to M/s. Hind High Vacuum
Co. Pvt. Ltd. The fabrication of chamber is in advance state of complexion. The
Robotic TIG Welding Chambers, when commissioned, will be one‐of‐its‐kind in the
world.
8.10 Design Group has been successfully providing pre‐tender and post‐tender
services for various public sector undertakings and several private sector
undertakings, in as much as assessment of costs, detailed specifications of various
items of work, conditions of contracts, tender documents, tender analysis and
reports leading to selection of construction and supply agencies as per time bound
schedules and needs of clients.
A Profile
25
29. Annexure – I
9. LIST OF PROJECTS ON HAND
A. POWER PROJECTS – DETAILED ENGINEERING
Sl. Name of the Project Installed Project Clients
No. Capacity Cost in Rs.
in MW Lakhs
1. Lower UHL SHEP Project, 13.00 9500 M/s. Trident Power Systems Ltd.,
Himachal Pradesh. Himachal Pradesh
2. Singatalur‐Huligudda Mini Hydel 18.00 6000 M/s..Tungabhadra Power Projects
Scheme, Karnataka‐ Ltd., Bangalore.
3. Lambadug Hydro Electric Project, 25.00 12250 M/s. Himachal Sorang Power Pvt.
Himachal Pradesh. Ltd, Shimla, Himachal Pradesh
4. Cauvery Small Hydel Project, 24.00 13000 M/s. XS Hydro Energy Private Ltd.,
Karnataka. Bangalore
5. Huvinahedagi Mini Hydel 24.75 13500 M/s. XS Hydro Power Pvt. Ltd,
Scheme, Karnataka. Bangalore
6. Agrahara MHSI & II, Karnataka. 1.475 700 Sarovara Energy Pvt Ltd.,
Bangalore.
7. Water Supply System for Bharathi Water ‐ M/s. Bharathi Cement Corporation
Cement Plant at Cuddapha, Supply Ltd Andhra Pradesh
Andhra Pradesh Scheme
8. Paudital Lassa Hydro‐Electric 24 19200 M/s. Greenko Hatkoti Energy Pvt
Project, Himachal Pradesh. Ltd., Hyderabad.
9. Jeori Lower Mangalad SHPP, 15 12000 M/s. Techology House (India) Pvt
Himachal Pradesh. Ltd., Hyderabad.
10. Nimishamba Mini Hydel Scheme, 3 1700 M/s. Nimishamba Energy India
Karnataka, Private Ltd., Bangalore
11. Kollya Mini Hydel Scheme, 24 19200 M/s. Kumaradhara Power Pvt Ltd
Karnataka. Bangalore
12. Chikkodi Windmill Project, 100 6000 M/s.Doddanavar Brothers, Belgaum
Karnataka.
13. Mahan Hydro Electric Project, 24 2000 M/s.Venika Hydro projects Pvt Ltd,
Chathisgard. Bangalore
Projects on Hand
26
30.
Sl. Installed Project
No. Name of the Project Capacity Cost in Rs. Clients
in MW Lakhs
14. Trishuli Galchhi Hydro Electric 75 80000 M/s. Siddhakali Power Pvt. Ltd.,
Project, Nepal. Nepal
15. Kukke 1 & 2 MHS, Karnataka. 24 14400 M/s. Kukke Hydro Projects Pvt Ltd,
Bangalore.
16. Anusha Mini Hydel Scheme, 4 1600 M/s. Dhenu Hydro Pvt Ltd
Andhra Pradesh. Hyderabad
17. Navya Mini Hydel Scheme, 2.60 1300 M/s. Mitra Energy Pvt Ltd
Andhra Pradesh. Hyderabad
18. Ramya MHS, Andhra Pradesh. 3.80 1900 M/s. Kurnool Energies Pvt Ltd
Hyderabad
19. Koilakunte Mini Hydel Scheme, 12 M/s. Dhenu Hydro Power Private
Andhra Pradesh. Ltd., Hyderabad.
20. Halsur Diversion weir under 400 M/s. Karnataka Neeravari Nigam
Shiggon lift Irrigation Scheme, Ltd., Karnataka
Savanur, Karnataka
21. River Water Intake Pump House 2 X 270 300 M/s. GVK Ltd through M/s. Fichtner
and Approach Bridge, Punjab. Consulting Engineers (India) Pvt
Bangalore
22. Machalgho Multipurpose Project, US $ 95 M/s. Gulf Civil Engineering &
Machalgho, Afghanistan. Million construction Co. Kabul, Afghanistan
23. Pashdan Irrigation Project, near US $ 180 M/s. Hewadwal Group Afghanistan
Heart, Afghanistan.
24. Tinget‐2 Hydro Electric Project in 81 60000 M/s. AMR—Mitra JV, Hyderabad
Himachal Pradesh
25. Balance of Plant for Rafha Gas 2 x 75 + 2 x M/s. SSEM Riyadh through M/s. ILF
based Power Plant, Saudi Arabia. 75 Abu Dhabi
26. Study Report on Gandak Canal 3 X 5 M/s. WAPCOS New Delhi
HEP in Valmikinagar, West
Champaran District, Bihar.
27. Detailed Design Engineering 2 X 2.5 4000 M/s. Sahu Hydro Power Pvt Ltd.,
services for Kurtha SHP in Hyderabad
Himachal Pradesh.
28. Detailed Design Engineering 2 X 2.5 4000 M/s. Sahu Hydro Power Pvt Ltd.,
services for Kuril SHP in Himachal Hyderabad
Pradesh.
Projects on Hand
27
31.
Sl. Name of the Project Installed Project Clients
No. Capacity Cost in Rs.
in MW Lakhs
29. Detailed Design Engineering 3 X 5 1200 M/s. Parvat Hydro Power Pvt Ltd.,
services for Chhoned SHP. Hyderabad
30. Detailed Design Engineering 3 X 8 19200 M/s. Pavanganga Power Private
services for Sangam SHP Raichur, Ltd., Hyderabad.
Karnataka.
31. Review Consultants for Umjaut 160 100000 M/s ETA Star Ltd,. Dubai
(70MW) & Umduma HEP (90MW)
in Meghalaya
B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT
Sl. Installed Project Clients
No. Name of the Project Capacity Cost in Rs.
in MW Lakhs
1 Bellary Solar Power Project, 5 7500 M/s.Vishrutha Power Pvt. Ltd.,
Karnataka. Bellary
2 Proposal to bring 10 TMC of Raw ‐ ‐ M/s. Larsen & Toubro Limited,
water from Sakleshpura to Bangalore
Chikkaballapur & Kolar District &
T.G. Halli
C. PRE TENDER ENGINEERING SERVICES
Sl. Installed Project Clients
No. Name of the Project Capacity Cost in Rs.
in MW Lakhs
Upper Narmada Irrigation Project Irrigation ‐ M/s. Gammon India Ltd. Mumbai
1.
Madhya Pradesh – EPC Bid Project
60MGD River water. Pipeline‐ ‐ M/s. Gammon India Ltd. Mumbai
Water
2. 73kms for VSNL Ltd, at Salboni in
Supply
West Bengal – EPC Bid
Agra Water Supply Project in Agra Water ‐ M/s. Gammon India Ltd. Mumbai
3.
– EPC Bid Supply
Raw water supply system for 4 x ‐ M/s. Gammon India Ltd. Mumbai
Water
4. 300 MW Raigarh SKS Power
Supply
Generation (Chattisgarh) Ltd
Projects on Hand
28
32.
D. PREPARATION OF TENDER DOCUMENT
Sl. Installed Project Clients
No Name of the Project Capacity Cost in
in MW Rs. Lakhs
1. Dagmara HEP – Preparation of bid 25 x 5 ‐ M/s. Bihar Electricity Board,
document for Civil, E&M, H&M through M/s. WAPCOS
Transmission Line Component New Delhi.
works
E. OTHERS
Sl. Installed Project Clients
No Name of the Project Capacity in Cost in
MW Rs. Lakhs
1. Design and drawings of Electrical Electrical ‐ M/s. Doddanavar Nanjinzhao
System for Beneficiation Plant, Distribution Mining and Metallurgy (P) Ltd.,
Bagalkot, Karnataka Belgaum Karnataka.
2. Detailed Civil Engineering for Two Coal ‐ M/s. Multi Design Infra Works Pvt.
Transfer points. Tunnel in cut & Handling Ltd. Bangalore
cover, Box Pulsing for coal System
conveyor system for addition of 2 x
250 MW to Sikka Thermal Power
Plant in Jamnagar District Gujarat
3. Design of 35.58 MLD capacity ‐ ‐ M/s. GVPR
Sewage Treatment Plant under
UGD Scheme to Shimoga City
Projects on Hand
29
33. Annexure – II (A)
10. ORGANISATION STRUCTURE
A. PANEL OF CONSULTANTS/ADVISORS
Sl. No. Name & Qualification Designation
1. Sri C.S. Hebli
Director Technical (Retd), Chairman &
Karnataka Power Corporation Ltd. Chief Consultant.
Bangalore.
2. Sri H.V. Eswaraiah
Director Technical (Retd), Consultant –Hydro Civil
Karnataka Power Corporation Ltd., Designs.
Bangalore.
3. Sri G.N. Yoganarasimhan,
Director (Retd),
Advisor‐Hydrology.
WRTD, Rourke,
Bangalore.
4. Sri. P.R. Balasubramanian,
CMD (Retd), FACT, Advisor‐ Gas Based Power
Triavaneore, Kerala. Plant.
Bangalore.
5. Dr. D.N. Seshagiri, PhD Harvard, USA.
Director (Retd),
Advisor – Engineering Geology.
Engineering Geology,
Geological Survey of India.
6. Sri.Vishwanath Balachandran,
Advisor‐ Engineering
Director General, GIS (Retd).
Geology.
Chennai.
7. Sri. Shankar Nesargi
Managing Director (Retd.) Advisor ‐Wind Energy
VVNL, Bangalore.
8. Sri. C. R. Venkatesh
Executive Director (Retd.) Advisor ‐Hydro Power
NHPC Ltd., New Delhi, Projects.
Bangalore.
9. Sri. H. Rangarajan, B.Sc, B.E.
Executive Director(Retd), Executive Director (Elec.)
KPCL, Bangalore.
Panel of Consultants / Advisors
30
34. Sl. No. Name & Qualification Designation
10. Sri B.V. Ramakrishnaiah,
Advisor – Gates.
Bangalore.
11. Sri Srinath Anekal, ME (Civil), MS(Environment)
USA. Advisor‐Environment.
Bangalore.
12. Sri. M. M. Kamath, Advisor – Marine Engineering.
Chief Engineer (Retd),
NMPT, Mangalore.
13. Sanker Pradesh, M.Tech (Roorkee),
Consultant‐ Geology.
New Delhi.
14. Sri. Thippeswamy
Advisor –Water and Waste
Chief Engineer (Retd.)
Water System.
BWSSB, Bangalore.
15. Sri. V. Suresh Kumar, M.Tech (Khargpur), Advisor – GIS
Bangalore.
16. Sri V. Narayanan,
Advisor – Transmission
General Manager, SAE (I) Ltd (Retd),
Lines.
Bangalore.
17. Sri. Ramanan
Chief Engineer (Retd.)
Consultant‐Hydro
NHPC Ltd., New Delhi,
Bangalore.
18. Dr. Y. Lingaraju. Advisor ‐ Ground Water
19. Sri. Umashankara , B.E. (Civil)
Ex‐Mecon. Advisor ‐Steel Structure.
20. Sri. G. Rajagopalan,
Director (Retd), Consultant – Engineering
Engineering Geology, Geology
Geological Survey of India, Chennai.
21. Sri. Krishnappa,
Advisor – Finance.
Financial Controller(Retd),
KPCL, Bangalore.
22. Sri. Sridhar Prabhu – Legal Adviser Advisor –PPA
23. Sri. Venkateshwar Rao
Consultant (Liaison)
New Delhi.
24. Sri T.S. Somanathan, B.E. (Mech).
Advisor –Welding.
Foremerly NLPC Ltd.,
Panel of Consultants / Advisors
31
35. Annexure – II (B)
B. TECHNICAL PERSONNEL
Sl. No. Name & Qualification Designation
1 Sri C.S. Hebli, B.E(Hons) Chairman.
2 Sri B.L. Lakshminarasimha, Chief Executive Officer
B.Sc., B.E., M.E., MIE, AIV, MASCE.
3 Sri. P.R.Mallikarjuna Executive Director (Design Head)
M.E.(I.I.Sc.), MIE, MIWRS, MISEO.
4 Sri. Chikkaguddappa B.E. (Civil) Director (Project Development)
5 Sri. H.Raghavendra Rao B.E. (Elec) Director (Electrical Generation.)
6 Sri M.M. Reddy, B.E.(Elecl) Director (Electrical Power Evacuation)
7 Sri.P.K.Rupangudi, M.E. (Civil) Director (Gates, Dams design)
8 Sri.U.R.Raghotham, M.Tech. (Civil) Director (Tunnel and Dam design)
9 Sri.R.Vasudevan B.E. (Elec) Deputy Director (Water & Waste Water)
10 Sri.K.T.Sreedhara, B.Tech (Civil) Deputy Director (Irrigation)
11 Sri. Narayana Achutha Deputy Director (Hydro civil design)
M.Tech, IIT Kanpur, (Hydraulics)
12 Sri.T.S.Srinivasa, B.E (Civil), M.E Deputy Director ‐‐Civil (Gas)
13 Sri.Sudarshan Rao B.E. (Elec) Manager (Electrical Generation)
14 Mr.Gangadar Pattanashetti Senior Design Engineer (Irrigation)
M.Tech, IIT Guwahati, (Water Resources)
15 Sri. Anantha Murthy,
General Manager (Civil Designs)
B.Sc AMIE (Civil)
16 Ms.Kavitha.M, B.E, MBA Administrative Officer
17 Sri. R. Suryanarayana, M.Sc (Geology) Consultants (Engineering Geology)
18 Ms. Sneha Dandavathe., B.E.(Civil) Design Engineer (Hydrology)
19 Mr. K.V. Chandrakanth B.E. (Elec) Design Engineer (Elec.)
20 Mr. Vasanth Kumar B.E (Civil) Design Engineer (Project Planning)
21 Mr. Shivanand, B.E (Civil) Design Engineer (Water conductor system)
22 Mr. Pramod Kumar, B.E.(Civil) Design Engineer (Power House & Tail Race)
23 Mr. Lokesh B.E (Civil) Design Engineer (Dam Design)
24 Mr. Sudeendra, M.Tech (Structures) Design Engineer (Gas Power Plant)
Technical Personnel
32
36. Sl. No. Name & Qualification Designation
25 Mr. Mohan Kumar, M.Tech (Structures) Design Engineer (Gas Power Plant)
26 Mr. Puneeth. S, B.E(Elec) Design Engineer (Elec.)
27 Mr. Naveen V. B.E.(Mech) Piping Engineer (Mechanical)
28 Mr. Yoghesh K ,B.E.(Civil) Design Engineer (Planning)
29 Ms. Anusha Hegde K. B.E.(Elec) Design Engineer (Electrical)
30 Ms. Smitha Nagaraj B.E.(Elec) Design Engineer (Electrical)
31 Ms. Kumari Diptimayee, B.E.(Civil) Design Engineer (Irrigation)
32 Ms. Poonam U Jadhav, B.E (Civil) Design Engineer
33 Mr. Pradyumna K, B.E.(Civil) Design Engineer (Trainee)
34 Mr. Vinay M V B.E .(Civil) Design Engineer (Trainee)
35 Mr. Saravanan S Design Engineer (Hydro Civil)
36 Ms.Sunita G Galgali, B.E (Civil) Assistant Design Engineer
37 Sri Mahesh Desai Manager (Drawings‐ Section)
38 Mr.Prasanna.T CAD Engineer (Electrical)
39 Mr.M.Shashi Kumar Junior Design Engineer (Drawings)
40 Mr.Manthesh.M CAD Engineer (Mechanical Piping)
41 Mr.Praveen.S.Ladva CAD Operator (Civil)
42 Mr.Nagashetty S CAD Engineer (Hydro)
43 Mr.Sangashetty V Biradar CAD Operator (Gas Power Plant)
44 Mrs. Sharadhamma H CAD Engineer (Civil)
Office Support Staff:
45 Sri. Nagesh, S Officer / Manager / Accountant
46 Sri Suresh Accountant
47 Ms. Thara. R Receptionist
48 Mrs. Geetha N Personal Secretary
49 Sri. Ravi Kumar K Stenographer Cum Secretary
50 Ms. Sowmya A Personal Secretary
Technical Personnel
33
37. Annexure – III (A)
11. LIST OF PROJECT ASSIGNMENTS SUCCESSFULLY COMPLETED
A. Preparation of Desk Study Report on Hydro Power Projects self identified by DG to
various IPP’s in Nepal and India.
Sl. Name of the Project Installed Project Cost Year Clients
No. Capacity in in Rs.
MW Lakhs
1. Jaleswar HEP, Nepal. 200.00 US $400 2008 M/s. Maytas Infra Ltd.,
Million Hyderabad.
2. Taksindu HEP, Nepal. 270.00 US $540 2008 M/s. Nandadevi Agro‐
Million Farms Pvt Ltd., Hyderabad.
3. Syar Khola ‘A’ HEP, Nepal 140.00 US $280 2008 M/s. Dunagiri Pvt Ltd.,
Million Hyderabad.
4. Syar Khola ‘B’ HEP, Nepal. 360.00 US $720 2008 M/s. Harmosha Pvt Ltd.,
Million Hyderabad.
5. Prok HEP, Nepal. 480.00 US $960 2008 M/s. Nandadevi Pvt Ltd.,
Million Hyderabad.
6. Jogimara Trisuli HEP, 240.00 US $480 2008 M/s. Haramosh Agro‐Farms
Nepal. Million Pvt Ltd., Hyderabad.
7. Bihi HEP, Nepal. 270.00 US $540 2008 M/s. Dunagiri Agro‐Farms
Million Pvt Ltd., Hyderabad.
8. Kappe HEP, Arunachal 98.00 73900 2008 M/s. Hemavathy power &
Pradesh. light Pvt Ltd
9. Champung Pobe HEP, 140.00 105500 2008 M/s. Hemavathy power &
Arunachal Pradesh. light Pvt Ltd, Bangalore.
10. Changlai HEP, Arunachal 48.00 36200 2008 M/s. Hemavathy power &
Pradesh. light Pvt Ltd, Bangalore.
11. Braing pube HEP, 48.00 36200 2008 M/s. Hemavathy power &
Arunachal Pradesh. light Pvt Ltd, Bangalore.
12. Pakke HEP, Arunachal 70.00 52800 2008 M/s. Hemavathy power &
Pradesh. light Pvt Ltd, Bangalore.
13. Nargum HEP, Arunachal 84.00 63300 2008 M/s. Hemavathy power &
Pradesh. light Pvt Ltd, Bangalore.
14. Chann Siang HEP 66.00 50557 2008 M/s. Hemavathy power &
Arunachal Pradesh. light Pvt Ltd, Bangalore.
Desk Study Report
34
38. Sl. Name of the Project Installed Project Cost Year Clients
No. Capacity in in Rs.
MW Lakhs
15. Papu HEP Arunachal 110.00 88000 2008 M/s. Hemavathy power &
Pradesh. light Pvt Ltd, Bangalore.
16. Arket Bazar HEP, Nepal. 110.00 US $220 2007 M/s. Parasnath Greenlands
Million Pvt Ltd., Hyderabad.
17. Uiya HEP, Nepal. 105.00 US $210 2007 M/s. Maytas Infra Ltd.,
Million Hyderabad.
18. Phillim HEP, Nepal. 150.00 US $300 2007 M/s. MMS Steel & Power
Million Ltd.,Hyderabad.
19. Amras HEP, Nepal. 150.00 US $300 2007 M/s. Maytas Properties Pvt
Million Ltd., Hyderabad.
20. Budhi Gandaki HEP, 600.00 US $1200 2007 M/s. RVK Energy Pvt Ltd.,
Nepal. Million Andhra Pradesh
Desk Study Report
35
39.
B. DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED
Sl. Name of the Project Installed Project Year Clients
No. Capacity in Cost in Rs.
MW Lakhs
1. Balance of Plant for Hail‐2 2 x55/75 2011 M/s. Alfanar Riyadh through
Gas based Power Plant, Saudi M/s. ILF Abu Dhabi
Arabia.
2. Computation of HFL, Irrigation 4000 2011 M/s. Karnataka Neeravari
elevation capacity of barrage, Nigama Limited, Karnataka.
design of barrage for Halasur
Barrage across Varada River
‐ Shiggaon Lift Irrigation
Scheme Dharwar District,
Karnataka
3. Detailed Analysis,Design Mechanical 5200 2010 M/s. Hind High Vacuum Co.
and Preparation of Pvt. Ltd. Bangalore
Fabrication of TIG Welding
Chamber.
4. Balance of civil works for — — 2010 M/s. Delkor Technik India
Horizonal Belt Filter Station Pvt Ltd., Bangalore.
Building including
Equipment and Accessories
Foundation Cango.
5. Al‐Gubrah Mobile SWRO — — 2010 M/s. ILF Abu Dhabi.
Plant Civil Design, Muscat.
6. Dandavathi Reservoir Irrigation 10200 2009 M/s. Karnataka Neeravari
Irrigation Project Karnataka Nigam Ltd., Bangalore
7. Varahi Underground Power 2 x 215 2500 2009 M/s. Karnataka Power
House Stage‐II Karnataka. Corporation Ltd., Bangalore
8. Energy Audit of Fiber Glass Energy 60 2009 M/s. ICP(India) Private Ltd.,
Product Manufacturing Audit Bangalore.
Units, Bangalore
9. 35 MLD/STP for Shimoga — — 2009 M/s. GVPRS Hyderabad.
Town, Shimoga District,
Karnataka.
Detailed Engineering – Completed
36
40.
Sl. Name of the Project Installed Project Year Clients
No. Capacity in Cost in Rs.
MW Lakhs
10. Balance of civil works for 18 — — 2009 M/s. Delkor Technik India
mtr dia x 3.0 SWD RCC tank Pvt Ltd., Bangalore.
for thickener application.
11. Detailed Engineering for 2009 Sharavathy Conductors Pvt
Transmission line including Ltd, Bangalore
Foundation Designs for the
20km, double circuit
transmission line connecting
Vajamangala 220kV station
to Kachakola 220kV station.
12. 25 mtr dia x 3.0 SWD — — 2009 M/s. Delkor Technik India
130TPH capacity RCC tank Pvt Ltd., Bangalore.
with tunnel and overflow
launder for thickener
application
13. 100MW Wind Farm 10 x 1.65 10000 2009 M/s.Doddanavar Brothers,
development‐1phase Belgaum Karnataka
16.5MW Chikkodi Belgaum
District, Karnataka
14. Energy Audit of steel Energy 50 2008 M/s. Goel Engineering
Fabrication Manufacturing Audit Private Ltd., Bangalore.
Unit, Bangalore.
15. Design and Drawing for DM — — 2008 M/s. Velath Engineering
Vessel. Works, Sharjah UAE
16. Construction Water supply 3 x 350 450000 2008 M/s. GMR Energy Limited,
for Kamalanga Thermal Bangalore
Power Plant, Orissa.
17. Somanamaradi Small Hydel 1 x 6 1500 2007 M/s. Narayanapur Power
Project‐ Stage‐II, in Raichur Co. Pvt. Ltd, Bangalore
District, Karnataka.
18. Balance of civil works for — — 2007 M/s. Velath Engineering
Design and Drawing for Works, Sharjah UAE
Sulphur Storage Tank.
19. Design and Drawing of Flue 2007 M/s. Velath Engineering
Gas Scrubber (V‐1507) Works, Sharjah UAE
Vessel.
Detailed Engineering – Completed
37
41.
Sl. Name of the Project Installed Project Year Clients
No. Capacity in Cost in Rs.
MW Lakhs
20. Detailed Engineering for — — 2007 Sharavathy Conductors Pvt
Transmission line towers Ltd, Bangalore
including Foundation
Designs for 50kms of Hiriyur
– Kudithini 440kV
Transmission line.
21. Balance of E&M works for 2 x 5 3000 2007 M/s. Meclin Fabricators
Bhavani Barrage Hydro Private Limited Chennai.
Electric Project I.
22. Balance of E&M works for 2 x 5 3000 2007 M/s. Sri Saravana
Bhavani Barrage Hydro Engineering Works
Electric Project II. company Pvt Ltd. Bhavani
Tamil Nadu
23. Construction of earthen — — 2007 M/s. ECC‐‐CPPL Pvt Ltd.,
bund for Sarvaraja Sarovara Hyderabad. through M/s.
Reservoir near Cuddaph, SM Constructions Bangalore.
Chittur District, Andhra
Pradesh.
24. Shamburi MHS, Dakshina 5 x 4.80 9726 2006 M/s.Rithwik Energy
Kannada District, Karnataka. Generation Pvt. Ltd.
Hyderabad.
25. Design and Drawing for — — 2006 M/s. Velath Engineering
Natural Gas Storage (Buffer) Works, Sharjah UAE
Pressure vessel.
26. Balance of Civil Works for 13 — — 2006 M/s. Delkor Technik India
mtr dia x 3.0 SWD RCC tank Pvt Ltd., Bangalore.
for thickener application.
27. Balance of Civil Works for 4 — — 2006 M/s.Rolls‐Royce Energy
x B35: 40V‐12G Genset Gas Systems India Pvt.Ltd.,
Power Plant at Sudan. New Delhi
28. Detailed Engineering for — — 2006 Sharavathy Conductors Pvt
Transmission line Towers Ltd, Bangalore
including Foundation Design
for 132/66/11 kV Kolar Sub‐
Station works.
Detailed Engineering – Completed
38
42.
Sl. Name of the Project Installed Project Year Clients
No. Capacity in Cost in Rs.
MW Lakhs
29. Perla Mini Hydel Scheme, 5 x 4.80 9726 2005 M/s.AMR Power Pvt. Ltd.
Dakshina Kannada District, Hyderabad.
Karnataka.
30. Nagarjuna Sagar Tail Pond 2 x 25 42500 2005 M/s. STUP Consultants
Dam and Hydro Power Private Ltd., Bangalore
Station, Nalgonda, Andhra
Pradesh
31. Construction of Gandikota Irrigation 5500 2005 M/s. STUP Consultants
Dam across Pennar River, Private Ltd., Bangalore
Kadapa, Andhra Pradesh.
32. Yakla Micro Hydel Scheme 2 x 250 100 2005 M/s. Raj Kumar and
in Dargeling West Bengal. Company, Bangalore
33. Somanamaradi Small Hydel 2 x 6 4800 2004 M/s. Narayanapur Power
Scheme, Raichur District, Co. Pvt. Ltd., Bangalore
Karnataka.
34. Hullahalla Mini Hydel 3 x 4 4740 2004 M/s.Limbavali Power Pvt.
Scheme, Mandya District, Ltd., Bangalore
Karnataka.
35. Somavathi Mini Hydel 2 x 3 2746 2004 M/s.SRM Power Pvt. Ltd.
Scheme, Chickmagalur Bangalore
District, Karnataka.
36. Gugal Small Hydel Scheme, 4 x 2.5 4000 2004 M/s.SRS Energy Pvt. Ltd.
Gulbarga District, Karnataka. Bangalore
37. Design of Anchor Blocks for — — 2004 M/s. Quest‐GE‐Global
Birkapilli HEP Turkey ( XLS Engineering Development
generation) Centre,Bangalore.
38. Koynad MHS, Kodagu 2 x 2 1800 2004 M/s. Sadguru Saai Energies
District, Karnataka. Pvt. Ltd., Bangalore.
39. Design and Preparation of Tank Farm 2004 M/s. Velath Engineering
GA drawings for following Works Sharju, UAE.
tanks. Crude Oil Tank Slop
Crude Oil Tank Crude Oil /
Water Tank Product Water
Tank Fire Water Tank
Diesel Oil Tank.
Detailed Engineering – Completed
39
43.
Sl. Name of the Project Installed Project Year Clients
No. Capacity in Cost in Rs.
MW Lakhs
40. 110 kV Switchyard extension Switchyard 100 2003 M/s. Bhowalaka Steels,
at Bellary Steels, Bellary Bangalore, through LEG.
District, Karnataka.
41. Pre‐Cast RCC Bridge over 2003 M/s. Mysore construction Co
Upper Tunga barrage across Ltd., Bangalore.
River Tunga, Shimoga
District, Karnataka.
42. Architural and Structural 300 2003 M/s. Nandalal Mohan Lal
services for Construction of Jairani Kapur Charitable
Pediatric Ward at Kidwai Trust Bangalore.
Memorial Institute of
Oncology – Honorary
Assignment
43. Link Canal MHS 2001, 1 x 1.5 700 2002 M/s.Graphite India Ltd.,
Mandya District, Karnataka. Bangalore.
44. Varahi Tail Race MHS, 5 x 7.5 13439 2002 M/s. Sandur Power Co. Pvt.
Udupi District, Karnataka. Ltd., Bangalore.
45. Civil works for the proposed — — 2002 M/s. ASEA Brown Boveri
132/33kV ODY at INDALCO. Ltd., Bangalore.
46. 132 KV Switchyard Switchyard 2002 M/s. BHEL Bangalore.
Capacitor Bank for HINLCO
Renukot.
47. 132 kV Switchyard near Switchyard 300 2001 M/s.Bharat Heavy Electricals
Samayanallur, Madurai, Ltd.
Tamil Nadu.
48. 110 kV Switchyard extension Switchyard 300 2001 M/s. BHEL, Bangalore,
connected with 128 MW DG through M/s.. MECON,
set installation for KSEB, Bangalore
Kozikhode.
49. 110 KV Substation at Substation 2001 M/s. LEG Bangalore
Navakarnataka Steels,
Bellary District, Karnataka.
50. 66 KV outdoor Switchyard Switchyard 2001 M/s. GEPC Ltd., Bangalore
and Substation at NAL
Bangalore.
Detailed Engineering – Completed
40
44.
Sl. Name of the Project Installed Project Year Clients
No. Capacity in Cost in Rs.
MW Lakhs
51. DG Plant at GE ITC Ltd., 7.4 4000 2000 M/s. GEITC Ltd., Bangalore
Whitefield, Bangalore
52. Design of Supplying Switchyard 800 2000 M/s.. AEG‐NGEF Limited
Structures of 220kV Switch Bangalore.
yard for M/s. Nippon Denro
Ispat Ltd., Dolvi, Maharastra.
53. 110 kV Switchyard at Switchyard 250 2000 M/s. Bharat Heavy
HINDALCO, Renukoot, Electricals Ltd. Bangalore.
Uttar Pradesh.
54. Design of Supplying Switchyard 200 1999 M/s. Kirloskar Electric
Structures for the proposed Company Ltd., Bangalore.
66 KV Outdoor Switchyard
at a very Cycles Ludhiana.
55. Harangi HEP at Harangi 2 x 4.5 3200 1999 M/s. Sulzer Flovel Hydro
Dam, Kushalnagar District, Ltd., Faridabad, Haryana.
Karnataka
56. Sheshadri Iyer MHS Mandya 3 x 2 1200 1999 M/s. Atria Power
District, Karnataka. Corporation Limited,
Bangalore.
57. Remodeling of Shiva Power — 1000 1998 M/s. Karnataka Power
Channel at Transmission Corporation
Shivanasamudram, Mandya Ltd., Bangalore.
District, Karnataka.
58. Dumkar Hydro‐Electric 3 x 1.5 300 1998 Chief Project Engineer,
Project at Leh, Ladakh, J&K Power Development
State. Corporation Ltd., Kargil,
J&K State.
60. Civil works for De‐Bottle — — 1995 M/s. NGEF Ltd., Bangalore
Neck Project MSDS‐4,
Electrical works of Bokaro
Steel Plant, Bihar.
61. 110/33KV Switchyard and Switchyard 300 1989 M/s. NGEF Ltd., Bangalore
Substation at Xeldem
Madgon Goa for Goa
Electricity Board.
Detailed Engineering – Completed
41
45.
Sl. Name of the Project Installed Project Year Clients
No. Capacity in Cost in Rs.
MW Lakhs
62. 110 KV Outdoor Yard Switchyard 150 1988 M/s. NGEF Ltd., Bangalore
Substation for M/s. Madras
Refineries Ltd., Manali
Chennai.
63. 132 KV Outdoor Yard and Switchyard 200 1987 M/s. NGEF Ltd., Bangalore
Substation for M/s. Petrofills
Co‐operatives Ltd., Kalewar,
Gujrat.
Detailed Engineering – Completed
42