4. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1199000 E 12900000 E
1199000 E 12900000 E
331000 N
331000 N
PILLARS 1 & 2 ARE PREFIXED BY SGGA B7875 20
BASED ON L.T.R MAP 03/16
SGGA B7875 20 4
BEARINGS REFERRED
TO MERIDIAN 1 WEST
NATIONAL GRID
S
N
E
W
PLAN OF LAND
FOR : ZEEPAY GHANA LIMITED
Shown Edge Pink
Scale: 1:2500 AREA =0.17 Acre(0.07 Ha)
LOCALITY
CANTONEMENTS
DISTRICT
LaDMA
REGION
GREATER ACCRA
SGGA B7875 20 3
051
19'
051º19'
230º49'
1
4
5
º
1
7
'
3
2
5
º
0
8
'
7
4
.
3
'
100.5'
100.6'
7
5
.
2
'
1
0º
3'33"
182º
2'9"
TO
SGGA
C2600
17
4
FROM
SGGA
EX
06
2
32882.7
3'
2567.72
'
2
LICENSED SURVEYOR
LICENSED No........
DATE : 14-07-2020
I.............................................., LICENSED SURVEYOR
CERTIFY THAT THIS PLAN IS FAITHFULLY
AND CORRECTLY EXECUTED AND ACCURATELY
SHOWS THE LAND WITHIN THE LIMITS OF
THE DESCRIPTION GIVEN TO ME
BY MY CLIENT.
1199000 E 12900000 E
1199000 E 12900000 E
331000 N
331000 N
PILLARS 1 & 2 ARE PREFIXED BY SGGA B7875 20
BASED ON L.T.R MAP 03/16
SGGA B7875 20 4
BEARINGS REFERRED
TO MERIDIAN 1 WEST
NATIONAL GRID
S
N
E
W
PLAN OF LAND
FOR : ZEEPAY GHANA LIMITED
Shown Edge Pink
Scale: 1:2500 AREA =0.17 Acre(0.07 Ha)
LOCALITY
CANTONEMENTS
DISTRICT
LaDMA
REGION
GREATER ACCRA
SGGA B7875 20 3
051
19'
051º19'
230º49'
1
4
5
º
1
7
'
3
2
5
º
0
8
'
7
4
.
3
'
100.5'
100.6'
7
5
.
2
'
1
0º
3'33"
182º
2'9"
TO
SGGA
C2600
17
4
FROM
SGGA
EX
06
2
32882.7
3'
2567.72
'
2
LICENSED SURVEYOR
LICENSED No........
DATE : 14-07-2020
I.............................................., LICENSED SURVEYOR
CERTIFY THAT THIS PLAN IS FAITHFULLY
AND CORRECTLY EXECUTED AND ACCURATELY
SHOWS THE LAND WITHIN THE LIMITS OF
THE DESCRIPTION GIVEN TO ME
BY MY CLIENT.
SITE PLAN
1:2500
THE PLOT
Site Plan
A-01
5. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1
2
2
N
1 1 1 1 1 1 1 1 1 1
1
L
L
L
L
L
31,045
22
,55
8
23
,27
3
3,150 3,150
3,000
150
3,000
150
2,718
150
3,001
1,004 1,200
1,100
1,652
1,8
50
2,000
1
,9
0
0
03
03
02
02
WALL LIGHT
WALL LIGHT
WALL LIGHT
RAMP
ENTRACE TERRACE
WATER TANK
GARDEN
PAVING
PAVING
PAVING
ROAD
01
01
OFFICE BLOCK
PARKING
SWIMMING POOL
PAVED WALK WAY
PEDESTRIAN WALKWAY
GEN
SET
PUMP ROOM POOL HOUSE
DISABLED
PARKING
GUARD
HOUSE
GUARD
HOUSE
SLIDING GATE TRACK
SLIDING GATE TRACK
SLIDING GATE TRACK
N
1:200
BLOCK PLAN
Block Plan
A-02
1:2500
SITE PLAN
6. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
2 1
2,450 420 4,681
300
3,802 7,107 3,816
300
5,566 2,450
900
300
4,500
300
14,725
300
6,145
300
EDGE OF BOUNDARY
PEDESTRIAN
GATE
1
1 1 1 1 1 1 1 1 1
1
2,695 3,150 3,150 3,150 3,150 3,150 3,150 3,150 3,150 3,150
300
4,500
300
900
300
300
300
900
300
300
300
150mm THICK BLOCK
WORK TO DETAIL
SCREEN WALL
TO OWNERS CHOICE
250x100 CONC.
COPPING
1800
600
225
675
450
100
900
450
150
1800
600
100
1700
450
150
600
4-12mm Ø RODS
5mm LINKS AT
200mm CTRS.
450
150mm THICK BLOCK
WORK TO DETAIL
250x100 CONC.
COPPING
1800
600
100
1700
450
150
1:100
STREET WALL ELEVATION
1:100
SIDE VIEW
1:50
STEEL SLIDING GATE ELEVATION
Wall Details
A-03
FABRICATED BY SPECIALIST
7. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
- syphonage pipe
soil and vent pipe
cistern overflow pipe
inspection eye
50mm dia. anti-
1. Air should be excluded from S.T.l. to encourage the growth of anaerobic bacteria to liquify sludge to facilitate the flow of the effluent .
3. Drains should be given sufficient fall and joints should be properly made to prevent the apperture and expedite the escape of accumulated gases.
ST 2 SA
ST 1
ST 2
SA
ST1
ground plan
MH
MH
precast system, cross section
typical man hole chamber
ground plan
effluent chamber
inlet
1200
reinforced
conc.
wall
2100
225
cross section
water level
non return valve
12mm smooth paster
reinforced conc. wall
floor gradient
50mm blinding
longitudinal section
600x600 precast conc. manhole cover
baffle wall
sludge level
benching to full
bore channel
2. Accumulated gases are expected to be connected and expelled through F.A.O which should be carried above eaves .
4. Septic tanks should be given sufficient fall and joints should be constructed in concrete not less than 150mm above ground level.
450
750
450
1800
150 225
3000
225
1800
225
525
1350
1200
2100
150
1800
150
100
2100
300
600
2100
900
900
450
900
2100
225
750
2400
1200
1200
5. Septic tanks over-all depth below ground level to be determned by the depth of inlet but should never be more than 1800mm deep.
6. In unavoidable cases where the approved lengths of soak away cold not be obtain this should be increased to make up for the difference
7 . Efficient outlet chamber should be opened and channelled to soak-away, blocked internally and at regular intervals in the situation where construction
of soak away may be inspected.
inspection chamber
effluent chamber
standard septic tank for 16 persons
8. Tanks should be connected as directed by the city engineer with the approval of the M.G.H
rammed earth base to give the drain a good gradient
Mortar mix for joints grips should be constructed
under joints to allow shanks of drain to rest on
capacity
THE FOLLOWING TABLE
GIVE EXAMPLES
521/2
100
width
length
450
MM
1800
MM
Main Compartment
depth
1200
MM
525
MM
2400
MM
425
MM
2625
MM
600
MM
2850
MM
600
MM
3000
MM
1200
MM
1200
MM
1200
MM
1200
MM
No. of
length
effluent
G person
E pit
perday
cuff
10
1950
MM
250
40
'' 15
2400
MM
328
20
3000
MM
376
60
30
3600
MM
470
75
40
4200
MM
625
Septic Tank Details
(Provisional)
A-04
8. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1
2
3
4
5
6
7
8
9
10
11
12
UP
21R
x
150
20G
x
300
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
DOWN
UP
21R
x
150
20G
x
300
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
DOWN
UP
21R x 150
20G x 300
W-01
Sill
50
2,400
3,800
W-01
Sill 50
2,400
3,875
W-01
Sill 50
2,400
3,875
W-01
Sill 50
2,400
3,875
D-09
W-01
Sill
-150
2,400
3,800
D-03
D-11
W-03
Sill 50
2,400
3,275
D-02
D-01
D-02
D-03 D-03 D-03
D-04
D-06
D-04
W-04
Sill
50
2,400
3,325
RG
F
D D
C C
B B
A A
1
1
2
2
3
3
4
4
5
5
1a
D1 D1
21,750
1,450 1,000 3,875 450 3,875 450 3,875 450 3,600 1,275 1,450
6,300 4,200 4,200 6,300
100 200
450 600
100
1,000 3,875 450 3,875 450 3,875 450 3,600
275
1,000
100
850
200 200 100
2,550
2,025
3,800
4,225
100
200
200
1,950
100
1,575
450
3,800
450
3,325
450
3,425 3,100 8,175 5,275 1,475
3,500 2,800 4,200 4,200 6,300
21,750
100
200
450
1,700
100
1,575
450
3,800
450
1,525
100
1,700
450
200
100
289
2,550
2,025
3,800
1,975
2,550
150
3,775
300
4,900
100
2,625
450
1,200
150
1,000
2,875
200
1,425
4,050
4,050
4,050
1,450 9,650 3,875 5,325 1,450
12,849
1,350
4,050
4,050
4,050
450 3,600 450 3,600 450 6,150
150
1,500
100
800
100
1,400
150
3,875
150
3,925
150
150
3,325
200
2,600 475 3,600 450 3,600 475 6,125
150
100 200 150
900
100
1,950
100
200
5,825 450 8,200 6,275
200
1,200
200
3,725
300
3,850
450
3,575
200
150
950 3,725 1,200 450 1,200 7,000
125
4,200 2,000
150
3,325
200
2,600
200
8,200
200
6,125
150 200 100
200
3,275
200
2,600
200
3,875 450 3,900 425 3,600 1,250
150
825
200 200 100
12900
2,500
1,400
150
7,925
150
150
3,850
150
600
800
700
1,825
150
100
3,675 2,850
+150
+150
+150
+150
V V
W
W
Z Z
U U
Y
Y
X
X
Front Elevation
Right
Elevation
Back Elevation
Left
Elevation
RAMP
ENTRACE TERRACE
Meeting Room
Open Work Space
Canteen
Reception
Kitchenette
Disabled WC
Staff WC
Visitor WC
Customer Care
200
3,725
300
3,850
450
3,325
450
1,200
Main Stair - GF
0.
1:100
GROUND FLOOR
Ground Floor
Plan
A-05
9. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
W-01
Sill
50
2,400
3,800
W-01
Sill 50
2,400
3,875
W-01
Sill 50
2,400
3,875
W-08
Sill 950
1,500
3,875
W-01
Sill 50
2,400
3,875
W-01
Sill
50
2,400
3,800
W-01
Sill 50
2,400
3,800
GW-01
Sill
50
2,400
3,850
W-03
Sill 50
2,400
3,275
W-02
Sill 50
2,400
3,600
W-02
Sill 50
2,400
3,600
D-02
D-02
D-02
D-06
W-02
Sill
50
2,400
3,600
D-05
W-04
Sill
50
2,400
3,325
D D
C C
B B
A A
1
1
2
2
3
3
4
4
5
5
1a
D1 D1
V V
W
W
Z Z
U U
Y
Y
X
X
Front Elevation
Right
Elevation
Back Elevation
Left
Elevation
100 200
450 600
100
1,000 3,875 450 3,875 450 3,875 450 3,875 1,000
100
850
200 200 100
2,550
2,025
3,800
4,150
100
2,350
100
9,900
150
2,550
9,975
125
3,275
175
2,600
175
8,225 475 3,800 1,050
100
850
200 200 100
3,500 2,950 8,250 5,300 1,450
3,525 2,775 4,200 4,225 6,275
2,550
7,800
2,500
4,050
4,050
4,050
21,700
100
200
450
1,700
100
1,575
450
3,800
450
1,525
100
1,700
450
200
100
4,050
4,050
4,050
12900
1,450 1,000 3,875 450 3,875 450 3,875 450 3,875 1,000 1,450
6,300 4,200 4,200 6,300
21,750
2,000
100
1,575
450
3,800
450
1,525
100
2,100
1,825
150
8,200
150
6,175
150
9,850
150
3,775
4,150
150
150
900
100
3,525
150
150
2,000
100
1,825
150
3,850
150
3,925
150
150
4,675
150
4,675 1,200 450
2,850
1,200 450 1,200
3,725
4,150
150
8,250
150
1,000
3,075
900
100
3,075
VOID
VOID VOID
VOID VOID VOID
Work Station
Office 1
WC
Bridge
Office 2
WC
WC
Office 3
Sales
D-08
GW-01
Sill 50
2,400
3,850
GW-01
Sill 50
2,400
3,850
6,325 13,225
150
1,150
150
3,275
200
2,600 475 3,600 450 3,600 475 4,825 1,300
1
2
3
4
5
6
7
8
9
10
11
12
UP
21R
x
150
20G
x
300
3,925
150
3,850
150
3,925
150
Main Stair -MF
1.
1:100
MEZZANINE FLOOR
Mezzanine Foor
Plan
A-06
11. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
W-01
Sill
150
2,400
3,800
W-01
Sill 150
2,400
3,800
W-05
Sill 1,600
500
800
D-03
D-03
W-05
Sill 1,600
500
800
W-03
Sill 150
2,400
3,275
D-02
D-02
D-07
D-07
D D
C C
B B
A A
1
1
2
2
3
3
4
4
5
5
1a
D1 D1
V V
W
W
Z Z
U U
Y
Y
X
X
Front Elevation
Right
Elevation
Back Elevation
Left
Elevation
100 200
450 600
100
4,875 450 3,875 450 3,875 450 4,875
100
850
200 200 100
15,417 4,883 1,450
21,750
100
200
200
1,950
100
1,575
450
3,800
450
3,325
450
2,550
5,825
4,225
12,899
1,300
300 200
3,275 3,000 6,925 1,275 450 4,875 1,450
200
3,275
200
2,600
175
6,950
100
1,175
150 300
3,800 1,075
100
1,250
100
3,500 2,800 4,200 4,200 6,300
21,750
2,550
2,025
3,800
1,975
2,550
100
200
450
1,700
100
1,575
450
3,800
450
1,250
150
125
100
1,700
450
200
100
4,050
4,050
4,050
1,425
12900
1,300
1,425
4,050
4,050
4,050
6,300 4,200 4,200 6,300
200
875 1,500 900
200
2,600
200 225
6,700 1,275
150
6,175
150
150
3,775
300
3,850
450
1,250
150
2,175
50
150
150
3,350
150
2,650
150
6,950
100
1,175
150
6,175
150
325
3,600
300
3,600
250
150
1,925
100
1,900
150
100
1,175
150
1,500 4,675
150
150
7,925
150
3,925
150
150
14,525 6,325
150
900 425 6,175
150
+9,900
+9,900
+9,900
+9,900
+9,900
+9,900
+9,900
+9,900
OPEN AREA
Squash Court
Storage Room2
Bar Area
Storage Room1
WC
WC
Open Area- 2ND FL
Main Stair - Roof
1:100
SECOND FLOOR
Second Floor Plan
A-08
12. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
D D
C C
B B
A A
1
1
2
2
3
3
4
4
5
5
1a
D1 D1
V V
W
W
Z Z
U U
Y
Y
X
X
Front Elevation
Right
Elevation
Back Elevation
Left
Elevation
14,650
200
5,150
100
875
200 175 100
14,375 5,625 1,450
21,750
8,350
200
3,900
200
1,225
150
8,350
4,300
1,375
14,025
200
3,301
200
2,600
200
8,174
200
5,150
100
1,250
100
3,501 3,000 13,524 1,450
21,375
100
2,350
100
7,800
100
2,350
100
2,550
7,800
2,550
12900
1,425
4,050
4,050
4,050
6,300 4,200 4,200 6,300
3,500 2,800 4,200 4,200 6,300
375
4,050
4,050
4,050
375
+13,200 +13,200
+13,200
+13,200
+13,200
+13,200
+13,200
+13,200
BITUMINOUS FELT LAID ON 150MM R.C SLAB
BITUMINOUS FELT LAID ON 150MM R.C SLAB
Concrete Roof
VOID
Concrete Roof
Concrete Roof
4.
1:100
ROOF PLAN
Roof Plan
A-09
13. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1 1a 2 3 4 5
-750
-1 FOUNDATION
-750
-1 FOUNDATION
±0
0 GROUND FLOOR
±0
0 GROUND FLOOR
+3,150
MEZZANINE FLOOR
+3,150
1 MEZZANINE FLOOR
+6,300
2 FIRST FLOOR
+6,300
2 FIRST FLOOR
+9,750
3 SECOND FLOOR
+9,750
3 SECOND FLOOR
+13,200
4 ROOF PLAN
+13,200
4 ROOF PLAN
Front Elevation
1:100
Front Elevation
A-10
14. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
5 4 3 2 1a 1
-750
-1 FOUNDATION
-750
-1 FOUNDATION
±0
0 GROUND FLOOR
±0
0 GROUND FLOOR
+3,150
MEZZANINE FLOOR
+3,150
1 MEZZANINE FLOOR
+6,300
2 FIRST FLOOR
+6,300
2 FIRST FLOOR
+9,750
3 SECOND FLOOR
+9,750
3 SECOND FLOOR
+13,200
4 ROOF PLAN
+13,200
4 ROOF PLAN
Back Elevation
1:100
Back Elevation
A-11
15. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
D C B A
D1
-750
-1 FOUNDATION
-750
-1 FOUNDATION
±0
0 GROUND FLOOR
±0
0 GROUND FLOOR
+3,150
1 MEZZANINE FLOOR
+3,150
1 MEZZANINE FLOOR
+6,300
2 FIRST FLOOR
+6,300
2 FIRST FLOOR
+9,750
3 SECOND FLOOR
+9,750
3 SECOND FLOOR
+13,200
4 ROOF PLAN
+13,200
4 ROOF PLAN
Left Elevation
1:100
Left Elevation
A-12
16. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
A B C D D1
-750
-1 FOUNDATION
-750
-1 FOUNDATION
±0
0 GROUND FLOOR
±0
0 GROUND FLOOR
+3,150
1 MEZZANINE FLOOR
+3,150
1 MEZZANINE FLOOR
+6,300
2 FIRST FLOOR
+6,300
2 FIRST FLOOR
+9,750
3 SECOND FLOOR
+9,750
3 SECOND FLOOR
+13,200
4 ROOF PLAN
+13,200
4 ROOF PLAN
Right Elevation
1:100
Right Elevation
A-13
17. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1 1a 2 3 4 5
-0.75
-1 FOUNDATION
±0.00
0 GROUND FLOOR
+3.15
1 MEZZANINE FLOOR
+6.30
2 FIRST FLOOR
+9.75
3 SECOND FLOOR
+13.20
4 ROOF PLAN
150
150
6,000
150
150
3,150
300
3,150
150
300
2,850
300
2,850
300
3,150
300
300
6,000
300
3,150
300
150
150
2,850
150
2,550
450
150
150
2,700
450
300
2,700
400
50
150
-0.75
±0.00
+2.55
+3.15
+5.70
+6.30
+9.15
+9.75
+10.80
+14.30 150
2,400
600
150
2,400
600
150
2,400
300
600
1,050
750
150
2,400
600
150
2,400
600
150
2,400
300
600
150
2,400
300
600
1,000
100
WORK STATION
OPEN WORK SPACE
OPEN WORK SPACE
OPEN WORK SPACE
SQUASH COURT
BAR AREA
CANTILEVER
OPEN WORK SPACE OPEN WORK SPACE
OPEN WORK SPACE
VOID VOID VOID BRIDGE
OPEN AREA
V
1:100
SECTION V-V
Sections
A-14
18. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1 1a 2 3 4 5
-750
-1 FOUNDATION
±0
0 GROUND FLOOR
+3,150
1 MEZZANINE FLOOR
+6,300
2 FIRST FLOOR
+9,750
3 SECOND FLOOR
+13,200
4 ROOF PLAN
150
150
2,850
300
2,850
150
150
2,700
450
300
3,150
150
2,550
600
2,550
600
2,850
600
2,850
600
1,000
750
6,150
150
150
3,150
150
150
3,150
150
1,000
100
2,550
450
150
150
2,850
300
3,150
300
-750
±0
+2,550
+3,150
+5,700
+6,300
+9,150
+9,750
+12,600
+13,200
+14,300
750
150
2,100
300
600
2,550
450
CANTEEN
MEETING ROOM KITCHEN
STAIR WELL
STAIR WELL
STAIR WELL
STAIR WELL
GYM
BAR AREA STORAGE ROOM 2
BOARD ROOM
SLEEP PORT
OFFICE 3
VOID-OUTSIDE
ROOF TOP (CONCRETED)
OFFICE 2
STORAGE ROOM 1
U
1:100
SECTION U-U
A-15
Sections
19. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
D C B A
D1
-750
-1 FOUNDATION
-750
-1 FOUNDATION
±0
0 GROUND FLOOR
±0
0 GROUND FLOOR
+3,150
1 MEZZANINE FLOOR
+3,150
1 MEZZANINE FLOOR
+6,300
2 FIRST FLOOR
+6,300
2 FIRST FLOOR
+9,750
3 SECOND FLOOR
+9,750
3 SECOND FLOOR
+13,200
4 ROOF PLAN
+13,200
4 ROOF PLAN
-750
±0
+1,500
+4,650
+8,100
+12,600
+13,200
+14,300
150
150
2,850
150
150
2,850
150
150
3,150
150
150
2,100
2,200
150
2,400
600
150
2,400
600
150
2,400
300
600
1,050
3,400
100
450
150
150
2,700
600
1,100
CUSTOMER
SERVICE
MEZZANINE
STAIR
STAIR
STAIR
STAIR OPEN AREA
WORK SPACE
OFFICE
OPEN WORK SPACE
MEZZANINE
X
1:100
SECTION X-X
A-16
Sections
20. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
A B C D D1
D-04
-0.75
-1 FOUNDATION
-0.75
-1 FOUNDATION
±0.00
0 GROUND FLOOR
±0.00
0 GROUND FLOOR
+3.15
1 MEZZANINE FLOOR
+3.15
1 MEZZANINE FLOOR
+6.30
2 FIRST FLOOR
+6.30
2 FIRST FLOOR
+9.75
3 SECOND FLOOR
+9.75
3 SECOND FLOOR
+13.20
4 ROOF PLAN
+13.20
4 ROOF PLAN
750
150
2,400
600
150
2,400
600
150
2,400
300
600
1,050
300
6,000
300
3,150
300
900
6,900
150
150
3,150
150
150
3,150
150
750
2,550
600
2,550
450
300
3,300
-0.75
±0.00
+2.55
+3.15
+5.70
+6.30
+9.15
+10.75
+10.75
750
150
2,100
300
600
150
2,400
450
300
3,300
MEZZANINE
WORK SPACE
MEZZANINE
SHOWER
OPEN WORK SPACE
OFFICE
BAR AREA
OPEN AREA
CONCRETE ROOF TOP
VOID
-
OUTSIDE
SHOWER
Y
1:100
SECTION Y-Y
Sections
A-17
21. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1 1a 2 3 4 5
D-01
D-03
D-05
D-06
D-07
-0.75
-1 FOUNDATION
±0.00
0 GROUND FLOOR
+3.15
1 MEZZANINE FLOOR
+6.30
2 FIRST FLOOR
+9.75
3 SECOND FLOOR
+13.20
4 ROOF PLAN
150
2,850
150
150
2,850
150
150
3,150
150
150
3,150
150
300
2,400
3,150
750
2,700
750
2,700
600
1,000
6,300
-0.75
±0.00
+2.55
+3.15
+5.70
+6.30
+9.15
+9.75
+10.80
+14.30
RECEPTION
CUSTOMER SERVICE
OPEN SPACE
SALES
VOID
VOID
VOID
OPEN PLAN OFFICE
OPEN PLAN OFFICE
OPEN PLAN OFFICE
OPEN PLAN OFFICE
SQUASH COURT
BAR/OPEN SPACE
Z
1:100
SECTION Z-Z
A-18
Sections
22. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
DOOR SCHEDULE
ID NO.
D-01
D-02
D-03
D-04
D-05
D-06
D-07
ILLUSTRATION
900
2,100
800
2,100
3,600
2,100
5,649
5
2,100
4,000
2,100
3,275
2,100
QUANTITY
1
15
6
3
4
3
LOCATION
Disabled WC
Reception
Mezzanine (All)
Gym
Canteen
Exit to Pool Area
Customer Care
Reception
Boardroom
Gym
Director's Office
Sales Office
Executive Office 1
Executive Office 2
Executive Office 3
Meeting Room
Office 3
Sleep Port
DESCRIPTION
PVC Doors Composite
Toilet Flush
Door.According to
clients specification
PVC Doors Composite
Toilet Flush
Door.According to
clients specification
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Door Schedule
A-19
23. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
D-07
D-08
D-09
D-10
D-11
1,500
2,100
3,725
2,100
3,600
2,400
4,875
2,100
2,875
5
2,100
2
1
1
2
1
Storage Room 1
Storage Room 2
Office 1
Entrance Terrace
Reception
Customer Care
Reception
Boardroom
Gym
Director's Office
Canteen
Exit To Pool Area
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
Manual swing safety
glass door systems
.Aluminum-Finishes
RAL -colors . Wall,
ceiling -installation
DOOR SCHEDULE
ID NO. ILLUSTRATION QUANTITY LOCATION DESCRIPTION
- Continued
A-20
Door Schedule
24. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
WINDOW SCHEDULE
ID NO.
GW-01
P-01
W-01
W-02
W-03
ILLUSTRATION
3,850
2,400
3,725
2,400
3,800
2,400
3,600
2,400
3,275
2,400
QUANTITY
3
3
20
3
4
LOCATION
- GlassWall -
Office 1
Office 2
Workstation
- Glass Partitions -
Driector's Office
Executive Office 1
Executive Office 2
Executive Office 3
(Exterior Windows)
Ground Floor
Mezzanine Floor
First Floor
Second Floor
Sales Office
Mezzanine Void
Meeting Room
Office 3
Sleep Port
Storage Room 1
DESCRIPTION
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,se
aling strip , friction hinge
etc.Customised as per client's
specification
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
Window Schedule
A-21
25. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
WINDOW SCHEDULE
ID NO.
GW-01
ILLUSTRATION QUANTITY LOCATION DESCRIPTION
W-04
W-05
W-06
W-08
Z
3,325
2,400
800
500
2,725
2,400
3,875
1,500
3
2
2
1
Meeting Room
Office 3
Sleep Port
Bar WCs
Gym
Mezzanine
Office 1
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
PVC(UPVC) windows .with
color,profile,glass,Handle,lock,
sealing strip , friction hinge
etc.Customised as per client's
specification
- Continued
A-22
Window Schedule
26. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
TIANG RAISED FLOOR
COVERING
(textile or elastic covering)
RAISED FLOOR PANEL
HOLLOW
GYPSUMBOARD 9mm
LAMP DOWNLIGHT
FINISHED FLOOR CARPET
HANGER 300.4
TRAPEZE SELF ANGELS
ALUMUNIUM FOIL, GLASSWOOL
OVERLAP
DUCTING
BJLS 60
FOR INSTALLATION
WEAK FLOW
FOR INSTALLATION
WEAK FLOW
LAMP DOWNLIGHT
TYPICAL FLOOR - SUSPENDED CEILING/ RAISED ACCESS FLOOR
D-07
1:20
Suspended Ceiling / Raised FloorDetail (1)
SUSPENDED CEILING ILLUSTRATION RAISED ACCESS FLOOR ILLUSTRATION A-26
Details
27. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
TYPICAL FLAT ROOF /PARAPET DETAIL
D-06
1:20
Roof Parapet Detail
Details
A-25
28. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
1,865
200
1,565
200
300
3,150
1,200
1,200
1,000
150
1,415
200
1
5
0
GLASS
RAILING
GLASS
RAILING
27O
BAR GRATING TREAD
(GROOVED NOSING)
315
15
25
150
OSHA 1910.25 & 29
INDUSTRIAL DOG-LEG STAIR TO
HATCH
1:50
D-05
1:50
D-04
1:10
D-03
8" x 2-1/4" x 1/4"
ALUMINUM CHANNEL
(TYPICAL)
5" CHANNEL
W/6" PLATE
NOTE:
ALL BOLTS / FASTNERS
NECESSARY TO ANCHOR
STAIRWAY ARE BY
INDUSTRIALSTAIRWAY
SPECIALIST
FACTORY FINISH
ALUMINIUM MILL FINISH
A-24
Details
TREAD WELDED AND BOLTED
TO STRINGER WITH 3/8" HEX
HEAD BOLTS
29. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
6,000
1,000
150
315
3,150
3,000
27O
INDUSTRIAL STRAIGHT STAIR
TO HATCH
CAPPED FOR MOUNTING
BAR GRATING TREAD
(GROOVED NOSING)
OSHA 1910.25 & 29
UNIFORM RISER HEIGHTS AND TREAD DEPTHS
BETWEEN LANDINGS
315
15 25
150
1,200
1,000
200
200
150
2,850
1:50
D-01
1:10
D-03
1:50
D-02
8" x 2-1/4" x 1/4"
ALUMINUM CHANNEL
(TYPICAL)
5" CHANNEL
W/6" PLATE ON SLAB
(BELOW 150mm ACCESS FLOOR)
5" CHANNEL
W/6" PLATE
1-1/4" SCH 40 ALUMINUM
PIPE HANDRAIL/GUARD RAIL
Details
FACTORY FINISH
ALUMINIUM MILL FINISH
NOTE:
ALL BOLTS / FASTNERS NECESSARY TO
ANCHOR
STAIRWAY ARE BY INDUSTRIALSTAIRWAY
SPECIALIST
A-23
Details
TREAD WELDED AND BOLTED
TO STRINGER WITH 3/8" HEX
HEAD BOLTS
30. NOTES
1.All dimensions are in metric.
2.Do not scale frome drawings.
3.Only figured dimensions to be worked
with.
4.Should any divergegence in dimensions
occur between Architectural,Engineering or
any Sub-contractors drawings,the contractor
shall immediately contact the Architect for
clarification
PROJECT:
DESCRIPTION:
ARCHITECT:
DESIGNED: SCALE:
DRAWN: DATE:
GABOCHIE DESIGN
Email:gabochiedesign@gmail.com
G.B.A 1:100
SHT No.
PROPOSED ZEEPAY
HEAD OFFICE
https://www.behance.net/gabochiedesign
DATE:
Oflyfo CAD
CLIENT:
ZEEPAY GHANA LIMITED
REVISION:
LOCATION:
CANTONEMENTS .
LaDMA DISTRICT
GREATER ACCRA
C
B
A
1
2
M
LEFT
BACK
RIGHT
N 2 1
C B A
C
B
A
1
2
M
N
1 2
2 1
C B A A B C
PLAN
WC
SECURITY
ROOF PLAN SECTION N-N
LEFT SIDE
FRONT
FRONT SIDE RIGHT SIDE BACK SIDE
3450
SECTION M-M
3300
550
150
150
2850
150
400
SECURITY
WC
1500
2450
4200
1800
1500
1250
600
600
600
400
1000
400
1550
800
500
600
150
SECURITY
750
1900
1250
905
400
825
1270
2500
2500
550
2850
450
Guard House
GUARD HOUSE
A-24