An Engineering Consulting
        Company
Content 
Sl. No.                               Description                      Page No. 
   1       Design Group – A Profile                                       1 
   2       ISO Certificate                                                4 
   3       Certificate of Consulting Engineers Association of India       5 
   4       Certificate of  Incorporation                                  6 
   5       Empanelment with BHEL                                          7 
   6       Empanelment with Construction Industry Development             8 
           Council 
   7       Merger of M/s. Subhadra Consulting Engineers with M/s.         9 
           Design Group Project Consultants Pvt Ltd 
   8       Experience ‐ write up on Sample Projects                       11 
   9       List of Project on Hand                                        26 
  10       Organization Structure                                           
               A. Panel of Consultants / Advisors                         30 
               B. Technical Personnel                                     32 
  11       List of Project /Assignments Successfully Completed              
               A.     Desk Study Report                                   34 
               B.     Detailed Engineering of Projects                    36 
               C.     Preparation of Detailed Project Reports             43 
               D.     Pre‐Feasibility Studies of Power Projects           50 
               E.     Pre‐ Tender Services                                59 
               F.     Due Diligence Report                                67 
  12       A few Certificates for Successfully Completed  Projects        72 
  13       Brief Profile of Advisor / Consultants                           
              a) Advisor                                                    
                    H.V. Eswaraiah, Hydro Power Projects                  89 
                    Shankar V. Nesargi, Wind Energy                       90 
                    P.R. Balasubramanian, Gas Based Power Plant           91 
                    B.V Ramakrishnaiah,  Gates & Penstocks                92 
                    Balachandran. V, Engineering Geology                  93 
                    C.R. Venkatesh , Hydro Power Projects                 94 



                                                                                Content   
Sl. No.                        Description                           Page No. 
              M.C. Rangarajan, E & M Works                              95 
              S. Ramanan, Hydro Power Projects                          96 
              Umashankar, Steel Structure                               97 
              Narayanan V, Transmission Line                            98 
              Channakeshava C, Computer aided designs                   99 
              Shridhar Prabhu, Legal Advisor, PPA                      100 
              Srinath. N, Environmental Engineering                    101 
           b) Consultants                                                 
              C.S. Hebli, Chairman                                     102 
              B.L Lakshminarasimha, Chief Executive Officer            103 
              P.R Mallikarjuna, Executive Director (Design Head)       104 
              P.K. Rupangudi , Director (Gates, Dams design)           105 
              Chikkaguddappa Director (Project Development             106 
              Raghavendra Rao H, Director (Electrical Generation)      107 
              M.M. Reddy, Director (Transmission line,                 108 
              Switchyard & Sub‐Station) 
              R .Vasudevan, Deputy Director (Water & Waste             109 
              Water) 
              U.R. Raghotham , Director (Tunnel and Dam design)        111 
              G. Penchalaiah, Irrigation Project – Investigation       112 
              Suryanarayana, Engineering Geology                       113 
              K. T. Sreedhara, Deputy Director (Irrigation)            114 
              Achutha Narayana, Deputy Director (Hydro civil           116 
              design) 
              T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based        117 
              Power Plant) 
              P Sudarshan Rao, Manager (Electrical Generation)         118 




                                                                              Content   
 

                                                
                         1. DESIGN GROUP –A PROFILE 
 
                                           was  established  in  1979  to  offer  consultancy 
DESIGN GROUP 
            services  for  civil  and  electrical  engineering 
projects. Having completed over 100 prestigious and varied assignments in the last 5 
years,  DG  is  a  leading  consultancy  firm,  offering  full‐fledged  consultancy  services 
across various fields of engineering in India and Abroad.  
 
Equipped to provide design consultancy on very large engineering projects, DG has 
been  providing  technical  consultancy  services  to  various  organizations  and 
companies  for  planning,  detailed  design,  and  implementation  of  Hydel,  thermal, 
and other power projects. These services include analysis of financial aspects, design 
engineering  for  electrical  installation  of  substations,  switchyards  and  transmission 
lines,  design  engineering  for  civil  engineering  structures  including  large  dams, 
tunnels  ,  canals,  power  canals,  cross  drainage  works,  surge  tanks,  penstock  ,  and 
power houses. DG also provides services related to other civil engineering fields of 
Irrigation, Water Supply, and Waste Water Treatment.   
 
DG,  which  has  an  annual  turnover  of  over  Rs.400  lakhs,  provides  consultancy 
services  required  for  the  implementation  of  projects,  right  from  concept  to 
completion,  commissioning,  operation  and  maintenance,  thereafter.  DG’s  services 
have  been  utilized  by  Large  Industrial  Houses,  Firms,  and  Independent  Power 
Producers in India, and elsewhere, for the planning and design engineering of their 
projects.  In  year  2004,  DG  was  honored  with  an  ISO  9001:2008  certification  for  its 
design engineering services and continues to hold the certification. 
 
DG  have  entered  into  MOU/  JV  with  number  of  large  institution  to  name  a  few 
Messers:  
    1) WAPCO New Delhi. 
    2) ILF Consulting Engineer, Austria 
                                                                                         A Profile 
                                                                                                1 
 

    3) GEM Engineering Company Ltd., Uganda 
    4) IL&FS Ltd., Hyderabad  
    5) NihamShand Cape town South Africa 
    6) Land Mark Holding Ltd. Nairobi, Kenya 
    7) SSDC Damam KSA 
 




                                                                 
                            Corporate Office
 
DG has been empanelled in a few public sector undertakings. 
    1) BHEL for extending design engineering services in Hydro Power projects  
    2) Karnataka  Neeravari  Nigam  Limited  for  engineering  services  for  Water 
       Resources Projects. 
    3) PFC consulting Limited, New Delhi for Power Projects. 
        
Our clients include Messers 
    1) Nuclear Power Corporation Limited. 
    2) Gammon India Limited. 
    3) Fichtner Limited. 

                                                                              A Profile 
                                                                                     2 
 

    4) GMR Energy Limited. 
    5) ILFS Infra Limited. 
    6) WAPCO 
    7) NTPC 
    8) BHEL 
    9) Ritwik Energy Limited Hyderabad 
    10) Greenko Energy Limited Hyderabad 
    11) AMR Mitra JV Ltd., Hyderabad 
            
More than 100 engineering  software’s have been developed  in house over a period 
of 20 years. In addition, more than a dozen engineering design softwares have been 
acquired and are in use for day to day work .State of Art facilities have been created 
to take up large Water Resources Projects. 
 
Presently the major Detailed Engineering works on hand are 
 


    1.         Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in 
               Saudi Arabia. 
    2.         Balance Plant for Rafha Gas based 2 x 55/70 MW + 2 x 35 MW Power Plant at 
               Rafha Saudi Arabia. 
    3.         Two Irrigation Projects in Afghanistan namely  
                a.    Machalgho Multipurpose Project, near Kabul 
                b.     Pashdan Multipurpose Project in Herat region. 
    4.         81 MW Tinget HEP in Himachal Pradesh, India. 
    5.   75 MW Trishuli Galachhi HEP in Nepal, India. 
    6.   25 MW Mahan‐3 HEP in Chhattisgarh, India. 
    7.   12 MW Gatambe HEP in Kandy Sri Lanka. 
    8.         Balance  of  Plant  for  32  MW  wind  mill  under  phase  II  near  Chikkodi  near 
               Belgaum, Karnataka, India. 
     

In addition 31 assignments are in different stages of implementation  


                                                                                            A Profile 
                                                                                                   3 
 




       
A Profile 
       4 
 

 




      

    A Profile 
           5 
 




     
 

    A Profile 
           6 
 

 




    A Profile 
           7 
 
     
 




            

        A Profile 
               8 
 

 




          

 
    A Profile 
           9 
 

 




            




    A Profile 
          10 
 

8.  EXPERIENCE  IN  DESIGN  ENGINEERING  OF  A  FEW  IMPORTANT 
PROJECTS 
 
8.1     Balance of Plant of Hail – 2 Power Plant 
 
M/s.  Alfanar  one  of  the  leading  EPC  contractors  in  Kingdom  Saudi  Arabia  was 
awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi 
Electric  Company.  M/s  ILF  Abu  Dubai,  UAE,  were  the  principal  consultants,  M/s. 
DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and 
to  issue  all  construction  drawings  and  designs  for  complete  plan  except  GTG. 
Siemens were the GTG equipment suppliers.  
 
This  was a fast track  project, involving  issue of  more than 600 drawings  in a  short 
span  of  4  months.  The  project  was  successfully  commissioned  on  schedule  in  the 
month of July 2011. The assignment included interaction with clients / SEC (Owners) 
during approval stage. 
 
The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/70 MW 
output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132 
kV GIS and 380 kV AIS. The extension project consisted of – 
 
    1. 132  kV,  220MVA  Generator  Transformer,  13.8kV  /  4.16kV  15MVA  unit 
        auxiliary  transformers,  10  nos.  service  transformers,  MV  &  LV  Switchgears 
        and other BOP. 
    2. Crude  oil  /  Distillate  oil  fired  Gas  Turbine  Generator  units  of  55/70MW 
        output – 2nos. 
    3. Crude oil treatment and forwarding and distillate oil forwarding system for 
        new units. 
    4. Associated piping, cabling & services 
 
                                              

                                                                                    A Profile 
                                                                                          11 
 

                                               

          GTG Building under Construction




                                                                                
 
The Engineering services for the project consisted of –  
 
    •   Civil  Engineering  involving  structural  designs,  Architectural  layouts, 
        equipment  foundations,  for  GTG  Building,  FOTP  Building  &  Switchgear 
        Building, etc,. 
    •   Mechanical  Engineering  involving  plant  Layouts,  piping,  equipment  sizing, 
        fire fighting system, HVAC, etc,.  
    •   Process Engineering involving overall process flow discussions, P & ID’s, etc,.  
    •   Electrical  Engineering  involving  system  studies,  development  of  SLD’s, 
        equipment  sizing,  for  transformers,  MV  &  LV,  Switchgears,  DC  &  UPS 
        Systems, Cable & inter connection schedules. 
    •   IAC  illumination  Engineering  involving  interfacing  new  unit  &  BOP  to 
        existing CLR. 
     




                                                                                   A Profile 
                                                                                         12 
 

     
    8. 2   Sea Water Intake for PFBR Plant Systems: 
     
    Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling 
    Water  System  under  ambitious  plan  of  generating  power  through  Plutonium  Fast 
    Breeder  Reactor  Project  (PFBR)  to  M/s.  Gammon  India  Limited.    The  major 
    components of the scheme  were off‐shore  intake shaft, on‐shore outlet shaft, and a 
    submarine tunnel connecting the two structures at about 45m below sea level.  M/s. 
    Design  Group  Project  Consultants  Pvt  Limited,  were  involved  in  detailed 
    engineering services for the sub marine tunnel and shafts.  The project is since been 
    successfully completed. 
     




                                                                                                  
 
    The total length of the sub marine tunnel is 565m, Horse shoe shaped with 3600 mm 
    dia  finished  diameter.    The  outer  diameter  varied  from  4300mm  to  4600mm, 
    thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate 
    rock  cover  region,  using  M‐45  grade  cement  concrete.     The tunnel  passes  through 
    Charnockyte type II  rock  medium having  modulas of elasticity  is 0.46 to 3.34  x 106  
    tons  per  square  meter.  The  poisons’  ratio  adopted  ranged  between  0.14  to  0.25  in 

                                                                                           A Profile 
                                                                                                 13 
 

rock and 0.15 in concrete.  The SBC of soil is 280 tonnes per sq. meter and strength of 
insitu rock is 75.60 Mpa. 
 




         Submarine Tunnel 
                                                                                          
                                                          




         Outlet Shaft as Viewed from Submarine Tunnel 



                                                                                           
                                                          
  As  per  report  investigation  report  the  dry  density  of  rock  is  2.66  to  2.99  gms  per 
cubic  centimeter.  The  tunnel  was  driven  45m  below  the  sea  level  without  any 
geological surprises.   The tunnel carries 29 cumecs of seawater required for cooling 

                                                                                              A Profile 
                                                                                                    14 
 

the PFBR Plant, with a bed gradient of 1 in 96.4.  The density of Sea Water found to 
be 1.024 ton per cum. 
 
In  addition,  inlet  shaft  (4250  /  5250  mm  dia)  and  outlet  shaft  (6000 /  7000  mm  dia) 
were sunk in both ends with 500mm, thick cement concrete lining using M‐45 grade 
concrete.  
 
8.3      Varahi Tail Race Mini Hydel Scheme: 
 
 



River  Varahi  is  an  important  West  flowing  river  of  Karnataka  State  with  large 
Hydel  power  potential.  Power  development  in  the  Varahi  Valley  with  an  installed 
capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x 
115=  230  MW  at  Varahi  Underground  Power  House  was  completed  by  Karnataka 
Power Corporation Ltd. in the year 1989.  The Varahi Tail Race Mini Hydel scheme 
has been planned and engineered by Design Group for M/s. Sandur Power Co. Ltd. 
Varahi  Tail  Race  Mini  Hydel  Scheme  utilizes  the  tailrace  discharges  of  Varahi 
Underground  Power  house  and  the  available  level  difference  between  the  point  of 
confluence of tailrace of Under round Power House with Varahi River and the FRL 
of  Varahi  Irrigation  Dam  proposed  downstream,  for  generation  of  power.  The 
proposed  scheme  comprises  of  the  construction  of  a  diversion  weir  across  Varahi 
river just downstream of the confluence of tail race of VUGPH with Varahi River, a 
gravity type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m 
Dia  simple  type  surge  tank,  7m  dia  penstock  tunnel,  3  Nos.  steel  penstocks  and  a 
power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW 
capacity each under phase I and a tail race joining the Varahi River on its right flank.  
Under Phase II, two more units of similar capacity have been added. 
                                                  
                                                  
                                                  
                                                  
                                                  
                                                                                           A Profile 
                                                                                                 15 
 

                                                         

               View of Diversion Weir Structure with radial gates




 
                                                                     
 
               Power House under Construction 

     
     
     
     
 
 
 
 
 
 
 
 
 



            Overview of Power House




                                                                     

                                                                        A Profile 
                                                                              16 
 
 
 

The  cost  of  the  project  inclusive  of  escalation  in  costs  during  construction  and 
financial charges is placed at Rs. 13,439 lakhs. The project is under advance stage of 
completion and is to be commissioned during the year 2005. 
 



            Penstock Tunnel, Concrete Lining under Construction 




                                                                                                                       
                                                                                                                           

          22m dia Shaft




                                                                                                                       
 




                                                                                                                              A Profile 
                                                                                                                                    17 
 

 
8.4     AMR/ SHAMBURI Mini Hydel Scheme  
 
M/s.  AMR  Power  Pvt.  Ltd.  Implemented  the  24  MW  (5  x4.8  MW)  Mini  Hydel 
Scheme  across  river  Nethravathi,  a  major  west  flowing  river  in  Karnataka.  The 
design  flood  at  the  barrage  is  11500  cumecs.  The  plant  is  situated  35  km  from 
Mangalore,  a  major  costal  city  in  west  Karnataka.  The  project  has  a  low  head 
fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a 
large flow.  The design discharges utilized for power draft is 78.47 cumecs per unit. 
The  units  are  capable  of  running  at  15%  continuous  overload.  ‘S’  type  Kaplan 
turbine  coupled  to  4800  KW  synchronous  generator  through  the  gear  box  are 
adopted.  During  the  construction,  another  developer  M/s.  Rithwik  Energy 
Generation proposed a 24 MW capacity power plant on the other bank. After mutual 
discussion, it was agreed to utilize the existing facilities of M/s. AMR Power.  
 




                                                                                   
 
Thus,  a  power  house  accommodating  10  x  4.8  MW  was  planned  and  developed, 
with  a  combined  annual  generation  of  115.14  GWHr.  The  scheme  comprises  of,  a 
barrage across river Nethravathi with 30 radial gates to safely pass the 11500 cumecs 
flood, non‐overflow sections, a power block on the left bank, a surface power house, 
and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river. 

                                                                                      A Profile 
                                                                                            18 
 

The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110 
KV  rating.  The  construction  took  27  months  and  the  plant  was  synchronized.  DG 
provided the design engineering services. 
 
8.5     Modernisation of Shivanasamudram Power Channel. 
 
Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company, owned by 
earstwhile Karnataka Electricity Board, as a part of the Modernisation programme of 
the existing Shivanasamudram Hydro Power Project, had proposed to  increase the 
water carrying capacity of the power channel upto the Shivanasamudram Balancing 
Reservoir  and  also  increasing  the  live  capacity  of  the  Shivanasamudram  Balancing 
Reservoir to cater to the increased needs of the power channel and also the increased 
needs of the drinking water supply for Bangalore City.  VVNL entrusted the work of 
planning  for  the  improvements  and  the  detailed  engineering  for  the  same  to 
Shivanasamudram Power Project is the earliest of the power projects constructed in 
India,  way  back  in  the  year  1902,  to  supply  electrical  power  to  Kolar  Gold  Mines 
situated 85 kms away. 
                                                                                         
        Divider wall under Construction                                                  
                                                                                         
                                                                                         
                                                                                         
                                                                                         
                                                                                         
                                                                                         
                                                                                         
                                                                                         
 
Originally a 2000m long power channel connecting Shiva head works and the Shiva 
Balancing  Reservoir  had  been  constructed  with  a  central  earthen  divider  wall  and 
side slopes lined with  stone pitching.  

                                                                                        A Profile 
                                                                                              19 
 

 
The central divider wall was an earthen bund with stone pitching on the side slopes 
the overall  dimensions of the divider wall has been 3.7m at the top and 8.2m at the 
bottom. 
 
Over a  period of the  last 100  years, the  water carrying capacity of the channel had 
been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting, 
vegetation  growth,  etc.    In  order  to  increase  the  discharge  carrying  capacity  of  the 
channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of 
the side slopes was  reset and covered  with RCC lining.  The  vegetation  growth  was 
completely removed.  After modernization, discharge carrying capacity of the power 
channel has increased to 59.5 cumecs.  The live capacity of Shiva Balancing Reservoir 
has  been  substantially  increased  by  desilting  the  reservoir  and  removal  of  weed 
growth.    In  addition,  DG  was  asked  to  suggest  simple  method  of  desilting  of  the 
Balancing Reservoir.  A simple technique of using a shovel mounted on a raft made 
out of a battery of empty steel drums was suggested and used along with ejection of 
the  silt  by  a  mud  pump  and  a  pipe  line  supported  on  empty  floating  drums,  and 
taken to the shores. 
 
8.6     Link Canal Mini Hydel Scheme: 
 
Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar 
project irrigation Canal System, took up the scheme to construct a link canal taking 
off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery 
Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail 
end of this link canal, there is a difference in level of about 8.3m between the bed of 
the  link  canal  and  the  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the 
construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to 
utilize the water flow of the link Canal and the head available at the drop at the end 
of Link Canal, for power generation.  
 

                                                                                           A Profile 
                                                                                                 20 
 
 
                                                




                   View of Power House as seen from Downstream
                                                                                     
  
Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar 
project irrigation Canal System, took up the scheme to construct a link canal taking 
off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery 
Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail 
end of this link canal, there is a difference in level of about 8.3m between the bed of 
the  link  canal  and  he  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the 
construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to 
utilize the water flow of the link Canal and the head available at the drop at the end 
of Link Canal, for power generation.   
 
The scheme is simple with minimum civil engineering works. The civil engineering 
components  comprise  of  a  70m  long  approach  channel,  intake  structure,  gated 
bypass  weir  with provision of automatic falling shutters, surface power house, tail 
channel  leading  the  water  back  to  the  branch  canal.  The  installed  capacity  of  the 
scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The 

                                                                                        A Profile 
                                                                                              21 
 

average annual energy  generation  is 10.10 GWHr.  The cost of the scheme  is Rs. 80 
Million. The Project was completed in the year 2003 by the Developers M/s Graphite 
India  Ltd.,  Bangalore,  The  civil  engineering  works  were  contracted  to  M/s  Mysore 
Construction  Co.,  Bangalore.    The  Planning  and  Detailed  Design  Engineering  was 
handled by Design Group.  
 
 



8.7     Captive  Power  Plant  of  5.8  MW  capacity  at  John  Welch  Research  Centre, 
Whitefield, Bangalore for M/s General Electric: 
 




            Overall view of DG Plant
                                                                                  




              Inside view of Generator Room
                                                                            
Design  Group  was  associated  as  a  major  leader  for  the  Planning,  Detailed 
Engineering  and  construction  co‐ordination  of  the  5.8  MW  Diesel  Engine  based 

                                                                                     A Profile 
                                                                                           22 
 

Captive Thermal Station of the GE India Technology Centre at Bangalore, which has 
been completed on a time bound schedule of 6 months. 
 
8.8    Windmill Power 
 
M/s.  Doddanavar  Brothers,  who  have  Plan  to  develop  100MW  Wind  Farm  in 
Chikkodi,  Belgaum  district  of  Karnataka,  India,  availed  our  technical  support  for 
Engineering of balance of a plant. Critical  main equipment of capacity 10 x 1.5 MW 
was sourced from M/s. Sinovel, China, while the rest was sourced locally. 




             Foundation of Wind Mill 
                                                                                           
                                                 
DG  assisted  the  developers  by  drafting  technical  specifications,  preparing  data 
sheets,  floating  tender  for  fabrication  of  towers,  tower  internals  and  electrical 
right from 690 volts to the grid connection. In addition, assistance was extended 
for  procurement  activities.  The  Civil  Raft  Foundation  drawings  were  provided 
after  detail  designs,  for  local  sub‐surface  soil  conditions.  The  entire  assignment 
was completed in 9 months.  
 
                                                 
                                                 
                                                 
                                                 
                                                                                              A Profile 
                                                                                                    23 
 




                               Wind Turbine Generator Hub 
                                                                                   
 
1. DG designed 33 kV outdoor yard sub‐station at  Wind farm, 33 kV transmission 
    line from Wind farm to  pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard 
    pooling  station  and  110  kV  transmission  line  from  pooling  station  to  KPTCL 
    evacuating 110 kV sub‐station. 
2. DG  prepared  technical  specification  for  33  kV  substation  at  Wind  farm,  33  kV 
    transmission  line,  33  /  110  kV  pooling  station  and  floated  enquiry  for  the 
    procurement  and  scrutinized  the  Vendor  offers  and  finalized  the  orders  on 
    suppliers. 
3. Vendor drawings and specification scrutinized. 
4. Assisted in commissioning the sub‐station and transmission line. 
 
The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x 
1.6  MW  GE  machines  have  been  selected,  the  civil  foundation  is  under 
construction.  
 
8.9    Design of Vacuum Chambers  
 

M/s.  Hind  High  Vacuum  Co.  Pvt.  Ltd.,  specializing  in  manufacture  of  Pressure 
Vessels  and  Vacuum  Chambers  for  defence,  pharmaceuticals,  and  solar  panels, 
entrusted to DG, design and  preparation of fabrication  drawings for a Robotic  TIG 

                                                                                      A Profile 
                                                                                            24 
 

Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for 
negative  pressure  of  1  kg  per  sq.cm,  with  a  rider  that  the  defection  of  internal 
structural members must be limited to 0.5 mm. 
 




                                                                                      
 
The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit 
chambers, tool chambers, etc. The  robotic arm  moves on rails. The  welding  will  be 
carried out  under Argon  gas atmosphere.  The chamber  were analysed  using NISA 
Software package and the analysis has been validated by Indian Institute of Science, 
Bangalore,  the  pioneer  research  institute,  by  using  ETAB  software.  The  analysis, 
design, and fabrication  drawings have been forwarded to M/s. Hind High Vacuum 
Co.  Pvt.  Ltd.  The  fabrication  of  chamber  is  in  advance  state  of  complexion.  The 
Robotic TIG Welding Chambers, when commissioned, will be one‐of‐its‐kind in the 
world.  
 
8.10    Design  Group  has  been  successfully  providing  pre‐tender  and  post‐tender 
services  for  various  public  sector  undertakings  and  several  private  sector 
undertakings,  in  as  much  as  assessment  of  costs,  detailed  specifications  of  various 
items  of  work,  conditions  of  contracts,  tender  documents,  tender  analysis  and 
reports  leading to selection of construction and  supply agencies as  per time bound 
schedules and needs of clients. 

                                                                                         A Profile 
                                                                                               25 
 
                                                                                                         Annexure – I 
9. LIST OF PROJECTS ON HAND 
                                                               

A. POWER PROJECTS – DETAILED ENGINEERING  
                                                                   

Sl.              Name of the Project               Installed            Project                   Clients 
No.                                                Capacity           Cost in Rs. 
                                                   in MW                Lakhs 
 1.    Lower       UHL        SHEP     Project,      13.00               9500         M/s. Trident Power Systems Ltd., 
       Himachal Pradesh.                                                                     Himachal Pradesh 


 2.    Singatalur‐Huligudda  Mini  Hydel             18.00               6000        M/s..Tungabhadra Power Projects 
       Scheme, Karnataka‐                                                                     Ltd., Bangalore. 

 3.    Lambadug Hydro Electric Project,              25.00               12250       M/s. Himachal Sorang Power Pvt. 
       Himachal Pradesh.                                                               Ltd, Shimla, Himachal Pradesh 

 4.    Cauvery  Small  Hydel  Project,               24.00               13000       M/s. XS Hydro Energy Private Ltd., 
       Karnataka.                                                                                Bangalore 
 5.    Huvinahedagi           Mini      Hydel        24.75               13500         M/s. XS Hydro Power Pvt. Ltd, 
       Scheme, Karnataka.                                                                        Bangalore 

 6.    Agrahara MHSI & II, Karnataka.                1.475                700            Sarovara Energy Pvt Ltd., 
                                                                                                 Bangalore. 
 7.    Water Supply System for Bharathi             Water                  ‐         M/s. Bharathi Cement Corporation 
       Cement       Plant     at    Cuddapha,       Supply                                  Ltd Andhra Pradesh 
       Andhra Pradesh                              Scheme 
 8.    Paudital      Lassa     Hydro‐Electric         24                 19200        M/s. Greenko Hatkoti Energy Pvt 
       Project, Himachal Pradesh.                                                            Ltd., Hyderabad. 


 9.    Jeori  Lower  Mangalad  SHPP,                  15                 12000        M/s. Techology House (India) Pvt 
       Himachal Pradesh.                                                                     Ltd., Hyderabad. 
10.    Nimishamba  Mini  Hydel  Scheme,                3                 1700          M/s. Nimishamba Energy India 
       Karnataka,                                                                          Private Ltd., Bangalore 
11.    Kollya      Mini      Hydel    Scheme,         24                 19200       M/s. Kumaradhara Power Pvt Ltd 
       Karnataka.                                                                                Bangalore 
12.    Chikkodi        Windmill        Project,       100                6000        M/s.Doddanavar Brothers, Belgaum 
       Karnataka. 
13.    Mahan  Hydro  Electric  Project,               24                 2000        M/s.Venika Hydro projects Pvt Ltd, 
       Chathisgard.                                                                              Bangalore 


                                                                                                             Projects on Hand 
                                                                                                                           26 
 
Sl.                                              Installed      Project 
No.           Name of the Project                Capacity     Cost in Rs.                 Clients  
                                                 in MW          Lakhs 
14.    Trishuli  Galchhi  Hydro  Electric           75           80000        M/s. Siddhakali Power Pvt. Ltd., 
       Project, Nepal.                                                                     Nepal 
15.    Kukke 1 & 2 MHS, Karnataka.                  24           14400       M/s. Kukke Hydro Projects Pvt Ltd, 
                                                                                         Bangalore. 
16.    Anusha  Mini  Hydel  Scheme,                  4           1600            M/s. Dhenu Hydro Pvt Ltd 
       Andhra Pradesh.                                                                   Hyderabad 
17.    Navya       Mini    Hydel    Scheme,        2.60          1300            M/s. Mitra Energy Pvt Ltd 
       Andhra Pradesh.                                                                   Hyderabad 
18.    Ramya MHS, Andhra Pradesh.                  3.80          1900          M/s. Kurnool Energies Pvt Ltd 
                                                                                         Hyderabad 
19.    Koilakunte  Mini  Hydel  Scheme,             12                        M/s. Dhenu Hydro Power Private 
       Andhra Pradesh.                                                                Ltd., Hyderabad. 
20.    Halsur  Diversion  weir  under                             400         M/s. Karnataka Neeravari Nigam 
       Shiggon  lift  Irrigation  Scheme,                                              Ltd., Karnataka 
       Savanur, Karnataka 
21.    River  Water  Intake  Pump  House          2 X 270         300        M/s. GVK Ltd through M/s. Fichtner 
       and Approach Bridge, Punjab.                                           Consulting Engineers (India) Pvt 
                                                                                         Bangalore 
22.    Machalgho  Multipurpose  Project,                        US $ 95         M/s. Gulf Civil Engineering & 
       Machalgho, Afghanistan.                                  Million      construction Co. Kabul, Afghanistan 
23.    Pashdan  Irrigation  Project,  near                     US $ 180      M/s. Hewadwal Group Afghanistan 
       Heart, Afghanistan. 
24.    Tinget‐2  Hydro  Electric  Project  in       81           60000        M/s. AMR—Mitra JV, Hyderabad 
       Himachal Pradesh 
25.    Balance  of  Plant  for  Rafha  Gas  2 x 75 + 2 x                     M/s. SSEM Riyadh through M/s. ILF 
       based Power Plant, Saudi Arabia.             75                                   Abu Dhabi 
26.    Study  Report  on  Gandak  Canal            3 X 5                         M/s. WAPCOS New Delhi 
       HEP      in    Valmikinagar,    West 
       Champaran District, Bihar. 
27.    Detailed       Design    Engineering       2 X 2.5        4000         M/s. Sahu Hydro Power Pvt Ltd., 
       services  for       Kurtha  SHP  in                                               Hyderabad 
       Himachal Pradesh. 
28.    Detailed       Design    Engineering       2 X 2.5        4000         M/s. Sahu Hydro Power Pvt Ltd., 
       services for Kuril SHP in Himachal                                                Hyderabad 
       Pradesh. 
        


                                                                                                      Projects on Hand 
                                                                                                                    27 
 
 Sl.                  Name of the Project               Installed         Project                     Clients 
No.                                                     Capacity        Cost in Rs. 
                                                        in MW             Lakhs 
    29.        Detailed      Design    Engineering        3 X 5            1200        M/s. Parvat Hydro Power Pvt Ltd., 
               services for Chhoned SHP.                                                            Hyderabad 
    30.        Detailed      Design    Engineering        3 X 8            19200         M/s. Pavanganga Power Private 
               services  for  Sangam  SHP  Raichur,                                               Ltd., Hyderabad. 
               Karnataka. 
    31.        Review  Consultants  for  Umjaut            160            100000            M/s ETA Star Ltd,. Dubai 
               (70MW) & Umduma HEP (90MW) 
               in Meghalaya 
                                                                     

B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT 
                                                                     

Sl.                                                     Installed         Project                     Clients 
No.                    Name of the Project              Capacity        Cost in Rs. 
                                                         in MW            Lakhs 
1              Bellary Solar Power Project,                 5              7500        M/s.Vishrutha Power Pvt. Ltd., 
               Karnataka.                                                              Bellary 

2              Proposal to bring 10 TMC of Raw              ‐                ‐         M/s. Larsen & Toubro Limited, 
               water from Sakleshpura to                                               Bangalore 
               Chikkaballapur & Kolar District & 
               T.G. Halli 
 

C. PRE TENDER ENGINEERING SERVICES  
            

Sl.                                                     Installed        Project                      Clients 
No.                   Name of the Project               Capacity        Cost in Rs. 
                                                         in MW            Lakhs 
               Upper  Narmada  Irrigation  Project      Irrigation           ‐         M/s. Gammon India Ltd. Mumbai 
    1. 
               Madhya Pradesh – EPC Bid                  Project 
               60MGD  River  water.  Pipeline‐                               ‐         M/s. Gammon India Ltd. Mumbai 
                                                         Water 
    2.         73kms for VSNL Ltd, at Salboni in 
                                                         Supply 
               West Bengal – EPC Bid 
               Agra Water Supply Project in Agra         Water               ‐         M/s. Gammon India Ltd. Mumbai 
    3. 
               – EPC Bid                                 Supply 
               Raw  water  supply  system  for  4  x                         ‐         M/s. Gammon India Ltd. Mumbai 
                                                         Water 
    4.         300  MW  Raigarh  SKS  Power 
                                                         Supply 
               Generation (Chattisgarh) Ltd 
 

                                                                                                                 Projects on Hand 
                                                                                                                               28 
 
 

D. PREPARATION OF TENDER DOCUMENT  
           

 Sl.                                                       Installed      Project                 Clients 
No                      Name of the Project                Capacity       Cost in 
                                                            in MW        Rs. Lakhs 
    1.        Dagmara HEP – Preparation of bid               25 x 5          ‐          M/s. Bihar Electricity Board, 
              document for Civil, E&M, H&M                                                 through M/s. WAPCOS  
              Transmission Line Component                                                       New Delhi. 
              works 
           

E. OTHERS 
 

Sl.                                                        Installed       Project                 Clients 
No                      Name of the Project               Capacity in      Cost in 
                                                             MW          Rs. Lakhs 
    1.        Design  and  drawings  of  Electrical        Electrical         ‐         M/s. Doddanavar Nanjinzhao 
              System  for  Beneficiation  Plant,  Distribution                         Mining and Metallurgy (P) Ltd., 
              Bagalkot, Karnataka                                                            Belgaum Karnataka. 

    2.        Detailed  Civil  Engineering  for  Two         Coal             ‐       M/s. Multi Design Infra Works Pvt. 
              Transfer  points.  Tunnel  in  cut  &        Handling                             Ltd. Bangalore 
              cover,     Box    Pulsing    for    coal      System 
              conveyor system  for addition  of 2 x 
              250  MW  to  Sikka  Thermal  Power 
              Plant in Jamnagar District Gujarat  
    3.        Design  of  35.58  MLD  capacity                 ‐              ‐                  M/s. GVPR 
              Sewage  Treatment  Plant  under 
              UGD Scheme to Shimoga City  
 




                                                                                                              Projects on Hand 
                                                                                                                            29 
  
                                                                     Annexure – II (A) 
10. ORGANISATION STRUCTURE 
A. PANEL OF CONSULTANTS/ADVISORS 
    

Sl. No.                      Name & Qualification              Designation 
  1.       Sri C.S. Hebli 
           Director Technical (Retd),                          Chairman & 
           Karnataka Power Corporation Ltd.                 Chief Consultant. 
           Bangalore. 
  2.       Sri H.V. Eswaraiah 
           Director Technical (Retd),                    Consultant –Hydro Civil 
           Karnataka Power Corporation Ltd.,                     Designs. 
           Bangalore. 
  3.       Sri G.N. Yoganarasimhan, 
           Director (Retd), 
                                                           Advisor‐Hydrology. 
           WRTD, Rourke, 
           Bangalore. 
  4.       Sri. P.R. Balasubramanian,  
           CMD (Retd), FACT,                            Advisor‐ Gas Based Power 
           Triavaneore, Kerala.                                    Plant. 
           Bangalore. 
  5.       Dr.  D.N. Seshagiri, PhD Harvard, USA.  
           Director (Retd), 
                                                      Advisor – Engineering Geology. 
           Engineering Geology, 
           Geological Survey of India. 
  6.       Sri.Vishwanath Balachandran, 
                                                          Advisor‐ Engineering 
           Director General, GIS (Retd). 
                                                                 Geology. 
           Chennai.   

  7.       Sri. Shankar Nesargi 
           Managing Director (Retd.)                      Advisor ‐Wind Energy 
           VVNL, Bangalore. 

  8.       Sri. C. R. Venkatesh 
           Executive Director (Retd.)                     Advisor ‐Hydro Power 
           NHPC Ltd., New Delhi,                                 Projects. 
           Bangalore. 
  9.       Sri. H. Rangarajan, B.Sc, B.E. 
           Executive Director(Retd),                     Executive Director (Elec.) 
           KPCL, Bangalore. 

                                                                 Panel of Consultants / Advisors 
                                                                                             30 
  
    Sl. No.    Name & Qualification                                        Designation 
      10.      Sri B.V. Ramakrishnaiah, 
                                                                         Advisor – Gates. 
               Bangalore. 
      11.      Sri Srinath Anekal, ME (Civil), MS(Environment) 
               USA.                                                  Advisor‐Environment. 
               Bangalore. 
      12.      Sri. M. M. Kamath,                                 Advisor – Marine Engineering. 
               Chief Engineer (Retd), 
               NMPT, Mangalore. 
      13.      Sanker Pradesh, M.Tech  (Roorkee),   
                                                                      Consultant‐ Geology. 
               New Delhi. 
      14.      Sri. Thippeswamy 
                                                                   Advisor –Water and Waste 
               Chief Engineer (Retd.) 
                                                                          Water System. 
               BWSSB, Bangalore. 
      15.      Sri. V. Suresh Kumar, M.Tech (Khargpur),                   Advisor – GIS 
               Bangalore.                                                         
      16.      Sri V. Narayanan, 
                                                                     Advisor – Transmission 
               General Manager, SAE (I) Ltd (Retd), 
                                                                              Lines. 
               Bangalore. 
      17.      Sri. Ramanan 
               Chief Engineer (Retd.) 
                                                                        Consultant‐Hydro 
               NHPC Ltd., New Delhi, 
               Bangalore. 
      18.      Dr. Y. Lingaraju.                                    Advisor ‐  Ground Water 
      19.      Sri. Umashankara , B.E. (Civil)                                    
               Ex‐Mecon.                                             Advisor ‐Steel Structure. 
      20.      Sri. G. Rajagopalan, 
               Director (Retd),                                     Consultant – Engineering 
               Engineering Geology,                                          Geology 
               Geological Survey of India, Chennai. 
      21.      Sri. Krishnappa, 
                                                                       Advisor – Finance. 
               Financial Controller(Retd), 
                                                                                  
               KPCL, Bangalore. 
      22.      Sri. Sridhar Prabhu – Legal Adviser                        Advisor –PPA 

      23.      Sri. Venkateshwar Rao 
                                                                       Consultant (Liaison) 
               New Delhi. 
      24.      Sri T.S. Somanathan, B.E. (Mech). 
                                                                       Advisor –Welding. 
               Foremerly NLPC Ltd., 
 

                                                                            Panel of Consultants / Advisors 
                                                                                                        31 
  

                                                                                                    Annexure – II (B) 
 

     B. TECHNICAL PERSONNEL 
                                                                

    Sl. No.               Name & Qualification                                          Designation 
       1       Sri C.S. Hebli, B.E(Hons)                                                 Chairman. 
       2       Sri B.L. Lakshminarasimha,                                          Chief Executive Officer 
                                  B.Sc., B.E., M.E., MIE, AIV, MASCE.                            
       3       Sri. P.R.Mallikarjuna                                         Executive Director (Design Head) 
                                M.E.(I.I.Sc.), MIE, MIWRS, MISEO.                                
       4       Sri. Chikkaguddappa  B.E. (Civil)                               Director (Project Development) 
       5       Sri. H.Raghavendra Rao B.E. (Elec)                             Director (Electrical Generation.) 
       6       Sri M.M. Reddy, B.E.(Elecl)                                 Director (Electrical Power Evacuation) 
       7       Sri.P.K.Rupangudi, M.E. (Civil)                                 Director (Gates, Dams design) 
       8       Sri.U.R.Raghotham, M.Tech. (Civil)                            Director (Tunnel and Dam design) 
       9       Sri.R.Vasudevan B.E. (Elec)                                Deputy Director (Water & Waste Water) 
      10       Sri.K.T.Sreedhara, B.Tech (Civil)                                Deputy Director (Irrigation) 
      11       Sri. Narayana  Achutha                                       Deputy Director (Hydro civil design) 
                                 M.Tech, IIT Kanpur, (Hydraulics)                               
      12       Sri.T.S.Srinivasa, B.E (Civil), M.E                              Deputy Director ‐‐Civil (Gas)      
      13       Sri.Sudarshan Rao B.E. (Elec)                                  Manager (Electrical Generation) 
      14       Mr.Gangadar Pattanashetti                                     Senior Design Engineer (Irrigation) 

                  M.Tech, IIT Guwahati, (Water Resources)                                       
      15       Sri. Anantha Murthy,  
                                                                              General Manager (Civil Designs) 
                                                  B.Sc AMIE (Civil) 
      16       Ms.Kavitha.M,  B.E, MBA                                             Administrative Officer  
      17       Sri. R. Suryanarayana, M.Sc (Geology)                         Consultants (Engineering Geology) 
      18       Ms. Sneha Dandavathe., B.E.(Civil)                              Design Engineer (Hydrology) 
      19       Mr. K.V. Chandrakanth B.E. (Elec)                                   Design Engineer (Elec.) 
      20       Mr. Vasanth Kumar B.E (Civil)                                 Design Engineer (Project Planning) 
      21       Mr. Shivanand, B.E (Civil)                                Design Engineer (Water conductor system) 
      22       Mr. Pramod Kumar, B.E.(Civil)                             Design Engineer (Power House & Tail Race) 
      23       Mr. Lokesh  B.E (Civil)                                         Design Engineer (Dam Design) 
      24       Mr. Sudeendra, M.Tech (Structures)                            Design Engineer (Gas Power Plant) 


                                                                                                         Technical Personnel 
                                                                                                                         32 
  

    Sl. No.                Name & Qualification                   Designation 
      25        Mr. Mohan Kumar, M.Tech (Structures)    Design Engineer (Gas Power Plant) 
      26        Mr. Puneeth. S, B.E(Elec)                    Design Engineer (Elec.) 
      27        Mr. Naveen V. B.E.(Mech)                  Piping Engineer (Mechanical) 
      28        Mr. Yoghesh K ,B.E.(Civil)                 Design Engineer (Planning) 
      29        Ms. Anusha Hegde K. B.E.(Elec)             Design Engineer (Electrical) 
      30        Ms. Smitha Nagaraj B.E.(Elec)              Design Engineer (Electrical) 
      31        Ms. Kumari Diptimayee, B.E.(Civil)         Design Engineer (Irrigation) 
      32        Ms. Poonam U Jadhav, B.E (Civil)                 Design Engineer  
      33        Mr. Pradyumna K, B.E.(Civil)                Design Engineer (Trainee) 
      34         Mr. Vinay M V  B.E .(Civil)                Design Engineer (Trainee) 
      35        Mr. Saravanan S                           Design Engineer (Hydro Civil)  
      36        Ms.Sunita G Galgali, B.E (Civil)            Assistant Design Engineer  
      37        Sri Mahesh Desai                          Manager (Drawings‐ Section) 
      38        Mr.Prasanna.T                               CAD Engineer (Electrical) 
      39        Mr.M.Shashi Kumar                       Junior Design Engineer (Drawings) 
      40        Mr.Manthesh.M                           CAD Engineer (Mechanical Piping)  
      41        Mr.Praveen.S.Ladva                            CAD Operator (Civil) 
      42        Mr.Nagashetty S                              CAD Engineer (Hydro) 
      43        Mr.Sangashetty V Biradar                CAD Operator (Gas Power Plant) 
      44        Mrs. Sharadhamma H                            CAD Engineer (Civil) 
                Office Support Staff:                                     
      45        Sri. Nagesh, S                           Officer / Manager / Accountant 
      46        Sri Suresh                                         Accountant 
      47        Ms. Thara. R                                       Receptionist 
      48        Mrs. Geetha N                                  Personal  Secretary 
      49        Sri. Ravi Kumar K                          Stenographer Cum Secretary 
      50        Ms. Sowmya A                                   Personal  Secretary 

             




                                                                                   Technical Personnel 
                                                                                                   33 
  

                                                                                               Annexure – III (A) 
 

11. LIST OF PROJECT ASSIGNMENTS SUCCESSFULLY COMPLETED 
                                       
                                                                  

A. Preparation of Desk Study Report on Hydro  Power  Projects self identified by DG to 
      various IPP’s in Nepal and India. 
            
            




    Sl.           Name of the Project              Installed     Project Cost    Year             Clients 
    No.                                           Capacity in        in Rs. 
                                                     MW              Lakhs 
     1.        Jaleswar HEP, Nepal.                  200.00          US $400     2008      M/s. Maytas Infra Ltd., 
                                                                     Million                    Hyderabad. 
     2.        Taksindu HEP, Nepal.                  270.00          US $540     2008      M/s. Nandadevi Agro‐
                                                                     Million             Farms Pvt Ltd., Hyderabad. 
     3.        Syar Khola ‘A’ HEP, Nepal             140.00          US $280     2008      M/s. Dunagiri Pvt Ltd., 
                                                                     Million                    Hyderabad. 
     4.        Syar Khola ‘B’ HEP, Nepal.            360.00          US $720     2008     M/s. Harmosha Pvt Ltd., 
                                                                     Million                    Hyderabad. 
     5.        Prok HEP, Nepal.                      480.00          US $960     2008     M/s. Nandadevi Pvt Ltd., 
                                                                     Million                    Hyderabad. 
     6.        Jogimara    Trisuli        HEP,       240.00          US $480     2008    M/s. Haramosh Agro‐Farms 
               Nepal.                                                Million                Pvt Ltd., Hyderabad. 
     7.        Bihi HEP, Nepal.                      270.00          US $540     2008    M/s. Dunagiri Agro‐Farms 
                                                                     Million               Pvt Ltd., Hyderabad. 
     8.        Kappe  HEP,  Arunachal                98.00            73900      2008    M/s. Hemavathy power & 
               Pradesh.                                                                         light Pvt Ltd 
     9.        Champung      Pobe         HEP,       140.00          105500      2008    M/s. Hemavathy power & 
               Arunachal Pradesh.                                                         light Pvt Ltd, Bangalore. 
    10.        Changlai  HEP,  Arunachal             48.00            36200      2008    M/s. Hemavathy power & 
               Pradesh.                                                                   light Pvt Ltd, Bangalore. 
    11.        Braing      pube           HEP,       48.00            36200      2008    M/s. Hemavathy power & 
               Arunachal Pradesh.                                                         light Pvt Ltd, Bangalore. 
    12.        Pakke     HEP,    Arunachal           70.00            52800      2008    M/s. Hemavathy power & 
               Pradesh.                                                                   light Pvt Ltd, Bangalore. 
    13.        Nargum  HEP,  Arunachal               84.00            63300      2008    M/s. Hemavathy power & 
               Pradesh.                                                                   light Pvt Ltd, Bangalore. 
                                                                                                       
    14.        Chann       Siang          HEP        66.00            50557      2008    M/s. Hemavathy power & 
               Arunachal Pradesh.                                                         light Pvt Ltd, Bangalore. 


                                                                                                          Desk Study Report 
                                                                                                                        34 
  

    Sl.    Name of the Project             Installed     Project Cost    Year             Clients 
    No.                                   Capacity in       in Rs. 
                                             MW            Lakhs 
    15.    Papu      HEP    Arunachal        110.00         88000        2008    M/s. Hemavathy power & 
           Pradesh.                                                               light Pvt Ltd, Bangalore. 
    16.    Arket Bazar HEP, Nepal.           110.00        US $220       2007    M/s. Parasnath Greenlands 
                                                           Million                 Pvt Ltd., Hyderabad. 

    17.    Uiya HEP, Nepal.                  105.00        US $210       2007      M/s. Maytas Infra Ltd., 
                                                           Million                      Hyderabad. 
    18.    Phillim HEP, Nepal.               150.00        US $300       2007     M/s. MMS Steel & Power 
                                                           Million                    Ltd.,Hyderabad. 
    19.    Amras HEP, Nepal.                150.00         US $300       2007    M/s. Maytas Properties Pvt 
                                                           Million                    Ltd., Hyderabad. 
    20.    Budhi       Gandaki    HEP,       600.00       US $1200       2007    M/s. RVK Energy Pvt Ltd., 
           Nepal.                                          Million                    Andhra Pradesh 
 




                                                                                               Desk Study Report 
                                                                                                             35 
  
 

B.         DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED 
                                                                  
                                                                      

    Sl.           Name of the Project              Installed             Project    Year               Clients 
    No.                                           Capacity in        Cost in Rs. 
                                                     MW                  Lakhs 
     1.    Balance  of  Plant  for  Hail‐2          2 x55/75                        2011    M/s. Alfanar Riyadh through 
           Gas based Power Plant, Saudi                                                         M/s. ILF Abu Dhabi 
           Arabia. 
    2.     Computation         of       HFL,       Irrigation             4000      2011     M/s. Karnataka Neeravari 
           elevation capacity of barrage,                                                   Nigama Limited, Karnataka. 
           design of barrage for Halasur                                                                     
           Barrage  across  Varada  River 
           ‐  Shiggaon  Lift  Irrigation 
           Scheme  Dharwar  District, 
           Karnataka 
    3.     Detailed       Analysis,Design         Mechanical              5200      2010    M/s. Hind High Vacuum Co. 
           and         Preparation         of                                                   Pvt. Ltd. Bangalore 
           Fabrication  of  TIG  Welding                                                                     
           Chamber. 
    4.     Balance  of  civil  works  for              —                   —        2010     M/s. Delkor Technik India 
           Horizonal  Belt  Filter  Station                                                     Pvt Ltd., Bangalore. 
           Building               including 
           Equipment  and  Accessories 
           Foundation Cango. 
    5.     Al‐Gubrah  Mobile  SWRO                     —                   —        2010        M/s. ILF Abu Dhabi. 
           Plant Civil Design, Muscat. 
    6.     Dandavathi             Reservoir        Irrigation            10200      2009     M/s. Karnataka Neeravari 
           Irrigation Project Karnataka                                                       Nigam Ltd., Bangalore 

    7.     Varahi  Underground  Power               2 x 215               2500      2009       M/s. Karnataka Power 
           House Stage‐II Karnataka.                                                        Corporation Ltd., Bangalore 
    8.     Energy  Audit  of  Fiber  Glass          Energy                 60       2009    M/s. ICP(India) Private Ltd., 
           Product         Manufacturing            Audit                                            Bangalore. 
           Units, Bangalore 
            
    9.     35  MLD/STP  for  Shimoga                   —                   —        2009     M/s. GVPRS Hyderabad. 
           Town,       Shimoga       District, 
           Karnataka. 
            


                                                                                              Detailed Engineering – Completed 
                                                                                                                            36 
  
Sl.           Name of the Project                Installed      Project       Year               Clients 
No.                                             Capacity in    Cost in Rs. 
                                                   MW            Lakhs 
10.    Balance  of  civil  works  for  18           —              —          2009    M/s. Delkor Technik India 
       mtr dia x 3.0 SWD RCC  tank                                                        Pvt Ltd., Bangalore. 
       for thickener application. 
11.    Detailed      Engineering        for                                   2009    Sharavathy Conductors Pvt 
       Transmission  line  including                                                         Ltd, Bangalore 
       Foundation  Designs  for  the 
       20km,         double          circuit 
       transmission  line  connecting 
       Vajamangala  220kV  station 
       to Kachakola 220kV station. 
12.    25  mtr  dia  x  3.0  SWD                    —              —          2009    M/s. Delkor Technik India 
       130TPH  capacity  RCC  tank                                                        Pvt Ltd., Bangalore. 
       with  tunnel  and  overflow 
       launder        for      thickener 
       application 
13.    100MW           Wind           Farm       10 x 1.65       10000        2009    M/s.Doddanavar Brothers, 
       development‐1phase                                                                 Belgaum Karnataka 
       16.5MW  Chikkodi  Belgaum                                                                       
       District, Karnataka 
14.    Energy       Audit      of      steel      Energy           50         2008      M/s. Goel Engineering 
       Fabrication      Manufacturing             Audit                                Private Ltd., Bangalore. 
       Unit, Bangalore. 
15.    Design  and Drawing for DM                   —              —          2008     M/s. Velath Engineering 
       Vessel.                                                                           Works, Sharjah UAE 
16.    Construction  Water  supply                3 x 350        450000       2008    M/s. GMR Energy Limited, 
       for     Kamalanga        Thermal                                                        Bangalore 
       Power Plant, Orissa. 
17.    Somanamaradi  Small  Hydel                  1 x 6          1500        2007    M/s. Narayanapur Power 
       Project‐  Stage‐II,  in  Raichur                                                Co. Pvt. Ltd, Bangalore 
       District, Karnataka. 
18.    Balance  of  civil  works  for               —              —          2007     M/s. Velath Engineering 
       Design  and  Drawing  for                                                         Works, Sharjah UAE 
       Sulphur Storage Tank. 
19.    Design  and  Drawing  of  Flue                                         2007     M/s. Velath Engineering 
       Gas        Scrubber      (V‐1507)                                                 Works, Sharjah UAE 
       Vessel. 


                                                                                        Detailed Engineering – Completed 
                                                                                                                      37 
  
Sl.           Name of the Project              Installed      Project       Year               Clients 
No.                                           Capacity in    Cost in Rs. 
                                                 MW            Lakhs 
20.    Detailed      Engineering       for        —              —          2007    Sharavathy Conductors Pvt 
       Transmission       line  towers                                                     Ltd, Bangalore 
       including              Foundation 
       Designs for 50kms of Hiriyur 
       –         Kudithini          440kV 
       Transmission line. 
21.    Balance  of  E&M  works  for              2 x 5          3000        2007      M/s. Meclin Fabricators 
       Bhavani        Barrage      Hydro                                             Private Limited Chennai. 
       Electric Project I. 
22.    Balance  of  E&M  works  for              2 x 5          3000        2007         M/s. Sri Saravana 
       Bhavani       Barrage       Hydro                                                Engineering Works 
       Electric Project II.                                                          company Pvt Ltd. Bhavani 
                                                                                            Tamil Nadu 
23.    Construction        of      earthen        —              —          2007     M/s. ECC‐‐CPPL Pvt Ltd., 
       bund  for  Sarvaraja  Sarovara                                                Hyderabad. through M/s. 
       Reservoir  near           Cuddaph,                                           SM Constructions Bangalore. 
       Chittur      District,     Andhra 
       Pradesh. 
24.    Shamburi  MHS,  Dakshina                 5 x 4.80        9726        2006        M/s.Rithwik Energy 
       Kannada District, Karnataka.                                                     Generation Pvt. Ltd. 
                                                                                            Hyderabad. 
25.    Design  and  Drawing  for                  —              —          2006      M/s. Velath Engineering 
       Natural  Gas  Storage  (Buffer)                                                  Works, Sharjah UAE 
       Pressure vessel. 
26.    Balance of Civil Works for 13              —              —          2006     M/s. Delkor Technik India 
       mtr dia x 3.0 SWD RCC  tank                                                      Pvt Ltd., Bangalore. 
       for thickener application. 
27.    Balance  of  Civil Works  for 4            —              —          2006      M/s.Rolls‐Royce Energy 
           x  B35:  40V‐12G  Genset  Gas                                              Systems India Pvt.Ltd., 
           Power Plant at Sudan.                                                             New Delhi 
28.    Detailed      Engineering       for        —              —          2006    Sharavathy Conductors Pvt 
       Transmission  line  Towers                                                          Ltd, Bangalore 
       including Foundation Design 
       for  132/66/11  kV  Kolar  Sub‐
       Station works. 
        


                                                                                      Detailed Engineering – Completed 
                                                                                                                    38 
  
Sl.        Name of the Project             Installed      Project       Year               Clients 
No.                                       Capacity in    Cost in Rs. 
                                             MW            Lakhs 
29.    Perla  Mini  Hydel  Scheme,          5 x 4.80        9726        2005    M/s.AMR Power Pvt. Ltd. 
       Dakshina  Kannada  District,                                                     Hyderabad. 
       Karnataka. 
30.    Nagarjuna  Sagar  Tail  Pond          2 x 25        42500        2005      M/s. STUP Consultants 
       Dam  and  Hydro  Power                                                     Private Ltd., Bangalore 
       Station,  Nalgonda,  Andhra 
       Pradesh 
31.    Construction  of  Gandikota         Irrigation       5500        2005      M/s. STUP Consultants 
       Dam  across  Pennar  River,                                                Private Ltd., Bangalore 
       Kadapa, Andhra Pradesh. 
32.    Yakla  Micro  Hydel  Scheme          2 x 250         100         2005       M/s. Raj Kumar and 
       in Dargeling West Bengal.                                                   Company, Bangalore 
33.    Somanamaradi  Small  Hydel            2 x 6          4800        2004    M/s. Narayanapur Power 
       Scheme,  Raichur  District,                                               Co. Pvt. Ltd., Bangalore 
       Karnataka. 
34.    Hullahalla      Mini     Hydel        3 x 4          4740        2004    M/s.Limbavali Power Pvt. 
       Scheme,  Mandya  District,                                                     Ltd., Bangalore 
       Karnataka. 
35.    Somavathi       Mini     Hydel        2 x 3          2746        2004    M/s.SRM Power Pvt. Ltd. 
       Scheme,         Chickmagalur                                                      Bangalore 
       District, Karnataka. 
36.    Gugal  Small  Hydel  Scheme,         4 x 2.5         4000        2004     M/s.SRS Energy Pvt. Ltd. 
       Gulbarga District, Karnataka.                                                     Bangalore 

37.    Design  of  Anchor  Blocks  for         —             —          2004      M/s. Quest‐GE‐Global 
       Birkapilli  HEP Turkey  (  XLS                                           Engineering Development 
       generation)                                                                   Centre,Bangalore. 
38.    Koynad        MHS,      Kodagu        2 x 2          1800        2004    M/s. Sadguru Saai Energies 
       District, Karnataka.                                                        Pvt. Ltd., Bangalore. 
39.    Design  and  Preparation  of       Tank Farm                     2004     M/s. Velath Engineering 
       GA  drawings  for  following                                                Works Sharju, UAE. 
       tanks.  Crude  Oil  Tank  Slop 
       Crude  Oil  Tank  Crude  Oil  / 
       Water  Tank  Product  Water 
       Tank Fire Water Tank 
       Diesel Oil Tank. 



                                                                                  Detailed Engineering – Completed 
                                                                                                                39 
  
Sl.           Name of the Project                Installed      Project       Year               Clients 
No.                                             Capacity in    Cost in Rs. 
                                                   MW            Lakhs 
40.    110 kV Switchyard  extension             Switchyard        100         2003      M/s. Bhowalaka Steels, 
       at  Bellary  Steels,  Bellary                                                   Bangalore, through LEG. 
       District, Karnataka. 
        
41.    Pre‐Cast  RCC  Bridge  over                                            2003    M/s. Mysore construction Co 
       Upper  Tunga  barrage  across                                                        Ltd., Bangalore. 
       River      Tunga,         Shimoga 
       District, Karnataka. 
42.    Architural  and  Structural                                300         2003     M/s. Nandalal Mohan Lal 
       services  for  Construction  of                                                  Jairani Kapur Charitable 
       Pediatric  Ward  at  Kidwai                                                         Trust Bangalore. 
       Memorial          Institute       of 
       Oncology          –      Honorary 
       Assignment 
43.    Link     Canal         MHS     2001,       1 x 1.5         700         2002      M/s.Graphite India Ltd., 
       Mandya District, Karnataka.                                                             Bangalore. 

44.    Varahi  Tail  Race  MHS,                   5 x 7.5        13439        2002    M/s. Sandur Power Co. Pvt. 
       Udupi District, Karnataka.                                                           Ltd., Bangalore. 
45.    Civil  works  for  the proposed              —              —          2002     M/s. ASEA Brown Boveri 
       132/33kV ODY at INDALCO.                                                             Ltd., Bangalore. 

46.    132        KV           Switchyard       Switchyard                    2002       M/s. BHEL Bangalore. 
       Capacitor  Bank  for  HINLCO 
       Renukot. 
47.    132  kV  Switchyard  near                Switchyard        300         2001    M/s.Bharat Heavy Electricals 
       Samayanallur,            Madurai,                                                           Ltd. 
       Tamil Nadu. 
48.    110 kV Switchyard  extension             Switchyard        300         2001       M/s. BHEL, Bangalore, 
       connected  with  128  MW  DG                                                     through M/s.. MECON, 
       set  installation  for  KSEB,                                                           Bangalore 
       Kozikhode. 
49.    110      KV      Substation        at    Substation                    2001        M/s. LEG Bangalore 
       Navakarnataka                 Steels, 
       Bellary District, Karnataka. 
50.    66  KV  outdoor  Switchyard              Switchyard                    2001    M/s. GEPC Ltd., Bangalore 
       and  Substation  at  NAL 
       Bangalore. 

                                                                                        Detailed Engineering – Completed 
                                                                                                                      40 
  
Sl.           Name of the Project                 Installed      Project       Year               Clients 
No.                                              Capacity in    Cost in Rs. 
                                                    MW            Lakhs 
51.    DG  Plant  at  GE  ITC  Ltd.,                 7.4           4000        2000    M/s. GEITC Ltd., Bangalore 
       Whitefield, Bangalore 
52.    Design          of          Supplying     Switchyard        800         2000    M/s.. AEG‐NGEF Limited 
       Structures  of  220kV  Switch                                                            Bangalore. 
       yard  for  M/s.  Nippon  Denro 
       Ispat Ltd., Dolvi, Maharastra. 
53.    110       kV     Switchyard         at    Switchyard        250         2000        M/s. Bharat Heavy 
       HINDALCO,                   Renukoot,                                           Electricals Ltd. Bangalore. 
       Uttar Pradesh. 
54.    Design          of          Supplying     Switchyard        200         1999      M/s. Kirloskar Electric 
       Structures  for  the  proposed                                                  Company Ltd., Bangalore. 
       66  KV  Outdoor  Switchyard 
       at a very Cycles Ludhiana. 
55.    Harangi  HEP  at  Harangi                   2 x 4.5         3200        1999     M/s. Sulzer Flovel Hydro 
       Dam,  Kushalnagar  District,                                                    Ltd., Faridabad, Haryana. 
       Karnataka 
56.    Sheshadri Iyer MHS Mandya                    3 x 2          1200        1999         M/s. Atria Power 
       District, Karnataka.                                                               Corporation Limited, 
                                                                                                Bangalore. 
57.    Remodeling  of  Shiva  Power                  —             1000        1998      M/s. Karnataka Power 
       Channel                             at                                          Transmission Corporation 
       Shivanasamudram,  Mandya                                                              Ltd., Bangalore. 
       District, Karnataka. 
58.    Dumkar                Hydro‐Electric        3 x 1.5         300         1998      Chief Project Engineer, 
       Project  at  Leh,  Ladakh,  J&K                                                    Power Development 
       State.                                                                           Corporation Ltd., Kargil, 
                                                                                                J&K State. 
60.    Civil  works  for  De‐Bottle                  —              —          1995    M/s. NGEF Ltd., Bangalore 
       Neck        Project          MSDS‐4, 
       Electrical  works  of  Bokaro 
       Steel Plant, Bihar. 
61.    110/33KV  Switchyard  and                 Switchyard        300         1989    M/s. NGEF Ltd., Bangalore 
       Substation            at       Xeldem 
       Madgon          Goa         for    Goa 
       Electricity Board. 




                                                                                         Detailed Engineering – Completed 
                                                                                                                       41 
  
Sl.           Name of the Project            Installed          Project       Year              Clients 
No.                                         Capacity in        Cost in Rs. 
                                               MW                Lakhs 

62.    110     KV    Outdoor      Yard      Switchyard            150         1988    M/s. NGEF Ltd., Bangalore 
       Substation  for  M/s.  Madras 
       Refineries     Ltd.,     Manali 
       Chennai. 
63.    132  KV  Outdoor  Yard  and          Switchyard            200         1987    M/s. NGEF Ltd., Bangalore 
       Substation  for  M/s.  Petrofills 
       Co‐operatives  Ltd.,  Kalewar, 
       Gujrat. 
                                                            




                                                                                       Detailed Engineering – Completed 
                                                                                                                     42 
  
 

C. PREPARATION OF DETAILED PROJECT REPORTS  
                                                                 

    Sl.         Name of the Project               Installed         Project Cost    Year              Clients 
    No                                           Capacity in        in Rs. Lakhs 
                                                    MW 
           Kukke  Hydro  Projects  Stage            8 x 3                                   M/s. Kukke Hydro Projects 
    1.     1       Dakshina        Kannada                             12714                    Pvt Ltd., Bangalore 
           District, Karnataka                                                      2011 
           Kukke  Hydro  Projects  Stage            4 x 3                                   M/s. Kukke Hydro Projects 
    2.     2       Dakshina        Kannada                              7113                    Pvt Ltd., Bangalore 
           District, Karnataka                                                      2011 
           Lower  UHL,  Mandi  District,           2 x 7.5                                  M/s. Trident Power Systems 
    3.     Himachal Pradesh                                             9435        2011       Pvt Ltd., Hyderabad 
           Dananahalli  MHS,  Mandya                                    4750        2011    M/s. Punam power Pvt Ltd, 
    4.     District, Karnataka                      2 x 3                                           Bangalore. 
           Feasibility  Study  on  water                                            2010       M/s.Bharathi Cement 
    5.     Supply  lines  for  Bharathi                                                        Corporation Limited 
           Cement        Factory         from                                                       Hyderabad 
           Saravaraju      Sarovar         De 
           Reservoir     near      Cuddaph 
           Andhra Pradesh. 
           Navya  Mini  Hydel  Scheme              2 x 1.3              2281                M/s. Mitra Energy Pvt Ltd 
    6.     near       Kurnool,         Andhra                                       2010            Hyderabad 
           Pradesh 
           Augmentation          of     Water        —                   —                   M/s. Hutti Gold Mines Co 
    7.     Supply  Scheme  at  Hutti                                                2010          Ltd. Bangalore 
           Gold  Mines  Raichur  District, 
           Karnataka 
           Kollaya        MHS            near                                                M/s. Kumaradhara Power 
    8.     Kumaradhara             Dakshina         6 x 4              12000        2010      Co.Pvt Ltd., Bangalore. 
           Kannada District, Karnataka 
           Solar  Power  Plant  at  Bellary         5 x 1                                    M/s. Vishrutha Power Pvt 
    9.     District, Karnataka                                          600         2009          Ltd., Bangalore 
           Anusha  Mini  Hydel  Scheme             2 x 1.9                                  M/s. Dhenu Hydro Pvt Ltd 
    10.    near       Kurnool,         Andhra                           2778        2009            Hyderabad 
           Pradesh 
    11.    Ramya          MHS            near       2 x 2               2900                M/s. Kurnool Energies Pvt 
           Kurnool,Andhra Pradesh                                                   2009         Ltd Hyderabad 



                                                                                                       Preparation of DPR 
                                                                                                                       43 
  
Sl.         Name of the Project                Installed     Project Cost    Year              Clients 
No                                            Capacity in    in Rs. Lakhs 
                                                 MW 
12.    Kodekal Basaveshwara MHS                  2 x 5                               M/s. Kodekal Basaveshwara 
       Near  Narayanapur  Dam,                                   4500                  Power Generation Pvt 
       Gulbarga                  District,                                   2009          Ltd.,Bangalore 
       Karnataka. 
       Magundi         MHS           near                                             M/s. Shakuntalam Power 
13.    Magundi  Village,  Mudigere               3 x 3           5200        2009       Pvt Ltd., Bangalore. 
       Taluk,         Chikkamangalur 
       District, Karnataka. 
       Dabevadi        MHS        Uttara                                             M/s.Dabevadi Hydel Power 
14.    Kannada District, Karnataka.              3 x 4           6271        2008     Pvt. Ltd., Uttara Kannada 
                                                                                             Karnataka. 
       Yadekumari  MHS  Hassan                  2 x 10.5         8200                M/s. Sri Maruthi Power Gen 
15.    District, Karnataka.                                                  2008     India Pvt Ltd., Bangalore 
       Devargaddi  MHS,  Uttara                                                      M/s.Baliyan Power Private 
16.    Kannada District, Karnataka.              2 x 3           3000        2008             Limited 
                                                                                             Bangalore. 
       Perdur      MHS,         Dakshina         2 x 3           3000        2008        M/s. Dishaa Power 
17.    Kannada District, Karnataka.                                                   Corporation Private Ltd., 
                                                                                             Bangalore. 
       H.  Malligeri  MHS,  near                 1 x 1           461         2007     M/s. Venika Green Power 
18.    Maddur         branch       canal,                                               Pvt Ltd., Bangalore. 
       Mandya District, Karnataka. 
       Hosamatha        MHS,         near       3 x 1.2          1807        2007        M/s.Vakkal Power 
19.    Hosamatha  village  Dakshina                                                       Corporation Ltd., 
       Kannada District, Karnataka.                                                          Bangalore. 
       Devarabetta  MHS,  Hassan                2 x 6.5          3910        2007    M/s. Pinnacle Green Power 
20.    District, Karnataka.                                                             Pvt. Ltd., Bangalore. 
       Addhole  MHS,  near  Bisale               3 x 8           8676        2007    M/s. Trimurthy Power Pvt. 
21.    village,    Hassan        District,                                                Ltd., Bangalore. 
       Karnataka. 
22.    Hongadahalli  Mini  Hydel                                                      M/s. Sri. Maruthi Power 
       Scheme,       Hassan      District,       18.9            7200        2007        Gen India Pvt Ltd., 
       Karnataka.                                                                            Bangalore 
23.    Mallahalli       MHS,         near                                             M/s. Nandini Power Co. 
       Patla,Kodagu              District,      3 x 8.39         9778        2007       Bangalore Pvt. Ltd., 
       Karnataka.                                                                            Bangalore. 


                                                                                                Preparation of DPR 
                                                                                                                44 
  
Sl.        Name of the Project               Installed     Project Cost    Year              Clients 
No                                          Capacity in    in Rs. Lakhs 
                                               MW 
24.    Hathipathar MHS                                                             M/s. Shasta Investment and 
       Chathisgarh State.                      2 x 6           7000        2007    Initiation Company Pvt Ltd 
                                                                                          Hyderabad. 
25.    Benchagaddi               MHS,                                                  M/s. Pusala Power 
       Dakshina  Kannada  District,             12             6000        2007        Company Pvt Ltd., 
       Karnataka                                                                          Hyderabad. 
26.    Talthare  MHS  in  Kodagu                                                       M/s. GM Property 
       District, Karnataka.                   2 x 3.7          3000        2007       Developers Pvt. Ltd, 
                                                                                           Bangalore. 
27.    Kanchimane  MHS,  Shimoga                                                   M/s. Sagar Power (Dandela) 
       District, Karnataka                     2 x 2           2000        2007       Pvt. Ltd Hyderabad 
       Tomabattu  MHS,  Shimoga                                                       M/s. Siddhi Vinayaka 
28.    District, Karnataka.                   2 x 2.5          2500        2007        Spechem (P) Ltd., 
                                                                                           Bangalore 
29.    Havinahedgi               MHS,                                               M/s. XS Power company 
       Hospet,Bellary          District,       4 x 6          12000        2007       Pvt Ltd Hyderabad. 
       Karnataka. 
30.    Construction  of  weir  across                                                 M/s. Mangalore City 
       across  River  Nethravathi  at                                               Corporation, Mangalore. 
       Thumbe for providing Water                                          2007                   
       Supply  to  Mangalore  City 
       Mangalore               District, 
       Karnataka. 
31.    Shamburi       MHS,         near       5 x 4.80         9733        2006       M/s. Rithwik Energy 
       Shamburi  /  Kamthi  Bazar                                                     Generation Pvt. Ltd., 
       village  Dakshina  Kannada                                                          Hyderabad 
       District, Karnataka, 
32.    Varahi        MHS,          near       2 x 4.50         4926        2006    M/s. South Canara Electric 
       Hosangadi  village  Udupi                                                     Power Ltd., Bangalore. 
       District, Karnataka, 
33.    Handihalla  MHS,  Mandya                               12000        2006        M/s.Penna Cement 
       District, Karnataka.                   3 x 8.25                                 Industries (P) Ltd., 
                                                                                           Bangalore 
34.    Sorang        HEP,          near                                              M/s. Himachal Sorang 
       Barakhamba  village,  Mandi             2 x 50         58600        2006    Power Pvt. Ltd., Hyderabad 
       Himachal Pradesh 


                                                                                              Preparation of DPR 
                                                                                                              45 
  
Sl.        Name of the Project               Installed     Project Cost    Year              Clients 
No                                          Capacity in    in Rs. Lakhs 
                                               MW 
35.    Maranahalli      MHS        near       3 x 4.70         5313        2006        M/s.Deepak Cables, 
       Maranahalli, Hassan District,                                                       Bangalore. 
       Karnataka. 
36.    Iggalur  Barrage  MHS,  near                                                M/s. Saroj Energy Co. Pvt. 
       Iggalur  village,  Bangalore           1 x1.50          861         2006          Ltd., Bangalore. 
       District, Karnataka. 
37.    Adishakthi  Maramma  MHS,               4 x 6                               M/s. Pioneer Genco Private 
       Mandya District, Karnataka.                             9600        2006         Ltd., Hyderabad 
38.    Shalvi  MHS  Shimla  District,                                                M/s. Oriental Structural 
       Himachal Pradesh State.                2 x 3.5          4859        2006     Engineers Pvt. Ltd., New 
                                                                                              Delhi. 
       Yatanur        MHS,         near        2 x 3           2000        2006     M/s. SKN Hydro Energy 
39.    Gulbarga District Karnataka.                                                          Pvt Ltd. 
       Yatanur Mini Hydel Scheme,              2 x 2                                M/s. SKN Hydro Energy 
40     Bijapur District, Karnataka.                            1600        2005        Pvt Ltd., Bangalore 
       Kallaja  MHS,  near  Kallaja           3 x 2.5          3943        2005    M/s.Srishti Power Pvt. Ltd., 
41.    village  Dakshina  Kannada                                                          Bangalore. 
       District, Karnataka. 
       Kollya  MHS,  near  Kollya  /           6 x 3           9671        2005         M/s.SNC Power 
42.    Veeramangala             village                                              Corporation Pvt. Ltd., 
       Dakshina  Kannada  District,                                                        Bangalore 
       Karnataka. 
       Neerukatte                MHS,         4 x 3.75         8185        2005         M/s..Sagar Power 
43.    Neerukatte Village Dakshina                                                      (Neerukatte) Ltd., 
       Kannada District, Karnataka.                                                        Bangalore. 
       Perla    MHS,    near      Perla       5 x 4.80         9901        2005    M/s. AMR Power Pvt. Ltd., 
44.    village  Dakshina  Kannada                                                          Bangalore 
       District, Karnataka. 
45.    Durgadahalla  MHS,  near                2 x 9           9377        2005      M/s. Corporate Hydro 
       Charmadi  village  Dakshina                                                      Energy Pvt. Ltd., 
       Kannada District, Karnataka.                                                        Hyderabad. 
46.    Dodda  Betta  MHS,  Hassan              3 x 7           7871        2005    M/s. Sanjeevini Power Pvt. 
       District, Karnataka.                                                              Ltd., Bangalore. 
47.    Somavathi                 MHS,          2 x 3           2746        2005     M/s. SRM Power Pvt. Lt., 
       Chikkamangalur          District,                                                   Bangalore. 
       Karnataka. 


                                                                                              Preparation of DPR 
                                                                                                              46 
  
Sl.        Name of the Project                 Installed     Project Cost    Year              Clients 
No                                            Capacity in    in Rs. Lakhs 
                                                 MW 
48.    Astalakshmi       MHS,        near       2 x 3.5          1816        2005      M/s..Shankaranarayana 
       Kumbaradi                 village,                                            Power Enterprises Pvt Ltd., 
       Chikkamangalur            District,                                                    Bangalore. 
       Karnataka. 
49.    Uyamballi        MHS,         near                                              M/s. SNS Power Project 
       Koggedoddi,             Bangalore         2 x 5           5512        2005          Pvt., Bangalore. 
       District, Karnataka 
50.    Surlabi  MHS  in  Somavarpet                                                    M/s. Core Green Hydro 
       Taluk,      Kodagu        District,       2 x 2           1600        2005       Power India Pvt Ltd., 
       Karnataka                                                                             Hyderabad 
51.    Gondi         MHS             near                                            M/s. Bhadragiri Power Pvt 
       Sidlipura,Tarikere          Taluk        2 x 1.5          1500        2005          Ltd., Bangalore. 
       Chikkamangalur            District, 
       Karnataka 
52.    Detailed       Survey         and                                               M/s. NTPC Hydro Ltd., 
       Investigation     work,       EIA                                                  Noid, NCR Delhi 
       Study  and  Preparation  of                                              
       DPR for following Projects.                                              
           a)    Belliyur HEP                     15             8200        2005 
           b) Neerukatte HEP                      15             8200        2005 
53.    Adahole MHS Phase 1 and 2                                                     M/s.  Trimurthi  Power  Pvt 
       near      Dakshina       Kannada                                              Ltd., Bangalore. 
       District, Karnataka.                     2 x 12.5        12500        2005 
54.    Gugal         Small         Hydel                                             M/s. SRS Energy Private Ltd., 
       Scheme,Gulbarga           District,      3 x 3.34         4958        2004             Bangalore. 
       Karnataka. 
55.    Somanamaradi  Small  Hydel                                9600        2004    M/s. Narayanapur Power Co. 
       Project  on  Upper  Krishna                                                       Pvt. Ltd., Bangalore 
       Right  Bank  Canal,  Raichur              4 x 6 
       District, Karnataka. 
56.    Baje  MHS  Udupi  District,               3 x 1           1456        2004    M/s. Devar Power Pvt. Ltd., 
       Karnataka.                                                                             Bangalore. 
58.    Kadamane  MHS‐II,  Hassan                2 x 7.5          8500        2004    M/s.Nagarjuna Holdings (P) 
       District, Karnataka.                                                                Ltd., Hyderabad. 
59.    Hullahalli       MHS,         near         2x1            800         2004     M/s.Karnataka Renewable 
       Hullahalli/  Ramapura  village,                                                Energy Development Ltd., 
       Mysore District, Karnataka.                                                            Bangalore. 


                                                                                                 Preparation of DPR 
                                                                                                                 47 
  
Sl.        Name of the Project                Installed     Project Cost    Year               Clients 
No                                           Capacity in    in Rs. Lakhs 
                                                MW 
60.    Shivanasamudram             MHS,         1 x 1           452         2004         M/s.Vakkal Power 
       Malavalli     Taluk,     Mandya                                              Corporation Ltd., Bangalore. 
       District, Karnataka 
61.    Chikkmandya                 MHS,        1 x 0.50         471         2004       M/s.Adichunchanagiri 
       Chikkmandya,             Mandya                                                Energy Projects Pvt. Ltd., 
       District, Karnataka.                                                                   Mandya. 
62.    Hullahalla MHS, Dhanagere,               3 x 4           4740        2004    M/s. Limbavali Power Pvt. 
       Mandya District, Karnataka.                                                        Ltd., Bangalore. 
       Dinnekere                  MHS,                                               M/s. Vejetha Glazed Tiles 
63.    Chikkamangalur           District,       2 x 3           3000        2004      Industries, Hyderabad, 
       Karnataka.                                                                        Andhra Pradesh. 
64.    Afzalpur       MHS,          near                                            M/s. Jasper Energy Pvt Ltd., 
       Afzalpur,Gulbarga  District,             2 x 4           4520        2004             Bangalore 
       Karnataka. 
65.    Sonna  MHS,  near  soma                                                      M/s. Jasper Energy Pvt Ltd., 
       villege  Gulbarga  District,             2 x 3           3300        2004             Bangalore 
       Karnataka. 
66.    Singatalur‐Huligudda  MHS                                                     M/s. Tungabhadra Power 
       near  Thimmalapur  village,              3 x 6           6000        2003    Co. Private Ltd., Bangalore. 
       Bellary District, Karnataka 
67     Mannapitlu       MHS,        near        3 x 5           6320        2003    M/s.Bobba Power Projects, 
       Arambodi  village  Dakshina                                                           Bangalore. 
       Kannada District, Karnataka. 
68.    Mulibettu       MHS,         near                                             M/s.Mount Kailash Power 
       Mulibettu  village  Dakshina            2 x 4.5          4282        2003    Projects Pvt. Ltd. Bangalore. 
       Kannada District,Karnataka. 

69.    Kilanjara  MHS,  near  Kalladi           2 x 3           3052        2003        M/s.Phalguni Power 
       village  Dakshina  Kannada                                                      Projects‐1, Bangalore. 
       District, Karnataka. 
70.    Kolavur MHS., near Niralike                                                      M/s.Phalguni Power 
       village  Dakshina  Kannada              2 x 4.5          4368        2003       Projects‐2, Bangalore. 
       District, Karnataka. 
71.    Horiabbe        MHS,         near        2 x 3           2596        2003      M/s. S.K. Farms, Hubli. 
       Siddapur      village     Udupi 
       District, Karnataka. 




                                                                                                Preparation of DPR 
                                                                                                                48 
  
    Sl.        Name of the Project                Installed     Project Cost    Year              Clients 
    No                                           Capacity in    in Rs. Lakhs 
                                                    MW 
    72.    MGHE          MHS       Shimoga          2 x 10         11500        2003    M/s.Suchindra Investment 
           District, Karnataka.                                                            & Financial Services, 
                                                                                                Bangalore 
    73.    Abilbiru      MHS,       Hassan          2 x 3           2273        2003     M/s. South‐West Hydro 
           District, Karnataka.                                                         Power Pvt. Ltd., Bangalore. 
    74.    Somavathi                  MHS,          2 x 3           2698        2003     M/s. SRM Power Pvt. Lt., 
           Chikkamangalur           District,                                                   Bangalore. 
           Karnataka. 
    75.    Akkihebbal  MHS,  Mandya                2 x 1.25                                M/s. Cauvery Hydro 
           District, Karnataka.                                     700         2002      Energy Ltd Bangalore 
    76.    Kadamane  MHS‐I,  Hassan                2 x 4.5          5200        2001    M/s.Paschim Hydro Energy 
           District, Karnataka.                                                            (P) Ltd., Hyderabad. 
    77.    Kumudavati       Mini     Hydel        2 x 0.250        361.98               M/s. Krisri Power Tech Pvt 
           Scheme,Haveri            District,                                   2001      Ltd, Bellary Karnataka 
           Karnataka. 
    78.    Keertihole      MHS          near                                              M/s. Subash Project & 
           Kutupuzha  village,Virajpet              3 x 8           7200        2001      Marketing Co Pvt Ltd., 
           Taluk,      Kodugu       District                                                    Bangalore, 
           Karnataka. 
    79.    Hemavathi       High       Level         2 x 2           600                  M/s. Flax India Limited 
           Canal  MHP,Gorur,  Hassan                                            2000            Bangalore 
           District, Karnataka. 
           Hebbakawadi  MHSMandya                                   400         1999    M/s. Jayalakshmi Power Co 
    80.    District, Karnataka.                     2 x 1                                 Private Ltd., Bangalore 
    81.    Maddur  Canal  MHSMandya                2 x 1.5          500         1998        M/s. Khodays Ltd., 
           District, Karnataka.                                                                 Bangalore 
    82.    New       Ganderbal       Hydro                                               M/s. Chief Engineer PDC 
           Electric  Project,  near  Jammu,         3 x 15          4000        1996     J&K State. Through M/s. 
           Jammu and Kashmir State                                                           THC New Delhi. 

 




                                                                                                   Preparation of DPR 
                                                                                                                   49 
  

D. PRE‐FEASIBILITY STUDIES OF POWER PROJECT 
                                                             

Sl.    Name of the Project                   Installed     Project Cost    Year              Clients 
No.                                         Capacity in    in Rs. Lakhs 
                                               MW 
 1     Baje‐Hiriadka MHS, Udupi                                 1425                 M/s. Aparimita Power 
       District, Karnataka.                   2 x 1.5                      2011        Ventures PVt Ltd., 
                                                                                            Bangalore 
 2     Gulisattenhalli           MHS,                           3185                 M/s. Aparimita Power 
       Hasan District, Karnataka.             2 x 2.5                      2011        Ventures PVt Ltd., 
                                                                                            Bangalore 
 3     Kuppahalli  MHS,  Mandya                                 2123                 M/s. Aparimita Power 
       District, Karnataka.                    2 x 2                       2011        Ventures PVt Ltd., 
                                                                                            Bangalore 
 4     Bellur    MHS,      Dakshina                             1500               M/s. Muktar Power (India) 
       Kannada                 District,      2 x 1.5                      2010         Private Ltd., Goa 
       Karnataka. 
 5     Mundaja       Hole        MHS,                           1000               M/s. Muktar Power (India) 
       Dakshina              Kannada           2 x 1                       2010         Private Ltd., Goa 
       District, Karnataka. 
 6     Ujre      MHS,      Dakshina                             1500               M/s. Muktar Power (India) 
       Kannada                 District,      2 x 1.5                      2010         Private Ltd., Goa 
       Karnataka. 
 7     Kumadvati        MHS        near                                            M/s. Brigade Infra Pvt Ltd 
       Anjanapura                             2 x 1.5           1400       2010             Bangalore 
       Chnnarayapatna, 
       Karnataka. 
 8     Um‐Lunar                 SHEP,         2 x 12            20000      2009        M/s. Green Valliey 
       Meghalaya           Northeast                                                 Industries Private Ltd., 
       State.                                                                               Kolkatha. 
 9     Gurkhi      MHS,      Belgaum                            9000       2009    M/s. Aditya Infrastructure 
       District, Karnataka.                    3 x 6                                       Hyderabad 
 10    Potli     MHS,        Belgaum           3 x 6            9000       2009    M/s. Aditya Infrastructure 
       District, Karnataka.                                                                Hyderabad 
 11    Chagotkallu  MHS,  Raichur                                600               M/s. Samvah Energy Pvt Ltd 
       District, Karnataka.                      2                         2009             Bangalore 
 12    Hurley      MHS          Hassan           1               540       2009    M/s. Classic Group Pvt Ltd., 
       District, Karnataka.                                                                 Bangalore 
13.    Kangtangshiri               HEP        2 x 17.5          20000      2008       M/s. Raajratna Metal 
       Arunachal Pradesh.                                                            Industries, Hyderabad 

                                                                                         Pre‐Feasibility Study Report 
                                                                                                                  50 
  

Sl.    Name of the Project                  Installed     Project Cost    Year              Clients 
No.                                        Capacity in    in Rs. Lakhs 
                                              MW 
14.    Ropum  HEP  Arunachal                   40            32000        2008       M/s. Raajratna Metal 
       Pradesh.                                                                     Industries, Hyderabad 
15.    Barpu       HEP        Arunachal        135          111645                   M/s. Raajratna Metal 
       Pradesh.                                                           2008      Industries, Hyderabad 
16.    Par       HEP          Arunachal        96            79400        2008       M/s. Par Infra Limited, 
       Pradesh                                                                            Hyderabad. 
17.    Dardu       HEP        Arunachal      3 x 25          52000        2008    M/s. Dardu Power Pvt Ltd., 
       Pradesh.                                                                           Hyderabad. 
18.    Alavalli     MHS         Hassan        2 x2            1600        2008    M/s. Hotel Maruthi Pvt. Ltd. 
       District Karnataka.                                                                 Bangalore. 
19.    Pema  Shelphu  ‐  HEP.                 97.5           61900        2008       M/s. Raajratna Energy 
       Arunachal Pradesh.                                                              Holdings Pvt. Ltd. 
                                                                                          Hyderabad. 
20.    Marwari                    HEP,          8             4000        2008     M/s. R.R. Construction & 
       Uttarakhand State.                                                         Infrastructure India Pvt Ltd. 
                                                                                          Hyderabad 
21.    Balganga‐II                HEP.          7             3500        2008     M/s. R.R. Construction & 
       Uttarakhand State.                                                         Infrastructure India Pvt Ltd. 
                                                                                          Hyderabad 
22.    Doodh  Ganga  /  Meena                   6             3000        2008     M/s. R.R. Construction & 
       HEP. Uttarakhand State.                                                    Infrastructure India Pvt Ltd. 
                                                                                          Hyderabad 
23.    Bernigad HEP,                           6.5            3300        2008     M/s. R.R. Construction & 
       Uttarakhand State.                                                         Infrastructure India Pvt Ltd. 
                                                                                          Hyderabad 
24.    Vijaya Nagar‐Rampur HEP                 20             1000        2008     M/s. R.R. Construction & 
       Uttarakhand State.                                                         Infrastructure India Pvt Ltd. 
                                                                                          Hyderabad 
25.    Rampur‐Tilwari HEP                      25            12500        2008      M/s. R.R. Construction & 
       Uttarakhand State.                                                         Infrastructure India Pvt Ltd. 
                                                                                           Hyderabad 
26.    Madya  Maheshwar  HEP                   18             9000        2008      M/s. R.R. Construction & 
       Uttarakhand State.                                                         Infrastructure India Pvt Ltd. 
                                                                                           Hyderabad 
27.    Kepjog         Mini        Hydel        10             4800        2008     M/s. Vensai Power Projects 
       Scheme,Jog,             Shimoga                                              Pvt Limited, Hyderabad 
       District Karnataka. 

                                                                                        Pre‐Feasibility Study Report 
                                                                                                                 51 
  

Sl.    Name of the Project                  Installed     Project Cost    Year              Clients 
No.                                        Capacity in    in Rs. Lakhs 
                                              MW 
28.    35  MW  Bio  Mass  Power                35         US $ 700,000    2008      M/s. Dass Green Energy 
       Plant     near      eggbough,                                                   Inc., Boston, USA. 
       Leeds, U.K 
29.    Baipadi  MHS,  Dakshina                2 x 3           2682        2007    M/s. Srishti Power Pvt. Ltd., 
       Kannada                District,                                                    Bangalore. 
       Karnataka. 
30.    Hemavathi         Right     Bank                       1350                M/s. Sri Maruthi Power Gen 
       Canal      MHS         Stage‐II.       2 x 1                       2007     India Pvt. Ltd. Bangalore. 
       Hassan District, Karnataka. 
31.    Kela                   Chavadi                         1200                 M/s. Delmon Energy Pvt. 
       MHS,Agumbe,           Shimoga          2 x 2                       2007          Ltd. Bangalore. 
       District, Karnataka. 
32.    Hosakambi          MHS,Uttara                          1200                M/s. Mysore Mercantile Co. 
       Kannada                District,       2 x 2                       2007          Ltd. Bangalore. 
       Karnataka. 

33.    Dugganballu  MHS,  Uttara                              3141                M/s. Mysore Mercantile Co. 
       Kannada                District,      2 x 2.5                      2007          Ltd. Bangalore. 
       Karnataka. 
34.    Tombattu      Hole         MHS,                        1000                   M/s. Siddhi Vinayaka 
       Shimoga                District,       1 x 2                       2007         Spechem Pvt Ltd., 
       Karnataka.                                                                          Bangalore 
35.    Bairekoppa MHS, Dharwar                                3320                M/s. Mysore Mercantile Co. 
       District, Karnataka.                  2 x 2.5                      2007          Ltd. Bangalore. 
36.    Kalgodu                    MHS,                        1080                M/s. Saisri Power Projects & 
       Chikkamagalur          District,       2 x 1                       2007     System Pvt Ltd Bangalore 
       Karnataka. 
        
37.    Sondahalla  MHS,  Uttara                               2555        2007         M/s. Disha Power 
       Kannada                District,      2 x 3.5                                  Corporation Pvt Ltd 
       Karnataka.                                                                          Bangalore 
38.    Kelasi      MHS,           Hubli‐                      3036                   M/s. Abletech Electro 
       Dharwar                District,      2 x 2.5                      2007    Engineers Pvt Ltd Bangalore 
       Karnataka. 
39.    Kallur  B  MHS,  Gulbarga                              6181                M/s. Jasper Energy Pvt Ltd., 
       District, Karnataka.                   4 x 4                       2007             Bangalore 
                                                                                                  

                                                                                        Pre‐Feasibility Study Report 
                                                                                                                 52 
  

Sl.    Name of the Project                  Installed     Project Cost    Year              Clients 
No.                                        Capacity in    in Rs. Lakhs 
                                              MW 
40.    Gundiadka                Small           5             1790        2007      M/s. Saileela Power Pvt. 
       Hydropower              Project.                                                 Ltd. Bangalore 
       Dakshina             Kannada 
       District, Karnataka. 
41.    Kottanadka  Mini  Hydel                2 x 1           1200        2007     M/s. AMR Power Private 
       Scheme,  Kodagu  District,                                                       Ltd. Bangalore. 
       Karnataka. 
42.    Kannadagal      MHS,Uttara            2 x 12          13200        2007    M/s. Trident power Systems 
       Kannada                District,                                              Pvt Ltd., Hyderabad. 
       Karnataka. 
43.    Illva  MHS  Uttara  Kannada             7.5            3771        2007    M/s. Sri Shankara Narayana 
       District, Karnataka.                                                       Power Corporation Pvt Ltd., 
                                                                                           Bangalore. 
44.    Kalgatta  MHS  Dakshina               2 x 2.5          2800        2007     M/s. Samvah Energy Pvt 
       Kannada                District,                                                 Ltd., Bangalore. 
       Karnataka 
45.    Kubjanadi  MHS  Udupi                 2 x 2.5          1750        2007    M/s. PSR Hydro Energy Pvt 
       District, Karnataka                                                              Ltd., Bangalore. 
46.    Manchikeri  MHP  Uttara                3 x 6           6210        2007    M/s. PSR Hydro Energy Pvt 
       Kannada                District,                                                        Ltd 
       Karnataka. 
        
47.    Kurkamane  Mini  Hydel                  24             8676        2006    M/s. Trimurthy Power Pvt. 
       Scheme,  Hassan  District,                                                       Ltd. Bangalore. 
       Karnataka. 
        
48.    Nanniru  Halla,  Shimoga               2 x 2           1800        2005     M/s. Pinnacle Renewable 
       District, Karnataka                                                        Energy Pvt. Ltd., Bangalore. 
49.    Ulippu       MHS,       Udupi          2 x 6           5958        2005      M/s. NTPC Hydro Ltd., 
       District, Karnataka                                                                   Noida. 
50.    Kallaja      MHS,       Udupi          2 x 3           2662        2005    M/s. Srishti Power Pvt. Ltd., 
       District, Karnataka                                                                 Bangalore. 
        
51.    Devaragundi  MHS,  Udupi               2 x 2           1814        2005     M/s. Astra Infrastructure 
       District, Karnataka.                                                        Pvt. Ltd., Secunderabad. 
                                                                                                  


                                                                                        Pre‐Feasibility Study Report 
                                                                                                                 53 
  

Sl.    Name of the Project                    Installed     Project Cost    Year              Clients 
No.                                          Capacity in    in Rs. Lakhs 
                                                MW 
52.    Horabele      MHS,        Udupi          1.00            3663        2005    M/s. Karnataka Renewable 
       District, Karnataka                                                          Energy Development Ltd., 
                                                                                            Bangalore. 
53.    Biligere      MHS,        Udupi            2             851         2005     M/s. Astra Infrastructure 
       District, Karnataka.                                                          Pvt. Ltd., Secunderabad. 

54.    Surlabi  MHS,  Dakshina                  2 x 2           1932        2005    M/s.Karnataka Renewable 
       Kannada                  District,                                           Energy Development Ltd., 
       Karnataka.                                                                     Bangalore., Bangalore. 
55.    Haraga        Hole         MHS,         2 x 1.5          1363        2005     M/s.Karnataka Renewable 
       Dakshina  Kannada  District,                                                  Energy Development Ltd., 
       Karnataka.                                                                            Bangalore. 
56.    Mukkodlu  MHS  Dakshina                   1.50           681         2005     M/s.Karnataka Renewable 
       Kannada District, Karnataka.                                                  Energy Development Ltd., 
                                                                                             Bangalore. 
57.    Sirangahalli  MHS,  Kodagu               0.80            331         2005    M/s.Karnataka Renewable 
       District, Karnataka.                                                         Energy Development Ltd., 
                                                                                            Bangalore. 
58.    Bhadrakali       Mini      Hydel         0.70            344         2005    M/s.Karnataka Renewable 
       Scheme,  Kodagu  District,                                                   Energy Development Ltd., 
       Karnataka.                                                                           Bangalore. 
59.    Chapparahalla  MHS  Phase                2 x 7           4200        2005    M/s. Akasha Ganga Energy 
       I Karnataka.                                                                    Pvt. Ltd., Bangalore. 
60.    Chapparahalla  MHS  Phase                  3             900         2005    M/s. Akasha Ganga Energy 
       II Karnataka.                                                                   Pvt. Ltd., Bangalore. 
61.    Katigudde  MHS  Kodagu                     2             915         2005     M/s. Delta Power Projects 
       District, Karnataka.                                                            Pvt. Ltd., Bangalore. 
62.    Murukannu                  MHS,                                      2004      M/s. Paschim Holdings 
       Sakeleshpura,            Hassan         2 x 5.5          4360                 private Ltd., Hyderabad. 
       District, Karnataka. 
63.    Balekallu MHS, Karnataka.                2 x 6           3720        2004      M/s. Paschim Holdings 
                                                                                     private Ltd., Hyderabad. 
64.    Hulikal  Hole  MHS,  Udupi               2 x 2           1700        2004    M/s. Devar Power Pvt. Ltd., 
       District, Karnataka.                                                                 Bangalore. 
65.    Vuddigudda                 MHS,         2 x 0.45         591         2004    M/s. Woodae Gooda Coffee 
       Chickmagalore            District,                                            Estate Mercara, Kodagu 
       Karnataka.                                                                       District Karnataka 


                                                                                          Pre‐Feasibility Study Report 
                                                                                                                   54 
  

Sl.    Name of the Project                   Installed     Project Cost    Year             Clients 
No.                                         Capacity in    in Rs. Lakhs 
                                               MW 
66.    Kadamane        Mini     Hydel          2 x 5           4500        2004    M/s. Nagarjuna Holdings 
       Scheme‐II,      Sakeleshpura                                                  Pvt Ltd., Hyderabad. 
       Hassan District, Karnataka 
67.    Durgadahallihalla          Mini         3 x 6           7500        2004    M/s. Nagarjuna Holdings 
       Hydel Scheme, Karnataka.                                                    Private Ltd., Hyderabad. 
68.    Koo Hole MHS, Madapura,                   1             461         2004    M/s.Karnataka Renewable 
       Kodagu District,Karnataka.                                                  Energy Development Ltd., 
                                                                                           Bangalore. 
69.    Napanda        Hole       MHS,         1 x 0.50         273         2004    M/s. Karnataka Renewable 
       Garavale,  Kodagu  District,                                                Energy Development Ltd., 
       Karnataka.                                                                          Bangalore. 
70.    Sulugodu          MHS          –        1 x 1           446         2004    M/s. Syed Ibrahim & Sons, 
       Megaravalli,      Hosanagara                                                        Shimoga. 
       Taluk,  Shimoga  District, 
       Karnataka 
71.    Koynad  MHS,  Madikeri                 2 x 1.75         1880        2004    M/s.Sadguru Sai Energies 
       Taluk,  Kodagu  Dakshina                                                       Pvt. Ltd., Bangalore. 
       Kannada                 District, 
       Karnataka. 
72.    Beliyur       MHS         South        2 x 7.5          9736        2004     M/s. NTPC Hydro Ltd., 
       Kannada                 District,                                            Noida. NCR New Delhi. 
       Karnataka. 
73.    Nirkatte  MHS  Dakshina                 3 x 5           7204        2004     M/s. NTPC Hydro Ltd., 
       Kannada                 District,                                               Noida. New Delhi 
       Karnataka  
74.    Dodda         Betta        MHS           74            19438        2004     M/s. NTPC Hydro Ltd., 
       Dakshina               Kannada                                                  Noida. New Delhi 
       District, Karnataka 
75.    Kulkunda  MHS  Dakshina                2 x 9.5          8260        2004     M/s. NTPC Hydro Ltd., 
       Kannada                 District,                                               Noida. New Delhi 
       Karnataka 
76.    Bhimanakallu               MHS         3 x 4.5          6383        2004     M/s. NTPC Hydro Ltd., 
       Dakshina               Kannada                                                  Noida. New Delhi 
       District, Karnataka  
77.    Kollya     MHS         Dakshina         3 x 6           9348        2004      M/s. NTPC Hydro Ltd., 
       Kannada District, Karnataka                                                     Noida. New Delhi 


                                                                                        Pre‐Feasibility Study Report 
                                                                                                                 55 
  

Sl.    Name of the Project                   Installed     Project Cost    Year              Clients 
No.                                         Capacity in    in Rs. Lakhs 
                                               MW 
78.    Bajimane      MHS        Udupi            2             946         2004    M/s. Falcon Power Pvt. Ltd., 
       District, Karnataka                                                                  Bangalore. 
79.    Devaragundi               MHS,                          1814                 M/s. Aster Infrastructure 
       Dharmasthala        Dakshina            2 x 2                       2004       Pvt. Ltd. Hyderabad. 
       Kannada                 District, 
       Karnataka. 
80.    Ganadahalli  MHP  Mandya                                1915                 M/s. SMR power Pvt Ltd., 
       District, Karnataka.                   2 x 2.5                      2004             Bangalore 
                                                                                                   
81.    Biligeri  MHS,  Madikeri,                               851                  M/s. Aster Infrastructure 
       Kodugu                  District,       2 x 1                       2004        Pvt Ltd Hyderabad 
       Karnataka                                                                                   
82.    Gulgal      MHS,    Gulbarga           3 x 3.3          3623        2004     M/s. SRS Energy Pvt Ltd., 
       District, Karnataka                                                                  Bangalore 
83.    Kadamane       Mini      Hydel                                      2003      M/s. Paschim Holdings 
       Scheme‐I,  Hassan  District,            2 x 3           3000                 private Ltd., Hyderabad. 
       Karnataka. 
84.    Hachinad      Mini       Hydel          2 x 1           1118        2003     M/s.Karnataka Renewable 
       Scheme,  Kodagu  District,                                                  Energy Development Ltd., 
       Karnataka.                                                                           Bangalore. 
85.    Uyamballi MHS, Bangalore                2 x 5           3663        2003     M/s.Karnataka Renewable 
       District, Karnataka.                                                        Energy Development Ltd., 
                                                                                            Bangalore. 
86.    Abilbiru                  MHS,         2 x 2.25         1350        2003    M/s. South West Hydro Pvt 
       Sakaleshpura            Hassan                                                    Ltd., Bangalore. 
       District, Karnataka 
87.    Kunchikal      Falls      MHS,         2 x 2.5          1500        2003    M/s. South Canara Electric 
       Dakshina              Kannada                                                 Co. Pvt. Ltd., Bangalore. 
       District, Karnataka. 
88.    Hosangadi      Mini       Hydel        2 x 1.5          1230        2003      M/s.Hosangadi Hydro 
       Scheme,             Dakshina                                                    Power Projects Ltd., 
       Kannada                 District,                                                    Bangalore. 
       Karnataka 
89.    Upper Kaneri MHS, Uttara                                3000                 M/s. Sree Swarna Energy 
       Kannada                 District,       2 x 5                       2003          Ltd Hyderabad. 
       Karnataka. 


                                                                                         Pre‐Feasibility Study Report 
                                                                                                                  56 
  

Sl.     Name of the Project                  Installed     Project Cost    Year              Clients 
No.                                         Capacity in    in Rs. Lakhs 
                                               MW 
90.     Dinnekere                MHS,                          459                 M/s. Jasper Energy Pvt Ltd 
        Chikmagalur            District,      2 x 0.5                      2003            Bangalore. 
        Karnataka.                                                                                 
91.     Mannapittlu  Hydro‐Power               3 x 3           4540        2003    M/s. Bobba Power Projects 
        Projects Dakshina Kannada                                                      Pvt Ltd., Bangalore 
        District, Karnataka 
92.     Debewadi                 MHS,         2 x 2.5          2569        2003       M/s. Aji Engineering 
        Chandryapatana,         Hassan                                                     Bangalore. 
        District, Karnataka. 
93.     Pre‐feasibility  Report  on                                        2002         M/s.Khoday Ltd., 
        Wind  Energy  Farm  near              10 x 0.5         2000                        Bangalore. 
        Chitradurga, Karnataka. 
94.     KIOC          L        Tailings                                    2002    M/s. Roche Mining. (MPJV) 
        Classification                &                                                Melboune Au strlia 
        Distribution Project 
95.     Dodda  Halla  Mini  Hydel                                          2001    M/s. Klen & Marshall Ltd., 
        Scheme,       Chickmagalore            3 x 6           900                         Bangalore. 
        District, Karnataka. 
96.     Singatalur‐Huligudda                                               2001    M/s. Reddy Veeranna & Co., 
        MHS,       Hospet,      Bellary        3 x 6           7200                    Private Bangalore. 
        District, Karnataka.                                                                       
97.     Horiabbe      MHS,      Udupi         2 x1.5 +         1877        2001      M/s. S K Farm Pvt Ltd., 
        District, Karnataka.                   1x0.5                                          Hubli 
98.     Hebbakawadi        MH       Sin                                    2000     M/s. Gilda Investments & 
        Mandya                 District,       3 x 1           600                    Financing, Bangalore 
        Karnataka 
99.     Right  Bank  High  Level                                           2000     M/s. Tungabhadra Power 
        Canal          MH           Sat       2 x 1.5          400                  Co. private Ltd., Bellary. 
        Tungabhadra              Dam,                                                              
        Hospet,  Bellary  District, 
        Karnataka. 
100.    2  x  5  MW  Elaneeru  Mini                                        2000    M/s. Nagarjuna Engineering 
        Hydel  Scheme,  Dakshina               2 x 5           3600                 & Contracts Private Ltd., 
        Kannada                District,                                                  Hyderabad. 
        Karnataka. 
         


                                                                                         Pre‐Feasibility Study Report 
                                                                                                                  57 
  

    Sl.     Name of the Project                 Installed     Project Cost    Year              Clients 
    No.                                        Capacity in    in Rs. Lakhs 
                                                  MW 
    101.    Elaneeru                 MHS                          3000                M/s. Nagarjuna Engineering 
            Chickmagalore         District,                                           & Corporation Co. Pvt Ltd. 
            Karnataka.                            2 x 3                       2000           Hyderabad. 
             
    102.    Kabbinale     Mini      Hydel                                     1999    M/s. Sanicons Engineering 
            Scheme,           Dakshina            2 x 1           700                    & Contracts Pvt Ltd, 
            Kannada               District,                                                   Bangalore. 
            Karnataka. 
    103.    Preparation  of  Executive            2 x 1           600                 M/s. Bright Vidyut Co Pvt 
            Summary       report        on                                                  Ltd., Bangalore 
            Kattepura     MHS         near 
            Kattepura               village 
            Arakalgud,              Hassan 
            District, Karnataka. 
 




                                                                                            Pre‐Feasibility Study Report 
                                                                                                                     58 
  

E. PRE‐TENDER SERVICES 
        

Sl.                Name of the Project              Installed      Project Cost    Year            Clients 
No.                                                Capacity in     in Rs. Lakhs 
                                                       MW 
1.         Indrasagar             Pollavaram       Multipurpose      450000        2011     M/s. ILFS Hyderabad. 
           Multipurpose  Project  –  A                Project 
           project of National Interest. 
2.         Ghattaprabha          HEP         at       2 x 10           4000        2011        M/s. Megawin 
           Ghattaprabha Dam, Karnataka                                                     Switchgear Pvt. Ltd., 
           EPC bid                                                                          Salem Tamil Nadu. 
3.         Pre‐Tender  service  for  Canal          Irrigation          —          2011        M/s. Associated 
           Distribution       network      and        Project                              Engineering Consultants 
           ancillary               structures                                                & Analysts Pvt Ltd., 
           preparation  of  GAD’s  for                                                            Mumbai. 
           Bridges,  Aqueducts,  Siphons 
           etc. 
4.         Balance of Plant for Rafha  Gas             400              —          2011      M/s. ILF Consulting 
           Based  Power  Plant,  Kingdom                                                    Engineers Abudabhi, 
           of Saudi Arabia.                                                                          UAE 

5.         Balance  of  Plant  for  AL—Jong            400              —          2011      M/s. ILF Consulting 
           of  Gas  Based  Power  Plant,                                                    Engineers Abudabhi, 
           Kingdom of Saudi Arabia.                                                                  UAE 
6.         Pre‐Tender         Services      for       2 x 7.5           —          2011         M/s. Megawin 
           Electro‐Mechanical Equipment                                                      Switchgear Pvt Ltd., 
           for Dumajorhi SHEP                                                                Salem, Tamil Nadu. 
7.         Pre‐Tender Services for Balgad             3 x 6.6           —          2011         M/s. Simplex 
           SHEP, Uttarkhand State                                                            Infrastructures Ltd., 
                                                                                                  Mumbai. 
8.         Pre‐Tender         Services      for        3 x 7            —          2011         M/s. Simplex 
           Khutani  SHEP  Uttarkhand                                                         Infrastructures Ltd., 
           State.                                                                                 Mumbai. 
9.         Pre‐Tender         Services      for       3 x 3.7           —          2011         M/s. Simplex 
           Seraghat  SHEP  Uttarkhand                                                        Infrastructures Ltd., 
           State                                                                                  Mumbai. 
10.        Balance  of  Plant  for  Qassim             400              —          2010      M/s.ILF Consulting 
           Gas       Based    Power       Plant                                             Engineers Abudabhi, 
           Qassim  Kingdom  of  Saudi                                                               UAE. 
           Arabia. 


                                                                                                     Pre‐Tender Services 
                                                                                                                      59 
  

Sl.    Name of the Project                     Installed     Project Cost    Year            Clients 
No.                                           Capacity in    in Rs. Lakhs 
                                                 MW 
11.    Balance  of  Plant  for  Tabouk‐2        2 x 70            —          2010      M/s.ILF Consulting 
       Gas    Based       Power      Plant                                            Engineers Abudabhi, 
       Tabouk,  Kingdom  of  Saudi                                                            UAE. 
       Arabia. 
12.    Basanthpur       and        Saradih     Irrigation         —          2010         M/s. Simplex 
       Barrage,      Janjgir    District,       Project                               Infrastructure Co Pvt 
       Chhattisgarh.                                                                     Ltd., Mumbai. 
13.    Kachchh  Branch  Canal  and             Irrigation         —          2010         M/s. Simplex 
       Rewa Branch Canal‐ Gujarat.              Project                               Infrastructure Co Pvt 
                                                                                         Ltd., Mumbai. 
14.    Bheden  ‐Jharsuguda  Water  Water Supply                   —          2010         M/s. Simplex 
       Supply, Orissa.                                                                Infrastructure Co Pvt 
                                                                                         Ltd., Mumbai. 
15.    Bansagar‐1  SHEP,  Mirzapur                9.5            4800        2010         M/s. Simplex 
       District, Uttar Pradesh                                                        Infrastructure Co Pvt 
                                                                                         Ltd., Mumbai. 
16     Somavathi MHS                               9             3000        2010        M/s.Velankeni 
                                                                                     Renewable Energy Pvt 
                                                                                         Ltd,.Bangalore. 
17.    Bandraun       SHEP      Lalitpur       14.0 MW            —          2010         M/s. Simplex 
       District, Uttar Pradesh                                                        Infrastructure Co Pvt 
                                                                                         Ltd., Mumbai. 
                                                                                                  
18.    Condenser  Cooling System for            2 x 300           —          2010    M/s.Gammon India Ltd., 
       2  x  300  MW  EMCO  TPP                                                             Mumbai 
       Warror Maharashtra 
19.    Plant  Water  System  Package            2 x 700                      2010    M/s.Gammon India Ltd., 
       for  Kakrapara  Atomic  Power                                                        Mumbai. 
       Project 3 & 4 units Gujarat 
        
20.    Dhaulasidh  HEP,  Himachal               40 MW            2000        2010      M/s.Design Group + 
       Pradesh.                                                                      M/s.Feedback Ventures 
                                                                                         (Joint Venture) 
21.    Kalisindh  Dam  Project  in             Irrigation        4000        2010         M/s.Simplex 
       Rajastan                                 Project                                Infrastructures Ltd. 
                                                                                            Mumbai 


                                                                                              Pre‐Tender Services 
                                                                                                               60 
  

Sl.    Name of the Project                       Installed     Project Cost    Year            Clients 
No.                                             Capacity in    in Rs. Lakhs 
                                                   MW 
23.    Detail                 Construction          —               —          2010     M/s. Rithwik Projects 
       Methodology  for  Vishnugad‐                                                      Pvt. Ltd. Hyderabad 
       Pipalkoti HEP in Uttranchal.                                                                 
24.    Meja SHEP, Mirzapur District,                9.00            —          2010         M/s. Simplex 
       Uttar Pradesh.                                                                   Infrastructure Co Ltd., 
                                                                                              Mumbai. 
25.    Pre‐Tender           Services      for  Water Supply       20000        2009    M/s. Gammon India Ltd., 
       Transportation  of  Water  from                                                         Mumbai 
       Mahanadi  River  at  Cuttack  to 
       Paradip  for  Paradip  Refinery 
       at Orissa. 
26.    Pashdan  Irrigation  Project  in          Irrigation      US $ 90       2009     M/s.Hewadwal Group 
       Afghanistan                                Project        Million                 Kabul, Afghanistan 
27     Almar  Irrigation  Project  in            Irrigation     US $ 190       2009     M/s.Hewadwal Group 
       Afghanistan                                Project        Million                 Kabul, Afghanistan 
28.    Shah‐wa‐Arus  Irrigation  and             Irrigation      US $ 45       2009     M/s.Hewadwal Group 
       Hydro      Power        Project    in      Project        Million                 Kabul, Afghanistan 
       Afghanistan 
29.    Sea  Water  Intake  System  for  Water Supply               1200        2009    M/s. Gammon India Ltd. 
       Ultra  Mega  Power  Project  at                                                         Mumbai 
       Krishnapatnam,              Andhra 
       Pradesh.‐ 6 x 660 MW 
30.    Raw Water Supply System for  Water Supply                               2008    M/s. Gammon India Ltd., 
       Alumina  Refinery  Expansion                                                            Mumbai 
       Project        of       M/s.Vedanta 
       Aluminium            Limited       at 
       Linjigarh in  Kalahandi District 
       of Orissa. 
        
31.    Upper Bhadra Irrigation Canal             Irrigation                    2007    M/s. Gammon India Ltd., 
       Network System Package II                  Project                                      Mumbai 
        
32.    Upper         Bhadra       Irrigation     Irrigation                    2007    M/s. Gammon India Ltd., 
       Project‐Package  Numbers  1  &             Project                                      Mumbai 
       3 Shimoga District, Karnataka. 
        


                                                                                                 Pre‐Tender Services 
                                                                                                                  61 
  

Sl.    Name of the Project                      Installed     Project Cost    Year             Clients 
No.                                            Capacity in    in Rs. Lakhs 
                                                  MW 
33.    Plant Water Supply Scheme at  Water Supply                  —          2007    M/s. Gammon India Ltd., 
       JSW‐Vijaynagar  Steel  Plant  at                                                       Mumbai. 
       Thoranagal,  Bellary  District, 
       Karnataka. 
34.    Review of draft EPC for Penan             4 x 70          10000        2007     M/s. Hemagiri Hydro 
       HEP, Sikkim India                                                               Energy Company Pvt 
                                                                                          Ltd., New Delhi. 
35.    Left    Bank      of     Indrasagar      Irrigation                             M/s. Maytas Infra Pvt 
       (Pollavaram)            HEP       in      Project                      2006        Ltd., Hyderabad 
       Anguluru                Devapatnam 
       Mandal,         East       Godavari 
       District, Andhra Pradesh 
36.    Galeru  Nagari  Sulaja  Sravanti         Irrigation         —          2006    M/s. Maytas Infra Private 
       (GNSS)  Flow  Canal  Project,             Project                                limited, Hyderabad. 
       Phase‐I, Andhra Pradesh. 
37.    Galeru  Nagari  Sulaja  Sravanti         Irrigation         —          2006      M/s. Maytas NCC JV 
       (GNSS)  Flow  Canal  Project,             Project                                   Private limited, 
       Phase‐II, Andhra Pradesh.                                                            Hyderabad. 
        
38.    Galeru  Nagari  Sulaja  Sravanti         Irrigation         —          2006    M/s. Maytas Infra Private 
       Project Andhra Pradesh                    Project                                limited, Hyderabad 
        
39.    Pre‐tender        Services       for     Irrigation         —          2005    M/s. Gammon India Ltd., 
       Velagonda  Irrigation  Project,           Project                                      Mumbai. 
       Nelagunda  Dristrict  Andhra 
       Pradesh. 
        
40.    Assistance  in  REQ/RFQ/  Offer           2 x 70          80000        2004    M/s. GMR Energy Ltd., 
       for  allotement  of  Badrinath                                                        Bangalore. 
       HEP         near          Badrinath, 
       Uttranchal State. 
        
41.    Pre‐Tender          services     for     Irrigation         —          2003          M/s. Simplex 
       Ainapur         Lift      Irrigation      Project                                Infrastructures Ltd. 
       Scheme.                                                                                Mumbai 
        


                                                                                                Pre‐Tender Services 
                                                                                                                 62 
  

                                                                                                   
Sl.    Name of the Project                      Installed     Project Cost    Year            Clients 
No.                                            Capacity in    in Rs. Lakhs 
                                                  MW 
42.    Pre‐Tender         service       for     Irrigation         —          2003    M/s. Chinnanachinuthu 
       Singatalur       Lift     Irrigation      Project                              and Company Bangalore. 
       Scheme, Karnataka. 
43.    Water       Processing     Projects  Water Supply           —          2003    M/s. Movers (India ) Pvt 
       Balance of Electrical Works                                                        Ltd., Bangalore 
44.    Implementation  of  3  x  5  MW            3 x 5           9000        2003    M/s. SEW Constructions 
       Canal  head  Power  house  on                                                      Ltd., New Delhi. 
       Left  Bank  Canal  of  Indira 
       Sagar        Project,      Madhya 
       Pradesh. 
45.    Pre‐Tender        Services       for     Irrigation       12000        2002     M/s. Engineers Projects 
       Singatalur       Lift     Irrigation      Project                                India Ltd., Chennai. 
       Scheme ‐ 4 Packages.                                                                        
46.    Pre‐Tender  services  400/220           Substation         1100        2002         M/s. ABB Ltd., 
       kV  for  connected  civil  works                                                      Bangalore. 
       of Switchyard at Nelamangala,                                                               
       Bangalore for KEB, Bangalore. 
47.    Bajemane  MHS  in  Kodagu                 2 x 1.5          450         2002     M/s. Falcon Power Pvt 
       District, Karnataka.                                                               Ltd., Bangalore. 
48.    Pre‐Tender  service  for  Greater  Water Supply           10000        2002      M/s. Johnson Eastern 
       Aizawl  water  Supply  scheme                                                  Power Aizawl Mizoram. 
       Phase II 
49.    Pre‐Tender         service       for     Irrigation         —          2002       M/s. G.J Ferandez 
       Singatalur       Lift     Irrigation      Project                               Secunderbad Andhar 
       Scheme.                                                                                Pradesh. 
50.    Dam  remodeling  studies  at                —               —          2002     M/s. Rochie Mining Mt 
       Lyka  –Lake  at  Kudremekh                                                      India Pvt Ltd., Cochin 
       Iron Ore Co Ltd.,                                                                 Kerala State India 
51.    Pre‐Tender         service       for     Irrigation        1200        2001        M/s. NGEF Ltd., 
       Periyapatna       Lift    Irrigation      Project                                     Bangalore 
       Scheme. 
52     Pre‐Tender service  for Balance             1.5            150         2001          M/s. Mysore 
       of  Civil  Works  for  Link  Canal                                               Construction Co Pvt 
       MHS,         Mandya        District,                                               Ltd., Bangalore. 
       Karnataka. 


                                                                                                Pre‐Tender Services 
                                                                                                                 63 
  

        



Sl.    Name of the Project                           Installed     Project Cost     Year            Clients 
No.                                                 Capacity in    in Rs. Lakhs 
                                                       MW 
53.    Pre  –  Tender  Services  for  DG                           $ 40 Million.    2001    M/s. National Trading 
       Captive Plants at Yemen.                                                                Co Ltd., Yemen. 
           a)    Sana’s (Option 1)                     3 x 5 
           b) Sana’s (Option 2 )                       4 x 5 
           c)    Hodaidah                              2 x 5 
           d) Taiz                                     2 x 5 
           e)    Aden                                  2 x 5 
54.    Pre‐Tender service for Cooling  Water Supply                     —           2001    M/s. Mega Engineering 
       Water            System                at                                            Enterprises, Hyderabad 
       Ramagundam  TPP,  Andhra 
       Pradesh. 
55.    Technical  Apprisal  report  on                  10             2500         2001    M/s. PSM Spinng Ltd., 
       DPR  of  Dummagudem  MHS                                                                  Hyderabad 
       across     river      Godavari         at 
       Dummagudam,                   Andhra 
       Pradesh. 
56.    Pre‐Tender           service          for      2 x 2.5          2000         2001    M/s. Krishi Power Tech 
       Siraguppa           MHS             near                                                Pvt Ltd., Bellary, 
       Kenchanagudam                 Village,                                                     Karnataka 
       Siraguppa        Taluk          Bellary 
       District, Karnataka. 
57.    Upper  Bhadra  Lift  Irrigation               Irrigation         —           2001     M/s. SNC, Bangalore. 
       Scheme, Karnataka.                             Project 
58.    Preparation         of      RFQ       for        500           22500         2000    M/s. Bay West Power & 
       Thermal       Power         Plant      at                                               Energy Pvt Ltd., 
       Baroda for M/s. GPCL. Gujarat                                                              Bangalore. 
59.    Pre‐Tender  services  for  Co‐                   75            30000         1999    M/s. Bay West Power & 
       generation       Captive           Power                                                Energy Pvt Ltd., 
       Plant     for       M/s.      Duncan                                                       Bangalore. 
       Industries  Ltd.,  at  Khanpur. 
       Uttar Pradesh. 
60.    Chuzachen        HEP         in      East      2 x 40            —           1999       M/s. Nagarjuna 
       Sikkim State,                                                                         Construction Co Ltd., 
                                                                                                 Hyderabad. 

                                                                                                     Pre‐Tender Services 
                                                                                                                      64 
  

Sl.    Name of the Project                        Installed      Project Cost    Year            Clients 
No.                                              Capacity in     in Rs. Lakhs 
                                                    MW 
61     Technical  Evaluation  Report                  —               —          1999      M/s. Bhrouka Power 
       on  Hemavathy  LBC  MHS,                                                             Corporation Ltd., 
       Hemavathy  river  bed  unit  &                                                          Bangalore. 
       Varahi Tail Race Scheme. 
62     Pre‐Tender        services         for         60            28000        1998    M/s. Bay West Power & 
       Captive      Power        Plant     at                                                Energy Pvt Ltd., 
       Kapasan,  Rajasthan  for  M/s.                                                          Bangalore. 
       HZL, Udaipur, Rajasthan. 

63     Pre‐Tender  services  for  DG                40/60           24000        1998    M/s. Bay West Power & 
       Plant      for    Kerala       State                                                  Energy Pvt Ltd., 
       Electricity Board. Kerala                                                               Bangalore. 

64     Pulichintala  Irrigation  Project,         Irrigation         1200        1998    M/s. Gammon India Ltd., 
       Andhra Project.                             Project                                      Mumbai. 
65     Upper  Tunga  Canal  Head                  Irrigation         4000        1998        M/s. Karnataka 
       Regulator,  Shimoga  District,              Project                                Neeravari Nigam Ltd., 
       Karnataka.                                                                          Shimoga, Karnataka. 

66     Pre‐bid  services  for  Koilsagar          Irrigation          —          1998        M/s. Nagarjuna 
       Lift Irrigation Scheme, Andhra              Project                                Construction Co Ltd., 
       Pradesh.                                                                                Hyderabad. 

67     Pre‐Tender services for 132 kV            Switchyard          670         1995     M/s. GEPC, Bangalore. 
       Switchyard  at Bidanasi,  Orissa 
       for M/s. OPGC. Ltd. 

68     Pre‐Tender        services         for    Illumination        100         1995     M/s. GEPC, Bangalore. 
       connected  Civil  Works  of  Port 
       Yard Lighting at  Chennai Port 
       for Ennore Coal Port Project. 
        
69     Haliyal Lift Irrigation Scheme,            Irrigation         160         1995    M/s.Mysore Construction 
       Karnataka.                                  Project                                   Co., Bangalore. 
                                                                                                      
70     Pre‐Tender        services         for      132 kV            900         1994     M/s. GEPC, Bangalore. 
       Substations        for        MSEB. 
       Maharashtra. 
        

                                                                                                   Pre‐Tender Services 
                                                                                                                    65 
  

 Sl.    Name of the Project                   Installed     Project Cost    Year            Clients 
No.                                          Capacity in    in Rs. Lakhs 
                                                MW 
 71     Pre‐Tender      services      for    400 kV/220         600         1994     M/s. GEPC, Bangalore. 
        connected  civil     works  of           kV                                             
        Substations  at  Meerut  and 
        Mandola  for  PGID.  New 
        Delhi. 
 72     Bhima  Lift  Irrigation  Project,     Irrigation       22000                M/s. Gammon India Ltd., 
        Gulbarga District, Karnataka.          Project                                     Mumbai. 
  




                                                                                             Pre‐Tender Services 
                                                                                                              66 
  

F. Due Diligence Report‐Completed   
                                                           

 Sl.           Name of the Project          Installed          Project       Year            Clients 
 No.                                       Capacity in        Cost in Rs. 
                                              MW                Lakhs 
  1     Technical  Apprisal  Report          2 x 2.5             2000        2011    M/s. Greenko Energies 
        for  Palloli  MHS  –River                                                     Pvt Ltd., Hyderabad. 
        Gurpur. 
  2     Technical  Apprisal  Report          2 x 2.5             2000        2011    M/s. Greenko Energies 
        for     Alehalli    MHS‐River                                                 Pvt Ltd., Hyderabad. 
        Bhadra 
  3     Technical  Apprisal  Report             3                1500        2011    M/s. Greenko Energies 
        for  Shiragola  MHS‐River                                                     Pvt Ltd., Hyderabad. 
        Bhadra,  Shimoga  District,                                                               
        Karnataka. 
  4     Technical  Apprisal  Report          2 x 2.5             2000        2011    M/s. Greenko Energies 
        for  Kuskal  MHS  –River                                                      Pvt Ltd., Hyderabad. 
        Bhadra,  Shimoga  District, 
        Karnataka. 
  5     Technical  Apprisal  Report             3                1500        2011    M/s. Greenko Energies 
        for  Jaladurga  MHS‐River                                                     Pvt Ltd., Hyderabad. 
        Tunga,      Hospet,     Bellary 
        District, Karnataka. 
  6     Technical  Apprisal  Report            4.5              22500        2011    M/s. Greenko Energies 
        for  Kantamangala  –River                                                     Pvt Ltd., Hyderabad. 
        Payaswini,Puttur  District, 
        Karnataka. 
  7     Updating of Financials DPR           2 x 4.5             5200        2011    M/s. Continental Energy 
        for Magundi MHS                                                                 Services Pvt Ltd., 
                                                                                           Hyderabad. 
  8     Concept  report  for  Water            —                  —          2010    M/s. Kelsatek Solutions 
        Recovery  from  Slime  Pond                                                    Pvt Ltd., Bangalore. 
        at  JSW  Hosepet,  Bellary 
        District, Karnataka. 
  9     Chunchi       Doddi      MHS,       3 x 3.559            4800        2010    M/s. Greenko Energies 
        Bangalore  Rural  District,                                                   Pvt Ltd., Hyderabad. 
        Karnataka. 




                                                                                               Due Diligence Report 
                                                                                                                67 
  

Sl.    Name of the Project                  Installed      Project       Year             Clients 
No.                                        Capacity in    Cost in Rs. 
                                              MW            Lakhs 
10     Bhadra  Left  Bank  Canal             1 x 1.5         1051        2010        M/s. Shree Matha 
       MHS,  Shimoga  District,                                                  Vaishnavi Infra‐Build Pvt 
       Karnataka.                                                                      Ltd., Mysore. 
11     Jalkoti  SHEP  in  Himachal           2 x 6.25       10400        2010    M/s. Prajwal Energy Pvt 
       Pradesh.                                                                       Ltd., Mumbai 
12     Hemavathy MHS,                                                    2010     M/s. Greenko Energies 
       a)   Left Bank Power                   4 x 4          8000                  Pvt Ltd., Hyderabad. 
       House                                                    
       b) River Bed Power                     2 x 4             
       House                                                    
       Hassan District, Karnataka                               
                                                             4000 
13     Himani  Chamunda  SHEP                2 x 4.75        8000        2010    M/s. Prajwal Energy Pvt 
       in Himachal Pradesh.                                                           Ltd., Mumbai 
14     Dadupur        MHS,        near        4 x 4          6400        2010      M/s.Bhoruka Power 
       Dadupur, Harayana.                                                          Corporation Pvt Ltd., 
                                                                                        Bangalore. 
15     Techno‐Economical                       165          110000       2010     M/s. Saraswathi Power 
       Viability  Study  on  DPR  of                                               Co Ltd., Hyderabad. 
       Dikku HEP, Nagaland. 
16     Somavathi                MHS,          2 x 3        2963.65       2010         M/s. Velankani 
       Chikkamagalur          District,                                           Renewable Energy Pvt 
       Karnataka.                                                                     Ltd.,Bangalore. 
17     Technical  Review  Report              4 x 6         12000        2009      M/s.Bhoruka Power 
       for  Chaya  Bhagawati  SHP,                                                 Corporation Pvt Ltd., 
       Karnataka.                                                                       Bangalore. 
18     Due  Diligence  report  for             7.5           5300        2009    M/s. Hemavathy Power 
       Sarju  I  MHS,  Bageshwar                                                     & Light Pvt Ltd., 
       Uttarakhand.                                                                     Bangalore. 
19     Sarju  II  MHS,  Bageshwar              15           10500        2009    M/s. Hemavathy Power 
       Uttarakhand                                                                   & Light Pvt Ltd., 
                                                                                        Bangalore. 
                                                                                              
20     Sarju  III  MHS,  Bageshwar             10.5          7500        2009    M/s. Hemavathy Power 
       Uttarakhand                                                                   & Light Pvt Ltd., 
                                                                                        Bangalore. 


                                                                                           Due Diligence Report 
                                                                                                            68 
  

Sl.    Name of the Project                   Installed      Project       Year            Clients 
No.                                         Capacity in    Cost in Rs. 
                                               MW            Lakhs 
21     Upper Sethi HEP, Nepal.                  127          100000       2009      M/s. Venika Hydro 
                                                                                     Projects Pvt. Ltd., 
                                                                                         Bangalore. 
22     Upper Modi HEP, Nepal.                   30           30000        2009     M/s Maytas Infra Ltd., 
                                                                                        Hyderabad. 
23     Paudital  Lassa  SHP  near               24           12600        2008     M/s. Tulajaa Bhavani 
       Roharu  Town  in  Himachal                                                 Energy Projects Pvt Ltd., 
       Pradesh.                                                                           Mumbai. 
24     Palor‐I  MHS  near  village            2 x 1.5         1300        2008     M/s. Tulajaa Bhavani 
       Lana  Palor  Sangarh  Taluk,                                               Energy Projects Pvt Ltd., 
       Simor  District,  Himachal                                                         Mumbai. 
       Pradesh                                                                                 
25     Palor‐II  MHS  near  village           2 x 2.25        1306        2008     M/s. Tulajaa Bhavani 
       Lana  Palor  Sangarh  Taluk,                                               Energy Projects Pvt Ltd., 
       Simor  District,  Himachal                                                         Mumbai. 
       Pradesh.                                                                                
26     Gundiadka  SHPP,  Dakshin              2 x 3.5         1925        2007     M/s. Sun Technics Pvt 
       Kannada                 District,                                              Ltd., Bangalore. 
       Karnataka. 
27     Burhi Gandaki HEP, Nepal               4 x 150        227618       2007    M/s. GMR Energy Ltd., 
                                                                                        New Delhi. 
28     Augmentation      of      water        Water           3940        2007      M/s. Mangalore City 
       supply  to  Mangalore  City.           Supply                              Corporation, Mangalore 
       Dakshina  Kannada District,                                                       Karnataka. 
       Karnataka. 
29     Kubjanadi      MHS,         near        2 x 2          1600        2007    M/s.PSR Hydro Energy 
       Coondapura, Karnataka.                                                       Pvt. Ltd., Bangalore. 
30     Marigundihole  MHS,  near              2 x 1.5         1250        2007    M/s.PSR Hydro Energy 
       Kadaba,       Chikkamagalur                                                  Pvt. Ltd., Bangalore. 
       District, Karnataka. 
31     Venurhole      MHS,         near       2 x 2.5         2000        2007    M/s.PSR Hydro Energy 
       Moodabidri,        Dakshina                                                  Pvt. Ltd., Bangalore. 
       Kannada District Karnataka 
32     Manchikere      MHS,        near       2 x 8.25        8000        2007    M/s.PSR Hydro Energy 
       Yellapura,Uttara  Kannada                                                    Pvt. Ltd., Bangalore. 
       District, Karnataka. 


                                                                                            Due Diligence Report 
                                                                                                             69 
  

Sl.    Name of the Project                  Installed      Project       Year             Clients 
No.                                        Capacity in    Cost in Rs. 
                                              MW            Lakhs 
33     Techno‐Economical                       100          60000        2007     M/s. Sunflag Iron and 
       viability  Study  for  Hanol‐                                             Steel Co Ltd., New Delhi. 
       Tiuni in Uttranchal. 
34     Baliyantrahole            MHS,         2 x 1          800         2007    M/s.Kodagu Power Pvt. 
       Kodagu District, Karnataka.                                                   Ltd., Bangalore. 
35     Middle Kolab SHP, Orissa.              3 x 6          9000        2006     M/s.Meenahshi Power 
                                                                                     Ltd., Hyderabad. 
36     Review  of  Hydrology  and            2 x 48         80000        2006     M/s. Indu Projects Ltd., 
       Power  Potential  for  Dik‐                                                     Hyderabad. 
       Chu HEP in Sikkim 
37     Samal  HEP  near            Kule       5 x 4         10000        2006        M/s.. KSK Energy 
       village      Angul    District,                                                 Ventures Ltd., 
       Orissa.                                                                          Hyderabad. 
38     Techno‐Economical                       180          108000       2006          M/s. Simplex 
       viability  study  for  Bajoli                                               Infrastructures Ltd., 
       Holi  Project  near  Holi                                                         Mumbai. 
       village, Himachal Pradesh.                                                              
39     Techno‐Economical                       95           60000        2006    M/s..Sunflag Iron & Steel 
       viability  study  for  Dibbin                                                Co.Ltd., New Delhi 
       HEP, Arunachal Pradesh.                                                                 
40     Kuthupuzha        MHS         in       2 x 2          200         2005     M/s. Raphidiam Power 
       Kodugu                District,                                               Supplies Pvt Ltd., 
       Karnataka.                                                                        Madikere 
41     Technical      appraisal      on        80           34700        2005     M/s. Nagarjuna Hydro 
       Bharmour          HEP         in                                              Energy Pvt Ltd., 
       Himachal Pradesh.                                                               Hyderabad. 
42     Preliminary  Assessment  of                           200         2005     M/s. Rahmhita Power 
       Power        Potential       for        650                                   Project Pvt Ltd., 
       Machgunda                 MHS,                        200                       Hyderabad. 
       Shalipura Branch Canal 1 &              600 
       2, Karnataka. 
43     Kelagur       MHS     Kodagu           2 x 2          1600        2005    M/s Karnataka Strips Pvt. 
       District, Karnataka.                                                          Ltd., Bangalore. 
44     Study of Power Potential  in            —              —          2004    M/s. NTPC Hydro Ltd., 
       Netravati  Basin  Western                                                 Noida, NCR New Delhi. 
       Ghats, Karnataka. 


                                                                                            Due Diligence Report 
                                                                                                             70 
  

    Sl.    Name of the Project            Installed      Project       Year          Clients 
    No.                                  Capacity in    Cost in Rs. 
                                            MW            Lakhs 
    45.    Project Appraisal for 40MW        40           20000        2004     M/s. Alpha Energy 
           Biomass  based  Thermal                                             System Ltd., Chennai 
           Power  Plant  in  Andhra                                                Tamil Nadu. 
           Pradesh. 
    46.    Techno‐Economical               2 x 48         65000        2004    M/s. Nagarjuna hydro 
           Viability  Study  on  DPR                                             Energy Pvt Ltd., 
           Jorthrang    Loop      HEP                                              Hyderabad. 
           Sikkim. 
 




                                                                                       Due Diligence Report 
                                                                                                        71 
 




    Certificate 
            72 
 




    Certificate 
            73 
 




                 
 
 


        Certificate 
                74 
 
     




                    
 
 
 

        Certificate 
                75 
 
     
 




                  
     




        Certificate 
                76 
 
 
 
 
     




        Certificate 
                77 
 
 
 
 
 
     


        Certificate 
                78 
 
 
 
     
 



        Certificate 
                79 
 
 
 
     



        Certificate 
                80 
 
 
 
     


        Certificate 
                81 
 
 
 
     


        Certificate 
                82 
 
 
     




                
 
 
         

            Certificate 
                    83 
 
 




          
 
 

    Certificate 
            84 
     




                 
 
 
 
         

            Certificate 
                    85 
 
 
 
     



        Certificate 
                86 
 
 
 
 
     


        Certificate 
                87 
 




Certificate 
        88 
13.     Brief Profile of Advisors / Consultants

    (a) Advisors 
 

Mr. H.V. Eswaraiah, is retired from Karnataka Power Corporation Limited, working as 

freelance  Consultants  for  large  Hydro  Power  Project.    Design  Group  is  availing  his 

technical  expertise  on  implementation  of  Hydro  Power  Project  related  to  contracts, 

QAC, PMC etc. 

 

Mr. H.V. Eswaraiah, after his Masters degree from renowned Indian Institute of Science, 

had  a  brief  stints  as  lecturer,  worked  in  State Public  Works  Department  before joining 

Karnataka Power Corporation Limited, as Assistant Executive Engineer in the year 1971, 

and  retired  as  Technical  Director  in  the  year  1997.    He  has  extensively  dealt  with  all 

aspects  of  Hydro Power  Projects,  starting  from  field  investigation,  preparation  of  PFR, 

DPRs,  Bid  preparation, technical  evaluation,  award  of  work,  as  Executive  Engineer, he 

has worked on  a 100m high Supa Concrete gravity Dam, achieved production level of 

1000  cumecs  per  day  of  concreting  production  and  laying  in  the  design.    At  corporate 

level,  in  charge  of  long  term  Power  Project  Planning,  advising  Managing  Director,  on 

settlements  of  dispute  and  claims  of  contracts,  direct monitoring  of    all  Projects  under 

construction, procurement and movement of Coal, Cement and Steel.  In his tenure, he 

has handled 15 Hydro Power Projects including a Thermal and Wind Projects.  He had 

wide experience in dealing with World Bank Funded Projects. 

 

After his retirements, he was appointed by NTPC for Koll dam (700 MW) as advisor.  He 

is  also  assisting  Banks  as  Lender  Engineers  for  various  Mini  Hydel  Scheme  funded  by 

Banks. 




                                                                                               Advisor 
                                                                                                   89 
 
Mr.  Shankar  V.  Nesargi,  B.E.  (Mech),  ME  (WR),  Joined  Karnataka  Power  Corporation 

Limited,  as  an  Engineer  in  the  year  1970  and  retired  as  Managing  Director  of  VVNL, 

subsidiary  Company  of  KPCL  in  the  year  2005.    As  an  Assistant  Engineer  handled 

investigation works of Kali Hydro Electric Project ( 6 x 135 MW)  including drift works. 
Incharge  Executive  Engineer  for  construction,  O  &  M  of  4  x  210  MW  

Raichur Thermal Power Plant, he had extensive explosure to Coal Plant, Railways, WTP, 

Boiler,    Turbines  etc.    During  this  period,  he  was  elevated,  as  Superintending  /  Chief 

Engineer.   In the  year  2003, he  was  appointed  as  Executive  Director totally  incharge  of 
Planning  Infrastructure  works  of  4  x  350  MW,  Bidadi  Gas  Based  Power  Plant,  near 

Bangalore.    Subsequently,  he  was  appointed,  as  Managing  Director,  Vishveswaraiah 

Vidyuth Nigama Ltd., incharge of O & M, of 600 MW Hydro Power Project including R 

&  M  works.    During  his  tenure  in  KPCL,  he  has  attended  several  National  and 
International Seminar and travel world wide. 

 

After retirement he was a freelance consultant to various foreign Companies in Uganda, 

Spain etc., traveled extensively in these countries as technical consultants. 

 

Presently,  he  works  as  a Managing  Director  of  DB  Global  Energy  Limited,  a Company 
dedicated  to  Wind  Power  Generation  as  IPPs,  executing  100  MW  of  Windfarm  near 

Belgaum, Karnataka. 

 

 




                                                                                              Advisor 
                                                                                                  90 
 

Mr. P.R. Balasubramanian, after obtaining Bachelor degree in Mechanical Engineer, had 

one  year  training  in  Nuclear  and  Allied  subjects  in  Bhabha  Automic  Research  Centre, 

Bombay.  Thereafter, he was absorbed in the department worked for a decade in various 

departments  of  BARC,  before  joining  Engineers  India  Limited,  New  Delhi  in  the  year 

1978.   Thereafter joined  Gas  Authority  of  India  Limited  and  worked  till  1990.    He  was 
selected,  as  Director  in  Neyveli  Lignite  Corporation  Ltd,  in  1997.   He  was  Chairman  / 

Managing  Director  of  Fertiliser  and  chemicals,  Travancore  up  to  his  retirement  in  the 

year 2002. 

 

He  is  a  freelance  consultant,  presently  independent  Director  of  REC,  India  Rare  Earth 

Ltd., (Department of Atomic Energy). 

 

His  areas  of  expertise  is  overall  Corporate  Management  of  Large  Organisations, 

Development  of  Engineering  Expertise  in  the  Organisation,  Conceptualising  of  Turn 

Around  strategies,  over  view  the  implementation  of  the  Projects  from  Concept  to 

Commissioning, preparation of quality Project Reports, Proper appraising of the Project 

Reports,  Resolving  Arbitration  Issues etc.,  by  applying  the  expertise  and  experience  in 

managing    various  projects  in  Nuclear  Chemicals,  Fine  Chemicals,  Petrochemicals, 

Hydrocarbons, Gas  Processing  Plants, Cross  Country Pipelines, Thermal  power  plants,
Fertilizer Complexes etc.




                                                                                            Advisor 
                                                                                                91
Mr.  B.V.  Ramakrishnaiah,  hydraulic  Gates  Consultants,  was  ranked  4th  in  Bachelor  of 
Engineer, and passed M.E. in distinction from India’s premier Institution namely Indian 
Institute of Science, Bangalore, in the year 1964.  He joined CW& PC, New Delhi, soon 
after  his  Master  degree  in  the  year  1962,  worked  mainly  in  design  and  drawing  of 
Hydraulic Gates for Irrigation and Hydro Power Projects.  In the year 1966 joined M/s. 
Triveni  Structurals  Ltd.,  Naini,  Allahabad,  served  over  13  years  in the  organization,  as 
Gates and Penstock design specialist.  During his tenure, he has designed cylinder Gates 
for Ramanaganga Project, which is only one of its kind in the country, operated by a 70 
tonnes  capacity  Hydraulic  hoist.  Another  gate  operated  by  650  tonnes  capacity 
Hydraulic  hoist  is  designed,  as  High  Pressure  slide  gates,  for  Baggi  control  works, 
Sundernagar,  Himachan Pradesh, High  Pressure  fixed  wheel  Penstock  emergency  gate 
was  designed  for  Beas  Project,  Punjab  for  a  clear  vent  size  of  10  feet  x  21  feet,  for  a 
design head of 110m.  This gate carries a total load of 2160 tonnes which is transferred to 
concrete through 12 wheels, 150 tonnes capacity hydraulic hoist  operates the gate.  Crest 
radial  gates  for  Itezhitezhi  Dam,  Zambia,  has  been  designed  which  was  vetted  by 
SWECC  Swedan.    Similarly,  Batten  outlet  radial  gates  had  been  designed  for  Great 
Reeha Power Project Tanzania. 
 
He resigned M/s. Triveni Structurals Ltd., in the year 1979, to start his own consultancy 
firm, where he has designed over 100 gates of various shapes and sizes.  To name a few, 
designed 18.288m x 17.145m spillway radial gates for Srisailam Hydro Electric Project in 
Andhra  Pradesh,  first time spherical  plain  bearings  were  used  for the Tirunion  instead 
of  normal  bronze  bushes.    Designed  one  of  the  tallest  Penstock  gate  of  size  6.75m  x 
15.75m in the country, for Lower Metur Project in Mettur Tamilnadu. 
 
As  regards  Penstocks,  Pipes,  2.743m  dia  for  a  static  head  of  405m  was  designed  for 
Kaufe  Gorge  HEP  in  Tambia  Africa,  4.88m  dia  to  withstand  static  head  of  51.2m  was 
designed  for  Bowatena  Power  Project  in  Sri  Lanka.    He  has  distinction  of  designing 
record breaking gate size and penstocks of large diameter in India.  He is ranked as a top 
class gate designer in India. 




                                                                                                  Advisor 
                                                                                                      92
Mr.  V.  Balachandran,  is  a  retired,  Deputy  Director  General  and  HOD  GSI,  Southern 

Region.  He  is  a  freelance  senior  Geologist  advising  Design  Group  on  Engineering 

Geology  for  Large  Hydro  and  Irrigation  Projects  in  India  and  Abroad.  Presently 

pursuing his doctoral thesis in Osmania University. 

 

Mr. V. Balachandran, after Masters’ degree in Geology joined Geology Survey of India in 

the  year  1971,  as  Junior  Geologist  and  retired,  as  Deputy  Director  General  and  HOD, 

GIS, Southern Region. Out of 36 years of experience in the fields of Geology, 30 years is 

spent in Engineering Geology, involved in conducting Preliminary Investigation to post 

construction  stage,  his  services  spread  all  over  India,  including  Supervision  and 

guidance  to  Project  Authorities.  A  few  Projects  where  he  was  directly  involved  are  : 

facilitated smooth negotiation, Chibro Khodri Hydro Power Project tunnel between two 

regional thrusts. Facilitated smooth negotiation of twin tunnels of Khan Hydel Scheme, 

upto  upper  Siwalik  incoherent  sand  rock  with  plethora  of  problems  such  as  seepage, 

collapse and daylighting of the tunnel. Selection of Dam site for 230m high rockfill dam 

project which was under investigation for a protracted period (40 years). By identifying 

source  of  seepage  at  Kadampari  Pumped  storage  scheme,  the  energy  generation  was 

substantially  enhanced.  Adopted  hydraulic  jacking  of  upper  Kodayan  tunnel  and 

suggested  other  remedial  measure.  Geological  investigation  was  extensively  carried  at 

MAPS  Kalpakkam  and  Kundankulam  for  Nuclear  Power  Corporation  Ltd.,  Extensive 

field  services  were  carried  out  with  special  reference  to  Seismological  studies  led  to 

clearance  for  Kundakulam  Atomic  Power  Plant.  Initiated  studies  on  Korada  Atomic 

Power  Plant  and  studies  on  Plutonium  Fast  Breeder  Reactor  Project  under  Madras 

Nuclear  Power  Plant  leading  to  clearance  to  the  Project.  Carried  out  Mega  thrust 

Tsunami  Hazard  studies  in  South  India.  Attended  several  National  and  International 

seminars,  and  presented  several  technical  papers,  Traveller  World  Wide,  including 

undergoing  training  in  Harza  Engineering,  USA  and  National  Resources  (Canada)  and 

Geological Survey of Canada at Vancouver Calgary and Ottawan Canada. 


                                                                                            Advisor 
                                                                                                93 
C.R.  Venkatesh  B.E.  (Civil),  M.E.  (Str),  obtained  first  class  with  distinction  in  Masters’ 

degree,  from  the  renowned  Indian  Institute  of  Science,  Bangalore.    He  worked,  as 

lecturer in Engineering Colleges, Assistant Residential Officer, CWPRS (Poona, Scientist 

Cement  Research  Institute  of  India,  New  Delhi,  before  joining  National  Hydro  Power 

Corporation  Ltd.,  as  Manager  in  the  year  1981,  worked  till  his  retirement  in  the  year 

2004.    During  his  tenure  in  NHPC  Ltd.,  he  has  risen  from  the  post  of  Manager  upto 

Executive  Director.    As  a  Chief  Engineer,  he  was  in  charge  of  Dulhasti  Hydro  Power 

Project  (3  x  130  MW).    As  an  Executive  Director,  Contract  Division,  managed  all 
procurement  activities  and  Civil  E  &  M  Works  Contracts.    Under  R  &  D  wing,  he  has 

evolved  cost  analysis  of  complicated  works,  suggested  various  means  for  cost  cutting.  

He was trained in detailed structural analysis of Chamber Concrete Dam in Canada; in 

Sweden,  under  went  Advanced  International  Hydro  Power  Develop  Project;  in 
Germany / Netherland attended Advanced Management Development Training. 

 

In  India,  under  went  specialized  technical  training  in  Reflection  Photo  elasticity  and 

strain  gauge  technique,   Dam  Safety,  Geotechnical  instrumentation etc.   He has  visited 

number of Foreign Countries. Deputed to Pakistan, participated in technical discussions, 

on Indus Watering Treatment. Had meeting with Arbitrators in connection with Internal 
Arbitration Tribunal on Chamera HEP Contract disputes.  He has 44 technical papers to 

his credit.  His research paper on De‐silting basin, won a special Certificate of merit by 

Central Board of Irrigation and Power, New Delhi. 

 

Since,  his  retirement,  his services,  as  freelance  consultant  is  being  used  by  major  Civil 

Contractors for dispute redressal and Arbitration. 




                                                                                                Advisor 
                                                                                                    94 
Mr. M.C. Rangarajan, is a free lance Electrical Engineering Consultant for various 

organisation including M/s. Design Group Project Consultants Pvt Ltd. 

 

Mr.  M.C.  Rangarajan,  after  obtaining  Bachelor  of  Engineer  degree  from  Indian 

Institute  of  Science,  in  the  year  1969,  joined  Karnataka  Power  Corporation  as 

Electrical  Engineer,  and  retired  in  the  year  2005,  after  36  years  of  rich  in 
experience  Hydro  Power  generation.  Important  assignment  to  name  as  Design 

and  Layout  of  Hydro  and  Thermal  Projects  sizing  of  units,  firming  up  of 

technical  specification,  bid  documents,  bid  processing,  contract  management, 

project  monitoring,  inspection  of  components,  Vendors  Plant.  He  was  involved 

in  construction  of  following  Hydro  Projects  to  name  a  few,  Nagjhani  (6  x  135 
MW) Supa Dam Power House (2 x 50 MW), Gerusoppa Dam Power House (4 x 

60  MW),  Kadra  Dam  Power  House  (3  x  50  MW),  and  Kodasalli  Dam  Power 

House  (3  x  40  MW).  In  addition  looked  after  O  &  M  of  Sharavathy  HEP  (1035 

MW), Varahi underground Power House (230 MW), R & M works etc. 

 

As a senior executive Chairman of Core  group for Q & AC of EPC Contract for 

500  MW  Bellary  Thermal  Power  Plant,  Power  Purchase  agreement  with  State 
level  distribution  Companies.  He  has  presented  several  technical  papers  in 

National and  International Conference; visited difference type of Power Houses 

and manufacturer units in India and Abroad. 




                                                                                    Advisor 
                                                                                        95
 

S. Ramanan, B.E. (Civil), worked in Karnataka Power Corporation Limited between 1975 

to 1984, after a brief stinct, as lecture in NIE Mysore.  Joined NHPC, in the year 1985, and 

retired in the year 2009, as General Manager. 

 

He had an exposure in all branches of Hydro Power Project, from Survey, Investigation, 
Preparation  of  PFRs  and  DPRs,  bid  documents,  to  Civil  designs,  construction  of HEPs.  

He  was  past  as  GM  Consulting  and  Bussiness  Development  Division,  dealt  with  Tidal 

Power  Project,  Infrastructure    development  in  Andaman  and  Nicobar  Island,  Varzab 

Power  Plant  in  Tajikistan  and  raising  of  Dhankari  dam  in  Port  Blair,  Andaman  and 
Nicobar  Island.    Till  his  retirement,  he  had  handled  over  5000  MW  of  Hydro  Power 

development in various capacities sparing across the length and breadth of India for 10 

HEPs in total.  He had a short stint in design and engineering of Power transmission line 

in  North  East  State.    He  is  a  freelance  consultant  advising  various  IPPs  in 
implementation of small Hydro Projects. 




                                                                                          Advisor 
                                                                                              96
 

Mr. Umashankar, is an advisor on design and drawing of large span roof trusses used in 

Power Plants, and complicated heavily loaded structural steel works. Presently advisor 

to Design Group. 

 

Mr. Umashankar joined MECON Ltd., in the year 1973, as steel structural engineer and 

retired in the year 2009, as Deputy General Manager. As a steel structural designer, he 

was actively involved in design of Steel Plants of large capacity in India, such as Bokaro 

Steel Plant (expansion) Bhilai steel plant (expansion, Titanium – Dioxide pigment plant 

in  Kerala,  Defence  Project  –  NSTL  at  Vizag  A.P.,  Kudremukh  Iron  Ore  Project,  Essar 

Steel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external 

Coal  handling  system  for  TNEB  at Chennai,  Birla  Copper  expansion  phase  II.  HGPL  – 

Expansion at Vizag A.P. Defence Project – Sea bird at Karwar, West Coasts of Karnataka, 

Essar Integrated Steel Plant at Hazira. More than half million tones of Steel design and 
fabrication of steel structure has been done under his guidance. He has been deputed to 

foreign  countries  by  MECON  for  inspection  and  fabrication  in  Countries  like  China, 

Germany,  Korea,  he  has  also  attended  several  work  shops  conducted  in  India  and 

Abroad. 




                                                                                         Advisor 
                                                                                             97 
 

Mr.  V.  Narayanan,  is  a  transmission  line  design  and  construction  expert.    Advisor  to 

Design Group on assignments pertaining to transmission lines, as and when required. 

 

After  his  Bachelor  degree  in  Civil  Engineering,  obtained  Masters  degree  in  Civil  and 

Hydraulic Engineering from India foremost Indian Institute of Science, Bangalore, in the 

year 1963.  soon after joined M/s. SAE (India) Ltd., as Design Engineer for transmission 

Tower, Civil Foundation and other allied works.  He has involved designs and drawings 

for various voltages from 66 kV to 220 kV to many Electricity Boards in India. 

 

Subsequently  1973  onwards  assumed  the  change  of  Production  Manager  in  M/s.  SAE 

Factory  at  Jabalpur.    He  was  deputed  to  M/s.  SAE,  Milano,  for  being  trained  in  their 

works  at  Lecco,  on  production engineering,  design  and  drawings,  Testing  Stations.   In 

the year 1978 was sent to Australia to acquaint with the working of Testing Station.  At 

Jabalpur  Plant,  made  a  commercially  viable  Testing  Station  in  par  with  International 

Testing Station.  He was responsible for increasing the production capacity to 30,000 MT 

per annum from 8000 MT.  As a General Manager responsible for design and testing of 

many 400 kV and 500 kV DC lines.  After his retirement worked in several International 
Companies, such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc.  He has wide 

technical knowledge in Transmission lines from concept to commissioning. 




                                                                                             Advisor 
                                                                                                 98
 

Mr. C. Channakeshava, Ph.D, is an freelance advisor to Design Group on Computer aided 

Mathematical  modeling  for  3D  complicated  structures  for  carrying  out  precision  analysis 

and design of Dams etc. 

 

Mr. C. Channakeshava, after his post graduation in M.E., from renowned Indian Institute of 

Science,  Bangalore,  obtain  his Ph.D  in  the same  Institution  in the  year  1988.   He  was Post 
Doctral  Research  Associates  in  University  of  Cincinnati  Ohio,  USA,  Louisiana  State 

University,  USA,  extensively  worked  on  Finite  Element  Method  applied  to  Civil 

Engineering works.  He has illustrious academic background, topper in Universities in India 

and Abroad. 

 

In  Bangalore,  joined  a  reputed  EMRC  Software  Company  (USA)  team  to  develop  world 
class NISA Software tool used extensively for Non‐linear analysis.  His field of interests are 

computational  mechanics,  Finite  Element  Analysis,  Boundary  Element  Analysis,  Analysis 

and Design of RCC & Steel Structurals, Roads and Bridges, Computer Aided Design. 

 




                                                                                               Advisor 
                                                                                                   99 
 
Mr. Shridhar Prabhu, freelance Solicitor specialize in Energy Law Audit and Regulatory 

Affairs and Compliance. Design Group is availing in services in PPA related matter. 

 

Mr. Shridhar Prabhu, after obtaining degree in law, started practicing in High Court of 

Karnataka, enrolled in Delhi Bar Council. As a specialist in Regulatory Appraise related 
to energy, he was nominated, as Vice Chairman, Energy Committee of the Federation of 

Karnataka  Chamber  of  Commerce  and  Industries,  Advisor  to  India  Wind  Turbine 

Manufacturers  Association.  Advisor  Renewable  Energy  Developer  Association, 

Karnataka  (REDAK).  Former  State  Council  Member  –  IWPA,  in  addition  during  his 

practice, he has represented India’s Wind Energy Sector, before the Supreme Court; first 

and  only  representative  of  the  Wind  Energy  Sector  to  represent  before  the  Central 

Electricity  Regulatory  Commission  (CERC),  New  Delhi.  Represented,  on  several 

occasions,  on  behalf  of  IPP’s,  he  has  argued  before  REC’S  on  fixation  of  Tariff, 

standardization of PPA’s renewable Power Purchase obligations for Wind Project. 
 

Envisaged a theme paper and chalked out action plans for NASDAQ listed IT Services 

Company  with  a  market  capitalization  of  over  US$  30  Billion  for  Green  Power 

procurements  in  Southern  States.  Engaged  for  advisory  and  tariff  filing  by  first  ever 
electric cooperative society and distribution license in Karnataka. 




                                                                                           Advisor
                                                                                              100
Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPP’s developers 

on  environmental  and  sustainable  Development  Areas  including  climate  change  and 

CDM  aspects  etc.,  Design  Group  seek  his  advice  on  specific  field  like  Environmental 

impact assessment, CDM due diligence and Environmental Protection project. 

 

Mr. Srinath N. Anekal after obtaining  Bachelor / Master degrees in Civil  Engineer from 

Bangalore  University  pursued higher  studies  in  University  of  Florida,  Gainsville,  USA, 

was  awarded  Master  degrees  in  Environmental  Engineering  Science  in  the  year  1993.  

Under gone, short term course in Finance for Non‐finance Managers IIM Bangalore, ISO 

14000  Environmental  Management  System  CII  India,  hazardous  waste  management 

operational practice, USA.  He has traveled widely in  USA, Inida, Banglaesh, Maruitius 

and  Mozambique.    Where  he  worked  extensively  in  the  field  of  Environment,  Energy 

and  Water.    He  demonstrated  experience  in  conceptualizing,  design,  promoting  and 

implementing innovative projects in the area of waste minimization, clean Technologies, 

Environmental  protection,  Urban  Water Supply  and  sanitation, Renewable  Energy  and 
clean  Development  Mechanism.    He  was  with  executing  Agencies  for  implementing 

reform oriented projects funded by world Bank, DflD, KfW, European Commission and 

Danida.  He has contributed to the development of country level strategies; especially on 

mainstream new development concepts, through conduct and participation in seminars 
and  workshops  and  effective  interaction  with  all  stake  holders  in  Government,  Non‐

Governmental Organization and Private Sectors. 




                                                                                         Advisor 
                                                                                            101 
(b) Consultants 
     
 Mr.  C.S.  Hebli,  B.E.  (Hons),  after  obtaining  Bachelor  degree  in  Civil  Engineer  with 

distinction, joined Bombay public works Department, in the year 1954, worked as Junior 

Engineer Planning  Minor  Irrigation  Project,  after  reorganization  of  Karnataka state,  his 

services  were  lent  to  Hydro  Electrical  Civil  Projects  in  the  year  1959,  as  Assistant 
Executive  Engineer,  involved  in  investigation  and  preparation  of  Bedthi,  Aghanashini, 

Mahadayi,  Kalinadi  (910  MW)  Projects.    HECP  was  converted  into  a  dedicated  power 

generation  company  called  Karnataka  Power  Corporation  Limited,  fully  owned  by 

Government of Karnataka to execute.  He raised from ranks upto first Technical Director 

of the Company, retired in the year 1988 with 37 years of rich power project experience.  

During  his  service,  activity  involved  in  Kalinadi  HEP  (910  mw),  Sharavathi  HEP  (835 

MW),  Varahi HEP  (239  MW).   Raichur TPS  (5 X  210  MW)  from  concept to  completion, 

involved  in  long  term  planning  of  Projects,  Hydro  policy  in  the  state  etc.    After 
retirement worked with Thapar Hydro Council, as consultant dealt with several Hydro 

and  Gas  based  Power  Plant  aggregating  to  2000  MW,    joined  as  Chairman,  Design 

Group  Project  Consultants Pvt  Ltd.,  Company  established  in  1979,  technically  guiding 

staff    strength  of  52  technocrates  effectively  involved  in  technical  advise.    Policy 

decisions, Company affairs etc. 




                                                                                         Consultant 
                                                                                               102
Mr.  B.L.  Lakshminarasimha,      B.Sc.,  B.E.,  M.E.,  M.I.E.,  F.I.V.,  M.A.S.C.E.,    after 

                 obtaining  Master  degree  in  Civil  Engineer  from  Birla  Institute  of 

                 Technology,  Pilani,  premier  educational  Institution  of  India 

                 (collaboration with M.I.T., USA,) after a short stint in Messers. Gerame 

and Binny Limited, joined Karnataka Power Corporation Limited, as a Civil Engineer in 

1975, resigned after 20 years of  service,  acquired technical knowledge in drafting of bid 

documents for large Hydro Power Projects, interpretation of Contract Clauses, resolved 

disputes, formulated schedule of rates, design of Surface Power House, framed structure 

through  3  D  modeling  etc.  Designed  and  constructed  KPCL  Corporate  office  building.  

Assisted  Company’s  legal  advisors  in  Arbitration  proceeding/Contract  disputes,  in  the 

Court of Law etc Founder member Design Group, established in 1979.  What turned out 

to be one man show in 1979 has grown to a large consultancy firm of repute in India and 

Abroad.    Over  3  decades  of  existence,  developed  an  exclusive  team  of  dedicated 

consultants having 40 years and above experience in Power and Irrigation Projects from 

concept to completion. 

 

Recently developed a dedicated team of engineers to extend design engineering services 

in  Water  and  Waste  Water  Treatment  Plants.  Successfully  steered  the  company  in 

obtaining KEMA ISO Certification, maintained consistent profitability over the decades.  

Executed  number  of  Joint  Venture  Partnership  in  India  and  Abroad,  such  as  CPRI, 

WAPCOS,  ILF,  for  implementation  of  Large  Projects  successfully,  signed  a  few  design 

engineering  assignment  contract  in  neighbouring  countries  such  as,  Saudi  Arabia, 

Dubai, Muscat, Ghana, Nepal, Sri Lanka. 

 

 

 

 




                                                                                                   Consultant 
                                                                                                          103
 

                    Mr.  P.R.  Mallikarjuna,  after  obtaining  M.E.,  from  prestigious  Indian 

                    Institute  of Science  in  the  year  1969,  worked  in  various  capacities  in  a 

                    Public  Sector  /  Private  Companies,  before  joining  Karnataka  Power 

                    Corporation in the year 1971, as Group Engineer (AEE), and retired in 

the  year  2000  as  Technical  Director,  with  an  illustrious  career  spanning  34  years  in 
various cadres. He was one of the Board of Directors of KPC Limited, for over 7 years, 

after his retirement. During his tenure in the KPCL, he was the head of Design wing and 

handled  all  major  Hydro  Projects,  Thermal  Power  Plants  from  concept  to 

commissioning.  Over  1200  MW  of  Power  Projects  has  been  investigated  under  his 
guidance and about 2000 MW of Power Projects has been designed. Further, 900 MW of 

Power  Projects  have  been  implemented  under  his  guidance.  He  has  attended  several 

National and International seminars, and contributed dozens of technical papers. After 

his retirement, he was involved in the preparation of revised DPR for 12 X 80 MW Indira 
Sagar  Polavaram  Hydro  Electric  Project  in  Andhra  Pradesh,  on  behalf  of  Andhra 

Pradesh  Irrigation  Department,  including  obtaining  clearances  from Central  Electricity 

Authorities,  New  Delhi.  He  was  involved  in  detailed  engineering  of  Nagarjuna  Sagar 

Tail Pond dam Power House (2 x 25 MW) and Varahi underground Power house – Stage 
II (2 x 115 MW). 

 

 From 2008 onwards, he heads the Civil Design wing of DGPCPL and is responsible for 

planning and design of Hydro Electric Projects and Large Irrigation Projects, etc. 




                                                                                              Consultant 
                                                                                                    104 
 
 

                   Mr. P.K. Rupangudi, after obtaining M.E., from prestigious University 

                   College  of  Engineering,  Bangalore  in  the  year  1971  worked  in  State 

                   Government         Organisation,    before  joining     Karnataka      Power 

                   Corporation in the year 1972 as Engineer and retired in the year 2004 

                   as  Chief  Engineer  with  an  illustrateous  carrier  spanning  32  years  in 

various cadres. During his tenure in the KPCL, he was head of Design  wing consisting 

of  engineers  of  all  discipline,  handled  all  major  Hydro,  Thermal  Power  Plants  from 

concept  to  completion.  Attended  several  National  and  International  seminars,  and 

contributed  several  technical  papers.  He  is  member  of  Gate  Committee  since  1996, 

formed  by  the  Govt.  of  Karnataka  for  design,  fabrication  erection  &  commissioning  of 

prestigious  Alamatti  Dam  Gates  and  hoists.  Even  to  date,  he  is  in  the  panel  for 

inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty 

member  on  the  continuing  education  to  the  Engineers  of  the  State,  organized  by  The 
Director, KERS – Mysore. He is the main author of History of Lingamakki & Talalakalale 

dams, of Sharavati Hydel Scheme assigned to him by the Karnataka Power Corporation. 

After  his retirement,  he  was  also  involved  in  detailed  engineering  of  Nagarjuna  Sagar 

tail  pond  Dam  and  Varahi  underground  Power  House  –  Stage  II  (2  x  115  MW)  and  a 
major weir for Lower Jurala H.E.P of Andhra Pradesh Power Generation Company.  

 

From 2010 onwards he is associated with DG responsible for implementation of Hydro 

Electric and Irrigation Projects.  




                                                                                         Consultant 
                                                                                               105 
Mr.  Chikkaguddappa  (C.G.  Appa),  joined  Design  Group  Project 

                   Consultants  Pvt  Ltd.,  in  2005,  as  a  Director  Hydro  Power  Project 

                   Planning  and  river  basin  study.    He  has  travelled  neighbouring 

                   countries, to advice IPP’s on Planning of Hydro Power Project. 

 

Mr. Chikkaguddappa (C.G. Appa), joined Karnataka Power Corporation Limited in the 

year  1973,  as  an  Engineer,  raised  to  the  level  and  retired  in  the  year  2005,  from 

Corporation after 38 years of long services.  From the day one, he was involved in river 

basin development in the Corporation, identifying and Planning Hydro Power Projects 

in  entire  length  and  breadth  of  Karnataka  state.    Mostly  dealt  with  Investigation  of 
HEP’s  like Shivana Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti 

Stage I HEP, from 1984, as a Assistant Executive Engineer, he was involved in field data 

collection  for  Hydrology,  surface  and  sub‐surface  details  for  preparation  of  DPR  for 

major  HEP’s    like  MahadayI  (318  MW),    Cauvery  Scheme  (270  MW),  Tamankal  (800 
MW), Almati Dam Power House (280 MW),  (Mekedath 1400 MW), Kali stage – III (1200 

MW)  Bedsti  stage  II  (400  MW),  Aghanashini  (600  MW),  Gundiya  High  heads  scheme 

(400)  conceived  if,  as  a  run  of  the  river  scheme,  study  proposed  for  Pumped  storage 

scheme at the existing Sharavathy complex (1000 MW) AND Kali Complex (1200 MW). 

He was one of the Authorities in river basin studies in Karnataka.  In addition, identified 

and prepared DPR’s for Mini Hydel Scheme of less than 25 MW. 

 

He joined  Design  Group  Project Consultants Pvt  Ltd.,  in the  year  2005,  responsible  for 
identifying and preparation of Desk Study Report for over 12,000 MW of Hydro Power 

Projects in neighbouring Country Nepal. 

 




                                                                                         Consultant 
                                                                                               106
 

                      Mr.  Raghavendra  Rao  H  after  obtaining  BE  degree  in  Electrical 

                      Engineering  from  National  Institute  of  Engineering,  Mysore  in  the 

                      yarer  1972  worked  in  Medium  Voltage  Switch  Gear  industry  as 

                      development  and  production  Engineer  till  1977  before  joining 

Karnataka  Power  Corporation  Ltd,  the  premier  organization  carrying  out  design, 

construction,  operation  and  maintenance  of  power  plants  in  the  state  of  Karnataka,.  He 

retired  as  Superintendent  Engineer  (Electrical)  from  KPCL  in  the  year  2006.  During  his 

tenure in KPCL he worked in the areas of design, construction, testing and commissioning 

and  maintenance  of  Hydro  and  Thermal  power  plants  mainly  in  the  areas  of  Electrical 

equipments and systems of power plants and the tenure included working at both power 

plants and the corporate design office.     

 

The  specialized  areas  are  control  and  protection  and  he  was  a  member  of  Protection 

committee of Southern Regional Electricity Board.  

 

After  joining  DG  in  2008  he  is  in  charge  of  Engineering  of  Electro Mechanical  systems  of 

Hydro and thermal power plants. He is an accredited energy auditor certified by Bureau of 

Energy Efficiency, India.   

 
 

 




                                                                                               Consultant 
                                                                                                     107 
Mr.  M.M.  Reddy  is  expert  in  substation  Layout  and  Electricals  designs 

                  from 33 kV upto 400 kV. His services are being used by Design Group in 

                  substation segment of Electrical Engineering. 

                   

Mr.  M.M.  Reddy  after  obtaining  Bachelors’  degree  in  Electrical  Engineering  from 

Bangalore  University,  in  the  year  1968,  worked  in  various  capacities  in  various 

organizations.  He  has  worked  in  NGEF  from  1968  to  1997  for  29  years  and  taken 

voluntary  retirement  in  the  year  1997,  as  Divisional  Manager.  During  his  tenure  in 

NGEF, he was head of Sub‐station group and handled switchyards from 33 kV to 220 kV 

from  designing  to  commissioning  of  sub‐stations  on  EPC  basis.  Under  his  guidance, 

about  600  MW  outdoor  Switchyard  from  33  kV  to  220  kV  have  been  designed  and 

commissioned. He has undergone training in high voltage outdoor yard sub‐stations in 

AEG – Telefunken, Germany for 6 months. 

 

In  May  1997,  he  joined  M/s.  Design  Group  Project  consultant  Pvt  Ltd.,  and  he  is 

responsible  for  designing  of  out  door  yard  substation  and  transmission  lines.  He  has 

designed  and  commissioned  various  switchyards  and  transmission  line  for  Hydro 

Power Project, to name a few major Projects: 

 

    i)     Varahi Tail Race (37 MW – 110 kV ODY) 

    ii)    Narayanpur Project Phase – I and II (18 MW ‐ 66 kV ODY) 

    iii)   Singatallur – Hulligudda (18 MW – 110 kV ODY) 

     

He has designed and commissioned balance of equipment for 15 MW Windmill 

Project. 
     




                                                                                         Consultant 
                                                                                                108 
Mr R. Vasudevan is a water utility management specialist with over 40 

                    years  of  experience  in  Design  Construction  &  Operation  of  Water 

                    utility  services  from  the  source  to  the  consumer,  presently  full  time 

                    consultant of Design Group. 

 

He is a 1971Batch Graduate in Electrical Engineering from Bangalore University. Joining 

Bangalore  Water  Supply  and  Sewerage  Board  in  the  same  year,  he  worked  in  various 

capacities  and  retired  as  the  Chief  Engineer  during  2010.  He  was  involved  in  all  the 

major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million residents of 

Bangalore  in  1971,  and  had  become  a  giant  utility  by  2010  supplying  over  900  MLD 
water to over 7 Million residents. 

He  was  associated  in  Cauvery  water supply  Scheme stage  I  to supply  135  MLD  water 

from  River  Cauvery,  in  establishing  pipe  fabrication  and  laying  activities;  Later  in  the 

stage  II  of  another  135  MLD  Project  he  was  in  charge  of  Electrical  system  Design  and 
Construction;  In the III stage  which  was  a  larger  270  MLD  Project  he  was  in  charge  of 

complete Electrical and Hydro‐Mechanical components of the project from tendering to 

completion. In the subsequent Stage IV‐Phase I Project which was with external funding, 

He  was  responsible  for  total  cross‐country  steel  pipeline  of  1950mm  Diameter  and  90 
Kilometers  long,  and  later  in  the  installation  of  Sewerage  pumping  stations  and  the 

electrical Design and Construction of Seven Sewage treatment plants. In the last 5 years 

of his service he was responsible for Securing ODA loan of INR 34000 Million from JICA 

for  Stage  IV  Phase  II  projects  of  500  MLD,  selection  of  project  consultants,  tendering 

selection and award of contracts for all water supply components.  

 

In the  course  of  his  service  he  has  participated  in  various  workshops  and seminars  on 

pumps  ,  cavitation,  cross‐country  pipeline  design,  water‐hammer  studies  and  control, 
water  treatment,  wastewater  treatment  and  sludge  disposal,  project  management, 



                                                                                           Consultant 
                                                                                                 109 
international  contracts,    leakage  reduction  and  distribution  improvement,  flow 

measurement, tariff structuring, urban planning , reuse and conservation, etc.  

 

He  led  the  Technical  team  which  presented  ‘Innovative  Practices  in  Revenue 

Management’  initiative  by  BWSSB  to  the  Department  of  Urban  Development  and 

Secured  the  First  Prize  in  National  Urban  Water  Awards,  2009,  from  the  Hon’ble 

President of India, in August 2009. 

 

Vasudevan  has  designed  pumping  systems  for several  lift  irrigation  pumping  systems, 

electrical  substations  and  surge  protection  to  pipeline  for  the  Consultancy  Centre  of 

BWSSB  from  1995  to  2007.  Many such  projects  have  been  commissioned  in  the  last  10 

years and are in operation. 

 

He  also  handled  an  assignment  on  ‘alternative  methods  of  infrastructure  finance  by 

Private  Sector,  Infrastructure  Bonds,  and  developing  Public‐Private  Partnerships’  in 

2009.  

 

He  also  secured  an  MBA  from  ICFAI  Dehradun  with  Finance  as  optional  subject.  On 

retirement  from  Service  he  joined  Design  Group  as  Water  Supply  Consultant  in 

September 2010. 




                                                                                        Consultant 
                                                                                              110 
 

                 Mr. U.R. Raghotham after obtaining M.Tech from Mysore University    in 

                the year 1974 worked as design engineer with the architects M/s Karekar 

                and  Sundaram  for  one  year  and  joined  Karnataka  Power  Corporation 

                Ltd., in 1975.   

 

During  the  service in  KPC  Ltd.,  he has  worked in  the  design  team  for  Supa  Dam for 5 

years  and  then  worked  as  AEE  (Construction)  in  Supa  Dam  for  7  years starting  from 

foundation level of the spillway and power blocks to the completion of the Dam.   

 

Further  he  was  in  charge  of  construction  of  Ghataprabha  Power  House.    From  1989 

onwards he worked in the design office as AEE and EE  for the planning and  design of 
various  Hydro  Electric  projects  including  Kadra  dam  and  Sharavathi  Tailrace  Project.  

Since 2003, he is working as a consultant and was involved in the design of  Nagarjuna 
Sagar  Tail  Pond  Dam  Project,  Gandikota  dam  project,  Lower  Jurala  project  of  Andhra 

Pradesh, Varahi Underground Power House (2x115MW) and many other projects.   He 
was  involved  in  the  preparation  of  DPR  for  Indira  Sagar  Polavaram      Hydro  Electric 

Project (960MW) and in obtaining clearance from CWC and CEA. 
 




                                                                                        Consultant 
                                                                                              111
Mr.  G.  Penchalaiah,  after  retirement  works  as  free  lance  Consultants,  for  various 

investigation agencies in flow monitoring in river regime pre‐construction Investigation 

works in large Irrigation Projects.  Design Group is utilizing his services for overseeing, 

Fielding investigation works in large Irrigation Projects in India and Abroad. 

             

Mr.  G. Penchalaiah  after  his  graduation  in  Civil  Engineering  from  Sri.  Venkateshwara 
University  in  1970, joined  Central  Water  Commission,  as Civil  Engineer  and  retired  in 

the year 2007, as Director.  He has vast experience in Water Resources Project Planning, 

specially  large  Irrigation  Project  investigation,  Hydrology,  Computation  of  yield, 

Development  of  Irrigation  dam  and  associated  Irrigation  Networks,  preparation  of 
Detailed  Project  Report.  He  was  posted  to  various  States  in  India,  was  familiar  with 

available  yield  in  various  river  for  Irrigation  utilization  to  improve  the  Agricultural 

Sector  and  Water  Management.    He  was  deputed  to  CEA,  New  Delhi,  responsible  for 

design  of  structures  and  cost estimates  for Thermal Power Project.   He  had made topo 
map studies, interlinking river,  water balance study, etc.  As a Senior Engineer worked 

on  Indo‐Nepal  Joint Projects,  namely Pancheshwar  Multipurpose Project, head  quarter 

at  Kathmandu,  Nepal.    Involved  in  preparation  of  DPR,  cost  estimates,  preparation  of 

Infrastructure  Planning  for  major  Power  /  Multipurpose  Projects,  such  as  Poornagiri, 
Rupaligad etc. 




                                                                                            Advisor 
                                                                                               112 
Mr.  Suryanarayana,  after  his  retirement  on  Deputy  General  Manager  ‐  Geology  from 

Karnataka Power  Corporation Limited,  works as freelance  Consultant.   He  is a  part  of 
Design  Group  being extensively  used  his  expertise  in  Engineering  Geology  in  various 

assignments undertaken,  on job to job basis. 

 

My.  Suryanarayana,  after  obtaining  Masters’  degree  in  Geological  Science,  joined 

Karnataka Power Corporation Limited, as Junior Geologist and retired in the year 2007, 

as Deputy General Manager – Geology.  During his tenure, he was involved in most of 

the  Hydro  Power  Project  implemented  by  Karnataka  Power  Corporation  Limited  in 

Karnataka, to name a few Rammam HEP (120 MW), Rolep HEP (60 MW) and Chakung 

Cha HEP (60 MW) all in Sikkim; 80 meter high Chakra Rock‐fill Dam: Varahi HEP (460 
MW).    Involved  in  preparation  of  DPR  for  Gundiya  Hydel  Scheme  (400  MW), 

Shivasamundram  Seasonal  Scheme  (270  MW),  Mekedatu  Multipurpose  Project  (360 
MW).  He is also involved in ongoing Himagiri HEP (280 MW), Upper Tunga Irrigation 

Project  involved  4  km  of  tunneling  etc.    Apart  from  this,  he  has  wide  experience  in 
advising  developers  /  IPPs  in  implementation  of  Mini  Hydel  Scheme  of  25  MW  and 

below all over India. 




                                                                                          Consultant 
                                                                                                 113
Mr.  K.T.Sreedhara,  after  obtaining  B.E  (Civil),  degree  from  Vikram 

                     University,  Ujjain,  in  the  year  1970.  worked  as  design  Engineer  in 

                     M/s.P.V.Raj & Co. Consulting Engineers Hyderabad from January 1971 

                     to November 1973. The works dealt in this period are Designs of Bridges 

                     and  Industrial  Structures  and  Buildings.  Then  joined  M/s.  Karnataka 

Power  Corporation  Ltd.,  a    public  sector  undertaking  of  government  of  Karnataka  on  

28.11.1973 and worked  Up to 31.01.2006 i.e. 32 years and 2 months in various capacities as 

AE,  AEE,  EE,  SE  &finally    retired  as    I/C  Chief  Engineer  on  superannuation  from  the 

Karnataka  Power  Corporation  service.  During  this  tenure  in  KPCL  worked  in  the  civil 
designs  wing  on  the  design  of  Gravity  dam  (concrete),  Earthen  dams,  water  conducting 

System and in construction wing worked in Precision survey works at Varahi under ground 

Power  &  Varahi  Schemes  and Sharavathi  Schemes  as  AEE.  As  Executive  Engineer  worked 

in  the  investigation  of  Power  Project  especially  High  Head  Scheme  and  Mini  Hydel 
Schemes. Further worked in designs wing in the designs of Sarpady Barrage Hydro Electric 

Project  and  consultancy  work  of  Markandeya  Dam  Project,    Kalasa  &  Bandurnala 

Consultancy work. for KNNL. 

 

 Further  in  construction  wing  as  Executive  Engineer  (Safety)  at  Raichur  Thermal  Power 

Station  Shakthinagar  In  addition  to  the  Safety  Engineering  of    Raichur  Thermal  Power 
Station  worked  on  deputation  to  KPCL  civil  designs  wing    involved  in  the  investigation 

work of  Bridge cum Barrage Project across River Krishna near Gugal. for KBJNL As Super 

Intending   Engineer and further I/C chief Engineer (civil) of Raichur Thermal Power Station 

(7X210 MW Installed Capacity as on 2006)  involved  in the civil maintenance works  of the 

Thermal  Power Generation Station. After retirement on 31/1/2006 after serving 32 for years 

with  KPCL joined  on  7/4/2006  as  Consultant  in    M/s Subhadra  Consulting  Engineers  who 

are also Associate  Consultants to M/s STUP consultants Pvt Ltd., Bangalore and worked up 
to 31/3/2010. During this tenure as Associate  Consultants to M/s STUP consultants  Pvt Ltd., 

Bangalore    involved  in  the    Detailed  Engineering  of  Nagarjunasagar  Tail  Pond  dam  , 


                                                                                           Consultant 
                                                                                                 114
Gandikota    Dam  and  Lower  Jurala  Hydro  Electric  Project    which  are  under  construction, 

Further involved in Preparation of revised DPR for Polavaram Hydro Electric Project with 

12X80MW(960MW) Installed Capacity . 

  

Currently from 1.4.2010 to till date working with Design Group Project Consultant Pvt Ltd., 

as Deputy Director (designs) in the planning, design of Hydro Power Projects and Irrigation 

Project and other Structure   

 

Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer (India) 2) 

Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics 




                                                                                          Consultant 
                                                                                                115
 

                      Mr. Achutha Narayana, after obtaining M.Tech from Prestigious Indian 

                      Institute  of  Technology  in  the  year  1996  and  has  since  15  years  of 

                      exclusive  experience  in  design  of  various  components  of  hydroelectric 

                      Projects. He started his career in Design Group Project Consultants Pvt. 

                      Ltd., Bangalore as Design Engineer (Civil) and was involved in Harangi 
HEP  (2x4.5MW)  in  Karnataka.  He  joined  NHPC  ltd.,  A  Govt.  of  India  Enterprise  in  year 

1998  and  was  involved  in  Planning  and  Construction  stage  Design  of  Dhauliganga  HEP 

(4x70MW),  Uttaranchal  and  Chamera‐III  HEP  (3x77MW),  Himachal  Pradesh.  He  was 

associated  with  the  preparation  of  DPR  of  Siyom  HEP  (1000MW),  Arunachal  Pradesh, 
Dhauliganga Intermediate HEP, Uttaranchal, Tender stage Design Activities for Chamera‐III 

HEP, Kishanganga HEP (3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was 

also  involved  in  Pre‐feasibility  reports  of  7  projects  in  Arunachal  Pradesh  under  “Prime 

Minister  50000MW  Initiative”  totaling  to  2581  MW.  He  was  also  associated  with  the 
consultancy project of Katra – Laole KRCL Stretch of Prestigious Jammu‐Kashmir Rail Link 

Project.  He  has  also  few  technical  papers  presented  in  various  National  Seminars. He  is  a 

member  of  Indian  Society  of  Rock  Mechanics  and  Tunneling  Technology  (ISMRTT)  and 

International  Society  for  Rock  Mechanics  (ISRM)  and  Indian  Hydropower  Association 
(INHA). 

 

He joined  TCE,  Bangalore  in  2007‐2008  and  was  associated  with  100MW  Augmentation  of 

Bhira Power station and Gokak SHEP. 

 

Since later half of 2008, he is working as Deputy Director (Designs) in Design Group Project 

Consultants  Pvt.  Ltd.  and  has  been  responsible  for  various  construction  stage  Hydel 
Projects, DPR’s and Pre‐tendering Services for various projects.   

                                                    

 




                                                                                              Consultant 
                                                                                                    116
 

                    Mr. T.S. Srinivasa, after obtaining M.E., from one of the noted Institution 

                    PSG College of Technology, Coimbatore, Tamilnadu in the year 1987 and 

                    B.E.  from  National  Institute  of  Engineering  College,  Mysore,  Karnataka 

                    in  the  year  1984,  worked  in  various  capacities  in  a Public  Sector/Private 

                    companies.  He  has  worked  In  Public  sector  Karnataka  Urban  Water 

Supply  &  Drainage  Board  (KUWS&DB)  from  1986  to  2006  for  21  years. He took  voluntary 

retirement  from  KUWS&DB  and  worked  in  private  organizations  such  as  M/s  Secon  as 

Manager and Ms/ Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).  

 

He was head of Design Wing while working with KUWS&DB, was involved in preparation 
of  many  DPRs  comprising  of  Planning,  Design,  Estimating,  implementation  of  number  of 

water supply and sewerage schemes  including Water treatment plants(WTPs) and Sewage 

Treatment  Plants(STPs)in  urban  areas  of  Karnataka  State.  He  was  involved  with  water 

supply & sewerage schemes’ proposals to second major city in the state viz., Hubli‐Dharwar 

city  under  World  Bank  Project.  He  was  also  involved  with  National  River  Conservation 

Projects for prevention of river pollution in the state. 

 

While working  with M/s. Secon, he was involved  with water supply and sewerage projects 

in different towns of Libya country. While working with M/s. Jurong Infrastructure Ltd., he 
was  involved  with  Design  and  implementation  of  Infrastructure  facilities  such  as  roads, 

water  supply,  sewerage,  storm  water  drainage,  Electrical  &  Communication  facilities  to  a 

number of town ship development projects including some of the SEZs. 

 

From  2009  onwards  he  heads the  Water  Division  of  DGPCL responsible  for  implementing 

water supply and sewerage projects. Presently he is involved with detail Civil  Engineering 

Design  of Rafha gas based Power Plant Project in Saudi Arabia. 




                                                                                              Consultant 
                                                                                                    117 
 

                Mr.  P  Sudarshan  Rao,  after  obtaining  B.E.  (E&E)  from  Malnad  College  of 

                Engineering,  Hassan  (Mysore  University)  in  1987  worked  in  the  same  college 

                and  Regional  College  of  Education,  Mysore  as  a  Lecturer  for  a  brief  period 

                before joining KPCL in 1989. 

 

He has more than 22 years of experience, as Assistant Executive Engineer in Karnataka Power 

Corporation  Limited,  a  State  owned  Public  Sector  Undertaking  with  dedication  for  Power 

Generation  to  the  State  with  ISO  9001  and  ISO  14001  certification.  He  has  experience  in 

Operation,  Maintenance  and  Design  wings  of  210/250  MW  coal  based  Thermal  Power  Plant. 

He  also  has  experience  across  domains  like  Inventory  Management,  Tendering,  Tender 

Evaluation,  Study  of  various  Control  System  drawings,  Planning  of  Preventive  and 

Breakdown  Maintenance  of  210  MW  Generator  &  Auxiliaries,  Erection  &  Commissioning  of 

Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear, 

220kV  &  400kV  Outdoor  Switchyard,  and  Station  Battery  System.  He  was  also  involved  in 

preparation  of  cable  schedules,  interconnection  schedules  and  commissioning  of  210  MW  & 

250MW coal fired thermal Units. 

 

After joining DG in February 2011, he is the group lead of Electrical Design team carrying out 

detail Engineering for gas based generating plants and hydro electric plants. 
 




                                                                                                Consultant 
                                                                                                      118 

Design Group Corporate Profile

  • 1.
  • 2.
    Content  Sl. No.  Description  Page No.  1  Design Group – A Profile  1  2  ISO Certificate  4  3  Certificate of Consulting Engineers Association of India  5  4  Certificate of  Incorporation  6  5  Empanelment with BHEL   7  6  Empanelment with Construction Industry Development  8  Council  7  Merger of M/s. Subhadra Consulting Engineers with M/s.  9  Design Group Project Consultants Pvt Ltd  8  Experience ‐ write up on Sample Projects  11  9  List of Project on Hand  26  10  Organization Structure      A. Panel of Consultants / Advisors   30    B. Technical Personnel   32  11  List of Project /Assignments Successfully Completed      A. Desk Study Report   34    B. Detailed Engineering of Projects  36    C. Preparation of Detailed Project Reports  43    D. Pre‐Feasibility Studies of Power Projects  50    E. Pre‐ Tender Services  59    F. Due Diligence Report  67  12  A few Certificates for Successfully Completed  Projects  72  13  Brief Profile of Advisor / Consultants      a) Advisor      H.V. Eswaraiah, Hydro Power Projects  89    Shankar V. Nesargi, Wind Energy  90    P.R. Balasubramanian, Gas Based Power Plant  91    B.V Ramakrishnaiah,  Gates & Penstocks  92    Balachandran. V, Engineering Geology  93    C.R. Venkatesh , Hydro Power Projects  94  Content   
  • 3.
    Sl. No.  Description  Page No.    M.C. Rangarajan, E & M Works  95    S. Ramanan, Hydro Power Projects  96    Umashankar, Steel Structure  97    Narayanan V, Transmission Line  98    Channakeshava C, Computer aided designs  99    Shridhar Prabhu, Legal Advisor, PPA  100    Srinath. N, Environmental Engineering  101    b) Consultants      C.S. Hebli, Chairman  102    B.L Lakshminarasimha, Chief Executive Officer  103    P.R Mallikarjuna, Executive Director (Design Head)  104    P.K. Rupangudi , Director (Gates, Dams design)  105    Chikkaguddappa Director (Project Development  106    Raghavendra Rao H, Director (Electrical Generation)  107    M.M. Reddy, Director (Transmission line,  108  Switchyard & Sub‐Station)    R .Vasudevan, Deputy Director (Water & Waste  109  Water)    U.R. Raghotham , Director (Tunnel and Dam design)  111    G. Penchalaiah, Irrigation Project – Investigation  112    Suryanarayana, Engineering Geology  113    K. T. Sreedhara, Deputy Director (Irrigation)  114    Achutha Narayana, Deputy Director (Hydro civil  116  design)    T.S Srinivasa, Deputy Director ‐‐Civil (Gas Based  117  Power Plant)    P Sudarshan Rao, Manager (Electrical Generation)  118  Content   
  • 4.
        1. DESIGN GROUP –A PROFILE    was  established  in  1979  to  offer  consultancy  DESIGN GROUP  services  for  civil  and  electrical  engineering  projects. Having completed over 100 prestigious and varied assignments in the last 5  years,  DG  is  a  leading  consultancy  firm,  offering  full‐fledged  consultancy  services  across various fields of engineering in India and Abroad.     Equipped to provide design consultancy on very large engineering projects, DG has  been  providing  technical  consultancy  services  to  various  organizations  and  companies  for  planning,  detailed  design,  and  implementation  of  Hydel,  thermal,  and other power projects. These services include analysis of financial aspects, design  engineering  for  electrical  installation  of  substations,  switchyards  and  transmission  lines,  design  engineering  for  civil  engineering  structures  including  large  dams,  tunnels  ,  canals,  power  canals,  cross  drainage  works,  surge  tanks,  penstock  ,  and  power houses. DG also provides services related to other civil engineering fields of  Irrigation, Water Supply, and Waste Water Treatment.      DG,  which  has  an  annual  turnover  of  over  Rs.400  lakhs,  provides  consultancy  services  required  for  the  implementation  of  projects,  right  from  concept  to  completion,  commissioning,  operation  and  maintenance,  thereafter.  DG’s  services  have  been  utilized  by  Large  Industrial  Houses,  Firms,  and  Independent  Power  Producers in India, and elsewhere, for the planning and design engineering of their  projects.  In  year  2004,  DG  was  honored  with  an  ISO  9001:2008  certification  for  its  design engineering services and continues to hold the certification.    DG  have  entered  into  MOU/  JV  with  number  of  large  institution  to  name  a  few  Messers:   1) WAPCO New Delhi.  2) ILF Consulting Engineer, Austria  A Profile  1 
  • 5.
      3) GEM Engineering Company Ltd., Uganda  4) IL&FS Ltd., Hyderabad   5) NihamShand Cape town South Africa  6) Land Mark Holding Ltd. Nairobi, Kenya  7) SSDC Damam KSA      Corporate Office   DG has been empanelled in a few public sector undertakings.  1) BHEL for extending design engineering services in Hydro Power projects   2) Karnataka  Neeravari  Nigam  Limited  for  engineering  services  for  Water  Resources Projects.  3) PFC consulting Limited, New Delhi for Power Projects.    Our clients include Messers  1) Nuclear Power Corporation Limited.  2) Gammon India Limited.  3) Fichtner Limited.  A Profile  2 
  • 6.
      4) GMR Energy Limited.  5) ILFS Infra Limited.  6) WAPCO  7) NTPC  8) BHEL  9) Ritwik Energy Limited Hyderabad  10) Greenko Energy Limited Hyderabad  11) AMR Mitra JV Ltd., Hyderabad    More than 100 engineering  software’s have been developed  in house over a period  of 20 years. In addition, more than a dozen engineering design softwares have been  acquired and are in use for day to day work .State of Art facilities have been created  to take up large Water Resources Projects.    Presently the major Detailed Engineering works on hand are    1.   Balance of Plant for Hail‐2, Gas based Power Plant 2 x 55 / 70 MW at Hail in  Saudi Arabia.  2.   Balance Plant for Rafha Gas based 2 x 55/70 MW + 2 x 35 MW Power Plant at  Rafha Saudi Arabia.  3.   Two Irrigation Projects in Afghanistan namely   a. Machalgho Multipurpose Project, near Kabul  b.  Pashdan Multipurpose Project in Herat region.  4.   81 MW Tinget HEP in Himachal Pradesh, India.  5.   75 MW Trishuli Galachhi HEP in Nepal, India.  6.   25 MW Mahan‐3 HEP in Chhattisgarh, India.  7.   12 MW Gatambe HEP in Kandy Sri Lanka.  8.   Balance  of  Plant  for  32  MW  wind  mill  under  phase  II  near  Chikkodi  near  Belgaum, Karnataka, India.    In addition 31 assignments are in different stages of implementation   A Profile  3 
  • 7.
        A Profile  4 
  • 8.
          A Profile  5 
  • 9.
          A Profile  6 
  • 10.
        A Profile  7 
  • 11.
            A Profile  8 
  • 12.
            A Profile  9 
  • 13.
          A Profile  10 
  • 14.
      8.  EXPERIENCE  IN DESIGN  ENGINEERING  OF  A  FEW  IMPORTANT  PROJECTS    8.1   Balance of Plant of Hail – 2 Power Plant    M/s.  Alfanar  one  of  the  leading  EPC  contractors  in  Kingdom  Saudi  Arabia  was  awarded construction of Balance of Plant of Hail‐2 Gas based Power Plant by Saudi  Electric  Company.  M/s  ILF  Abu  Dubai,  UAE,  were  the  principal  consultants,  M/s.  DGPCPL was appointed as sub consultants by M/s. ILF for Detail Engineering and  to  issue  all  construction  drawings  and  designs  for  complete  plan  except  GTG.  Siemens were the GTG equipment suppliers.     This  was a fast track  project, involving  issue of  more than 600 drawings  in a  short  span  of  4  months.  The  project  was  successfully  commissioned  on  schedule  in  the  month of July 2011. The assignment included interaction with clients / SEC (Owners)  during approval stage.    The project comprised extension of Hail – 2 Power plant by adding 2 nos 55/70 MW  output Gas Turbine Generator sets to the existing 6 nos Gas Turbine Generators 132  kV GIS and 380 kV AIS. The extension project consisted of –    1. 132  kV,  220MVA  Generator  Transformer,  13.8kV  /  4.16kV  15MVA  unit  auxiliary  transformers,  10  nos.  service  transformers,  MV  &  LV  Switchgears  and other BOP.  2. Crude  oil  /  Distillate  oil  fired  Gas  Turbine  Generator  units  of  55/70MW  output – 2nos.  3. Crude oil treatment and forwarding and distillate oil forwarding system for  new units.  4. Associated piping, cabling & services      A Profile  11 
  • 15.
        GTG Building under Construction     The Engineering services for the project consisted of –     • Civil  Engineering  involving  structural  designs,  Architectural  layouts,  equipment  foundations,  for  GTG  Building,  FOTP  Building  &  Switchgear  Building, etc,.  • Mechanical  Engineering  involving  plant  Layouts,  piping,  equipment  sizing,  fire fighting system, HVAC, etc,.   • Process Engineering involving overall process flow discussions, P & ID’s, etc,.   • Electrical  Engineering  involving  system  studies,  development  of  SLD’s,  equipment  sizing,  for  transformers,  MV  &  LV,  Switchgears,  DC  &  UPS  Systems, Cable & inter connection schedules.  • IAC  illumination  Engineering  involving  interfacing  new  unit  &  BOP  to  existing CLR.    A Profile  12 
  • 16.
        8. 2   Sea Water Intake for PFBR Plant Systems:    Nuclear Power Corporation Limited, Kalpakkam, awarded Seawater Intake Cooling  Water  System  under  ambitious  plan  of  generating  power  through  Plutonium  Fast  Breeder  Reactor  Project  (PFBR)  to  M/s.  Gammon  India  Limited.    The  major  components of the scheme  were off‐shore  intake shaft, on‐shore outlet shaft, and a  submarine tunnel connecting the two structures at about 45m below sea level.  M/s.  Design  Group  Project  Consultants  Pvt  Limited,  were  involved  in  detailed  engineering services for the sub marine tunnel and shafts.  The project is since been  successfully completed.        The total length of the sub marine tunnel is 565m, Horse shoe shaped with 3600 mm  dia  finished  diameter.    The  outer  diameter  varied  from  4300mm  to  4600mm,  thickness of lining adopted is 350mm in good rock and 500 thick RCC in inadequate  rock  cover  region,  using  M‐45  grade  cement  concrete.     The tunnel  passes  through  Charnockyte type II  rock  medium having  modulas of elasticity  is 0.46 to 3.34  x 106   tons  per  square  meter.  The  poisons’  ratio  adopted  ranged  between  0.14  to  0.25  in  A Profile  13 
  • 17.
      rock and 0.15 in concrete.  The SBC of soil is 280 tonnes per sq. meter and strength of  insitu rock is 75.60 Mpa.    Submarine Tunnel      Outlet Shaft as Viewed from Submarine Tunnel        As  per  report  investigation  report  the  dry  density  of  rock  is  2.66  to  2.99  gms  per  cubic  centimeter.  The  tunnel  was  driven  45m  below  the  sea  level  without  any  geological surprises.   The tunnel carries 29 cumecs of seawater required for cooling  A Profile  14 
  • 18.
      the PFBR Plant, with a bed gradient of 1 in 96.4.  The density of Sea Water found to  be 1.024 ton per cum.    In  addition,  inlet shaft  (4250  /  5250  mm  dia)  and  outlet  shaft  (6000 /  7000  mm  dia)  were sunk in both ends with 500mm, thick cement concrete lining using M‐45 grade  concrete.     8.3    Varahi Tail Race Mini Hydel Scheme:      River  Varahi  is  an  important  West  flowing  river  of  Karnataka  State  with  large  Hydel  power  potential.  Power  development  in  the  Varahi  Valley  with  an  installed  capacity of 239 MW consisting of 2 x 4.5 = 9 MW at Mani Dam Power House and 2 x  115=  230  MW  at  Varahi  Underground  Power  House  was  completed  by  Karnataka  Power Corporation Ltd. in the year 1989.  The Varahi Tail Race Mini Hydel scheme  has been planned and engineered by Design Group for M/s. Sandur Power Co. Ltd.  Varahi  Tail  Race  Mini  Hydel  Scheme  utilizes  the  tailrace  discharges  of  Varahi  Underground  Power  house  and  the  available  level  difference  between  the  point  of  confluence of tailrace of Under round Power House with Varahi River and the FRL  of  Varahi  Irrigation  Dam  proposed  downstream,  for  generation  of  power.  The  proposed  scheme  comprises  of  the  construction  of  a  diversion  weir  across  Varahi  river just downstream of the confluence of tail race of VUGPH with Varahi River, a  gravity type intake, a 2290m long, 7m dia horse shoe shaped head race tunnel, 22m  Dia  simple  type  surge  tank,  7m  dia  penstock  tunnel,  3  Nos.  steel  penstocks  and  a  power house with three standard vertical shaft type full Kaplan turbines of 7.5 MW  capacity each under phase I and a tail race joining the Varahi River on its right flank.   Under Phase II, two more units of similar capacity have been added.            A Profile  15 
  • 19.
        View of Diversion Weir Structure with radial gates             Power House under Construction                            Overview of Power House   A Profile  16 
  • 20.
          The  cost  of the  project  inclusive  of  escalation  in  costs  during  construction  and  financial charges is placed at Rs. 13,439 lakhs. The project is under advance stage of  completion and is to be commissioned during the year 2005.    Penstock Tunnel, Concrete Lining under Construction                                                                           22m dia Shaft     A Profile  17 
  • 21.
        8.4   AMR/ SHAMBURI Mini Hydel Scheme     M/s.  AMR  Power  Pvt.  Ltd.  Implemented  the  24  MW  (5  x4.8  MW)  Mini  Hydel  Scheme  across  river  Nethravathi,  a  major  west  flowing  river  in  Karnataka.  The  design  flood  at  the  barrage  is  11500  cumecs.  The  plant  is  situated  35  km  from  Mangalore,  a  major  costal  city  in  west  Karnataka.  The  project  has  a  low  head  fluctuating between 3.95 m to 10.8 m. The rated head of the turbines is 7.31m,with a  large flow.  The design discharges utilized for power draft is 78.47 cumecs per unit.  The  units  are  capable  of  running  at  15%  continuous  overload.  ‘S’  type  Kaplan  turbine  coupled  to  4800  KW  synchronous  generator  through  the  gear  box  are  adopted.  During  the  construction,  another  developer  M/s.  Rithwik  Energy  Generation proposed a 24 MW capacity power plant on the other bank. After mutual  discussion, it was agreed to utilize the existing facilities of M/s. AMR Power.         Thus,  a  power  house  accommodating  10  x  4.8  MW  was  planned  and  developed,  with  a  combined  annual  generation  of  115.14  GWHr.  The  scheme  comprises  of,  a  barrage across river Nethravathi with 30 radial gates to safely pass the 11500 cumecs  flood, non‐overflow sections, a power block on the left bank, a surface power house,  and a 95.86m x 32m x 2km long tail pool and channel. The water is led back to river.  A Profile  18 
  • 22.
      The power is evacuated to the nearest substation at Netlamanur, 15 km away, at 110  KV  rating.  The construction  took  27  months  and  the  plant  was  synchronized.  DG  provided the design engineering services.    8.5   Modernisation of Shivanasamudram Power Channel.    Visveswaraiah Vidyut Nigam Limited (VVNL), a Public Sector Company, owned by  earstwhile Karnataka Electricity Board, as a part of the Modernisation programme of  the existing Shivanasamudram Hydro Power Project, had proposed to  increase the  water carrying capacity of the power channel upto the Shivanasamudram Balancing  Reservoir  and  also  increasing  the  live  capacity  of  the  Shivanasamudram  Balancing  Reservoir to cater to the increased needs of the power channel and also the increased  needs of the drinking water supply for Bangalore City.  VVNL entrusted the work of  planning  for  the  improvements  and  the  detailed  engineering  for  the  same  to  Shivanasamudram Power Project is the earliest of the power projects constructed in  India,  way  back  in  the  year  1902,  to  supply  electrical  power  to  Kolar  Gold  Mines  situated 85 kms away.    Divider wall under Construction                      Originally a 2000m long power channel connecting Shiva head works and the Shiva  Balancing  Reservoir  had  been  constructed  with  a  central  earthen  divider  wall  and  side slopes lined with  stone pitching.   A Profile  19 
  • 23.
        The central divider wall was an earthen bund with stone pitching on the side slopes  the overall  dimensions of the divider wall has been 3.7m at the top and 8.2m at the  bottom.    Over a  period of the last 100  years, the  water carrying capacity of the channel had  been reduced to 22.6 cumecs, from the original capacity of 34 cumecs, due to silting,  vegetation  growth,  etc.    In  order  to  increase  the  discharge  carrying  capacity  of  the  channel, the divider wall was replaced by a thin RCC dividing wall; the pitching of  the side slopes was  reset and covered  with RCC lining.  The  vegetation  growth  was  completely removed.  After modernization, discharge carrying capacity of the power  channel has increased to 59.5 cumecs.  The live capacity of Shiva Balancing Reservoir  has  been  substantially  increased  by  desilting  the  reservoir  and  removal  of  weed  growth.    In  addition,  DG  was  asked  to  suggest  simple  method  of  desilting  of  the  Balancing Reservoir.  A simple technique of using a shovel mounted on a raft made  out of a battery of empty steel drums was suggested and used along with ejection of  the  silt  by  a  mud  pump  and  a  pipe  line  supported  on  empty  floating  drums,  and  taken to the shores.    8.6   Link Canal Mini Hydel Scheme:    Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar  project irrigation Canal System, took up the scheme to construct a link canal taking  off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery  Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail  end of this link canal, there is a difference in level of about 8.3m between the bed of  the  link  canal  and  the  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the  construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to  utilize the water flow of the link Canal and the head available at the drop at the end  of Link Canal, for power generation.     A Profile  20 
  • 24.
          View of Power House as seen from Downstream      Karnataka  Irrigation  Department,  as  a  part  of  the  modernization  of  K.R.  Sagar  project irrigation Canal System, took up the scheme to construct a link canal taking  off  from  the  Visveswaraya  canal  before  Hulikere  tunnel  and  joining  the  Cauvery  Branch canal near Peehalli at the 17th Mile (27.20 km) in Mandya District.  At the tail  end of this link canal, there is a difference in level of about 8.3m between the bed of  the  link  canal  and  he  bed  of  the  Cauvery  branch  canal  and  is  negotiated  by  the  construction of a drop structure.  Link Canal Mini Hydel Scheme was formulated to  utilize the water flow of the link Canal and the head available at the drop at the end  of Link Canal, for power generation.      The scheme is simple with minimum civil engineering works. The civil engineering  components  comprise  of  a  70m  long  approach  channel,  intake  structure,  gated  bypass  weir  with provision of automatic falling shutters, surface power house, tail  channel  leading  the  water  back  to  the  branch  canal.  The  installed  capacity  of  the  scheme is 1500 kW, with one unit of Vertical full Kaplan Turbine and generator. The  A Profile  21 
  • 25.
      average annual energy  generation  is 10.10 GWHr. The cost of the scheme  is Rs. 80  Million. The Project was completed in the year 2003 by the Developers M/s Graphite  India  Ltd.,  Bangalore,  The  civil  engineering  works  were  contracted  to  M/s  Mysore  Construction  Co.,  Bangalore.    The  Planning  and  Detailed  Design  Engineering  was  handled by Design Group.       8.7   Captive  Power  Plant  of  5.8  MW  capacity  at  John  Welch  Research  Centre,  Whitefield, Bangalore for M/s General Electric:    Overall view of DG Plant   Inside view of Generator Room   Design  Group  was  associated  as  a  major  leader  for  the  Planning,  Detailed  Engineering  and  construction  co‐ordination  of  the  5.8  MW  Diesel  Engine  based  A Profile  22 
  • 26.
      Captive Thermal Station of the GE India Technology Centre at Bangalore, which has  been completed on a time bound schedule of 6 months.    8.8  Windmill Power    M/s.  Doddanavar  Brothers,  who  have  Plan  to  develop  100MW  Wind  Farm  in  Chikkodi,  Belgaum  district  of  Karnataka,  India,  availed  our  technical  support  for  Engineering of balance of a plant. Critical  main equipment of capacity 10 x 1.5 MW  was sourced from M/s. Sinovel, China, while the rest was sourced locally.  Foundation of Wind Mill            DG  assisted  the  developers  by  drafting  technical  specifications,  preparing  data  sheets,  floating  tender  for  fabrication  of  towers,  tower  internals  and  electrical  right from 690 volts to the grid connection. In addition, assistance was extended  for  procurement  activities.  The  Civil  Raft  Foundation  drawings  were  provided  after  detail  designs,  for  local  sub‐surface  soil  conditions.  The  entire  assignment  was completed in 9 months.             A Profile  23 
  • 27.
      Wind Turbine Generator Hub      1. DG designed 33 kV outdoor yard sub‐station at  Wind farm, 33 kV transmission  line from Wind farm to  pooling 33 / 110 kV sub‐station, 33 / 110 kV outdoor yard  pooling  station  and  110  kV  transmission  line  from  pooling  station  to  KPTCL  evacuating 110 kV sub‐station.  2. DG  prepared  technical  specification  for  33  kV  substation  at  Wind  farm,  33  kV  transmission  line,  33  /  110  kV  pooling  station  and  floated  enquiry  for  the  procurement  and  scrutinized  the  Vendor  offers  and  finalized  the  orders  on  suppliers.  3. Vendor drawings and specification scrutinized.  4. Assisted in commissioning the sub‐station and transmission line.    The first batch of 10 x 1.5 MW has been commissioned. Under second stage 20 x  1.6  MW  GE  machines  have  been  selected,  the  civil  foundation  is  under  construction.     8.9  Design of Vacuum Chambers     M/s.  Hind  High  Vacuum  Co.  Pvt.  Ltd.,  specializing  in  manufacture  of  Pressure  Vessels  and  Vacuum  Chambers  for  defence,  pharmaceuticals,  and  solar  panels,  entrusted to DG, design and  preparation of fabrication  drawings for a Robotic  TIG  A Profile  24 
  • 28.
      Welding chamber of size 7m x 5m x 3m. The M.S. Vacuum Chamber is designed for  negative  pressure  of 1  kg  per  sq.cm,  with  a  rider  that  the  defection  of  internal  structural members must be limited to 0.5 mm.        The chamber consists of a main chamber, a man entry/exit chamber, robot entry/ exit  chambers, tool chambers, etc. The  robotic arm  moves on rails. The  welding  will  be  carried out  under Argon  gas atmosphere.  The chamber  were analysed  using NISA  Software package and the analysis has been validated by Indian Institute of Science,  Bangalore,  the  pioneer  research  institute,  by  using  ETAB  software.  The  analysis,  design, and fabrication  drawings have been forwarded to M/s. Hind High Vacuum  Co.  Pvt.  Ltd.  The  fabrication  of  chamber  is  in  advance  state  of  complexion.  The  Robotic TIG Welding Chambers, when commissioned, will be one‐of‐its‐kind in the  world.     8.10  Design  Group  has  been  successfully  providing  pre‐tender  and  post‐tender  services  for  various  public  sector  undertakings  and  several  private  sector  undertakings,  in  as  much  as  assessment  of  costs,  detailed  specifications  of  various  items  of  work,  conditions  of  contracts,  tender  documents,  tender  analysis  and  reports  leading to selection of construction and  supply agencies as  per time bound  schedules and needs of clients.  A Profile  25 
  • 29.
      Annexure – I  9. LIST OF PROJECTS ON HAND    A. POWER PROJECTS – DETAILED ENGINEERING     Sl.  Name of the Project  Installed  Project  Clients  No.  Capacity  Cost in Rs.  in MW  Lakhs  1.  Lower  UHL  SHEP  Project,  13.00  9500  M/s. Trident Power Systems Ltd.,  Himachal Pradesh.  Himachal Pradesh  2.  Singatalur‐Huligudda  Mini  Hydel  18.00  6000  M/s..Tungabhadra Power Projects  Scheme, Karnataka‐  Ltd., Bangalore.  3.  Lambadug Hydro Electric Project,  25.00  12250  M/s. Himachal Sorang Power Pvt.  Himachal Pradesh.  Ltd, Shimla, Himachal Pradesh  4.  Cauvery  Small  Hydel  Project,  24.00  13000  M/s. XS Hydro Energy Private Ltd.,  Karnataka.  Bangalore  5.  Huvinahedagi  Mini  Hydel  24.75  13500  M/s. XS Hydro Power Pvt. Ltd,  Scheme, Karnataka.  Bangalore  6.  Agrahara MHSI & II, Karnataka.  1.475  700  Sarovara Energy Pvt Ltd.,  Bangalore.  7.  Water Supply System for Bharathi  Water  ‐  M/s. Bharathi Cement Corporation  Cement  Plant  at  Cuddapha,  Supply  Ltd Andhra Pradesh  Andhra Pradesh   Scheme  8.  Paudital  Lassa  Hydro‐Electric  24  19200  M/s. Greenko Hatkoti Energy Pvt  Project, Himachal Pradesh.  Ltd., Hyderabad.  9.  Jeori  Lower  Mangalad  SHPP,  15  12000  M/s. Techology House (India) Pvt  Himachal Pradesh.  Ltd., Hyderabad.  10.  Nimishamba  Mini  Hydel  Scheme,  3  1700  M/s. Nimishamba Energy India  Karnataka,  Private Ltd., Bangalore  11.  Kollya  Mini  Hydel  Scheme,  24  19200  M/s. Kumaradhara Power Pvt Ltd  Karnataka.  Bangalore  12.  Chikkodi  Windmill  Project,  100  6000  M/s.Doddanavar Brothers, Belgaum  Karnataka.  13.  Mahan  Hydro  Electric  Project,  24  2000  M/s.Venika Hydro projects Pvt Ltd,  Chathisgard.  Bangalore  Projects on Hand  26 
  • 30.
      Sl.  Installed  Project  No.  Name of the Project  Capacity  Cost in Rs.  Clients   in MW  Lakhs  14.  Trishuli  Galchhi  Hydro  Electric  75  80000  M/s. Siddhakali Power Pvt. Ltd.,  Project, Nepal.  Nepal  15.  Kukke 1 & 2 MHS, Karnataka.  24  14400  M/s. Kukke Hydro Projects Pvt Ltd,  Bangalore.  16.  Anusha  Mini  Hydel  Scheme,  4  1600  M/s. Dhenu Hydro Pvt Ltd  Andhra Pradesh.  Hyderabad  17.  Navya  Mini  Hydel  Scheme,  2.60  1300  M/s. Mitra Energy Pvt Ltd  Andhra Pradesh.  Hyderabad  18.  Ramya MHS, Andhra Pradesh.  3.80  1900  M/s. Kurnool Energies Pvt Ltd  Hyderabad  19.  Koilakunte  Mini  Hydel  Scheme,  12    M/s. Dhenu Hydro Power Private  Andhra Pradesh.  Ltd., Hyderabad.  20.  Halsur  Diversion  weir  under    400  M/s. Karnataka Neeravari Nigam  Shiggon  lift  Irrigation  Scheme,  Ltd., Karnataka  Savanur, Karnataka  21.  River  Water  Intake  Pump  House  2 X 270  300  M/s. GVK Ltd through M/s. Fichtner  and Approach Bridge, Punjab.  Consulting Engineers (India) Pvt    Bangalore  22.  Machalgho  Multipurpose  Project,    US $ 95  M/s. Gulf Civil Engineering &  Machalgho, Afghanistan.  Million  construction Co. Kabul, Afghanistan  23.  Pashdan  Irrigation  Project,  near    US $ 180  M/s. Hewadwal Group Afghanistan  Heart, Afghanistan.  24.  Tinget‐2  Hydro  Electric  Project  in  81  60000  M/s. AMR—Mitra JV, Hyderabad  Himachal Pradesh  25.  Balance  of  Plant  for  Rafha  Gas  2 x 75 + 2 x    M/s. SSEM Riyadh through M/s. ILF  based Power Plant, Saudi Arabia.  75  Abu Dhabi  26.  Study  Report  on  Gandak  Canal  3 X 5    M/s. WAPCOS New Delhi  HEP  in  Valmikinagar,  West  Champaran District, Bihar.  27.  Detailed  Design  Engineering  2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd.,  services  for  Kurtha  SHP  in  Hyderabad  Himachal Pradesh.  28.  Detailed  Design  Engineering  2 X 2.5  4000  M/s. Sahu Hydro Power Pvt Ltd.,  services for Kuril SHP in Himachal  Hyderabad  Pradesh.    Projects on Hand  27 
  • 31.
      Sl.  Name of the Project  Installed  Project  Clients  No.  Capacity  Cost in Rs.  in MW  Lakhs  29.  Detailed  Design  Engineering  3 X 5  1200  M/s. Parvat Hydro Power Pvt Ltd.,  services for Chhoned SHP.  Hyderabad  30.  Detailed  Design  Engineering  3 X 8  19200  M/s. Pavanganga Power Private  services  for  Sangam  SHP  Raichur,  Ltd., Hyderabad.  Karnataka.  31.  Review  Consultants  for  Umjaut  160  100000  M/s ETA Star Ltd,. Dubai  (70MW) & Umduma HEP (90MW)  in Meghalaya    B. SOLAR POWER PROJECTS – DETAILED PROJECT REPORT    Sl.  Installed  Project  Clients  No.  Name of the Project  Capacity  Cost in Rs.  in MW  Lakhs  1  Bellary Solar Power Project,  5  7500  M/s.Vishrutha Power Pvt. Ltd.,  Karnataka.  Bellary  2  Proposal to bring 10 TMC of Raw  ‐  ‐  M/s. Larsen & Toubro Limited,  water from Sakleshpura to  Bangalore  Chikkaballapur & Kolar District &  T.G. Halli    C. PRE TENDER ENGINEERING SERVICES     Sl.  Installed  Project  Clients  No.  Name of the Project  Capacity  Cost in Rs.  in MW  Lakhs  Upper  Narmada  Irrigation  Project  Irrigation  ‐  M/s. Gammon India Ltd. Mumbai  1.  Madhya Pradesh – EPC Bid  Project  60MGD  River  water.  Pipeline‐ ‐  M/s. Gammon India Ltd. Mumbai  Water  2.  73kms for VSNL Ltd, at Salboni in  Supply  West Bengal – EPC Bid  Agra Water Supply Project in Agra  Water  ‐  M/s. Gammon India Ltd. Mumbai  3.  – EPC Bid  Supply  Raw  water  supply  system  for  4  x  ‐  M/s. Gammon India Ltd. Mumbai  Water  4.  300  MW  Raigarh  SKS  Power  Supply  Generation (Chattisgarh) Ltd    Projects on Hand  28 
  • 32.
        D. PREPARATION OF TENDER DOCUMENT     Sl.  Installed  Project  Clients  No Name of the Project  Capacity  Cost in  in MW  Rs. Lakhs  1.  Dagmara HEP – Preparation of bid  25 x 5  ‐  M/s. Bihar Electricity Board,  document for Civil, E&M, H&M  through M/s. WAPCOS   Transmission Line Component  New Delhi.  works    E. OTHERS    Sl.  Installed  Project  Clients  No Name of the Project  Capacity in  Cost in  MW  Rs. Lakhs  1.  Design  and  drawings  of  Electrical  Electrical  ‐  M/s. Doddanavar Nanjinzhao  System  for  Beneficiation  Plant,  Distribution  Mining and Metallurgy (P) Ltd.,  Bagalkot, Karnataka  Belgaum Karnataka.  2.  Detailed  Civil  Engineering  for  Two  Coal  ‐  M/s. Multi Design Infra Works Pvt.  Transfer  points.  Tunnel  in  cut  &  Handling  Ltd. Bangalore  cover,  Box  Pulsing  for  coal  System  conveyor system  for addition  of 2 x  250  MW  to  Sikka  Thermal  Power  Plant in Jamnagar District Gujarat   3.  Design  of  35.58  MLD  capacity  ‐  ‐  M/s. GVPR  Sewage  Treatment  Plant  under  UGD Scheme to Shimoga City     Projects on Hand  29 
  • 33.
       Annexure – II (A)  10. ORGANISATION STRUCTURE  A. PANEL OF CONSULTANTS/ADVISORS    Sl. No.  Name & Qualification  Designation  1.  Sri C.S. Hebli    Director Technical (Retd),  Chairman &  Karnataka Power Corporation Ltd.  Chief Consultant.  Bangalore.  2.  Sri H.V. Eswaraiah  Director Technical (Retd),  Consultant –Hydro Civil  Karnataka Power Corporation Ltd.,  Designs.  Bangalore.  3.  Sri G.N. Yoganarasimhan,  Director (Retd),  Advisor‐Hydrology.  WRTD, Rourke,  Bangalore.  4.  Sri. P.R. Balasubramanian,   CMD (Retd), FACT,   Advisor‐ Gas Based Power  Triavaneore, Kerala.  Plant.  Bangalore.  5.  Dr.  D.N. Seshagiri, PhD Harvard, USA.   Director (Retd),  Advisor – Engineering Geology.  Engineering Geology,  Geological Survey of India.  6.  Sri.Vishwanath Balachandran,  Advisor‐ Engineering  Director General, GIS (Retd).  Geology.  Chennai.    7.  Sri. Shankar Nesargi  Managing Director (Retd.)  Advisor ‐Wind Energy  VVNL, Bangalore.  8.  Sri. C. R. Venkatesh  Executive Director (Retd.)  Advisor ‐Hydro Power  NHPC Ltd., New Delhi,  Projects.  Bangalore.  9.  Sri. H. Rangarajan, B.Sc, B.E.  Executive Director(Retd),   Executive Director (Elec.)  KPCL, Bangalore.  Panel of Consultants / Advisors  30 
  • 34.
       Sl. No.  Name & Qualification  Designation  10.  Sri B.V. Ramakrishnaiah,  Advisor – Gates.  Bangalore.  11.  Sri Srinath Anekal, ME (Civil), MS(Environment)  USA.  Advisor‐Environment.  Bangalore.  12.  Sri. M. M. Kamath,   Advisor – Marine Engineering.  Chief Engineer (Retd),  NMPT, Mangalore.  13.  Sanker Pradesh, M.Tech  (Roorkee),    Consultant‐ Geology.  New Delhi.  14.  Sri. Thippeswamy  Advisor –Water and Waste  Chief Engineer (Retd.)  Water System.  BWSSB, Bangalore.  15.  Sri. V. Suresh Kumar, M.Tech (Khargpur),  Advisor – GIS  Bangalore.    16.  Sri V. Narayanan,  Advisor – Transmission  General Manager, SAE (I) Ltd (Retd),  Lines.  Bangalore.  17.  Sri. Ramanan  Chief Engineer (Retd.)  Consultant‐Hydro  NHPC Ltd., New Delhi,  Bangalore.  18.  Dr. Y. Lingaraju.  Advisor ‐  Ground Water  19.  Sri. Umashankara , B.E. (Civil)    Ex‐Mecon.  Advisor ‐Steel Structure.  20.  Sri. G. Rajagopalan,  Director (Retd),  Consultant – Engineering  Engineering Geology,  Geology  Geological Survey of India, Chennai.  21.  Sri. Krishnappa,  Advisor – Finance.  Financial Controller(Retd),    KPCL, Bangalore.  22.  Sri. Sridhar Prabhu – Legal Adviser   Advisor –PPA  23.  Sri. Venkateshwar Rao  Consultant (Liaison)  New Delhi.  24.  Sri T.S. Somanathan, B.E. (Mech).  Advisor –Welding.  Foremerly NLPC Ltd.,    Panel of Consultants / Advisors  31 
  • 35.
       Annexure – II (B)    B. TECHNICAL PERSONNEL    Sl. No.  Name & Qualification  Designation  1  Sri C.S. Hebli, B.E(Hons)  Chairman.  2  Sri B.L. Lakshminarasimha,  Chief Executive Officer              B.Sc., B.E., M.E., MIE, AIV, MASCE.     3  Sri. P.R.Mallikarjuna    Executive Director (Design Head)    M.E.(I.I.Sc.), MIE, MIWRS, MISEO.     4  Sri. Chikkaguddappa  B.E. (Civil)  Director (Project Development)  5  Sri. H.Raghavendra Rao B.E. (Elec)  Director (Electrical Generation.)  6  Sri M.M. Reddy, B.E.(Elecl)  Director (Electrical Power Evacuation)  7  Sri.P.K.Rupangudi, M.E. (Civil)  Director (Gates, Dams design)  8  Sri.U.R.Raghotham, M.Tech. (Civil)   Director (Tunnel and Dam design)  9  Sri.R.Vasudevan B.E. (Elec)  Deputy Director (Water & Waste Water)  10  Sri.K.T.Sreedhara, B.Tech (Civil)  Deputy Director (Irrigation)  11  Sri. Narayana  Achutha  Deputy Director (Hydro civil design)    M.Tech, IIT Kanpur, (Hydraulics)    12  Sri.T.S.Srinivasa, B.E (Civil), M.E  Deputy Director ‐‐Civil (Gas)       13  Sri.Sudarshan Rao B.E. (Elec)  Manager (Electrical Generation)  14  Mr.Gangadar Pattanashetti  Senior Design Engineer (Irrigation)    M.Tech, IIT Guwahati, (Water Resources)    15  Sri. Anantha Murthy,   General Manager (Civil Designs)  B.Sc AMIE (Civil)  16  Ms.Kavitha.M,  B.E, MBA  Administrative Officer   17  Sri. R. Suryanarayana, M.Sc (Geology)  Consultants (Engineering Geology)  18  Ms. Sneha Dandavathe., B.E.(Civil)  Design Engineer (Hydrology)  19  Mr. K.V. Chandrakanth B.E. (Elec)  Design Engineer (Elec.)  20  Mr. Vasanth Kumar B.E (Civil)  Design Engineer (Project Planning)  21  Mr. Shivanand, B.E (Civil)  Design Engineer (Water conductor system)  22  Mr. Pramod Kumar, B.E.(Civil)  Design Engineer (Power House & Tail Race)  23  Mr. Lokesh  B.E (Civil)  Design Engineer (Dam Design)  24  Mr. Sudeendra, M.Tech (Structures)  Design Engineer (Gas Power Plant)  Technical Personnel  32 
  • 36.
       Sl. No.  Name & Qualification  Designation  25  Mr. Mohan Kumar, M.Tech (Structures)  Design Engineer (Gas Power Plant)  26  Mr. Puneeth. S, B.E(Elec)  Design Engineer (Elec.)  27  Mr. Naveen V. B.E.(Mech)  Piping Engineer (Mechanical)  28  Mr. Yoghesh K ,B.E.(Civil)  Design Engineer (Planning)  29  Ms. Anusha Hegde K. B.E.(Elec)  Design Engineer (Electrical)  30  Ms. Smitha Nagaraj B.E.(Elec)  Design Engineer (Electrical)  31  Ms. Kumari Diptimayee, B.E.(Civil)  Design Engineer (Irrigation)  32  Ms. Poonam U Jadhav, B.E (Civil)  Design Engineer   33  Mr. Pradyumna K, B.E.(Civil)  Design Engineer (Trainee)  34   Mr. Vinay M V  B.E .(Civil)   Design Engineer (Trainee)  35  Mr. Saravanan S   Design Engineer (Hydro Civil)   36  Ms.Sunita G Galgali, B.E (Civil)  Assistant Design Engineer   37  Sri Mahesh Desai  Manager (Drawings‐ Section)  38  Mr.Prasanna.T  CAD Engineer (Electrical)  39  Mr.M.Shashi Kumar  Junior Design Engineer (Drawings)  40  Mr.Manthesh.M  CAD Engineer (Mechanical Piping)   41  Mr.Praveen.S.Ladva  CAD Operator (Civil)  42  Mr.Nagashetty S   CAD Engineer (Hydro)  43  Mr.Sangashetty V Biradar  CAD Operator (Gas Power Plant)  44  Mrs. Sharadhamma H   CAD Engineer (Civil)    Office Support Staff:    45  Sri. Nagesh, S  Officer / Manager / Accountant  46  Sri Suresh   Accountant  47  Ms. Thara. R  Receptionist  48  Mrs. Geetha N  Personal  Secretary  49  Sri. Ravi Kumar K   Stenographer Cum Secretary  50  Ms. Sowmya A  Personal  Secretary      Technical Personnel  33 
  • 37.
       Annexure – III (A)    11. LIST OF PROJECT ASSIGNMENTS SUCCESSFULLY COMPLETED      A. Preparation of Desk Study Report on Hydro  Power  Projects self identified by DG to  various IPP’s in Nepal and India.      Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs.  MW  Lakhs  1.  Jaleswar HEP, Nepal.  200.00  US $400  2008  M/s. Maytas Infra Ltd.,  Million  Hyderabad.  2.  Taksindu HEP, Nepal.  270.00  US $540  2008  M/s. Nandadevi Agro‐ Million  Farms Pvt Ltd., Hyderabad.  3.  Syar Khola ‘A’ HEP, Nepal  140.00  US $280  2008  M/s. Dunagiri Pvt Ltd.,  Million  Hyderabad.  4.  Syar Khola ‘B’ HEP, Nepal.  360.00  US $720  2008  M/s. Harmosha Pvt Ltd.,  Million  Hyderabad.  5.  Prok HEP, Nepal.  480.00  US $960  2008  M/s. Nandadevi Pvt Ltd.,  Million  Hyderabad.  6.  Jogimara  Trisuli  HEP,  240.00  US $480  2008  M/s. Haramosh Agro‐Farms  Nepal.  Million  Pvt Ltd., Hyderabad.  7.  Bihi HEP, Nepal.  270.00  US $540  2008  M/s. Dunagiri Agro‐Farms  Million  Pvt Ltd., Hyderabad.  8.  Kappe  HEP,  Arunachal  98.00  73900  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd  9.  Champung  Pobe  HEP,  140.00  105500  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  10.  Changlai  HEP,  Arunachal  48.00  36200  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  11.  Braing  pube  HEP,  48.00  36200  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  12.  Pakke  HEP,  Arunachal  70.00  52800  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  13.  Nargum  HEP,  Arunachal  84.00  63300  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.    14.  Chann  Siang  HEP  66.00  50557  2008  M/s. Hemavathy power &  Arunachal Pradesh.  light Pvt Ltd, Bangalore.  Desk Study Report  34 
  • 38.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs.  MW  Lakhs  15.  Papu  HEP  Arunachal  110.00  88000  2008  M/s. Hemavathy power &  Pradesh.  light Pvt Ltd, Bangalore.  16.  Arket Bazar HEP, Nepal.  110.00  US $220  2007  M/s. Parasnath Greenlands  Million  Pvt Ltd., Hyderabad.  17.  Uiya HEP, Nepal.  105.00  US $210  2007  M/s. Maytas Infra Ltd.,  Million  Hyderabad.  18.  Phillim HEP, Nepal.  150.00  US $300  2007  M/s. MMS Steel & Power  Million  Ltd.,Hyderabad.  19.  Amras HEP, Nepal.  150.00  US $300  2007  M/s. Maytas Properties Pvt  Million  Ltd., Hyderabad.  20.  Budhi  Gandaki  HEP,  600.00  US $1200  2007  M/s. RVK Energy Pvt Ltd.,  Nepal.  Million  Andhra Pradesh    Desk Study Report  35 
  • 39.
         B. DETAILED ENGINEERING OF PROJECTS ‐ COMPLETED      Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  1.  Balance  of  Plant  for  Hail‐2  2 x55/75    2011  M/s. Alfanar Riyadh through  Gas based Power Plant, Saudi  M/s. ILF Abu Dhabi  Arabia.  2.  Computation  of  HFL,  Irrigation  4000  2011  M/s. Karnataka Neeravari  elevation capacity of barrage,  Nigama Limited, Karnataka.  design of barrage for Halasur    Barrage  across  Varada  River  ‐  Shiggaon  Lift  Irrigation  Scheme  Dharwar  District,  Karnataka  3.  Detailed  Analysis,Design  Mechanical  5200  2010  M/s. Hind High Vacuum Co.  and  Preparation  of  Pvt. Ltd. Bangalore  Fabrication  of  TIG  Welding    Chamber.  4.  Balance  of  civil  works  for  —  —  2010  M/s. Delkor Technik India  Horizonal  Belt  Filter  Station  Pvt Ltd., Bangalore.  Building  including  Equipment  and  Accessories  Foundation Cango.  5.  Al‐Gubrah  Mobile  SWRO  —  —  2010  M/s. ILF Abu Dhabi.  Plant Civil Design, Muscat.  6.  Dandavathi  Reservoir  Irrigation  10200  2009  M/s. Karnataka Neeravari  Irrigation Project Karnataka  Nigam Ltd., Bangalore  7.  Varahi  Underground  Power  2 x 215  2500  2009  M/s. Karnataka Power  House Stage‐II Karnataka.  Corporation Ltd., Bangalore  8.  Energy  Audit  of  Fiber  Glass  Energy  60  2009  M/s. ICP(India) Private Ltd.,  Product  Manufacturing  Audit  Bangalore.  Units, Bangalore    9.  35  MLD/STP  for  Shimoga  —  —  2009  M/s. GVPRS Hyderabad.  Town,  Shimoga  District,  Karnataka.    Detailed Engineering – Completed  36 
  • 40.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  10.  Balance  of  civil  works  for  18  —  —  2009  M/s. Delkor Technik India  mtr dia x 3.0 SWD RCC  tank  Pvt Ltd., Bangalore.  for thickener application.  11.  Detailed  Engineering  for      2009  Sharavathy Conductors Pvt  Transmission  line  including  Ltd, Bangalore  Foundation  Designs  for  the  20km,  double  circuit  transmission  line  connecting  Vajamangala  220kV  station  to Kachakola 220kV station.  12.  25  mtr  dia  x  3.0  SWD  —  —  2009  M/s. Delkor Technik India  130TPH  capacity  RCC  tank  Pvt Ltd., Bangalore.  with  tunnel  and  overflow  launder  for  thickener  application  13.  100MW  Wind  Farm  10 x 1.65  10000  2009  M/s.Doddanavar Brothers,  development‐1phase  Belgaum Karnataka  16.5MW  Chikkodi  Belgaum    District, Karnataka  14.  Energy  Audit  of  steel  Energy  50  2008  M/s. Goel Engineering  Fabrication  Manufacturing  Audit  Private Ltd., Bangalore.  Unit, Bangalore.  15.  Design  and Drawing for DM  —  —  2008  M/s. Velath Engineering  Vessel.  Works, Sharjah UAE  16.  Construction  Water  supply  3 x 350  450000  2008  M/s. GMR Energy Limited,  for  Kamalanga  Thermal  Bangalore  Power Plant, Orissa.  17.  Somanamaradi  Small  Hydel  1 x 6  1500  2007  M/s. Narayanapur Power  Project‐  Stage‐II,  in  Raichur  Co. Pvt. Ltd, Bangalore  District, Karnataka.  18.  Balance  of  civil  works  for  —  —  2007  M/s. Velath Engineering  Design  and  Drawing  for  Works, Sharjah UAE  Sulphur Storage Tank.  19.  Design  and  Drawing  of  Flue      2007  M/s. Velath Engineering  Gas  Scrubber  (V‐1507)  Works, Sharjah UAE  Vessel.  Detailed Engineering – Completed  37 
  • 41.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  20.  Detailed  Engineering  for  —  —  2007  Sharavathy Conductors Pvt  Transmission  line  towers  Ltd, Bangalore  including  Foundation  Designs for 50kms of Hiriyur  –  Kudithini  440kV  Transmission line.  21.  Balance  of  E&M  works  for  2 x 5  3000  2007  M/s. Meclin Fabricators  Bhavani  Barrage  Hydro  Private Limited Chennai.  Electric Project I.  22.  Balance  of  E&M  works  for  2 x 5  3000  2007  M/s. Sri Saravana  Bhavani  Barrage  Hydro  Engineering Works  Electric Project II.  company Pvt Ltd. Bhavani  Tamil Nadu  23.  Construction  of  earthen  —  —  2007  M/s. ECC‐‐CPPL Pvt Ltd.,  bund  for  Sarvaraja  Sarovara  Hyderabad. through M/s.  Reservoir  near  Cuddaph,  SM Constructions Bangalore.  Chittur  District,  Andhra  Pradesh.  24.  Shamburi  MHS,  Dakshina  5 x 4.80  9726  2006  M/s.Rithwik Energy  Kannada District, Karnataka.  Generation Pvt. Ltd.  Hyderabad.  25.  Design  and  Drawing  for  —  —  2006  M/s. Velath Engineering  Natural  Gas  Storage  (Buffer)  Works, Sharjah UAE  Pressure vessel.  26.  Balance of Civil Works for 13  —  —  2006  M/s. Delkor Technik India  mtr dia x 3.0 SWD RCC  tank  Pvt Ltd., Bangalore.  for thickener application.  27.  Balance  of  Civil Works  for 4  —  —  2006  M/s.Rolls‐Royce Energy  x  B35:  40V‐12G  Genset  Gas  Systems India Pvt.Ltd.,  Power Plant at Sudan.  New Delhi  28.  Detailed  Engineering  for  —  —  2006  Sharavathy Conductors Pvt  Transmission  line  Towers  Ltd, Bangalore  including Foundation Design  for  132/66/11  kV  Kolar  Sub‐ Station works.    Detailed Engineering – Completed  38 
  • 42.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  29.  Perla  Mini  Hydel  Scheme,  5 x 4.80  9726  2005  M/s.AMR Power Pvt. Ltd.  Dakshina  Kannada  District,  Hyderabad.  Karnataka.  30.  Nagarjuna  Sagar  Tail  Pond  2 x 25  42500  2005  M/s. STUP Consultants  Dam  and  Hydro  Power  Private Ltd., Bangalore  Station,  Nalgonda,  Andhra  Pradesh  31.  Construction  of  Gandikota  Irrigation  5500  2005  M/s. STUP Consultants  Dam  across  Pennar  River,  Private Ltd., Bangalore  Kadapa, Andhra Pradesh.  32.  Yakla  Micro  Hydel  Scheme  2 x 250  100  2005  M/s. Raj Kumar and  in Dargeling West Bengal.  Company, Bangalore  33.  Somanamaradi  Small  Hydel  2 x 6  4800  2004  M/s. Narayanapur Power  Scheme,  Raichur  District,  Co. Pvt. Ltd., Bangalore  Karnataka.  34.  Hullahalla  Mini  Hydel  3 x 4  4740  2004  M/s.Limbavali Power Pvt.  Scheme,  Mandya  District,  Ltd., Bangalore  Karnataka.  35.  Somavathi  Mini  Hydel  2 x 3  2746  2004  M/s.SRM Power Pvt. Ltd.  Scheme,  Chickmagalur  Bangalore  District, Karnataka.  36.  Gugal  Small  Hydel  Scheme,  4 x 2.5  4000  2004  M/s.SRS Energy Pvt. Ltd.  Gulbarga District, Karnataka.  Bangalore  37.  Design  of  Anchor  Blocks  for  —  —  2004  M/s. Quest‐GE‐Global  Birkapilli  HEP Turkey  (  XLS  Engineering Development  generation)  Centre,Bangalore.  38.  Koynad  MHS,  Kodagu  2 x 2  1800  2004  M/s. Sadguru Saai Energies  District, Karnataka.  Pvt. Ltd., Bangalore.  39.  Design  and  Preparation  of  Tank Farm    2004  M/s. Velath Engineering  GA  drawings  for  following  Works Sharju, UAE.  tanks.  Crude  Oil  Tank  Slop  Crude  Oil  Tank  Crude  Oil  /  Water  Tank  Product  Water  Tank Fire Water Tank  Diesel Oil Tank.  Detailed Engineering – Completed  39 
  • 43.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  40.  110 kV Switchyard  extension  Switchyard  100  2003  M/s. Bhowalaka Steels,  at  Bellary  Steels,  Bellary  Bangalore, through LEG.  District, Karnataka.    41.  Pre‐Cast  RCC  Bridge  over      2003  M/s. Mysore construction Co  Upper  Tunga  barrage  across  Ltd., Bangalore.  River  Tunga,  Shimoga  District, Karnataka.  42.  Architural  and  Structural    300  2003  M/s. Nandalal Mohan Lal  services  for  Construction  of  Jairani Kapur Charitable  Pediatric  Ward  at  Kidwai  Trust Bangalore.  Memorial  Institute  of  Oncology  –  Honorary  Assignment  43.  Link  Canal  MHS  2001,  1 x 1.5  700  2002  M/s.Graphite India Ltd.,  Mandya District, Karnataka.  Bangalore.  44.  Varahi  Tail  Race  MHS,  5 x 7.5  13439  2002  M/s. Sandur Power Co. Pvt.  Udupi District, Karnataka.  Ltd., Bangalore.  45.  Civil  works  for  the proposed  —  —  2002  M/s. ASEA Brown Boveri  132/33kV ODY at INDALCO.  Ltd., Bangalore.  46.  132  KV  Switchyard  Switchyard    2002  M/s. BHEL Bangalore.  Capacitor  Bank  for  HINLCO  Renukot.  47.  132  kV  Switchyard  near  Switchyard  300  2001  M/s.Bharat Heavy Electricals  Samayanallur,  Madurai,  Ltd.  Tamil Nadu.  48.  110 kV Switchyard  extension  Switchyard  300  2001  M/s. BHEL, Bangalore,  connected  with  128  MW  DG  through M/s.. MECON,  set  installation  for  KSEB,  Bangalore  Kozikhode.  49.  110  KV  Substation  at  Substation    2001  M/s. LEG Bangalore  Navakarnataka  Steels,  Bellary District, Karnataka.  50.  66  KV  outdoor  Switchyard  Switchyard    2001  M/s. GEPC Ltd., Bangalore  and  Substation  at  NAL  Bangalore.  Detailed Engineering – Completed  40 
  • 44.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  51.  DG  Plant  at  GE  ITC  Ltd.,  7.4  4000  2000  M/s. GEITC Ltd., Bangalore  Whitefield, Bangalore  52.  Design  of  Supplying  Switchyard  800  2000  M/s.. AEG‐NGEF Limited  Structures  of  220kV  Switch  Bangalore.  yard  for  M/s.  Nippon  Denro  Ispat Ltd., Dolvi, Maharastra.  53.  110  kV  Switchyard  at  Switchyard  250  2000  M/s. Bharat Heavy  HINDALCO,  Renukoot,  Electricals Ltd. Bangalore.  Uttar Pradesh.  54.  Design  of  Supplying  Switchyard  200  1999  M/s. Kirloskar Electric  Structures  for  the  proposed  Company Ltd., Bangalore.  66  KV  Outdoor  Switchyard  at a very Cycles Ludhiana.  55.  Harangi  HEP  at  Harangi  2 x 4.5  3200  1999  M/s. Sulzer Flovel Hydro  Dam,  Kushalnagar  District,    Ltd., Faridabad, Haryana.  Karnataka  56.  Sheshadri Iyer MHS Mandya  3 x 2  1200  1999  M/s. Atria Power  District, Karnataka.    Corporation Limited,  Bangalore.  57.  Remodeling  of  Shiva  Power  —  1000  1998  M/s. Karnataka Power  Channel  at    Transmission Corporation  Shivanasamudram,  Mandya  Ltd., Bangalore.  District, Karnataka.  58.  Dumkar  Hydro‐Electric  3 x 1.5  300  1998  Chief Project Engineer,  Project  at  Leh,  Ladakh,  J&K  Power Development  State.  Corporation Ltd., Kargil,  J&K State.  60.  Civil  works  for  De‐Bottle  —  —  1995  M/s. NGEF Ltd., Bangalore  Neck  Project  MSDS‐4,  Electrical  works  of  Bokaro  Steel Plant, Bihar.  61.  110/33KV  Switchyard  and  Switchyard  300  1989  M/s. NGEF Ltd., Bangalore  Substation  at  Xeldem  Madgon  Goa  for  Goa  Electricity Board.  Detailed Engineering – Completed  41 
  • 45.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  62.  110  KV  Outdoor  Yard  Switchyard  150  1988  M/s. NGEF Ltd., Bangalore  Substation  for  M/s.  Madras  Refineries  Ltd.,  Manali  Chennai.  63.  132  KV  Outdoor  Yard  and  Switchyard  200  1987  M/s. NGEF Ltd., Bangalore  Substation  for  M/s.  Petrofills  Co‐operatives  Ltd.,  Kalewar,  Gujrat.    Detailed Engineering – Completed  42 
  • 46.
         C. PREPARATION OF DETAILED PROJECT REPORTS     Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW    Kukke  Hydro  Projects  Stage  8 x 3      M/s. Kukke Hydro Projects  1.  1  Dakshina  Kannada  12714    Pvt Ltd., Bangalore  District, Karnataka  2011    Kukke  Hydro  Projects  Stage  4 x 3      M/s. Kukke Hydro Projects  2.  2  Dakshina  Kannada  7113    Pvt Ltd., Bangalore  District, Karnataka  2011    Lower  UHL,  Mandi  District,  2 x 7.5      M/s. Trident Power Systems  3.  Himachal Pradesh  9435  2011  Pvt Ltd., Hyderabad    Dananahalli  MHS,  Mandya    4750  2011  M/s. Punam power Pvt Ltd,  4.  District, Karnataka  2 x 3  Bangalore.    Feasibility  Study  on  water      2010  M/s.Bharathi Cement  5.  Supply  lines  for  Bharathi  Corporation Limited  Cement  Factory  from  Hyderabad  Saravaraju  Sarovar  De  Reservoir  near  Cuddaph  Andhra Pradesh.    Navya  Mini  Hydel  Scheme  2 x 1.3  2281    M/s. Mitra Energy Pvt Ltd  6.  near  Kurnool,  Andhra  2010  Hyderabad  Pradesh    Augmentation  of  Water  —  —    M/s. Hutti Gold Mines Co  7.  Supply  Scheme  at  Hutti  2010  Ltd. Bangalore  Gold  Mines  Raichur  District,  Karnataka    Kollaya  MHS  near        M/s. Kumaradhara Power  8.  Kumaradhara  Dakshina  6 x 4  12000  2010  Co.Pvt Ltd., Bangalore.  Kannada District, Karnataka    Solar  Power  Plant  at  Bellary  5 x 1      M/s. Vishrutha Power Pvt  9.  District, Karnataka  600  2009  Ltd., Bangalore    Anusha  Mini  Hydel  Scheme  2 x 1.9      M/s. Dhenu Hydro Pvt Ltd  10.  near  Kurnool,  Andhra  2778  2009  Hyderabad  Pradesh  11.  Ramya  MHS  near  2 x 2  2900    M/s. Kurnool Energies Pvt  Kurnool,Andhra Pradesh  2009  Ltd Hyderabad  Preparation of DPR  43 
  • 47.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW  12.  Kodekal Basaveshwara MHS  2 x 5      M/s. Kodekal Basaveshwara  Near  Narayanapur  Dam,  4500    Power Generation Pvt  Gulbarga  District,  2009  Ltd.,Bangalore  Karnataka.    Magundi  MHS  near        M/s. Shakuntalam Power  13.  Magundi  Village,  Mudigere  3 x 3  5200  2009  Pvt Ltd., Bangalore.  Taluk,  Chikkamangalur  District, Karnataka.    Dabevadi  MHS  Uttara        M/s.Dabevadi Hydel Power  14.  Kannada District, Karnataka.  3 x 4  6271  2008  Pvt. Ltd., Uttara Kannada  Karnataka.    Yadekumari  MHS  Hassan  2 x 10.5  8200    M/s. Sri Maruthi Power Gen  15.  District, Karnataka.  2008  India Pvt Ltd., Bangalore    Devargaddi  MHS,  Uttara        M/s.Baliyan Power Private  16.  Kannada District, Karnataka.  2 x 3  3000  2008  Limited  Bangalore.    Perdur  MHS,  Dakshina  2 x 3  3000  2008  M/s. Dishaa Power  17.  Kannada District, Karnataka.  Corporation Private Ltd.,  Bangalore.    H.  Malligeri  MHS,  near  1 x 1  461  2007  M/s. Venika Green Power  18.  Maddur  branch  canal,  Pvt Ltd., Bangalore.  Mandya District, Karnataka.    Hosamatha  MHS,  near  3 x 1.2  1807  2007  M/s.Vakkal Power  19.  Hosamatha  village  Dakshina  Corporation Ltd.,  Kannada District, Karnataka.  Bangalore.    Devarabetta  MHS,  Hassan  2 x 6.5  3910  2007  M/s. Pinnacle Green Power  20.  District, Karnataka.  Pvt. Ltd., Bangalore.    Addhole  MHS,  near  Bisale  3 x 8  8676  2007  M/s. Trimurthy Power Pvt.  21.  village,  Hassan  District,  Ltd., Bangalore.  Karnataka.  22.  Hongadahalli  Mini  Hydel        M/s. Sri. Maruthi Power  Scheme,  Hassan  District,  18.9  7200  2007  Gen India Pvt Ltd.,  Karnataka.  Bangalore  23.  Mallahalli  MHS,  near        M/s. Nandini Power Co.  Patla,Kodagu  District,  3 x 8.39  9778  2007  Bangalore Pvt. Ltd.,  Karnataka.  Bangalore.  Preparation of DPR  44 
  • 48.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW  24.  Hathipathar MHS        M/s. Shasta Investment and  Chathisgarh State.  2 x 6  7000  2007  Initiation Company Pvt Ltd  Hyderabad.  25.  Benchagaddi  MHS,        M/s. Pusala Power  Dakshina  Kannada  District,  12  6000  2007  Company Pvt Ltd.,  Karnataka  Hyderabad.  26.  Talthare  MHS  in  Kodagu        M/s. GM Property  District, Karnataka.  2 x 3.7  3000  2007  Developers Pvt. Ltd,  Bangalore.  27.  Kanchimane  MHS,  Shimoga        M/s. Sagar Power (Dandela)  District, Karnataka  2 x 2  2000  2007  Pvt. Ltd Hyderabad    Tomabattu  MHS,  Shimoga        M/s. Siddhi Vinayaka  28.  District, Karnataka.  2 x 2.5  2500  2007  Spechem (P) Ltd.,  Bangalore  29.  Havinahedgi  MHS,        M/s. XS Power company  Hospet,Bellary  District,  4 x 6  12000  2007  Pvt Ltd Hyderabad.  Karnataka.  30.  Construction  of  weir  across        M/s. Mangalore City  across  River  Nethravathi  at    Corporation, Mangalore.  Thumbe for providing Water  2007    Supply  to  Mangalore  City  Mangalore  District,  Karnataka.  31.  Shamburi  MHS,  near  5 x 4.80  9733  2006  M/s. Rithwik Energy  Shamburi  /  Kamthi  Bazar  Generation Pvt. Ltd.,  village  Dakshina  Kannada  Hyderabad  District, Karnataka,  32.  Varahi  MHS,  near  2 x 4.50  4926  2006  M/s. South Canara Electric  Hosangadi  village  Udupi  Power Ltd., Bangalore.  District, Karnataka,  33.  Handihalla  MHS,  Mandya    12000  2006  M/s.Penna Cement  District, Karnataka.  3 x 8.25  Industries (P) Ltd.,  Bangalore  34.  Sorang  HEP,  near        M/s. Himachal Sorang  Barakhamba  village,  Mandi  2 x 50  58600  2006  Power Pvt. Ltd., Hyderabad  Himachal Pradesh  Preparation of DPR  45 
  • 49.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW  35.  Maranahalli  MHS  near  3 x 4.70  5313  2006  M/s.Deepak Cables,  Maranahalli, Hassan District,  Bangalore.  Karnataka.  36.  Iggalur  Barrage  MHS,  near        M/s. Saroj Energy Co. Pvt.  Iggalur  village,  Bangalore  1 x1.50  861  2006  Ltd., Bangalore.  District, Karnataka.  37.  Adishakthi  Maramma  MHS,  4 x 6      M/s. Pioneer Genco Private  Mandya District, Karnataka.  9600  2006  Ltd., Hyderabad  38.  Shalvi  MHS  Shimla  District,        M/s. Oriental Structural  Himachal Pradesh State.  2 x 3.5  4859  2006  Engineers Pvt. Ltd., New  Delhi.    Yatanur  MHS,  near  2 x 3  2000  2006  M/s. SKN Hydro Energy  39.  Gulbarga District Karnataka.  Pvt Ltd.    Yatanur Mini Hydel Scheme,  2 x 2      M/s. SKN Hydro Energy  40  Bijapur District, Karnataka.  1600  2005  Pvt Ltd., Bangalore    Kallaja  MHS,  near  Kallaja  3 x 2.5  3943  2005  M/s.Srishti Power Pvt. Ltd.,  41.  village  Dakshina  Kannada  Bangalore.  District, Karnataka.    Kollya  MHS,  near  Kollya  /  6 x 3  9671  2005  M/s.SNC Power  42.  Veeramangala  village  Corporation Pvt. Ltd.,  Dakshina  Kannada  District,  Bangalore  Karnataka.    Neerukatte  MHS,  4 x 3.75  8185  2005  M/s..Sagar Power  43.  Neerukatte Village Dakshina  (Neerukatte) Ltd.,  Kannada District, Karnataka.  Bangalore.    Perla  MHS,  near  Perla  5 x 4.80  9901  2005  M/s. AMR Power Pvt. Ltd.,  44.  village  Dakshina  Kannada  Bangalore  District, Karnataka.  45.  Durgadahalla  MHS,  near  2 x 9  9377  2005  M/s. Corporate Hydro  Charmadi  village  Dakshina  Energy Pvt. Ltd.,  Kannada District, Karnataka.  Hyderabad.  46.  Dodda  Betta  MHS,  Hassan  3 x 7  7871  2005  M/s. Sanjeevini Power Pvt.  District, Karnataka.  Ltd., Bangalore.  47.  Somavathi  MHS,  2 x 3  2746  2005  M/s. SRM Power Pvt. Lt.,  Chikkamangalur  District,  Bangalore.  Karnataka.  Preparation of DPR  46 
  • 50.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW  48.  Astalakshmi  MHS,  near  2 x 3.5  1816  2005  M/s..Shankaranarayana  Kumbaradi  village,  Power Enterprises Pvt Ltd.,  Chikkamangalur  District,  Bangalore.  Karnataka.  49.  Uyamballi  MHS,  near        M/s. SNS Power Project  Koggedoddi,  Bangalore  2 x 5  5512  2005  Pvt., Bangalore.  District, Karnataka  50.  Surlabi  MHS  in  Somavarpet        M/s. Core Green Hydro  Taluk,  Kodagu  District,  2 x 2  1600  2005  Power India Pvt Ltd.,  Karnataka  Hyderabad  51.  Gondi  MHS  near        M/s. Bhadragiri Power Pvt  Sidlipura,Tarikere  Taluk  2 x 1.5  1500  2005  Ltd., Bangalore.  Chikkamangalur  District,  Karnataka  52.  Detailed  Survey  and        M/s. NTPC Hydro Ltd.,  Investigation  work,  EIA        Noid, NCR Delhi  Study  and  Preparation  of        DPR for following Projects.        a) Belliyur HEP  15  8200  2005  b) Neerukatte HEP  15  8200  2005  53.  Adahole MHS Phase 1 and 2        M/s.  Trimurthi  Power  Pvt  near  Dakshina  Kannada        Ltd., Bangalore.  District, Karnataka.  2 x 12.5  12500  2005  54.  Gugal  Small  Hydel        M/s. SRS Energy Private Ltd.,  Scheme,Gulbarga  District,  3 x 3.34  4958  2004  Bangalore.  Karnataka.  55.  Somanamaradi  Small  Hydel    9600  2004  M/s. Narayanapur Power Co.  Project  on  Upper  Krishna    Pvt. Ltd., Bangalore  Right  Bank  Canal,  Raichur  4 x 6  District, Karnataka.  56.  Baje  MHS  Udupi  District,  3 x 1  1456  2004  M/s. Devar Power Pvt. Ltd.,  Karnataka.  Bangalore.  58.  Kadamane  MHS‐II,  Hassan  2 x 7.5  8500  2004  M/s.Nagarjuna Holdings (P)  District, Karnataka.  Ltd., Hyderabad.  59.  Hullahalli  MHS,  near  2x1  800  2004  M/s.Karnataka Renewable  Hullahalli/  Ramapura  village,  Energy Development Ltd.,  Mysore District, Karnataka.  Bangalore.  Preparation of DPR  47 
  • 51.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW  60.  Shivanasamudram  MHS,  1 x 1  452  2004  M/s.Vakkal Power    Malavalli  Taluk,  Mandya  Corporation Ltd., Bangalore.  District, Karnataka  61.  Chikkmandya  MHS,  1 x 0.50  471  2004  M/s.Adichunchanagiri    Chikkmandya,  Mandya  Energy Projects Pvt. Ltd.,  District, Karnataka.  Mandya.  62.  Hullahalla MHS, Dhanagere,  3 x 4  4740  2004  M/s. Limbavali Power Pvt.  Mandya District, Karnataka.  Ltd., Bangalore.    Dinnekere  MHS,        M/s. Vejetha Glazed Tiles  63.  Chikkamangalur  District,  2 x 3  3000  2004  Industries, Hyderabad,    Karnataka.  Andhra Pradesh.  64.  Afzalpur  MHS,  near        M/s. Jasper Energy Pvt Ltd.,  Afzalpur,Gulbarga  District,  2 x 4  4520  2004  Bangalore  Karnataka.  65.  Sonna  MHS,  near  soma        M/s. Jasper Energy Pvt Ltd.,    villege  Gulbarga  District,  2 x 3  3300  2004  Bangalore  Karnataka.  66.  Singatalur‐Huligudda  MHS        M/s. Tungabhadra Power  near  Thimmalapur  village,  3 x 6  6000  2003  Co. Private Ltd., Bangalore.  Bellary District, Karnataka  67  Mannapitlu  MHS,  near  3 x 5  6320  2003  M/s.Bobba Power Projects,  Arambodi  village  Dakshina  Bangalore.  Kannada District, Karnataka.  68.  Mulibettu  MHS,  near        M/s.Mount Kailash Power  Mulibettu  village  Dakshina  2 x 4.5  4282  2003  Projects Pvt. Ltd. Bangalore.  Kannada District,Karnataka.  69.  Kilanjara  MHS,  near  Kalladi  2 x 3  3052  2003  M/s.Phalguni Power    village  Dakshina  Kannada  Projects‐1, Bangalore.  District, Karnataka.  70.  Kolavur MHS., near Niralike        M/s.Phalguni Power    village  Dakshina  Kannada  2 x 4.5  4368  2003  Projects‐2, Bangalore.  District, Karnataka.  71.  Horiabbe  MHS,  near  2 x 3  2596  2003  M/s. S.K. Farms, Hubli.    Siddapur  village  Udupi  District, Karnataka.  Preparation of DPR  48 
  • 52.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No  Capacity in  in Rs. Lakhs  MW  72.  MGHE  MHS  Shimoga  2 x 10  11500  2003  M/s.Suchindra Investment  District, Karnataka.  & Financial Services,  Bangalore  73.  Abilbiru  MHS,  Hassan  2 x 3  2273  2003  M/s. South‐West Hydro  District, Karnataka.  Power Pvt. Ltd., Bangalore.  74.  Somavathi  MHS,  2 x 3  2698  2003  M/s. SRM Power Pvt. Lt.,    Chikkamangalur  District,  Bangalore.  Karnataka.  75.  Akkihebbal  MHS,  Mandya  2 x 1.25      M/s. Cauvery Hydro  District, Karnataka.  700  2002  Energy Ltd Bangalore  76.  Kadamane  MHS‐I,  Hassan  2 x 4.5  5200  2001  M/s.Paschim Hydro Energy    District, Karnataka.  (P) Ltd., Hyderabad.  77.  Kumudavati  Mini  Hydel  2 x 0.250  361.98    M/s. Krisri Power Tech Pvt    Scheme,Haveri  District,  2001  Ltd, Bellary Karnataka  Karnataka.  78.  Keertihole  MHS  near        M/s. Subash Project &    Kutupuzha  village,Virajpet  3 x 8  7200  2001  Marketing Co Pvt Ltd.,  Taluk,  Kodugu  District  Bangalore,  Karnataka.  79.  Hemavathi  High  Level  2 x 2  600    M/s. Flax India Limited    Canal  MHP,Gorur,  Hassan  2000  Bangalore  District, Karnataka.    Hebbakawadi  MHSMandya    400  1999  M/s. Jayalakshmi Power Co  80.  District, Karnataka.  2 x 1  Private Ltd., Bangalore  81.  Maddur  Canal  MHSMandya  2 x 1.5  500  1998  M/s. Khodays Ltd.,    District, Karnataka.  Bangalore  82.  New  Ganderbal  Hydro        M/s. Chief Engineer PDC    Electric  Project,  near  Jammu,  3 x 15  4000  1996  J&K State. Through M/s.  Jammu and Kashmir State    THC New Delhi.    Preparation of DPR  49 
  • 53.
       D. PRE‐FEASIBILITY STUDIES OF POWER PROJECT    Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  1  Baje‐Hiriadka MHS, Udupi    1425    M/s. Aparimita Power  District, Karnataka.  2 x 1.5  2011  Ventures PVt Ltd.,  Bangalore  2  Gulisattenhalli  MHS,    3185    M/s. Aparimita Power  Hasan District, Karnataka.  2 x 2.5  2011  Ventures PVt Ltd.,  Bangalore  3  Kuppahalli  MHS,  Mandya    2123    M/s. Aparimita Power  District, Karnataka.  2 x 2  2011  Ventures PVt Ltd.,  Bangalore  4  Bellur  MHS,  Dakshina    1500    M/s. Muktar Power (India)  Kannada  District,  2 x 1.5  2010  Private Ltd., Goa  Karnataka.  5  Mundaja  Hole  MHS,    1000    M/s. Muktar Power (India)  Dakshina  Kannada  2 x 1  2010  Private Ltd., Goa  District, Karnataka.  6  Ujre  MHS,  Dakshina    1500    M/s. Muktar Power (India)  Kannada  District,  2 x 1.5  2010  Private Ltd., Goa  Karnataka.  7  Kumadvati  MHS  near        M/s. Brigade Infra Pvt Ltd  Anjanapura  2 x 1.5  1400  2010  Bangalore  Chnnarayapatna,  Karnataka.  8  Um‐Lunar  SHEP,  2 x 12  20000  2009  M/s. Green Valliey  Meghalaya  Northeast  Industries Private Ltd.,  State.  Kolkatha.  9  Gurkhi  MHS,  Belgaum    9000  2009  M/s. Aditya Infrastructure  District, Karnataka.  3 x 6  Hyderabad  10  Potli  MHS,  Belgaum  3 x 6  9000  2009  M/s. Aditya Infrastructure  District, Karnataka.  Hyderabad  11  Chagotkallu  MHS,  Raichur    600    M/s. Samvah Energy Pvt Ltd  District, Karnataka.  2  2009  Bangalore  12  Hurley  MHS  Hassan  1  540  2009  M/s. Classic Group Pvt Ltd.,  District, Karnataka.  Bangalore  13.  Kangtangshiri  HEP  2 x 17.5  20000  2008  M/s. Raajratna Metal  Arunachal Pradesh.  Industries, Hyderabad  Pre‐Feasibility Study Report  50 
  • 54.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  14.  Ropum  HEP  Arunachal  40  32000  2008  M/s. Raajratna Metal  Pradesh.  Industries, Hyderabad  15.  Barpu  HEP  Arunachal  135  111645    M/s. Raajratna Metal  Pradesh.  2008  Industries, Hyderabad  16.  Par  HEP  Arunachal  96  79400  2008  M/s. Par Infra Limited,  Pradesh  Hyderabad.  17.  Dardu  HEP  Arunachal  3 x 25  52000  2008  M/s. Dardu Power Pvt Ltd.,  Pradesh.  Hyderabad.  18.  Alavalli  MHS  Hassan  2 x2  1600  2008  M/s. Hotel Maruthi Pvt. Ltd.  District Karnataka.  Bangalore.  19.  Pema  Shelphu  ‐  HEP.  97.5  61900  2008  M/s. Raajratna Energy  Arunachal Pradesh.  Holdings Pvt. Ltd.  Hyderabad.  20.  Marwari  HEP,  8  4000  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad  21.  Balganga‐II  HEP.  7  3500  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad  22.  Doodh  Ganga  /  Meena  6  3000  2008  M/s. R.R. Construction &  HEP. Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad  23.  Bernigad HEP,  6.5  3300  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad  24.  Vijaya Nagar‐Rampur HEP  20  1000  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad  25.  Rampur‐Tilwari HEP  25  12500  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad  26.  Madya  Maheshwar  HEP  18  9000  2008  M/s. R.R. Construction &  Uttarakhand State.  Infrastructure India Pvt Ltd.  Hyderabad  27.  Kepjog  Mini  Hydel  10  4800  2008  M/s. Vensai Power Projects  Scheme,Jog,  Shimoga  Pvt Limited, Hyderabad  District Karnataka.  Pre‐Feasibility Study Report  51 
  • 55.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  28.  35  MW  Bio  Mass  Power  35  US $ 700,000  2008  M/s. Dass Green Energy  Plant  near  eggbough,  Inc., Boston, USA.  Leeds, U.K  29.  Baipadi  MHS,  Dakshina  2 x 3  2682  2007  M/s. Srishti Power Pvt. Ltd.,  Kannada  District,  Bangalore.  Karnataka.  30.  Hemavathi  Right  Bank    1350    M/s. Sri Maruthi Power Gen  Canal  MHS  Stage‐II.  2 x 1  2007  India Pvt. Ltd. Bangalore.  Hassan District, Karnataka.  31.  Kela  Chavadi    1200    M/s. Delmon Energy Pvt.  MHS,Agumbe,  Shimoga  2 x 2  2007  Ltd. Bangalore.  District, Karnataka.  32.  Hosakambi  MHS,Uttara    1200    M/s. Mysore Mercantile Co.  Kannada  District,  2 x 2  2007  Ltd. Bangalore.  Karnataka.  33.  Dugganballu  MHS,  Uttara    3141    M/s. Mysore Mercantile Co.  Kannada  District,  2 x 2.5  2007  Ltd. Bangalore.  Karnataka.  34.  Tombattu  Hole  MHS,    1000    M/s. Siddhi Vinayaka  Shimoga  District,  1 x 2  2007  Spechem Pvt Ltd.,  Karnataka.  Bangalore  35.  Bairekoppa MHS, Dharwar    3320    M/s. Mysore Mercantile Co.  District, Karnataka.  2 x 2.5  2007  Ltd. Bangalore.  36.  Kalgodu  MHS,    1080    M/s. Saisri Power Projects &  Chikkamagalur  District,  2 x 1  2007  System Pvt Ltd Bangalore  Karnataka.    37.  Sondahalla  MHS,  Uttara    2555  2007  M/s. Disha Power  Kannada  District,  2 x 3.5  Corporation Pvt Ltd  Karnataka.  Bangalore  38.  Kelasi  MHS,  Hubli‐   3036    M/s. Abletech Electro  Dharwar  District,  2 x 2.5  2007  Engineers Pvt Ltd Bangalore  Karnataka.  39.  Kallur  B  MHS,  Gulbarga    6181    M/s. Jasper Energy Pvt Ltd.,  District, Karnataka.  4 x 4  2007  Bangalore    Pre‐Feasibility Study Report  52 
  • 56.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  40.  Gundiadka  Small  5  1790  2007  M/s. Saileela Power Pvt.  Hydropower  Project.  Ltd. Bangalore  Dakshina  Kannada  District, Karnataka.  41.  Kottanadka  Mini  Hydel  2 x 1  1200  2007  M/s. AMR Power Private  Scheme,  Kodagu  District,  Ltd. Bangalore.  Karnataka.  42.  Kannadagal  MHS,Uttara  2 x 12  13200  2007  M/s. Trident power Systems  Kannada  District,  Pvt Ltd., Hyderabad.  Karnataka.  43.  Illva  MHS  Uttara  Kannada  7.5  3771  2007  M/s. Sri Shankara Narayana  District, Karnataka.  Power Corporation Pvt Ltd.,  Bangalore.  44.  Kalgatta  MHS  Dakshina  2 x 2.5  2800  2007  M/s. Samvah Energy Pvt  Kannada  District,  Ltd., Bangalore.  Karnataka  45.  Kubjanadi  MHS  Udupi  2 x 2.5  1750  2007  M/s. PSR Hydro Energy Pvt  District, Karnataka  Ltd., Bangalore.  46.  Manchikeri  MHP  Uttara  3 x 6  6210  2007  M/s. PSR Hydro Energy Pvt  Kannada  District,  Ltd  Karnataka.    47.  Kurkamane  Mini  Hydel  24  8676  2006  M/s. Trimurthy Power Pvt.  Scheme,  Hassan  District,  Ltd. Bangalore.  Karnataka.    48.  Nanniru  Halla,  Shimoga  2 x 2  1800  2005  M/s. Pinnacle Renewable  District, Karnataka  Energy Pvt. Ltd., Bangalore.  49.  Ulippu  MHS,  Udupi  2 x 6  5958  2005  M/s. NTPC Hydro Ltd.,  District, Karnataka  Noida.  50.  Kallaja  MHS,  Udupi  2 x 3  2662  2005  M/s. Srishti Power Pvt. Ltd.,  District, Karnataka  Bangalore.    51.  Devaragundi  MHS,  Udupi  2 x 2  1814  2005  M/s. Astra Infrastructure  District, Karnataka.  Pvt. Ltd., Secunderabad.    Pre‐Feasibility Study Report  53 
  • 57.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  52.  Horabele  MHS,  Udupi  1.00  3663  2005  M/s. Karnataka Renewable  District, Karnataka  Energy Development Ltd.,  Bangalore.  53.  Biligere  MHS,  Udupi  2  851  2005  M/s. Astra Infrastructure  District, Karnataka.  Pvt. Ltd., Secunderabad.  54.  Surlabi  MHS,  Dakshina  2 x 2  1932  2005  M/s.Karnataka Renewable  Kannada  District,  Energy Development Ltd.,  Karnataka.  Bangalore., Bangalore.  55.  Haraga  Hole  MHS,  2 x 1.5  1363  2005  M/s.Karnataka Renewable  Dakshina  Kannada  District,  Energy Development Ltd.,  Karnataka.  Bangalore.  56.  Mukkodlu  MHS  Dakshina  1.50  681  2005  M/s.Karnataka Renewable  Kannada District, Karnataka.  Energy Development Ltd.,  Bangalore.  57.  Sirangahalli  MHS,  Kodagu  0.80  331  2005  M/s.Karnataka Renewable  District, Karnataka.  Energy Development Ltd.,  Bangalore.  58.  Bhadrakali  Mini  Hydel  0.70  344  2005  M/s.Karnataka Renewable  Scheme,  Kodagu  District,  Energy Development Ltd.,  Karnataka.  Bangalore.  59.  Chapparahalla  MHS  Phase  2 x 7  4200  2005  M/s. Akasha Ganga Energy  I Karnataka.  Pvt. Ltd., Bangalore.  60.  Chapparahalla  MHS  Phase  3  900  2005  M/s. Akasha Ganga Energy  II Karnataka.  Pvt. Ltd., Bangalore.  61.  Katigudde  MHS  Kodagu  2  915  2005  M/s. Delta Power Projects  District, Karnataka.  Pvt. Ltd., Bangalore.  62.  Murukannu  MHS,      2004  M/s. Paschim Holdings  Sakeleshpura,  Hassan  2 x 5.5  4360  private Ltd., Hyderabad.  District, Karnataka.  63.  Balekallu MHS, Karnataka.  2 x 6  3720  2004  M/s. Paschim Holdings  private Ltd., Hyderabad.  64.  Hulikal  Hole  MHS,  Udupi  2 x 2  1700  2004  M/s. Devar Power Pvt. Ltd.,  District, Karnataka.  Bangalore.  65.  Vuddigudda  MHS,  2 x 0.45  591  2004  M/s. Woodae Gooda Coffee  Chickmagalore  District,  Estate Mercara, Kodagu  Karnataka.  District Karnataka  Pre‐Feasibility Study Report  54 
  • 58.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  66.  Kadamane  Mini  Hydel  2 x 5  4500  2004  M/s. Nagarjuna Holdings  Scheme‐II,  Sakeleshpura  Pvt Ltd., Hyderabad.  Hassan District, Karnataka  67.  Durgadahallihalla  Mini  3 x 6  7500  2004  M/s. Nagarjuna Holdings  Hydel Scheme, Karnataka.  Private Ltd., Hyderabad.  68.  Koo Hole MHS, Madapura,  1  461  2004  M/s.Karnataka Renewable  Kodagu District,Karnataka.  Energy Development Ltd.,  Bangalore.  69.  Napanda  Hole  MHS,  1 x 0.50  273  2004  M/s. Karnataka Renewable  Garavale,  Kodagu  District,  Energy Development Ltd.,  Karnataka.  Bangalore.  70.  Sulugodu  MHS  –  1 x 1  446  2004  M/s. Syed Ibrahim & Sons,  Megaravalli,  Hosanagara  Shimoga.  Taluk,  Shimoga  District,  Karnataka  71.  Koynad  MHS,  Madikeri  2 x 1.75  1880  2004  M/s.Sadguru Sai Energies  Taluk,  Kodagu  Dakshina  Pvt. Ltd., Bangalore.  Kannada  District,  Karnataka.  72.  Beliyur  MHS  South  2 x 7.5  9736  2004  M/s. NTPC Hydro Ltd.,  Kannada  District,  Noida. NCR New Delhi.  Karnataka.  73.  Nirkatte  MHS  Dakshina  3 x 5  7204  2004  M/s. NTPC Hydro Ltd.,  Kannada  District,  Noida. New Delhi  Karnataka   74.  Dodda  Betta  MHS  74  19438  2004  M/s. NTPC Hydro Ltd.,  Dakshina  Kannada  Noida. New Delhi  District, Karnataka  75.  Kulkunda  MHS  Dakshina  2 x 9.5  8260  2004  M/s. NTPC Hydro Ltd.,  Kannada  District,  Noida. New Delhi  Karnataka  76.  Bhimanakallu  MHS  3 x 4.5  6383  2004  M/s. NTPC Hydro Ltd.,  Dakshina  Kannada  Noida. New Delhi  District, Karnataka   77.  Kollya  MHS  Dakshina  3 x 6  9348  2004  M/s. NTPC Hydro Ltd.,  Kannada District, Karnataka  Noida. New Delhi  Pre‐Feasibility Study Report  55 
  • 59.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  78.  Bajimane  MHS  Udupi  2  946  2004  M/s. Falcon Power Pvt. Ltd.,  District, Karnataka  Bangalore.  79.  Devaragundi  MHS,    1814    M/s. Aster Infrastructure  Dharmasthala  Dakshina  2 x 2  2004  Pvt. Ltd. Hyderabad.  Kannada  District,  Karnataka.  80.  Ganadahalli  MHP  Mandya    1915    M/s. SMR power Pvt Ltd.,  District, Karnataka.  2 x 2.5  2004  Bangalore    81.  Biligeri  MHS,  Madikeri,    851    M/s. Aster Infrastructure  Kodugu  District,  2 x 1  2004  Pvt Ltd Hyderabad  Karnataka    82.  Gulgal  MHS,  Gulbarga  3 x 3.3  3623  2004  M/s. SRS Energy Pvt Ltd.,  District, Karnataka  Bangalore  83.  Kadamane  Mini  Hydel      2003  M/s. Paschim Holdings  Scheme‐I,  Hassan  District,  2 x 3  3000  private Ltd., Hyderabad.  Karnataka.  84.  Hachinad  Mini  Hydel  2 x 1  1118  2003  M/s.Karnataka Renewable  Scheme,  Kodagu  District,  Energy Development Ltd.,  Karnataka.  Bangalore.  85.  Uyamballi MHS, Bangalore  2 x 5  3663  2003  M/s.Karnataka Renewable  District, Karnataka.  Energy Development Ltd.,  Bangalore.  86.  Abilbiru  MHS,  2 x 2.25  1350  2003  M/s. South West Hydro Pvt  Sakaleshpura  Hassan  Ltd., Bangalore.  District, Karnataka  87.  Kunchikal  Falls  MHS,  2 x 2.5  1500  2003  M/s. South Canara Electric  Dakshina  Kannada  Co. Pvt. Ltd., Bangalore.  District, Karnataka.  88.  Hosangadi  Mini  Hydel  2 x 1.5  1230  2003  M/s.Hosangadi Hydro  Scheme,  Dakshina  Power Projects Ltd.,  Kannada  District,  Bangalore.  Karnataka  89.  Upper Kaneri MHS, Uttara    3000    M/s. Sree Swarna Energy  Kannada  District,  2 x 5  2003  Ltd Hyderabad.  Karnataka.  Pre‐Feasibility Study Report  56 
  • 60.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  90.  Dinnekere  MHS,    459    M/s. Jasper Energy Pvt Ltd  Chikmagalur  District,  2 x 0.5  2003  Bangalore.  Karnataka.    91.  Mannapittlu  Hydro‐Power  3 x 3  4540  2003  M/s. Bobba Power Projects  Projects Dakshina Kannada  Pvt Ltd., Bangalore  District, Karnataka  92.  Debewadi  MHS,  2 x 2.5  2569  2003  M/s. Aji Engineering  Chandryapatana,  Hassan  Bangalore.  District, Karnataka.  93.  Pre‐feasibility  Report  on      2002  M/s.Khoday Ltd.,  Wind  Energy  Farm  near  10 x 0.5  2000  Bangalore.  Chitradurga, Karnataka.  94.  KIOC  L  Tailings      2002  M/s. Roche Mining. (MPJV)  Classification  &  Melboune Au strlia  Distribution Project  95.  Dodda  Halla  Mini  Hydel      2001  M/s. Klen & Marshall Ltd.,  Scheme,  Chickmagalore  3 x 6  900  Bangalore.  District, Karnataka.  96.  Singatalur‐Huligudda      2001  M/s. Reddy Veeranna & Co.,  MHS,  Hospet,  Bellary  3 x 6  7200  Private Bangalore.  District, Karnataka.    97.  Horiabbe  MHS,  Udupi  2 x1.5 +  1877  2001  M/s. S K Farm Pvt Ltd.,  District, Karnataka.  1x0.5  Hubli  98.  Hebbakawadi  MH  Sin      2000  M/s. Gilda Investments &  Mandya  District,  3 x 1  600  Financing, Bangalore  Karnataka  99.  Right  Bank  High  Level      2000  M/s. Tungabhadra Power  Canal  MH  Sat  2 x 1.5  400  Co. private Ltd., Bellary.  Tungabhadra  Dam,    Hospet,  Bellary  District,  Karnataka.  100.  2  x  5  MW  Elaneeru  Mini      2000  M/s. Nagarjuna Engineering  Hydel  Scheme,  Dakshina  2 x 5  3600  & Contracts Private Ltd.,  Kannada  District,  Hyderabad.  Karnataka.    Pre‐Feasibility Study Report  57 
  • 61.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  101.  Elaneeru  MHS    3000    M/s. Nagarjuna Engineering  Chickmagalore  District,      & Corporation Co. Pvt Ltd.  Karnataka.  2 x 3  2000  Hyderabad.    102.  Kabbinale  Mini  Hydel      1999  M/s. Sanicons Engineering  Scheme,  Dakshina  2 x 1  700  & Contracts Pvt Ltd,  Kannada  District,  Bangalore.  Karnataka.  103.  Preparation  of  Executive  2 x 1  600    M/s. Bright Vidyut Co Pvt  Summary  report  on  Ltd., Bangalore  Kattepura  MHS  near  Kattepura  village  Arakalgud,  Hassan  District, Karnataka.    Pre‐Feasibility Study Report  58 
  • 62.
       E. PRE‐TENDER SERVICES    Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  1.  Indrasagar  Pollavaram  Multipurpose  450000  2011  M/s. ILFS Hyderabad.  Multipurpose  Project  –  A  Project  project of National Interest.  2.  Ghattaprabha  HEP  at  2 x 10  4000  2011  M/s. Megawin  Ghattaprabha Dam, Karnataka  Switchgear Pvt. Ltd.,  EPC bid  Salem Tamil Nadu.  3.  Pre‐Tender  service  for  Canal  Irrigation  —  2011  M/s. Associated  Distribution  network  and  Project  Engineering Consultants  ancillary  structures  & Analysts Pvt Ltd.,  preparation  of  GAD’s  for  Mumbai.  Bridges,  Aqueducts,  Siphons  etc.  4.  Balance of Plant for Rafha  Gas  400  —  2011  M/s. ILF Consulting  Based  Power  Plant,  Kingdom  Engineers Abudabhi,  of Saudi Arabia.  UAE  5.  Balance  of  Plant  for  AL—Jong  400  —  2011  M/s. ILF Consulting  of  Gas  Based  Power  Plant,  Engineers Abudabhi,  Kingdom of Saudi Arabia.  UAE  6.  Pre‐Tender  Services  for  2 x 7.5  —  2011  M/s. Megawin  Electro‐Mechanical Equipment  Switchgear Pvt Ltd.,  for Dumajorhi SHEP  Salem, Tamil Nadu.  7.  Pre‐Tender Services for Balgad  3 x 6.6  —  2011  M/s. Simplex  SHEP, Uttarkhand State  Infrastructures Ltd.,  Mumbai.  8.  Pre‐Tender  Services  for  3 x 7  —  2011  M/s. Simplex  Khutani  SHEP  Uttarkhand  Infrastructures Ltd.,  State.  Mumbai.  9.  Pre‐Tender  Services  for  3 x 3.7  —  2011  M/s. Simplex  Seraghat  SHEP  Uttarkhand  Infrastructures Ltd.,  State  Mumbai.  10.  Balance  of  Plant  for  Qassim  400  —  2010  M/s.ILF Consulting  Gas  Based  Power  Plant  Engineers Abudabhi,  Qassim  Kingdom  of  Saudi  UAE.  Arabia.  Pre‐Tender Services  59 
  • 63.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  11.  Balance  of  Plant  for  Tabouk‐2  2 x 70  —  2010  M/s.ILF Consulting  Gas  Based  Power  Plant  Engineers Abudabhi,  Tabouk,  Kingdom  of  Saudi  UAE.  Arabia.  12.  Basanthpur  and  Saradih  Irrigation  —  2010  M/s. Simplex  Barrage,  Janjgir  District,  Project  Infrastructure Co Pvt  Chhattisgarh.  Ltd., Mumbai.  13.  Kachchh  Branch  Canal  and  Irrigation  —  2010  M/s. Simplex  Rewa Branch Canal‐ Gujarat.  Project  Infrastructure Co Pvt  Ltd., Mumbai.  14.  Bheden  ‐Jharsuguda  Water  Water Supply  —  2010  M/s. Simplex  Supply, Orissa.  Infrastructure Co Pvt  Ltd., Mumbai.  15.  Bansagar‐1  SHEP,  Mirzapur  9.5  4800  2010  M/s. Simplex  District, Uttar Pradesh  Infrastructure Co Pvt  Ltd., Mumbai.  16  Somavathi MHS  9  3000  2010  M/s.Velankeni  Renewable Energy Pvt  Ltd,.Bangalore.  17.  Bandraun  SHEP  Lalitpur  14.0 MW  —  2010  M/s. Simplex  District, Uttar Pradesh  Infrastructure Co Pvt  Ltd., Mumbai.    18.  Condenser  Cooling System for  2 x 300  —  2010  M/s.Gammon India Ltd.,  2  x  300  MW  EMCO  TPP  Mumbai  Warror Maharashtra  19.  Plant  Water  System  Package  2 x 700    2010  M/s.Gammon India Ltd.,  for  Kakrapara  Atomic  Power  Mumbai.  Project 3 & 4 units Gujarat    20.  Dhaulasidh  HEP,  Himachal  40 MW  2000  2010  M/s.Design Group +  Pradesh.  M/s.Feedback Ventures    (Joint Venture)  21.  Kalisindh  Dam  Project  in  Irrigation  4000  2010  M/s.Simplex  Rajastan  Project  Infrastructures Ltd.  Mumbai  Pre‐Tender Services  60 
  • 64.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  23.  Detail  Construction  —  —  2010  M/s. Rithwik Projects  Methodology  for  Vishnugad‐ Pvt. Ltd. Hyderabad  Pipalkoti HEP in Uttranchal.    24.  Meja SHEP, Mirzapur District,  9.00  —  2010  M/s. Simplex  Uttar Pradesh.  Infrastructure Co Ltd.,  Mumbai.  25.  Pre‐Tender  Services  for  Water Supply  20000  2009  M/s. Gammon India Ltd.,  Transportation  of  Water  from  Mumbai  Mahanadi  River  at  Cuttack  to  Paradip  for  Paradip  Refinery  at Orissa.  26.  Pashdan  Irrigation  Project  in  Irrigation  US $ 90  2009  M/s.Hewadwal Group  Afghanistan  Project  Million  Kabul, Afghanistan  27  Almar  Irrigation  Project  in  Irrigation  US $ 190  2009  M/s.Hewadwal Group  Afghanistan  Project  Million  Kabul, Afghanistan  28.  Shah‐wa‐Arus  Irrigation  and  Irrigation  US $ 45  2009  M/s.Hewadwal Group  Hydro  Power  Project  in  Project  Million  Kabul, Afghanistan  Afghanistan  29.  Sea  Water  Intake  System  for  Water Supply  1200  2009  M/s. Gammon India Ltd.  Ultra  Mega  Power  Project  at  Mumbai  Krishnapatnam,  Andhra  Pradesh.‐ 6 x 660 MW  30.  Raw Water Supply System for  Water Supply    2008  M/s. Gammon India Ltd.,  Alumina  Refinery  Expansion  Mumbai  Project  of  M/s.Vedanta  Aluminium  Limited  at  Linjigarh in  Kalahandi District  of Orissa.    31.  Upper Bhadra Irrigation Canal  Irrigation    2007  M/s. Gammon India Ltd.,  Network System Package II  Project  Mumbai    32.  Upper  Bhadra  Irrigation  Irrigation    2007  M/s. Gammon India Ltd.,  Project‐Package  Numbers  1  &  Project  Mumbai  3 Shimoga District, Karnataka.    Pre‐Tender Services  61 
  • 65.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  33.  Plant Water Supply Scheme at  Water Supply  —  2007  M/s. Gammon India Ltd.,  JSW‐Vijaynagar  Steel  Plant  at  Mumbai.  Thoranagal,  Bellary  District,  Karnataka.  34.  Review of draft EPC for Penan  4 x 70  10000  2007  M/s. Hemagiri Hydro  HEP, Sikkim India  Energy Company Pvt  Ltd., New Delhi.  35.  Left  Bank  of  Indrasagar  Irrigation      M/s. Maytas Infra Pvt  (Pollavaram)  HEP  in  Project  2006  Ltd., Hyderabad  Anguluru  Devapatnam  Mandal,  East  Godavari  District, Andhra Pradesh  36.  Galeru  Nagari  Sulaja  Sravanti  Irrigation  —  2006  M/s. Maytas Infra Private  (GNSS)  Flow  Canal  Project,  Project  limited, Hyderabad.  Phase‐I, Andhra Pradesh.  37.  Galeru  Nagari  Sulaja  Sravanti  Irrigation  —  2006  M/s. Maytas NCC JV  (GNSS)  Flow  Canal  Project,  Project  Private limited,  Phase‐II, Andhra Pradesh.  Hyderabad.    38.  Galeru  Nagari  Sulaja  Sravanti  Irrigation  —  2006  M/s. Maytas Infra Private  Project Andhra Pradesh  Project  limited, Hyderabad    39.  Pre‐tender  Services  for  Irrigation  —  2005  M/s. Gammon India Ltd.,  Velagonda  Irrigation  Project,  Project  Mumbai.  Nelagunda  Dristrict  Andhra  Pradesh.    40.  Assistance  in  REQ/RFQ/  Offer  2 x 70  80000  2004  M/s. GMR Energy Ltd.,  for  allotement  of  Badrinath  Bangalore.  HEP  near  Badrinath,  Uttranchal State.    41.  Pre‐Tender  services  for  Irrigation  —  2003  M/s. Simplex  Ainapur  Lift  Irrigation  Project  Infrastructures Ltd.  Scheme.  Mumbai    Pre‐Tender Services  62 
  • 66.
                   Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  42.  Pre‐Tender  service  for  Irrigation  —  2003  M/s. Chinnanachinuthu  Singatalur  Lift  Irrigation  Project  and Company Bangalore.  Scheme, Karnataka.  43.  Water  Processing  Projects  Water Supply  —  2003  M/s. Movers (India ) Pvt  Balance of Electrical Works  Ltd., Bangalore  44.  Implementation  of  3  x  5  MW  3 x 5  9000  2003  M/s. SEW Constructions  Canal  head  Power  house  on  Ltd., New Delhi.  Left  Bank  Canal  of  Indira  Sagar  Project,  Madhya  Pradesh.  45.  Pre‐Tender  Services  for  Irrigation  12000  2002  M/s. Engineers Projects  Singatalur  Lift  Irrigation  Project  India Ltd., Chennai.  Scheme ‐ 4 Packages.    46.  Pre‐Tender  services  400/220  Substation  1100  2002  M/s. ABB Ltd.,  kV  for  connected  civil  works  Bangalore.  of Switchyard at Nelamangala,    Bangalore for KEB, Bangalore.  47.  Bajemane  MHS  in  Kodagu  2 x 1.5  450  2002  M/s. Falcon Power Pvt  District, Karnataka.  Ltd., Bangalore.  48.  Pre‐Tender  service  for  Greater  Water Supply  10000  2002  M/s. Johnson Eastern  Aizawl  water  Supply  scheme  Power Aizawl Mizoram.  Phase II  49.  Pre‐Tender  service  for  Irrigation  —  2002  M/s. G.J Ferandez  Singatalur  Lift  Irrigation  Project  Secunderbad Andhar  Scheme.  Pradesh.  50.  Dam  remodeling  studies  at  —  —  2002  M/s. Rochie Mining Mt  Lyka  –Lake  at  Kudremekh  India Pvt Ltd., Cochin  Iron Ore Co Ltd.,  Kerala State India  51.  Pre‐Tender  service  for  Irrigation  1200  2001  M/s. NGEF Ltd.,  Periyapatna  Lift  Irrigation  Project    Bangalore  Scheme.  52  Pre‐Tender service  for Balance  1.5  150  2001  M/s. Mysore  of  Civil  Works  for  Link  Canal  Construction Co Pvt  MHS,  Mandya  District,  Ltd., Bangalore.  Karnataka.  Pre‐Tender Services  63 
  • 67.
         Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  53.  Pre  –  Tender  Services  for  DG    $ 40 Million.  2001  M/s. National Trading  Captive Plants at Yemen.    Co Ltd., Yemen.  a) Sana’s (Option 1)  3 x 5  b) Sana’s (Option 2 )  4 x 5  c) Hodaidah  2 x 5  d) Taiz  2 x 5  e) Aden  2 x 5  54.  Pre‐Tender service for Cooling  Water Supply  —  2001  M/s. Mega Engineering  Water  System  at  Enterprises, Hyderabad  Ramagundam  TPP,  Andhra  Pradesh.  55.  Technical  Apprisal  report  on  10  2500  2001  M/s. PSM Spinng Ltd.,  DPR  of  Dummagudem  MHS  Hyderabad  across  river  Godavari  at  Dummagudam,  Andhra  Pradesh.  56.  Pre‐Tender  service  for  2 x 2.5  2000  2001  M/s. Krishi Power Tech  Siraguppa  MHS  near  Pvt Ltd., Bellary,  Kenchanagudam  Village,  Karnataka  Siraguppa  Taluk  Bellary  District, Karnataka.  57.  Upper  Bhadra  Lift  Irrigation  Irrigation  —  2001  M/s. SNC, Bangalore.  Scheme, Karnataka.  Project  58.  Preparation  of  RFQ  for  500  22500  2000  M/s. Bay West Power &  Thermal  Power  Plant  at  Energy Pvt Ltd.,  Baroda for M/s. GPCL. Gujarat  Bangalore.  59.  Pre‐Tender  services  for  Co‐ 75  30000  1999  M/s. Bay West Power &  generation  Captive  Power  Energy Pvt Ltd.,  Plant  for  M/s.  Duncan  Bangalore.  Industries  Ltd.,  at  Khanpur.  Uttar Pradesh.  60.  Chuzachen  HEP  in  East  2 x 40  —  1999  M/s. Nagarjuna  Sikkim State,  Construction Co Ltd.,  Hyderabad.  Pre‐Tender Services  64 
  • 68.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  61  Technical  Evaluation  Report  —  —  1999  M/s. Bhrouka Power  on  Hemavathy  LBC  MHS,  Corporation Ltd.,  Hemavathy  river  bed  unit  &  Bangalore.  Varahi Tail Race Scheme.  62  Pre‐Tender  services  for  60  28000  1998  M/s. Bay West Power &  Captive  Power  Plant  at  Energy Pvt Ltd.,  Kapasan,  Rajasthan  for  M/s.  Bangalore.  HZL, Udaipur, Rajasthan.  63  Pre‐Tender  services  for  DG  40/60  24000  1998  M/s. Bay West Power &  Plant  for  Kerala  State  Energy Pvt Ltd.,  Electricity Board. Kerala  Bangalore.  64  Pulichintala  Irrigation  Project,  Irrigation  1200  1998  M/s. Gammon India Ltd.,  Andhra Project.  Project  Mumbai.  65  Upper  Tunga  Canal  Head  Irrigation  4000  1998  M/s. Karnataka  Regulator,  Shimoga  District,  Project  Neeravari Nigam Ltd.,  Karnataka.  Shimoga, Karnataka.  66  Pre‐bid  services  for  Koilsagar  Irrigation  —  1998  M/s. Nagarjuna  Lift Irrigation Scheme, Andhra  Project  Construction Co Ltd.,  Pradesh.  Hyderabad.  67  Pre‐Tender services for 132 kV  Switchyard  670  1995  M/s. GEPC, Bangalore.  Switchyard  at Bidanasi,  Orissa  for M/s. OPGC. Ltd.  68  Pre‐Tender  services  for  Illumination  100  1995  M/s. GEPC, Bangalore.  connected  Civil  Works  of  Port  Yard Lighting at  Chennai Port  for Ennore Coal Port Project.    69  Haliyal Lift Irrigation Scheme,  Irrigation  160  1995  M/s.Mysore Construction  Karnataka.  Project  Co., Bangalore.    70  Pre‐Tender  services  for  132 kV  900  1994  M/s. GEPC, Bangalore.  Substations  for  MSEB.  Maharashtra.    Pre‐Tender Services  65 
  • 69.
       Sl.  Name of the Project  Installed  Project Cost  Year  Clients  No.  Capacity in  in Rs. Lakhs  MW  71  Pre‐Tender  services  for  400 kV/220  600  1994  M/s. GEPC, Bangalore.  connected  civil  works  of  kV    Substations  at  Meerut  and  Mandola  for  PGID.  New  Delhi.  72  Bhima  Lift  Irrigation  Project,  Irrigation  22000    M/s. Gammon India Ltd.,  Gulbarga District, Karnataka.  Project  Mumbai.     Pre‐Tender Services  66 
  • 70.
       F. Due Diligence Report‐Completed      Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  1  Technical  Apprisal  Report  2 x 2.5  2000  2011  M/s. Greenko Energies  for  Palloli  MHS  –River  Pvt Ltd., Hyderabad.  Gurpur.  2  Technical  Apprisal  Report  2 x 2.5  2000  2011  M/s. Greenko Energies  for  Alehalli  MHS‐River  Pvt Ltd., Hyderabad.  Bhadra  3  Technical  Apprisal  Report  3  1500  2011  M/s. Greenko Energies  for  Shiragola  MHS‐River  Pvt Ltd., Hyderabad.  Bhadra,  Shimoga  District,    Karnataka.  4  Technical  Apprisal  Report  2 x 2.5  2000  2011  M/s. Greenko Energies  for  Kuskal  MHS  –River  Pvt Ltd., Hyderabad.  Bhadra,  Shimoga  District,  Karnataka.  5  Technical  Apprisal  Report  3  1500  2011  M/s. Greenko Energies  for  Jaladurga  MHS‐River  Pvt Ltd., Hyderabad.  Tunga,  Hospet,  Bellary  District, Karnataka.  6  Technical  Apprisal  Report  4.5  22500  2011  M/s. Greenko Energies  for  Kantamangala  –River  Pvt Ltd., Hyderabad.  Payaswini,Puttur  District,  Karnataka.  7  Updating of Financials DPR  2 x 4.5  5200  2011  M/s. Continental Energy  for Magundi MHS  Services Pvt Ltd.,  Hyderabad.  8  Concept  report  for  Water  —  —  2010  M/s. Kelsatek Solutions  Recovery  from  Slime  Pond  Pvt Ltd., Bangalore.  at  JSW  Hosepet,  Bellary  District, Karnataka.  9  Chunchi  Doddi  MHS,  3 x 3.559  4800  2010  M/s. Greenko Energies  Bangalore  Rural  District,  Pvt Ltd., Hyderabad.  Karnataka.  Due Diligence Report  67 
  • 71.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  10  Bhadra  Left  Bank  Canal  1 x 1.5  1051  2010  M/s. Shree Matha  MHS,  Shimoga  District,  Vaishnavi Infra‐Build Pvt  Karnataka.  Ltd., Mysore.  11  Jalkoti  SHEP  in  Himachal  2 x 6.25  10400  2010  M/s. Prajwal Energy Pvt  Pradesh.  Ltd., Mumbai  12  Hemavathy MHS,      2010  M/s. Greenko Energies  a) Left Bank Power  4 x 4  8000  Pvt Ltd., Hyderabad.  House      b) River Bed Power  2 x 4    House    Hassan District, Karnataka    4000  13  Himani  Chamunda  SHEP  2 x 4.75  8000  2010  M/s. Prajwal Energy Pvt  in Himachal Pradesh.  Ltd., Mumbai  14  Dadupur  MHS,  near  4 x 4  6400  2010  M/s.Bhoruka Power  Dadupur, Harayana.  Corporation Pvt Ltd.,  Bangalore.  15  Techno‐Economical  165  110000  2010  M/s. Saraswathi Power  Viability  Study  on  DPR  of  Co Ltd., Hyderabad.  Dikku HEP, Nagaland.  16  Somavathi  MHS,  2 x 3  2963.65  2010  M/s. Velankani  Chikkamagalur  District,  Renewable Energy Pvt  Karnataka.  Ltd.,Bangalore.  17  Technical  Review  Report  4 x 6  12000  2009  M/s.Bhoruka Power  for  Chaya  Bhagawati  SHP,  Corporation Pvt Ltd.,  Karnataka.  Bangalore.  18  Due  Diligence  report  for  7.5  5300  2009  M/s. Hemavathy Power  Sarju  I  MHS,  Bageshwar  & Light Pvt Ltd.,  Uttarakhand.  Bangalore.  19  Sarju  II  MHS,  Bageshwar  15  10500  2009  M/s. Hemavathy Power  Uttarakhand  & Light Pvt Ltd.,  Bangalore.    20  Sarju  III  MHS,  Bageshwar  10.5  7500  2009  M/s. Hemavathy Power  Uttarakhand  & Light Pvt Ltd.,  Bangalore.  Due Diligence Report  68 
  • 72.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  21  Upper Sethi HEP, Nepal.  127  100000  2009  M/s. Venika Hydro    Projects Pvt. Ltd.,  Bangalore.  22  Upper Modi HEP, Nepal.  30  30000  2009  M/s Maytas Infra Ltd.,  Hyderabad.  23  Paudital  Lassa  SHP  near  24  12600  2008  M/s. Tulajaa Bhavani  Roharu  Town  in  Himachal  Energy Projects Pvt Ltd.,  Pradesh.  Mumbai.  24  Palor‐I  MHS  near  village  2 x 1.5  1300  2008  M/s. Tulajaa Bhavani  Lana  Palor  Sangarh  Taluk,  Energy Projects Pvt Ltd.,  Simor  District,  Himachal  Mumbai.  Pradesh    25  Palor‐II  MHS  near  village  2 x 2.25  1306  2008  M/s. Tulajaa Bhavani  Lana  Palor  Sangarh  Taluk,  Energy Projects Pvt Ltd.,  Simor  District,  Himachal  Mumbai.  Pradesh.    26  Gundiadka  SHPP,  Dakshin  2 x 3.5  1925  2007  M/s. Sun Technics Pvt  Kannada  District,  Ltd., Bangalore.  Karnataka.  27  Burhi Gandaki HEP, Nepal  4 x 150  227618  2007  M/s. GMR Energy Ltd.,  New Delhi.  28  Augmentation  of  water  Water  3940  2007  M/s. Mangalore City  supply  to  Mangalore  City.  Supply  Corporation, Mangalore  Dakshina  Kannada District,  Karnataka.  Karnataka.  29  Kubjanadi  MHS,  near  2 x 2  1600  2007  M/s.PSR Hydro Energy  Coondapura, Karnataka.  Pvt. Ltd., Bangalore.  30  Marigundihole  MHS,  near  2 x 1.5  1250  2007  M/s.PSR Hydro Energy  Kadaba,  Chikkamagalur  Pvt. Ltd., Bangalore.  District, Karnataka.  31  Venurhole  MHS,  near  2 x 2.5  2000  2007  M/s.PSR Hydro Energy  Moodabidri,  Dakshina  Pvt. Ltd., Bangalore.  Kannada District Karnataka  32  Manchikere  MHS,  near  2 x 8.25  8000  2007  M/s.PSR Hydro Energy  Yellapura,Uttara  Kannada  Pvt. Ltd., Bangalore.  District, Karnataka.  Due Diligence Report  69 
  • 73.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  33  Techno‐Economical  100  60000  2007  M/s. Sunflag Iron and  viability  Study  for  Hanol‐ Steel Co Ltd., New Delhi.  Tiuni in Uttranchal.  34  Baliyantrahole  MHS,  2 x 1  800  2007  M/s.Kodagu Power Pvt.  Kodagu District, Karnataka.  Ltd., Bangalore.  35  Middle Kolab SHP, Orissa.  3 x 6  9000  2006  M/s.Meenahshi Power  Ltd., Hyderabad.  36  Review  of  Hydrology  and  2 x 48  80000  2006  M/s. Indu Projects Ltd.,  Power  Potential  for  Dik‐ Hyderabad.  Chu HEP in Sikkim  37  Samal  HEP  near  Kule  5 x 4  10000  2006  M/s.. KSK Energy  village  Angul  District,  Ventures Ltd.,  Orissa.  Hyderabad.  38  Techno‐Economical  180  108000  2006  M/s. Simplex  viability  study  for  Bajoli  Infrastructures Ltd.,  Holi  Project  near  Holi  Mumbai.  village, Himachal Pradesh.    39  Techno‐Economical  95  60000  2006  M/s..Sunflag Iron & Steel  viability  study  for  Dibbin  Co.Ltd., New Delhi  HEP, Arunachal Pradesh.    40  Kuthupuzha  MHS  in  2 x 2  200  2005  M/s. Raphidiam Power  Kodugu  District,  Supplies Pvt Ltd.,  Karnataka.  Madikere  41  Technical  appraisal  on  80  34700  2005  M/s. Nagarjuna Hydro  Bharmour  HEP  in  Energy Pvt Ltd.,  Himachal Pradesh.  Hyderabad.  42  Preliminary  Assessment  of    200  2005  M/s. Rahmhita Power  Power  Potential  for  650    Project Pvt Ltd.,  Machgunda  MHS,    200  Hyderabad.  Shalipura Branch Canal 1 &  600  2, Karnataka.  43  Kelagur  MHS  Kodagu  2 x 2  1600  2005  M/s Karnataka Strips Pvt.  District, Karnataka.  Ltd., Bangalore.  44  Study of Power Potential  in  —  —  2004  M/s. NTPC Hydro Ltd.,  Netravati  Basin  Western  Noida, NCR New Delhi.  Ghats, Karnataka.  Due Diligence Report  70 
  • 74.
       Sl.  Name of the Project  Installed  Project  Year  Clients  No.  Capacity in  Cost in Rs.  MW  Lakhs  45.  Project Appraisal for 40MW  40  20000  2004  M/s. Alpha Energy  Biomass  based  Thermal  System Ltd., Chennai  Power  Plant  in  Andhra  Tamil Nadu.  Pradesh.  46.  Techno‐Economical  2 x 48  65000  2004  M/s. Nagarjuna hydro  Viability  Study  on  DPR  Energy Pvt Ltd.,  Jorthrang  Loop  HEP  Hyderabad.  Sikkim.    Due Diligence Report  71 
  • 75.
      Certificate  72 
  • 76.
      Certificate  73 
  • 77.
            Certificate  74 
  • 78.
                  Certificate  75 
  • 79.
              Certificate  76 
  • 80.
              Certificate  77 
  • 81.
                  Certificate  78 
  • 82.
                Certificate  79 
  • 83.
              Certificate  80 
  • 84.
              Certificate  81 
  • 85.
              Certificate  82 
  • 86.
                      Certificate  83 
  • 87.
              Certificate  84 
  • 88.
                    Certificate  85 
  • 89.
              Certificate  86 
  • 90.
                Certificate  87 
  • 91.
  • 92.
    13. Brief Profile of Advisors / Consultants (a) Advisors    Mr. H.V. Eswaraiah, is retired from Karnataka Power Corporation Limited, working as  freelance  Consultants  for  large  Hydro  Power  Project.    Design  Group  is  availing  his  technical  expertise  on  implementation  of  Hydro  Power  Project  related  to  contracts,  QAC, PMC etc.    Mr. H.V. Eswaraiah, after his Masters degree from renowned Indian Institute of Science,  had  a  brief  stints  as  lecturer,  worked  in  State Public  Works  Department  before joining  Karnataka Power Corporation Limited, as Assistant Executive Engineer in the year 1971,  and  retired  as  Technical  Director  in  the  year  1997.    He  has  extensively  dealt  with  all  aspects  of  Hydro Power  Projects,  starting  from  field  investigation,  preparation  of  PFR,  DPRs,  Bid  preparation, technical  evaluation,  award  of  work,  as  Executive  Engineer, he  has worked on  a 100m high Supa Concrete gravity Dam, achieved production level of  1000  cumecs  per  day  of  concreting  production  and  laying  in  the  design.    At  corporate  level,  in  charge  of  long  term  Power  Project  Planning,  advising  Managing  Director,  on  settlements  of  dispute  and  claims  of  contracts,  direct monitoring  of    all  Projects  under  construction, procurement and movement of Coal, Cement and Steel.  In his tenure, he  has handled 15 Hydro Power Projects including a Thermal and Wind Projects.  He had  wide experience in dealing with World Bank Funded Projects.    After his retirements, he was appointed by NTPC for Koll dam (700 MW) as advisor.  He  is  also  assisting  Banks  as  Lender  Engineers  for  various  Mini  Hydel  Scheme  funded  by  Banks.  Advisor  89 
  • 93.
      Mr.  Shankar  V. Nesargi,  B.E.  (Mech),  ME  (WR),  Joined  Karnataka  Power  Corporation  Limited,  as  an  Engineer  in  the  year  1970  and  retired  as  Managing  Director  of  VVNL,  subsidiary  Company  of  KPCL  in  the  year  2005.    As  an  Assistant  Engineer  handled  investigation works of Kali Hydro Electric Project ( 6 x 135 MW)  including drift works.  Incharge  Executive  Engineer  for  construction,  O  &  M  of  4  x  210  MW   Raichur Thermal Power Plant, he had extensive explosure to Coal Plant, Railways, WTP,  Boiler,    Turbines  etc.    During  this  period,  he  was  elevated,  as  Superintending  /  Chief  Engineer.   In the  year  2003, he  was  appointed  as  Executive  Director totally  incharge  of  Planning  Infrastructure  works  of  4  x  350  MW,  Bidadi  Gas  Based  Power  Plant,  near  Bangalore.    Subsequently,  he  was  appointed,  as  Managing  Director,  Vishveswaraiah  Vidyuth Nigama Ltd., incharge of O & M, of 600 MW Hydro Power Project including R  &  M  works.    During  his  tenure  in  KPCL,  he  has  attended  several  National  and  International Seminar and travel world wide.    After retirement he was a freelance consultant to various foreign Companies in Uganda,  Spain etc., traveled extensively in these countries as technical consultants.    Presently,  he  works  as  a Managing  Director  of  DB  Global  Energy  Limited,  a Company  dedicated  to  Wind  Power  Generation  as  IPPs,  executing  100  MW  of  Windfarm  near  Belgaum, Karnataka.      Advisor  90 
  • 94.
      Mr. P.R. Balasubramanian, after obtaining Bachelor degree in Mechanical Engineer, had  one  year  training in  Nuclear  and  Allied  subjects  in  Bhabha  Automic  Research  Centre,  Bombay.  Thereafter, he was absorbed in the department worked for a decade in various  departments  of  BARC,  before  joining  Engineers  India  Limited,  New  Delhi  in  the  year  1978.   Thereafter joined  Gas  Authority  of  India  Limited  and  worked  till  1990.    He  was  selected,  as  Director  in  Neyveli  Lignite  Corporation  Ltd,  in  1997.   He  was  Chairman  /  Managing  Director  of  Fertiliser  and  chemicals,  Travancore  up  to  his  retirement  in  the  year 2002.    He  is  a  freelance  consultant,  presently  independent  Director  of  REC,  India  Rare  Earth  Ltd., (Department of Atomic Energy).    His  areas  of  expertise  is  overall  Corporate  Management  of  Large  Organisations,  Development  of  Engineering  Expertise  in  the  Organisation,  Conceptualising  of  Turn  Around  strategies,  over  view  the  implementation  of  the  Projects  from  Concept  to  Commissioning, preparation of quality Project Reports, Proper appraising of the Project  Reports,  Resolving  Arbitration  Issues etc.,  by  applying  the  expertise  and  experience  in  managing    various  projects  in  Nuclear  Chemicals,  Fine  Chemicals,  Petrochemicals,  Hydrocarbons, Gas  Processing  Plants, Cross  Country Pipelines, Thermal  power  plants, Fertilizer Complexes etc. Advisor  91
  • 95.
    Mr.  B.V.  Ramakrishnaiah, hydraulic  Gates  Consultants,  was  ranked  4th  in  Bachelor  of  Engineer, and passed M.E. in distinction from India’s premier Institution namely Indian  Institute of Science, Bangalore, in the year 1964.  He joined CW& PC, New Delhi, soon  after  his  Master  degree  in  the  year  1962,  worked  mainly  in  design  and  drawing  of  Hydraulic Gates for Irrigation and Hydro Power Projects.  In the year 1966 joined M/s.  Triveni  Structurals  Ltd.,  Naini,  Allahabad,  served  over  13  years  in the  organization,  as  Gates and Penstock design specialist.  During his tenure, he has designed cylinder Gates  for Ramanaganga Project, which is only one of its kind in the country, operated by a 70  tonnes  capacity  Hydraulic  hoist.  Another  gate  operated  by  650  tonnes  capacity  Hydraulic  hoist  is  designed,  as  High  Pressure  slide  gates,  for  Baggi  control  works,  Sundernagar,  Himachan Pradesh, High  Pressure  fixed  wheel  Penstock  emergency  gate  was  designed  for  Beas  Project,  Punjab  for  a  clear  vent  size  of  10  feet  x  21  feet,  for  a  design head of 110m.  This gate carries a total load of 2160 tonnes which is transferred to  concrete through 12 wheels, 150 tonnes capacity hydraulic hoist  operates the gate.  Crest  radial  gates  for  Itezhitezhi  Dam,  Zambia,  has  been  designed  which  was  vetted  by  SWECC  Swedan.    Similarly,  Batten  outlet  radial  gates  had  been  designed  for  Great  Reeha Power Project Tanzania.    He resigned M/s. Triveni Structurals Ltd., in the year 1979, to start his own consultancy  firm, where he has designed over 100 gates of various shapes and sizes.  To name a few,  designed 18.288m x 17.145m spillway radial gates for Srisailam Hydro Electric Project in  Andhra  Pradesh,  first time spherical  plain  bearings  were  used  for the Tirunion  instead  of  normal  bronze  bushes.    Designed  one  of  the  tallest  Penstock  gate  of  size  6.75m  x  15.75m in the country, for Lower Metur Project in Mettur Tamilnadu.    As  regards  Penstocks,  Pipes,  2.743m  dia  for  a  static  head  of  405m  was  designed  for  Kaufe  Gorge  HEP  in  Tambia  Africa,  4.88m  dia  to  withstand  static  head  of  51.2m  was  designed  for  Bowatena  Power  Project  in  Sri  Lanka.    He  has  distinction  of  designing  record breaking gate size and penstocks of large diameter in India.  He is ranked as a top  class gate designer in India.  Advisor  92
  • 96.
    Mr.  V.  Balachandran, is  a  retired,  Deputy  Director  General  and  HOD  GSI,  Southern  Region.  He  is  a  freelance  senior  Geologist  advising  Design  Group  on  Engineering  Geology  for  Large  Hydro  and  Irrigation  Projects  in  India  and  Abroad.  Presently  pursuing his doctoral thesis in Osmania University.    Mr. V. Balachandran, after Masters’ degree in Geology joined Geology Survey of India in  the  year  1971,  as  Junior  Geologist  and  retired,  as  Deputy  Director  General  and  HOD,  GIS, Southern Region. Out of 36 years of experience in the fields of Geology, 30 years is  spent in Engineering Geology, involved in conducting Preliminary Investigation to post  construction  stage,  his  services  spread  all  over  India,  including  Supervision  and  guidance  to  Project  Authorities.  A  few  Projects  where  he  was  directly  involved  are  :  facilitated smooth negotiation, Chibro Khodri Hydro Power Project tunnel between two  regional thrusts. Facilitated smooth negotiation of twin tunnels of Khan Hydel Scheme,  upto  upper  Siwalik  incoherent  sand  rock  with  plethora  of  problems  such  as  seepage,  collapse and daylighting of the tunnel. Selection of Dam site for 230m high rockfill dam  project which was under investigation for a protracted period (40 years). By identifying  source  of  seepage  at  Kadampari  Pumped  storage  scheme,  the  energy  generation  was  substantially  enhanced.  Adopted  hydraulic  jacking  of  upper  Kodayan  tunnel  and  suggested  other  remedial  measure.  Geological  investigation  was  extensively  carried  at  MAPS  Kalpakkam  and  Kundankulam  for  Nuclear  Power  Corporation  Ltd.,  Extensive  field  services  were  carried  out  with  special  reference  to  Seismological  studies  led  to  clearance  for  Kundakulam  Atomic  Power  Plant.  Initiated  studies  on  Korada  Atomic  Power  Plant  and  studies  on  Plutonium  Fast  Breeder  Reactor  Project  under  Madras  Nuclear  Power  Plant  leading  to  clearance  to  the  Project.  Carried  out  Mega  thrust  Tsunami  Hazard  studies  in  South  India.  Attended  several  National  and  International  seminars,  and  presented  several  technical  papers,  Traveller  World  Wide,  including  undergoing  training  in  Harza  Engineering,  USA  and  National  Resources  (Canada)  and  Geological Survey of Canada at Vancouver Calgary and Ottawan Canada.  Advisor  93 
  • 97.
    C.R.  Venkatesh  B.E. (Civil),  M.E.  (Str),  obtained  first  class  with  distinction  in  Masters’  degree,  from  the  renowned  Indian  Institute  of  Science,  Bangalore.    He  worked,  as  lecturer in Engineering Colleges, Assistant Residential Officer, CWPRS (Poona, Scientist  Cement  Research  Institute  of  India,  New  Delhi,  before  joining  National  Hydro  Power  Corporation  Ltd.,  as  Manager  in  the  year  1981,  worked  till  his  retirement  in  the  year  2004.    During  his  tenure  in  NHPC  Ltd.,  he  has  risen  from  the  post  of  Manager  upto  Executive  Director.    As  a  Chief  Engineer,  he  was  in  charge  of  Dulhasti  Hydro  Power  Project  (3  x  130  MW).    As  an  Executive  Director,  Contract  Division,  managed  all  procurement  activities  and  Civil  E  &  M  Works  Contracts.    Under  R  &  D  wing,  he  has  evolved  cost  analysis  of  complicated  works,  suggested  various  means  for  cost  cutting.   He was trained in detailed structural analysis of Chamber Concrete Dam in Canada; in  Sweden,  under  went  Advanced  International  Hydro  Power  Develop  Project;  in  Germany / Netherland attended Advanced Management Development Training.    In  India,  under  went  specialized  technical  training  in  Reflection  Photo  elasticity  and  strain  gauge  technique,   Dam  Safety,  Geotechnical  instrumentation etc.   He has  visited  number of Foreign Countries. Deputed to Pakistan, participated in technical discussions,  on Indus Watering Treatment. Had meeting with Arbitrators in connection with Internal  Arbitration Tribunal on Chamera HEP Contract disputes.  He has 44 technical papers to  his credit.  His research paper on De‐silting basin, won a special Certificate of merit by  Central Board of Irrigation and Power, New Delhi.    Since,  his  retirement,  his services,  as  freelance  consultant  is  being  used  by  major  Civil  Contractors for dispute redressal and Arbitration.  Advisor  94 
  • 98.
    Mr. M.C. Rangarajan, is a free lance Electrical Engineering Consultant for various  organisation including M/s. Design Group Project Consultants Pvt Ltd.    Mr.  M.C.  Rangarajan, after  obtaining  Bachelor  of  Engineer  degree  from  Indian  Institute  of  Science,  in  the  year  1969,  joined  Karnataka  Power  Corporation  as  Electrical  Engineer,  and  retired  in  the  year  2005,  after  36  years  of  rich  in  experience  Hydro  Power  generation.  Important  assignment  to  name  as  Design  and  Layout  of  Hydro  and  Thermal  Projects  sizing  of  units,  firming  up  of  technical  specification,  bid  documents,  bid  processing,  contract  management,  project  monitoring,  inspection  of  components,  Vendors  Plant.  He  was  involved  in  construction  of  following  Hydro  Projects  to  name  a  few,  Nagjhani  (6  x  135  MW) Supa Dam Power House (2 x 50 MW), Gerusoppa Dam Power House (4 x  60  MW),  Kadra  Dam  Power  House  (3  x  50  MW),  and  Kodasalli  Dam  Power  House  (3  x  40  MW).  In  addition  looked  after  O  &  M  of  Sharavathy  HEP  (1035  MW), Varahi underground Power House (230 MW), R & M works etc.    As a senior executive Chairman of Core  group for Q & AC of EPC Contract for  500  MW  Bellary  Thermal  Power  Plant,  Power  Purchase  agreement  with  State  level  distribution  Companies.  He  has  presented  several  technical  papers  in  National and  International Conference; visited difference type of Power Houses  and manufacturer units in India and Abroad.  Advisor  95
  • 99.
      S. Ramanan, B.E. (Civil), worked in Karnataka Power Corporation Limited between 1975  to 1984, after a brief stinct, as lecture in NIE Mysore.  Joined NHPC, in the year 1985, and  retired in the year 2009, as General Manager.    He had an exposure in all branches of Hydro Power Project, from Survey, Investigation,  Preparation  of  PFRs and  DPRs,  bid  documents,  to  Civil  designs,  construction  of HEPs.   He  was  past  as  GM  Consulting  and  Bussiness  Development  Division,  dealt  with  Tidal  Power  Project,  Infrastructure    development  in  Andaman  and  Nicobar  Island,  Varzab  Power  Plant  in  Tajikistan  and  raising  of  Dhankari  dam  in  Port  Blair,  Andaman  and  Nicobar  Island.    Till  his  retirement,  he  had  handled  over  5000  MW  of  Hydro  Power  development in various capacities sparing across the length and breadth of India for 10  HEPs in total.  He had a short stint in design and engineering of Power transmission line  in  North  East  State.    He  is  a  freelance  consultant  advising  various  IPPs  in  implementation of small Hydro Projects.  Advisor  96
  • 100.
      Mr. Umashankar, is an advisor on design and drawing of large span roof trusses used in  Power Plants, and complicated heavily loaded structural steel works. Presently advisor  to Design Group.    Mr. Umashankar joined MECON Ltd., in the year 1973, as steel structural engineer and  retired in the year 2009, as Deputy General Manager. As a steel structural designer, he  was actively involved in design of Steel Plants of large capacity in India, such as Bokaro  Steel Plant (expansion) Bhilai steel plant (expansion, Titanium – Dioxide pigment plant  in  Kerala,  Defence Project  –  NSTL  at  Vizag  A.P.,  Kudremukh  Iron  Ore  Project,  Essar  Steel Plant, at Hazira. Jindal Vijayanagar Steel Plant at Toranagallu, Karnataka, external  Coal  handling  system  for  TNEB  at Chennai,  Birla  Copper  expansion  phase  II.  HGPL  –  Expansion at Vizag A.P. Defence Project – Sea bird at Karwar, West Coasts of Karnataka,  Essar Integrated Steel Plant at Hazira. More than half million tones of Steel design and  fabrication of steel structure has been done under his guidance. He has been deputed to  foreign  countries  by  MECON  for  inspection  and  fabrication  in  Countries  like  China,  Germany,  Korea,  he  has  also  attended  several  work  shops  conducted  in  India  and  Abroad.  Advisor  97 
  • 101.
      Mr.  V.  Narayanan, is  a  transmission  line  design  and  construction  expert.    Advisor  to  Design Group on assignments pertaining to transmission lines, as and when required.    After  his  Bachelor  degree  in  Civil  Engineering,  obtained  Masters  degree  in  Civil  and  Hydraulic Engineering from India foremost Indian Institute of Science, Bangalore, in the  year 1963.  soon after joined M/s. SAE (India) Ltd., as Design Engineer for transmission  Tower, Civil Foundation and other allied works.  He has involved designs and drawings  for various voltages from 66 kV to 220 kV to many Electricity Boards in India.    Subsequently  1973  onwards  assumed  the  change  of  Production  Manager  in  M/s.  SAE  Factory  at  Jabalpur.    He  was  deputed  to  M/s.  SAE,  Milano,  for  being  trained  in  their  works  at  Lecco,  on  production engineering,  design  and  drawings,  Testing  Stations.   In  the year 1978 was sent to Australia to acquaint with the working of Testing Station.  At  Jabalpur  Plant,  made  a  commercially  viable  Testing  Station  in  par  with  International  Testing Station.  He was responsible for increasing the production capacity to 30,000 MT  per annum from 8000 MT.  As a General Manager responsible for design and testing of  many 400 kV and 500 kV DC lines.  After his retirement worked in several International  Companies, such as Zamul Steels, Daman, TNB Malaysia, Kulalanpur etc.  He has wide  technical knowledge in Transmission lines from concept to commissioning.  Advisor  98
  • 102.
      Mr. C. Channakeshava, Ph.D, is an freelance advisor to Design Group on Computer aided  Mathematical  modeling  for 3D  complicated  structures  for  carrying  out  precision  analysis  and design of Dams etc.    Mr. C. Channakeshava, after his post graduation in M.E., from renowned Indian Institute of  Science,  Bangalore,  obtain  his Ph.D  in  the same  Institution  in the  year  1988.   He  was Post  Doctral  Research  Associates  in  University  of  Cincinnati  Ohio,  USA,  Louisiana  State  University,  USA,  extensively  worked  on  Finite  Element  Method  applied  to  Civil  Engineering works.  He has illustrious academic background, topper in Universities in India  and Abroad.    In  Bangalore,  joined  a  reputed  EMRC  Software  Company  (USA)  team  to  develop  world  class NISA Software tool used extensively for Non‐linear analysis.  His field of interests are  computational  mechanics,  Finite  Element  Analysis,  Boundary  Element  Analysis,  Analysis  and Design of RCC & Steel Structurals, Roads and Bridges, Computer Aided Design.    Advisor  99 
  • 103.
      Mr. Shridhar Prabhu, freelance Solicitor specialize in Energy Law Audit and Regulatory  Affairs and Compliance. Design Group is availing in services in PPA related matter.    Mr. Shridhar Prabhu, after obtaining degree in law, started practicing in High Court of  Karnataka, enrolled in Delhi Bar Council. As a specialist in Regulatory Appraise related  to energy, he was nominated, as Vice Chairman, Energy Committee of the Federation of  Karnataka  Chamber  of Commerce  and  Industries,  Advisor  to  India  Wind  Turbine  Manufacturers  Association.  Advisor  Renewable  Energy  Developer  Association,  Karnataka  (REDAK).  Former  State  Council  Member  –  IWPA,  in  addition  during  his  practice, he has represented India’s Wind Energy Sector, before the Supreme Court; first  and  only  representative  of  the  Wind  Energy  Sector  to  represent  before  the  Central  Electricity  Regulatory  Commission  (CERC),  New  Delhi.  Represented,  on  several  occasions,  on  behalf  of  IPP’s,  he  has  argued  before  REC’S  on  fixation  of  Tariff,  standardization of PPA’s renewable Power Purchase obligations for Wind Project.    Envisaged a theme paper and chalked out action plans for NASDAQ listed IT Services  Company  with  a  market  capitalization  of  over  US$  30  Billion  for  Green  Power  procurements  in  Southern  States.  Engaged  for  advisory  and  tariff  filing  by  first  ever  electric cooperative society and distribution license in Karnataka.  Advisor 100
  • 104.
    Mr. Srinath N. Anekal, is a free lance advisor to various organizations, IPP’s developers  on  environmental  and sustainable  Development  Areas  including  climate  change  and  CDM  aspects  etc.,  Design  Group  seek  his  advice  on  specific  field  like  Environmental  impact assessment, CDM due diligence and Environmental Protection project.    Mr. Srinath N. Anekal after obtaining  Bachelor / Master degrees in Civil  Engineer from  Bangalore  University  pursued higher  studies  in  University  of  Florida,  Gainsville,  USA,  was  awarded  Master  degrees  in  Environmental  Engineering  Science  in  the  year  1993.   Under gone, short term course in Finance for Non‐finance Managers IIM Bangalore, ISO  14000  Environmental  Management  System  CII  India,  hazardous  waste  management  operational practice, USA.  He has traveled widely in  USA, Inida, Banglaesh, Maruitius  and  Mozambique.    Where  he  worked  extensively  in  the  field  of  Environment,  Energy  and  Water.    He  demonstrated  experience  in  conceptualizing,  design,  promoting  and  implementing innovative projects in the area of waste minimization, clean Technologies,  Environmental  protection,  Urban  Water Supply  and  sanitation, Renewable  Energy  and  clean  Development  Mechanism.    He  was  with  executing  Agencies  for  implementing  reform oriented projects funded by world Bank, DflD, KfW, European Commission and  Danida.  He has contributed to the development of country level strategies; especially on  mainstream new development concepts, through conduct and participation in seminars  and  workshops  and  effective  interaction  with  all  stake  holders  in  Government,  Non‐ Governmental Organization and Private Sectors.  Advisor  101 
  • 105.
    (b) Consultants     Mr.  C.S.  Hebli,  B.E.  (Hons),  after  obtaining  Bachelor  degree  in  Civil  Engineer  with  distinction, joined Bombay public works Department, in the year 1954, worked as Junior  Engineer Planning  Minor  Irrigation  Project,  after  reorganization  of  Karnataka state,  his  services  were  lent  to  Hydro  Electrical  Civil  Projects  in  the  year  1959,  as  Assistant  Executive  Engineer,  involved  in  investigation  and  preparation  of  Bedthi,  Aghanashini,  Mahadayi,  Kalinadi  (910  MW)  Projects.    HECP  was  converted  into  a  dedicated  power  generation  company  called  Karnataka  Power  Corporation  Limited,  fully  owned  by  Government of Karnataka to execute.  He raised from ranks upto first Technical Director  of the Company, retired in the year 1988 with 37 years of rich power project experience.   During  his  service,  activity  involved  in  Kalinadi  HEP  (910  mw),  Sharavathi  HEP  (835  MW),  Varahi HEP  (239  MW).   Raichur TPS  (5 X  210  MW)  from  concept to  completion,  involved  in  long  term  planning  of  Projects,  Hydro  policy  in  the  state  etc.    After  retirement worked with Thapar Hydro Council, as consultant dealt with several Hydro  and  Gas  based  Power  Plant  aggregating  to  2000  MW,    joined  as  Chairman,  Design  Group  Project  Consultants Pvt  Ltd.,  Company  established  in  1979,  technically  guiding  staff    strength  of  52  technocrates  effectively  involved  in  technical  advise.    Policy  decisions, Company affairs etc.  Consultant  102
  • 106.
    Mr.  B.L.  Lakshminarasimha,  B.Sc.,  B.E.,  M.E.,  M.I.E.,  F.I.V.,  M.A.S.C.E.,  after  obtaining  Master  degree  in  Civil  Engineer  from  Birla  Institute  of  Technology,  Pilani,  premier  educational  Institution  of  India  (collaboration with M.I.T., USA,) after a short stint in Messers. Gerame  and Binny Limited, joined Karnataka Power Corporation Limited, as a Civil Engineer in  1975, resigned after 20 years of  service,  acquired technical knowledge in drafting of bid  documents for large Hydro Power Projects, interpretation of Contract Clauses, resolved  disputes, formulated schedule of rates, design of Surface Power House, framed structure  through  3  D  modeling  etc.  Designed  and  constructed  KPCL  Corporate  office  building.   Assisted  Company’s  legal  advisors  in  Arbitration  proceeding/Contract  disputes,  in  the  Court of Law etc Founder member Design Group, established in 1979.  What turned out  to be one man show in 1979 has grown to a large consultancy firm of repute in India and  Abroad.    Over  3  decades  of  existence,  developed  an  exclusive  team  of  dedicated  consultants having 40 years and above experience in Power and Irrigation Projects from  concept to completion.    Recently developed a dedicated team of engineers to extend design engineering services  in  Water  and  Waste  Water  Treatment  Plants.  Successfully  steered  the  company  in  obtaining KEMA ISO Certification, maintained consistent profitability over the decades.   Executed  number  of  Joint  Venture  Partnership  in  India  and  Abroad,  such  as  CPRI,  WAPCOS,  ILF,  for  implementation  of  Large  Projects  successfully,  signed  a  few  design  engineering  assignment  contract  in  neighbouring  countries  such  as,  Saudi  Arabia,  Dubai, Muscat, Ghana, Nepal, Sri Lanka.          Consultant  103
  • 107.
      Mr.  P.R.  Mallikarjuna,  after  obtaining  M.E.,  from  prestigious  Indian  Institute  of Science  in  the  year  1969,  worked  in  various  capacities  in  a  Public  Sector  /  Private  Companies,  before  joining  Karnataka  Power  Corporation in the year 1971, as Group Engineer (AEE), and retired in  the  year  2000  as  Technical  Director,  with  an  illustrious  career  spanning  34  years  in  various cadres. He was one of the Board of Directors of KPC Limited, for over 7 years,  after his retirement. During his tenure in the KPCL, he was the head of Design wing and  handled  all  major  Hydro  Projects,  Thermal  Power  Plants  from  concept  to  commissioning.  Over  1200  MW  of  Power  Projects  has  been  investigated  under  his  guidance and about 2000 MW of Power Projects has been designed. Further, 900 MW of  Power  Projects  have  been  implemented  under  his  guidance.  He  has  attended  several  National and International seminars, and contributed dozens of technical papers. After  his retirement, he was involved in the preparation of revised DPR for 12 X 80 MW Indira  Sagar  Polavaram  Hydro  Electric  Project  in  Andhra  Pradesh,  on  behalf  of  Andhra  Pradesh  Irrigation  Department,  including  obtaining  clearances  from Central  Electricity  Authorities,  New  Delhi.  He  was  involved  in  detailed  engineering  of  Nagarjuna  Sagar  Tail Pond dam Power House (2 x 25 MW) and Varahi underground Power house – Stage  II (2 x 115 MW).     From 2008 onwards, he heads the Civil Design wing of DGPCPL and is responsible for  planning and design of Hydro Electric Projects and Large Irrigation Projects, etc.  Consultant  104 
  • 108.
        Mr. P.K. Rupangudi, after obtaining M.E., from prestigious University  College  of  Engineering,  Bangalore  in  the  year  1971  worked  in  State  Government  Organisation,  before  joining  Karnataka  Power  Corporation in the year 1972 as Engineer and retired in the year 2004  as  Chief  Engineer  with  an  illustrateous  carrier  spanning  32  years  in  various cadres. During his tenure in the KPCL, he was head of Design  wing consisting  of  engineers  of  all  discipline,  handled  all  major  Hydro,  Thermal  Power  Plants  from  concept  to  completion.  Attended  several  National  and  International  seminars,  and  contributed  several  technical  papers.  He  is  member  of  Gate  Committee  since  1996,  formed  by  the  Govt.  of  Karnataka  for  design,  fabrication  erection  &  commissioning  of  prestigious  Alamatti  Dam  Gates  and  hoists.  Even  to  date,  he  is  in  the  panel  for  inspection of Hydromechanical works of the State Govt. Organisations. He was a faculty  member  on  the  continuing  education  to  the  Engineers  of  the  State,  organized  by  The  Director, KERS – Mysore. He is the main author of History of Lingamakki & Talalakalale  dams, of Sharavati Hydel Scheme assigned to him by the Karnataka Power Corporation.  After  his retirement,  he  was  also  involved  in  detailed  engineering  of  Nagarjuna  Sagar  tail  pond  Dam  and  Varahi  underground  Power  House  –  Stage  II  (2  x  115  MW)  and  a  major weir for Lower Jurala H.E.P of Andhra Pradesh Power Generation Company.     From 2010 onwards he is associated with DG responsible for implementation of Hydro  Electric and Irrigation Projects.   Consultant  105 
  • 109.
    Mr.  Chikkaguddappa  (C.G. Appa),  joined  Design  Group  Project  Consultants  Pvt  Ltd.,  in  2005,  as  a  Director  Hydro  Power  Project  Planning  and  river  basin  study.    He  has  travelled  neighbouring  countries, to advice IPP’s on Planning of Hydro Power Project.    Mr. Chikkaguddappa (C.G. Appa), joined Karnataka Power Corporation Limited in the  year  1973,  as  an  Engineer,  raised  to  the  level  and  retired  in  the  year  2005,  from  Corporation after 38 years of long services.  From the day one, he was involved in river  basin development in the Corporation, identifying and Planning Hydro Power Projects  in  entire  length  and  breadth  of  Karnataka  state.    Mostly  dealt  with  Investigation  of  HEP’s  like Shivana Samudhra seasonal scheme ( 4 x 270 MW), revision of DPR for Bedti  Stage I HEP, from 1984, as a Assistant Executive Engineer, he was involved in field data  collection  for  Hydrology,  surface  and  sub‐surface  details  for  preparation  of  DPR  for  major  HEP’s    like  MahadayI  (318  MW),    Cauvery  Scheme  (270  MW),  Tamankal  (800  MW), Almati Dam Power House (280 MW),  (Mekedath 1400 MW), Kali stage – III (1200  MW)  Bedsti  stage  II  (400  MW),  Aghanashini  (600  MW),  Gundiya  High  heads  scheme  (400)  conceived  if,  as  a  run  of  the  river  scheme,  study  proposed  for  Pumped  storage  scheme at the existing Sharavathy complex (1000 MW) AND Kali Complex (1200 MW).  He was one of the Authorities in river basin studies in Karnataka.  In addition, identified  and prepared DPR’s for Mini Hydel Scheme of less than 25 MW.    He joined  Design  Group  Project Consultants Pvt  Ltd.,  in the  year  2005,  responsible  for  identifying and preparation of Desk Study Report for over 12,000 MW of Hydro Power  Projects in neighbouring Country Nepal.    Consultant  106
  • 110.
      Mr.  Raghavendra  Rao  H  after  obtaining  BE  degree  in  Electrical  Engineering  from  National  Institute  of  Engineering,  Mysore  in  the  yarer  1972  worked  in  Medium  Voltage  Switch  Gear  industry  as  development  and  production  Engineer  till  1977  before  joining  Karnataka  Power  Corporation  Ltd,  the  premier  organization  carrying  out  design,  construction,  operation  and  maintenance  of  power  plants  in  the  state  of  Karnataka,.  He  retired  as  Superintendent  Engineer  (Electrical)  from  KPCL  in  the  year  2006.  During  his  tenure in KPCL he worked in the areas of design, construction, testing and commissioning  and  maintenance  of  Hydro  and  Thermal  power  plants  mainly  in  the  areas  of  Electrical  equipments and systems of power plants and the tenure included working at both power  plants and the corporate design office.        The  specialized  areas  are  control  and  protection  and  he  was  a  member  of  Protection  committee of Southern Regional Electricity Board.     After  joining  DG  in  2008  he  is  in  charge  of  Engineering  of  Electro Mechanical  systems  of  Hydro and thermal power plants. He is an accredited energy auditor certified by Bureau of  Energy Efficiency, India.          Consultant  107 
  • 111.
    Mr.  M.M.  Reddy is  expert  in  substation  Layout  and  Electricals  designs  from 33 kV upto 400 kV. His services are being used by Design Group in  substation segment of Electrical Engineering.    Mr.  M.M.  Reddy  after  obtaining  Bachelors’  degree  in  Electrical  Engineering  from  Bangalore  University,  in  the  year  1968,  worked  in  various  capacities  in  various  organizations.  He  has  worked  in  NGEF  from  1968  to  1997  for  29  years  and  taken  voluntary  retirement  in  the  year  1997,  as  Divisional  Manager.  During  his  tenure  in  NGEF, he was head of Sub‐station group and handled switchyards from 33 kV to 220 kV  from  designing  to  commissioning  of  sub‐stations  on  EPC  basis.  Under  his  guidance,  about  600  MW  outdoor  Switchyard  from  33  kV  to  220  kV  have  been  designed  and  commissioned. He has undergone training in high voltage outdoor yard sub‐stations in  AEG – Telefunken, Germany for 6 months.    In  May  1997,  he  joined  M/s.  Design  Group  Project  consultant  Pvt  Ltd.,  and  he  is  responsible  for  designing  of  out  door  yard  substation  and  transmission  lines.  He  has  designed  and  commissioned  various  switchyards  and  transmission  line  for  Hydro  Power Project, to name a few major Projects:    i) Varahi Tail Race (37 MW – 110 kV ODY)  ii) Narayanpur Project Phase – I and II (18 MW ‐ 66 kV ODY)  iii) Singatallur – Hulligudda (18 MW – 110 kV ODY)    He has designed and commissioned balance of equipment for 15 MW Windmill  Project.    Consultant  108 
  • 112.
    Mr R. Vasudevan is a water utility management specialist with over 40  years  of  experience  in  Design  Construction  &  Operation  of  Water  utility  services  from  the  source  to  the  consumer,  presently  full  time  consultant of Design Group.    He is a 1971Batch Graduate in Electrical Engineering from Bangalore University. Joining  Bangalore  Water  Supply  and  Sewerage  Board  in  the  same  year,  he  worked  in  various  capacities  and  retired  as  the  Chief  Engineer  during  2010.  He  was  involved  in  all  the  major Projects of BWSSB which was supplying 135 MLD water to 1.5 Million residents of  Bangalore  in  1971,  and  had  become  a  giant  utility  by  2010  supplying  over  900  MLD  water to over 7 Million residents.  He  was  associated  in  Cauvery  water supply  Scheme stage  I  to supply  135  MLD  water  from  River  Cauvery,  in  establishing  pipe  fabrication  and  laying  activities;  Later  in  the  stage  II  of  another  135  MLD  Project  he  was  in  charge  of  Electrical  system  Design  and  Construction;  In the III stage  which  was  a  larger  270  MLD  Project  he  was  in  charge  of  complete Electrical and Hydro‐Mechanical components of the project from tendering to  completion. In the subsequent Stage IV‐Phase I Project which was with external funding,  He  was  responsible  for  total  cross‐country  steel  pipeline  of  1950mm  Diameter  and  90  Kilometers  long,  and  later  in  the  installation  of  Sewerage  pumping  stations  and  the  electrical Design and Construction of Seven Sewage treatment plants. In the last 5 years  of his service he was responsible for Securing ODA loan of INR 34000 Million from JICA  for  Stage  IV  Phase  II  projects  of  500  MLD,  selection  of  project  consultants,  tendering  selection and award of contracts for all water supply components.     In the  course  of  his  service  he  has  participated  in  various  workshops  and seminars  on  pumps  ,  cavitation,  cross‐country  pipeline  design,  water‐hammer  studies  and  control,  water  treatment,  wastewater  treatment  and  sludge  disposal,  project  management,  Consultant  109 
  • 113.
    international  contracts,   leakage  reduction  and  distribution  improvement,  flow  measurement, tariff structuring, urban planning , reuse and conservation, etc.     He  led  the  Technical  team  which  presented  ‘Innovative  Practices  in  Revenue  Management’  initiative  by  BWSSB  to  the  Department  of  Urban  Development  and  Secured  the  First  Prize  in  National  Urban  Water  Awards,  2009,  from  the  Hon’ble  President of India, in August 2009.    Vasudevan  has  designed  pumping  systems  for several  lift  irrigation  pumping  systems,  electrical  substations  and  surge  protection  to  pipeline  for  the  Consultancy  Centre  of  BWSSB  from  1995  to  2007.  Many such  projects  have  been  commissioned  in  the  last  10  years and are in operation.    He  also  handled  an  assignment  on  ‘alternative  methods  of  infrastructure  finance  by  Private  Sector,  Infrastructure  Bonds,  and  developing  Public‐Private  Partnerships’  in  2009.     He  also  secured  an  MBA  from  ICFAI  Dehradun  with  Finance  as  optional  subject.  On  retirement  from  Service  he  joined  Design  Group  as  Water  Supply  Consultant  in  September 2010.  Consultant  110 
  • 114.
       Mr. U.R. Raghotham after obtaining M.Tech from Mysore University    in  the year 1974 worked as design engineer with the architects M/s Karekar  and  Sundaram  for  one  year  and  joined  Karnataka  Power  Corporation  Ltd., in 1975.      During  the  service in  KPC  Ltd.,  he has  worked in  the  design  team  for  Supa  Dam for 5  years  and  then  worked  as  AEE  (Construction)  in  Supa  Dam  for  7  years starting  from  foundation level of the spillway and power blocks to the completion of the Dam.      Further  he  was  in  charge  of  construction  of  Ghataprabha  Power  House.    From  1989  onwards he worked in the design office as AEE and EE  for the planning and  design of  various  Hydro  Electric  projects  including  Kadra  dam  and  Sharavathi  Tailrace  Project.   Since 2003, he is working as a consultant and was involved in the design of  Nagarjuna  Sagar  Tail  Pond  Dam  Project,  Gandikota  dam  project,  Lower  Jurala  project  of  Andhra  Pradesh, Varahi Underground Power House (2x115MW) and many other projects.   He  was  involved  in  the  preparation  of  DPR  for  Indira  Sagar  Polavaram      Hydro  Electric  Project (960MW) and in obtaining clearance from CWC and CEA.    Consultant  111
  • 115.
    Mr.  G.  Penchalaiah, after  retirement  works  as  free  lance  Consultants,  for  various  investigation agencies in flow monitoring in river regime pre‐construction Investigation  works in large Irrigation Projects.  Design Group is utilizing his services for overseeing,  Fielding investigation works in large Irrigation Projects in India and Abroad.      Mr.  G. Penchalaiah  after  his  graduation  in  Civil  Engineering  from  Sri.  Venkateshwara  University  in  1970, joined  Central  Water  Commission,  as Civil  Engineer  and  retired  in  the year 2007, as Director.  He has vast experience in Water Resources Project Planning,  specially  large  Irrigation  Project  investigation,  Hydrology,  Computation  of  yield,  Development  of  Irrigation  dam  and  associated  Irrigation  Networks,  preparation  of  Detailed  Project  Report.  He  was  posted  to  various  States  in  India,  was  familiar  with  available  yield  in  various  river  for  Irrigation  utilization  to  improve  the  Agricultural  Sector  and  Water  Management.    He  was  deputed  to  CEA,  New  Delhi,  responsible  for  design  of  structures  and  cost estimates  for Thermal Power Project.   He  had made topo  map studies, interlinking river,  water balance study, etc.  As a Senior Engineer worked  on  Indo‐Nepal  Joint Projects,  namely Pancheshwar  Multipurpose Project, head  quarter  at  Kathmandu,  Nepal.    Involved  in  preparation  of  DPR,  cost  estimates,  preparation  of  Infrastructure  Planning  for  major  Power  /  Multipurpose  Projects,  such  as  Poornagiri,  Rupaligad etc.  Advisor  112 
  • 116.
    Mr.  Suryanarayana,  after his  retirement  on  Deputy  General  Manager  ‐  Geology  from  Karnataka Power  Corporation Limited,  works as freelance  Consultant.   He  is a  part  of  Design  Group  being extensively  used  his  expertise  in  Engineering  Geology  in  various  assignments undertaken,  on job to job basis.    My.  Suryanarayana,  after  obtaining  Masters’  degree  in  Geological  Science,  joined  Karnataka Power Corporation Limited, as Junior Geologist and retired in the year 2007,  as Deputy General Manager – Geology.  During his tenure, he was involved in most of  the  Hydro  Power  Project  implemented  by  Karnataka  Power  Corporation  Limited  in  Karnataka, to name a few Rammam HEP (120 MW), Rolep HEP (60 MW) and Chakung  Cha HEP (60 MW) all in Sikkim; 80 meter high Chakra Rock‐fill Dam: Varahi HEP (460  MW).    Involved  in  preparation  of  DPR  for  Gundiya  Hydel  Scheme  (400  MW),  Shivasamundram  Seasonal  Scheme  (270  MW),  Mekedatu  Multipurpose  Project  (360  MW).  He is also involved in ongoing Himagiri HEP (280 MW), Upper Tunga Irrigation  Project  involved  4  km  of  tunneling  etc.    Apart  from  this,  he  has  wide  experience  in  advising  developers  /  IPPs  in  implementation  of  Mini  Hydel  Scheme  of  25  MW  and  below all over India.  Consultant  113
  • 117.
    Mr.  K.T.Sreedhara,  after obtaining  B.E  (Civil),  degree  from  Vikram  University,  Ujjain,  in  the  year  1970.  worked  as  design  Engineer  in  M/s.P.V.Raj & Co. Consulting Engineers Hyderabad from January 1971  to November 1973. The works dealt in this period are Designs of Bridges  and  Industrial  Structures  and  Buildings.  Then  joined  M/s.  Karnataka  Power  Corporation  Ltd.,  a    public  sector  undertaking  of  government  of  Karnataka  on   28.11.1973 and worked  Up to 31.01.2006 i.e. 32 years and 2 months in various capacities as  AE,  AEE,  EE,  SE  &finally    retired  as    I/C  Chief  Engineer  on  superannuation  from  the  Karnataka  Power  Corporation  service.  During  this  tenure  in  KPCL  worked  in  the  civil  designs  wing  on  the  design  of  Gravity  dam  (concrete),  Earthen  dams,  water  conducting  System and in construction wing worked in Precision survey works at Varahi under ground  Power  &  Varahi  Schemes  and Sharavathi  Schemes  as  AEE.  As  Executive  Engineer  worked  in  the  investigation  of  Power  Project  especially  High  Head  Scheme  and  Mini  Hydel  Schemes. Further worked in designs wing in the designs of Sarpady Barrage Hydro Electric  Project  and  consultancy  work  of  Markandeya  Dam  Project,    Kalasa  &  Bandurnala  Consultancy work. for KNNL.     Further  in  construction  wing  as  Executive  Engineer  (Safety)  at  Raichur  Thermal  Power  Station  Shakthinagar  In  addition  to  the  Safety  Engineering  of    Raichur  Thermal  Power  Station  worked  on  deputation  to  KPCL  civil  designs  wing    involved  in  the  investigation  work of  Bridge cum Barrage Project across River Krishna near Gugal. for KBJNL As Super  Intending   Engineer and further I/C chief Engineer (civil) of Raichur Thermal Power Station  (7X210 MW Installed Capacity as on 2006)  involved  in the civil maintenance works  of the  Thermal  Power Generation Station. After retirement on 31/1/2006 after serving 32 for years  with  KPCL joined  on  7/4/2006  as  Consultant  in    M/s Subhadra  Consulting  Engineers  who  are also Associate  Consultants to M/s STUP consultants Pvt Ltd., Bangalore and worked up  to 31/3/2010. During this tenure as Associate  Consultants to M/s STUP consultants  Pvt Ltd.,  Bangalore    involved  in  the    Detailed  Engineering  of  Nagarjunasagar  Tail  Pond  dam  ,  Consultant  114
  • 118.
    Gandikota    Dam and  Lower  Jurala  Hydro  Electric  Project    which  are  under  construction,  Further involved in Preparation of revised DPR for Polavaram Hydro Electric Project with  12X80MW(960MW) Installed Capacity .     Currently from 1.4.2010 to till date working with Design Group Project Consultant Pvt Ltd.,  as Deputy Director (designs) in the planning, design of Hydro Power Projects and Irrigation  Project and other Structure      Active Member of the Professional Bodies like 1) Fellow of Institution of Engineer (India) 2)  Life Member of Indian Road Congress 3) Member of Indian Society for Hydraulics  Consultant  115
  • 119.
      Mr. Achutha Narayana, after obtaining M.Tech from Prestigious Indian  Institute  of  Technology  in  the  year  1996  and  has  since  15  years  of  exclusive  experience  in  design  of  various  components  of  hydroelectric  Projects. He started his career in Design Group Project Consultants Pvt.  Ltd., Bangalore as Design Engineer (Civil) and was involved in Harangi  HEP  (2x4.5MW)  in  Karnataka.  He  joined  NHPC  ltd.,  A  Govt.  of  India  Enterprise  in  year  1998  and  was  involved  in  Planning  and  Construction  stage  Design  of  Dhauliganga  HEP  (4x70MW),  Uttaranchal  and  Chamera‐III  HEP  (3x77MW),  Himachal  Pradesh.  He  was  associated  with  the  preparation  of  DPR  of  Siyom  HEP  (1000MW),  Arunachal  Pradesh,  Dhauliganga Intermediate HEP, Uttaranchal, Tender stage Design Activities for Chamera‐III  HEP, Kishanganga HEP (3x110MW), J&K and Chutak HEP (4x11MW), Kargil, J&K He was  also  involved  in  Pre‐feasibility  reports  of  7  projects  in  Arunachal  Pradesh  under  “Prime  Minister  50000MW  Initiative”  totaling  to  2581  MW.  He  was  also  associated  with  the  consultancy project of Katra – Laole KRCL Stretch of Prestigious Jammu‐Kashmir Rail Link  Project.  He  has  also  few  technical  papers  presented  in  various  National  Seminars. He  is  a  member  of  Indian  Society  of  Rock  Mechanics  and  Tunneling  Technology  (ISMRTT)  and  International  Society  for  Rock  Mechanics  (ISRM)  and  Indian  Hydropower  Association  (INHA).    He joined  TCE,  Bangalore  in  2007‐2008  and  was  associated  with  100MW  Augmentation  of  Bhira Power station and Gokak SHEP.    Since later half of 2008, he is working as Deputy Director (Designs) in Design Group Project  Consultants  Pvt.  Ltd.  and  has  been  responsible  for  various  construction  stage  Hydel  Projects, DPR’s and Pre‐tendering Services for various projects.        Consultant  116
  • 120.
      Mr. T.S. Srinivasa, after obtaining M.E., from one of the noted Institution  PSG College of Technology, Coimbatore, Tamilnadu in the year 1987 and  B.E.  from  National  Institute  of  Engineering  College,  Mysore,  Karnataka  in  the  year  1984,  worked  in  various  capacities  in  a Public  Sector/Private  companies.  He  has  worked  In  Public  sector  Karnataka  Urban  Water  Supply  &  Drainage  Board  (KUWS&DB)  from  1986  to  2006  for  21  years. He took  voluntary  retirement  from  KUWS&DB  and  worked  in  private  organizations  such  as  M/s  Secon  as  Manager and Ms/ Jurong Infrastructure Ltd., as Principal Engineer (Infrastructure).     He was head of Design Wing while working with KUWS&DB, was involved in preparation  of  many  DPRs  comprising  of  Planning,  Design,  Estimating,  implementation  of  number  of  water supply and sewerage schemes  including Water treatment plants(WTPs) and Sewage  Treatment  Plants(STPs)in  urban  areas  of  Karnataka  State.  He  was  involved  with  water  supply & sewerage schemes’ proposals to second major city in the state viz., Hubli‐Dharwar  city  under  World  Bank  Project.  He  was  also  involved  with  National  River  Conservation  Projects for prevention of river pollution in the state.    While working  with M/s. Secon, he was involved  with water supply and sewerage projects  in different towns of Libya country. While working with M/s. Jurong Infrastructure Ltd., he  was  involved  with  Design  and  implementation  of  Infrastructure  facilities  such  as  roads,  water  supply,  sewerage,  storm  water  drainage,  Electrical  &  Communication  facilities  to  a  number of town ship development projects including some of the SEZs.    From  2009  onwards  he  heads the  Water  Division  of  DGPCL responsible  for  implementing  water supply and sewerage projects. Presently he is involved with detail Civil  Engineering  Design  of Rafha gas based Power Plant Project in Saudi Arabia.  Consultant  117 
  • 121.
      Mr.  P  Sudarshan  Rao,  after  obtaining  B.E.  (E&E)  from  Malnad  College  of  Engineering,  Hassan  (Mysore  University)  in  1987  worked  in  the  same  college  and  Regional  College  of  Education,  Mysore  as  a  Lecturer  for  a  brief  period  before joining KPCL in 1989.    He has more than 22 years of experience, as Assistant Executive Engineer in Karnataka Power  Corporation  Limited,  a  State  owned  Public  Sector  Undertaking  with  dedication  for  Power  Generation  to  the  State  with  ISO  9001  and  ISO  14001  certification.  He  has  experience  in  Operation,  Maintenance  and  Design  wings  of  210/250  MW  coal  based  Thermal  Power  Plant.  He  also  has  experience  across  domains  like  Inventory  Management,  Tendering,  Tender  Evaluation,  Study  of  various  Control  System  drawings,  Planning  of  Preventive  and  Breakdown  Maintenance  of  210  MW  Generator  &  Auxiliaries,  Erection  &  Commissioning  of  Power Transformers of capacities from 50MVA to 315 MVA, 6.6 kV & 415V Indoor Switchgear,  220kV  &  400kV  Outdoor  Switchyard,  and  Station  Battery  System.  He  was  also  involved  in  preparation  of  cable  schedules,  interconnection  schedules  and  commissioning  of  210  MW  &  250MW coal fired thermal Units.    After joining DG in February 2011, he is the group lead of Electrical Design team carrying out  detail Engineering for gas based generating plants and hydro electric plants.    Consultant  118