Case Discussion Board Questions:
Is it possible for a company to have such a strong technical community that technical integrity is
more important than the project itself?
What specific problems are present in the management of research and development projects?
What recommendations would you make?
Quasar Communications, Inc. (QCI), is a thirty-year-old, $350 million division of
Communication Systems International, the world’s largest communications company. QCI
employs about 340 people of which more than 200 are engineers. Ever since the company was
founded thirty years ago, engineers have held every major position within the company,
including president and vice president. The vice president for accounting and finance, for
example, has an electrical engineering degree from Purdue and a master’s degree in business
administration from Harvard.
QCI, up until 1996, was a traditional organization where everything flowed up and down. In
1996, QCI hired a major consulting company to come in and train all of their personnel in project
management. Because of the reluctance of the line managers to accept formalized project
management, QCI adopted an informal, fragmented project management structure where the
project managers had lots of responsibility but very little authority. The line managers were still
running the show.
In 1999, QCI had grown to a point where the majority of their business base revolved around
twelve large customers and thirty to forty small customers. The time had come to create a
separate line organization for project managers, where each individual could be shown a career
path in the company and the company could benefit by creating a body of planners and managers
dedicated to the completion of a project. The project management group was headed up by a vice
president and included the following full-time personnel:
Four individuals to handle the twelve large customers Five individuals for the
thirty to forty small customers Three individuals for R&D projects One individual for
capital equipment projects
The nine customer project managers were expected to handle two to three projects at one time if
necessary. Because the customer requests usually did not come in at the same time, it was
anticipated that each project manager would handle only one project at a time. The R&D and
capital equipment project managers were expected to handle several projects at once.
In addition to the above personnel, the company also maintained a staff of four product managers
who controlled the profitable off-the-shelf product lines. The product managers reported to the
vice president of marketing and sales.
In October 1999, the vice president for project management decided to take a more active role in
the problems that project managers were having and held counseling sessions for each project
manager. The following major problem areas were discovered.
R&D PROJECT MANAGEMENT
Project manager: “My biggest problem is working with these diverse groups that aren’t
sure what they want. My job is to develop new products that can be introduced into the
marketplace. I have to work with engineering, marketing, product management, manufacturing,
quality assurance, finance, and accounting. Everyone wants a detailed schedule and product cost
breakdown. How can I do that when we aren’t even sure what the end-item will look like or what
materials are needed? Last month I prepared a detailed schedule for the development of a new
product, assuming that everything would go according to the plan. I worked with the R&D
engineering group to establish what we considered to be a realistic milestone. Marketing pushed
the milestone to the left because they wanted the product to be introduced into the marketplace
earlier. Manufacturing then pushed the milestone to the right, claiming that they would need
more time to verify the engineering specifications. Finance and accounting then pushed the
milestone to the left asserting that management wanted a quicker return on investment. Now,
how can I make all of the groups happy?”
Vice president: “Whom do you have the biggest problems with?”
Project manager: “That’s easy—marketing! Every week marketing gets a copy of the
project status report and decides whether to cancel the project. Several times marketing has
canceled projects without even discussing it with me, and I’m supposed to be the project leader.”
Vice president: “Marketing is in the best position to cancel the project because they have the
inside information on the profitability, risk, return on investment, and competitive environment.”
Project manager: “The situation that we’re in now makes it impossible for the project
manager to be dedicated to a project where he does not have all of the information at hand.
Perhaps we should either have the R&D project managers report to someone in marketing or
have the marketing group provide additional information to the project managers.”
SMALL CUSTOMER PROJECT MANAGEMENT
Project manager: “I find it virtually impossible to be dedicated to and effectively manage
three projects that have priorities that are not reasonably close. My low-priority customer always
suffers. And even if I try to give all of my customers equal status, I do not know how to organize
myself and have effective time management on several projects.”
Project manager: “Why is it that the big projects carry all of the weight and the smaller
ones suffer?”
Project manager: “Several of my projects are so small that they stay in one functional
department. When that happens, the line manager feels that he is the true project manager
operating in a vertical environment. On one of my projects I found that a line manager had
promised the customer that additional tests would be run. This additional testing was not priced
out as part of the original statement of work. On another project the line manager made certain
remarks about the technical requirements of the project. The customer assumed that the line
manager’s remarks reflected company policy. Our line managers don’t realize that only the
project manager can make commitments (on resources) to the customer as well as on company
policy. I know this can happen on large projects as well, but it is more pronounced on small
projects.”
LARGE CUSTOMER PROJECT MANAGEMENT
Project manager: “Those of us who manage the large projects are also marketing
personnel, and occasionally, we are the ones who bring in the work. Yet, every- one appears to
be our superior. Marketing always looks down on us, and when we bring in a large contract,
marketing just looks down on us as if we’re riding their coattails or as if we were just lucky. The
engineering group outranks us because all managers and executives are promoted from there.
Those guys never live up to commitments. Last month I sent an inflammatory memo to a line
manager because of his poor response to my requests. Now, I get no support at all from him.
This doesn’t happen all of the time, but when it does, it’s frustrating.”
Project manager: “On large projects, how do we, the project managers, know when the
project is in trouble? How do we decide when the project will fail? Some of our large projects
are total disasters and should fail, but management comes to the rescue and pulls the best
resources off of the good projects to cure the ailing projects. We then end up with six marginal
projects and one partial catastrophe as opposed to six excellent projects and one failure. Why
don’t we just let the bad projects fail?”
Vice president: “We have to keep up our image for our customers. In most other companies,
performance is sacrificed in order to meet time and cost. Here at QCI, with our professional
integrity at stake, our engineers are willing to sacrifice time and cost in order to meet
specifications. Several of our customers come to us because of this. Last year we had a project
where, at the scheduled project termination date, engineering was able to satisfy only 75 percent
of the customer’s performance specifications. The project manager showed the results to the
customer, and the customer decided to change his specification requirements to agree with the
product that we designed. Our engineering people thought that this was a ‘slap in the face’ and
refused to sign off the engineering drawings. The problem went all the way up to the president
for resolution. The final result was that the customer would give us an additional few months if
we would spend our own money to try to meet the original specification. It cost us a bundle, but
we did it because our integrity and professional reputation were at stake.”
CAPITAL EQUIPMENT PROJECT MANAGEMENT
Project manager: “My biggest complaint is with this new priority scheduling computer
package we’re supposedly considering to install. The way I understand it, the computer program
will establish priorities for all of the projects in-house, based on the feasibility study, cost-benefit
analysis, and return on investment. Somehow I feel as though my projects will always be the
lowest priority, and I’ll never be able to get sufficient functional resources.”
Project manager: “Every time I lay out a reasonable schedule for one of our capital
equipment projects, a problem occurs in the manufacturing area and the functional employees are
always pulled off of my project to assist manufacturing.
And now I have to explain to everyone why I’m behind schedule. Why am I always the one to
suffer?”
The vice president carefully weighed the remarks of his project managers. Now came the
difficult part. What, if anything, could the vice president do to amend the situation given the
current organizational environment?
Solution

More Related Content

Similar to Case Discussion Board QuestionsIs it possible for a company to ha.pdf

Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxDeliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxcargillfilberto
 
Role Of Project Manager
Role Of Project ManagerRole Of Project Manager
Role Of Project ManagerAlison Reed
 
Project Management Project Manager Project
Project Management Project Manager ProjectProject Management Project Manager Project
Project Management Project Manager ProjectErin Moore
 
Drupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking About
Drupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking AboutDrupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking About
Drupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking AboutBill Annibell
 
1. The Monthly Project Report Each month, all project managers we.docx
1. The Monthly Project Report Each month, all project managers we.docx1. The Monthly Project Report Each month, all project managers we.docx
1. The Monthly Project Report Each month, all project managers we.docxKiyokoSlagleis
 
Three Topics to Consider1. The Monthly Project Report Each mont.docx
Three Topics to Consider1. The Monthly Project Report Each mont.docxThree Topics to Consider1. The Monthly Project Report Each mont.docx
Three Topics to Consider1. The Monthly Project Report Each mont.docxVannaSchrader3
 
Garnette's ici project 1
Garnette's ici project 1Garnette's ici project 1
Garnette's ici project 1Garnette Robert
 
Project Manager/Business Analyst friction and how to overcome it by Penny Pullan
Project Manager/Business Analyst friction and how to overcome it by Penny PullanProject Manager/Business Analyst friction and how to overcome it by Penny Pullan
Project Manager/Business Analyst friction and how to overcome it by Penny PullanMaking Projects Work Ltd.
 
Respond to one of the following questionsQuestion 1.docx
Respond to one of the following questionsQuestion 1.docxRespond to one of the following questionsQuestion 1.docx
Respond to one of the following questionsQuestion 1.docxpeggyd2
 
SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...
SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...
SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...South Tyrol Free Software Conference
 
Top 10 Reasons Why You Should Go into Project Management
Top 10 Reasons Why You Should Go into Project ManagementTop 10 Reasons Why You Should Go into Project Management
Top 10 Reasons Why You Should Go into Project ManagementDivya Malik
 
Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...
Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...
Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...Dialexa
 
101 Project Management Problems And How To Solve Them
101 Project Management Problems And How To Solve Them101 Project Management Problems And How To Solve Them
101 Project Management Problems And How To Solve ThemAmy Cernava
 
Business Analysts Value in Today's Work Environment
Business Analysts Value in Today's Work EnvironmentBusiness Analysts Value in Today's Work Environment
Business Analysts Value in Today's Work EnvironmentMAX Technical Training
 
If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...Ed Kozak
 
Young Project Leaders - 2020 Project Management Institute Interview
Young Project Leaders - 2020 Project Management Institute InterviewYoung Project Leaders - 2020 Project Management Institute Interview
Young Project Leaders - 2020 Project Management Institute InterviewRajesh Kumar Nalla
 
Myths of Construction Project Management
Myths of Construction Project Management Myths of Construction Project Management
Myths of Construction Project Management Pinoy Builders
 

Similar to Case Discussion Board QuestionsIs it possible for a company to ha.pdf (20)

Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docxDeliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
Deliverable 2 - Using Visuals to Enhance Viewer PerceptionCompet.docx
 
Role Of Project Manager
Role Of Project ManagerRole Of Project Manager
Role Of Project Manager
 
Project Management Project Manager Project
Project Management Project Manager ProjectProject Management Project Manager Project
Project Management Project Manager Project
 
Drupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking About
Drupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking AboutDrupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking About
Drupal GovCon 2021 - The MOST Important Agile Role NO ONE is Talking About
 
1. The Monthly Project Report Each month, all project managers we.docx
1. The Monthly Project Report Each month, all project managers we.docx1. The Monthly Project Report Each month, all project managers we.docx
1. The Monthly Project Report Each month, all project managers we.docx
 
Three Topics to Consider1. The Monthly Project Report Each mont.docx
Three Topics to Consider1. The Monthly Project Report Each mont.docxThree Topics to Consider1. The Monthly Project Report Each mont.docx
Three Topics to Consider1. The Monthly Project Report Each mont.docx
 
Garnette's ici project 1
Garnette's ici project 1Garnette's ici project 1
Garnette's ici project 1
 
project management phase guide
project management phase guideproject management phase guide
project management phase guide
 
Project Manager/Business Analyst friction and how to overcome it by Penny Pullan
Project Manager/Business Analyst friction and how to overcome it by Penny PullanProject Manager/Business Analyst friction and how to overcome it by Penny Pullan
Project Manager/Business Analyst friction and how to overcome it by Penny Pullan
 
Respond to one of the following questionsQuestion 1.docx
Respond to one of the following questionsQuestion 1.docxRespond to one of the following questionsQuestion 1.docx
Respond to one of the following questionsQuestion 1.docx
 
Client Expectations.pptx
Client Expectations.pptxClient Expectations.pptx
Client Expectations.pptx
 
SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...
SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...
SFScon 2020 - Elia Rigo - A study about Project Management techniques in virt...
 
Top 10 Reasons Why You Should Go into Project Management
Top 10 Reasons Why You Should Go into Project ManagementTop 10 Reasons Why You Should Go into Project Management
Top 10 Reasons Why You Should Go into Project Management
 
Inspired
InspiredInspired
Inspired
 
Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...
Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...
Minimum Viable Bureaucracy- A Practical Approach to Scaling Agile Project Man...
 
101 Project Management Problems And How To Solve Them
101 Project Management Problems And How To Solve Them101 Project Management Problems And How To Solve Them
101 Project Management Problems And How To Solve Them
 
Business Analysts Value in Today's Work Environment
Business Analysts Value in Today's Work EnvironmentBusiness Analysts Value in Today's Work Environment
Business Analysts Value in Today's Work Environment
 
If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...
 
Young Project Leaders - 2020 Project Management Institute Interview
Young Project Leaders - 2020 Project Management Institute InterviewYoung Project Leaders - 2020 Project Management Institute Interview
Young Project Leaders - 2020 Project Management Institute Interview
 
Myths of Construction Project Management
Myths of Construction Project Management Myths of Construction Project Management
Myths of Construction Project Management
 

More from fastechsrv

What is the purpose of performing a dark reaction Explain why it is.pdf
What is the purpose of performing a dark reaction Explain why it is.pdfWhat is the purpose of performing a dark reaction Explain why it is.pdf
What is the purpose of performing a dark reaction Explain why it is.pdffastechsrv
 
What is a tissue _____ What are some identifying features of merist.pdf
What is a tissue _____  What are some identifying features of merist.pdfWhat is a tissue _____  What are some identifying features of merist.pdf
What is a tissue _____ What are some identifying features of merist.pdffastechsrv
 
Tonya and Lydia are two senior nursing students assigned to work in .pdf
Tonya and Lydia are two senior nursing students assigned to work in .pdfTonya and Lydia are two senior nursing students assigned to work in .pdf
Tonya and Lydia are two senior nursing students assigned to work in .pdffastechsrv
 
This figure shows the stress-strain curve for a polymer. The followi.pdf
This figure shows the stress-strain curve for a polymer. The followi.pdfThis figure shows the stress-strain curve for a polymer. The followi.pdf
This figure shows the stress-strain curve for a polymer. The followi.pdffastechsrv
 
There are 6 holes in a wall. A mouse is in one hole I dont know wh.pdf
There are 6 holes in a wall.  A mouse is in one hole I dont know wh.pdfThere are 6 holes in a wall.  A mouse is in one hole I dont know wh.pdf
There are 6 holes in a wall. A mouse is in one hole I dont know wh.pdffastechsrv
 
The identity below was verified incorrectly. In which line was an err.pdf
The identity below was verified incorrectly. In which line was an err.pdfThe identity below was verified incorrectly. In which line was an err.pdf
The identity below was verified incorrectly. In which line was an err.pdffastechsrv
 
The FED is both centralized and decentralized in its structure. .pdf
The FED is both centralized and decentralized in its structure. .pdfThe FED is both centralized and decentralized in its structure. .pdf
The FED is both centralized and decentralized in its structure. .pdffastechsrv
 
The diameter of the Milky Way disc is approximately 9x10^20 meters. .pdf
The diameter of the Milky Way disc is approximately 9x10^20 meters. .pdfThe diameter of the Milky Way disc is approximately 9x10^20 meters. .pdf
The diameter of the Milky Way disc is approximately 9x10^20 meters. .pdffastechsrv
 
The Ad Hoc network shown below (including node Q) is currently operat.pdf
The Ad Hoc network shown below (including node Q) is currently operat.pdfThe Ad Hoc network shown below (including node Q) is currently operat.pdf
The Ad Hoc network shown below (including node Q) is currently operat.pdffastechsrv
 
take the following code and give details of what each line of code i.pdf
take the following code and give details of what each line of code i.pdftake the following code and give details of what each line of code i.pdf
take the following code and give details of what each line of code i.pdffastechsrv
 
RNA is important for all of the following reasons EXCEPT most RNA .pdf
RNA is important for all of the following reasons EXCEPT  most RNA .pdfRNA is important for all of the following reasons EXCEPT  most RNA .pdf
RNA is important for all of the following reasons EXCEPT most RNA .pdffastechsrv
 
Patient A got IV (Intravenous) fluid at the hospital that turned out .pdf
Patient A got IV (Intravenous) fluid at the hospital that turned out .pdfPatient A got IV (Intravenous) fluid at the hospital that turned out .pdf
Patient A got IV (Intravenous) fluid at the hospital that turned out .pdffastechsrv
 
Need help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdf
Need help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdfNeed help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdf
Need help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdffastechsrv
 
Novotny et al. The authors of the paper Why are there so many speci.pdf
Novotny et al. The authors of the paper Why are there so many speci.pdfNovotny et al. The authors of the paper Why are there so many speci.pdf
Novotny et al. The authors of the paper Why are there so many speci.pdffastechsrv
 
Match the description with the appropriate term. Where more than one .pdf
Match the description with the appropriate term. Where more than one .pdfMatch the description with the appropriate term. Where more than one .pdf
Match the description with the appropriate term. Where more than one .pdffastechsrv
 
How should globalization be viewed as a four dimensional concept.pdf
How should globalization be viewed as a four dimensional concept.pdfHow should globalization be viewed as a four dimensional concept.pdf
How should globalization be viewed as a four dimensional concept.pdffastechsrv
 
I want the show the works step by step for Aand B Autism is a seriou.pdf
I want the show the works step by step for Aand B Autism is a seriou.pdfI want the show the works step by step for Aand B Autism is a seriou.pdf
I want the show the works step by step for Aand B Autism is a seriou.pdffastechsrv
 
If only one strand of the DNA molecule is transcribed for a particul.pdf
If only one strand of the DNA molecule is transcribed for a particul.pdfIf only one strand of the DNA molecule is transcribed for a particul.pdf
If only one strand of the DNA molecule is transcribed for a particul.pdffastechsrv
 
How do each of the factors listed in (1) affect the diffusion of sol.pdf
How do each of the factors listed in (1) affect the diffusion of sol.pdfHow do each of the factors listed in (1) affect the diffusion of sol.pdf
How do each of the factors listed in (1) affect the diffusion of sol.pdffastechsrv
 
find the domain of the function f (x)= 2x3 x8SolutionNumerat.pdf
find the domain of the function f (x)= 2x3 x8SolutionNumerat.pdffind the domain of the function f (x)= 2x3 x8SolutionNumerat.pdf
find the domain of the function f (x)= 2x3 x8SolutionNumerat.pdffastechsrv
 

More from fastechsrv (20)

What is the purpose of performing a dark reaction Explain why it is.pdf
What is the purpose of performing a dark reaction Explain why it is.pdfWhat is the purpose of performing a dark reaction Explain why it is.pdf
What is the purpose of performing a dark reaction Explain why it is.pdf
 
What is a tissue _____ What are some identifying features of merist.pdf
What is a tissue _____  What are some identifying features of merist.pdfWhat is a tissue _____  What are some identifying features of merist.pdf
What is a tissue _____ What are some identifying features of merist.pdf
 
Tonya and Lydia are two senior nursing students assigned to work in .pdf
Tonya and Lydia are two senior nursing students assigned to work in .pdfTonya and Lydia are two senior nursing students assigned to work in .pdf
Tonya and Lydia are two senior nursing students assigned to work in .pdf
 
This figure shows the stress-strain curve for a polymer. The followi.pdf
This figure shows the stress-strain curve for a polymer. The followi.pdfThis figure shows the stress-strain curve for a polymer. The followi.pdf
This figure shows the stress-strain curve for a polymer. The followi.pdf
 
There are 6 holes in a wall. A mouse is in one hole I dont know wh.pdf
There are 6 holes in a wall.  A mouse is in one hole I dont know wh.pdfThere are 6 holes in a wall.  A mouse is in one hole I dont know wh.pdf
There are 6 holes in a wall. A mouse is in one hole I dont know wh.pdf
 
The identity below was verified incorrectly. In which line was an err.pdf
The identity below was verified incorrectly. In which line was an err.pdfThe identity below was verified incorrectly. In which line was an err.pdf
The identity below was verified incorrectly. In which line was an err.pdf
 
The FED is both centralized and decentralized in its structure. .pdf
The FED is both centralized and decentralized in its structure. .pdfThe FED is both centralized and decentralized in its structure. .pdf
The FED is both centralized and decentralized in its structure. .pdf
 
The diameter of the Milky Way disc is approximately 9x10^20 meters. .pdf
The diameter of the Milky Way disc is approximately 9x10^20 meters. .pdfThe diameter of the Milky Way disc is approximately 9x10^20 meters. .pdf
The diameter of the Milky Way disc is approximately 9x10^20 meters. .pdf
 
The Ad Hoc network shown below (including node Q) is currently operat.pdf
The Ad Hoc network shown below (including node Q) is currently operat.pdfThe Ad Hoc network shown below (including node Q) is currently operat.pdf
The Ad Hoc network shown below (including node Q) is currently operat.pdf
 
take the following code and give details of what each line of code i.pdf
take the following code and give details of what each line of code i.pdftake the following code and give details of what each line of code i.pdf
take the following code and give details of what each line of code i.pdf
 
RNA is important for all of the following reasons EXCEPT most RNA .pdf
RNA is important for all of the following reasons EXCEPT  most RNA .pdfRNA is important for all of the following reasons EXCEPT  most RNA .pdf
RNA is important for all of the following reasons EXCEPT most RNA .pdf
 
Patient A got IV (Intravenous) fluid at the hospital that turned out .pdf
Patient A got IV (Intravenous) fluid at the hospital that turned out .pdfPatient A got IV (Intravenous) fluid at the hospital that turned out .pdf
Patient A got IV (Intravenous) fluid at the hospital that turned out .pdf
 
Need help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdf
Need help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdfNeed help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdf
Need help coding MorseCode in JavaCreate Class MorseCodeClient. T.pdf
 
Novotny et al. The authors of the paper Why are there so many speci.pdf
Novotny et al. The authors of the paper Why are there so many speci.pdfNovotny et al. The authors of the paper Why are there so many speci.pdf
Novotny et al. The authors of the paper Why are there so many speci.pdf
 
Match the description with the appropriate term. Where more than one .pdf
Match the description with the appropriate term. Where more than one .pdfMatch the description with the appropriate term. Where more than one .pdf
Match the description with the appropriate term. Where more than one .pdf
 
How should globalization be viewed as a four dimensional concept.pdf
How should globalization be viewed as a four dimensional concept.pdfHow should globalization be viewed as a four dimensional concept.pdf
How should globalization be viewed as a four dimensional concept.pdf
 
I want the show the works step by step for Aand B Autism is a seriou.pdf
I want the show the works step by step for Aand B Autism is a seriou.pdfI want the show the works step by step for Aand B Autism is a seriou.pdf
I want the show the works step by step for Aand B Autism is a seriou.pdf
 
If only one strand of the DNA molecule is transcribed for a particul.pdf
If only one strand of the DNA molecule is transcribed for a particul.pdfIf only one strand of the DNA molecule is transcribed for a particul.pdf
If only one strand of the DNA molecule is transcribed for a particul.pdf
 
How do each of the factors listed in (1) affect the diffusion of sol.pdf
How do each of the factors listed in (1) affect the diffusion of sol.pdfHow do each of the factors listed in (1) affect the diffusion of sol.pdf
How do each of the factors listed in (1) affect the diffusion of sol.pdf
 
find the domain of the function f (x)= 2x3 x8SolutionNumerat.pdf
find the domain of the function f (x)= 2x3 x8SolutionNumerat.pdffind the domain of the function f (x)= 2x3 x8SolutionNumerat.pdf
find the domain of the function f (x)= 2x3 x8SolutionNumerat.pdf
 

Recently uploaded

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 

Recently uploaded (20)

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 

Case Discussion Board QuestionsIs it possible for a company to ha.pdf

  • 1. Case Discussion Board Questions: Is it possible for a company to have such a strong technical community that technical integrity is more important than the project itself? What specific problems are present in the management of research and development projects? What recommendations would you make? Quasar Communications, Inc. (QCI), is a thirty-year-old, $350 million division of Communication Systems International, the world’s largest communications company. QCI employs about 340 people of which more than 200 are engineers. Ever since the company was founded thirty years ago, engineers have held every major position within the company, including president and vice president. The vice president for accounting and finance, for example, has an electrical engineering degree from Purdue and a master’s degree in business administration from Harvard. QCI, up until 1996, was a traditional organization where everything flowed up and down. In 1996, QCI hired a major consulting company to come in and train all of their personnel in project management. Because of the reluctance of the line managers to accept formalized project management, QCI adopted an informal, fragmented project management structure where the project managers had lots of responsibility but very little authority. The line managers were still running the show. In 1999, QCI had grown to a point where the majority of their business base revolved around twelve large customers and thirty to forty small customers. The time had come to create a separate line organization for project managers, where each individual could be shown a career path in the company and the company could benefit by creating a body of planners and managers dedicated to the completion of a project. The project management group was headed up by a vice president and included the following full-time personnel: Four individuals to handle the twelve large customers Five individuals for the thirty to forty small customers Three individuals for R&D projects One individual for capital equipment projects The nine customer project managers were expected to handle two to three projects at one time if necessary. Because the customer requests usually did not come in at the same time, it was anticipated that each project manager would handle only one project at a time. The R&D and capital equipment project managers were expected to handle several projects at once. In addition to the above personnel, the company also maintained a staff of four product managers who controlled the profitable off-the-shelf product lines. The product managers reported to the vice president of marketing and sales. In October 1999, the vice president for project management decided to take a more active role in
  • 2. the problems that project managers were having and held counseling sessions for each project manager. The following major problem areas were discovered. R&D PROJECT MANAGEMENT Project manager: “My biggest problem is working with these diverse groups that aren’t sure what they want. My job is to develop new products that can be introduced into the marketplace. I have to work with engineering, marketing, product management, manufacturing, quality assurance, finance, and accounting. Everyone wants a detailed schedule and product cost breakdown. How can I do that when we aren’t even sure what the end-item will look like or what materials are needed? Last month I prepared a detailed schedule for the development of a new product, assuming that everything would go according to the plan. I worked with the R&D engineering group to establish what we considered to be a realistic milestone. Marketing pushed the milestone to the left because they wanted the product to be introduced into the marketplace earlier. Manufacturing then pushed the milestone to the right, claiming that they would need more time to verify the engineering specifications. Finance and accounting then pushed the milestone to the left asserting that management wanted a quicker return on investment. Now, how can I make all of the groups happy?” Vice president: “Whom do you have the biggest problems with?” Project manager: “That’s easy—marketing! Every week marketing gets a copy of the project status report and decides whether to cancel the project. Several times marketing has canceled projects without even discussing it with me, and I’m supposed to be the project leader.” Vice president: “Marketing is in the best position to cancel the project because they have the inside information on the profitability, risk, return on investment, and competitive environment.” Project manager: “The situation that we’re in now makes it impossible for the project manager to be dedicated to a project where he does not have all of the information at hand. Perhaps we should either have the R&D project managers report to someone in marketing or have the marketing group provide additional information to the project managers.” SMALL CUSTOMER PROJECT MANAGEMENT Project manager: “I find it virtually impossible to be dedicated to and effectively manage three projects that have priorities that are not reasonably close. My low-priority customer always suffers. And even if I try to give all of my customers equal status, I do not know how to organize myself and have effective time management on several projects.” Project manager: “Why is it that the big projects carry all of the weight and the smaller ones suffer?” Project manager: “Several of my projects are so small that they stay in one functional department. When that happens, the line manager feels that he is the true project manager operating in a vertical environment. On one of my projects I found that a line manager had
  • 3. promised the customer that additional tests would be run. This additional testing was not priced out as part of the original statement of work. On another project the line manager made certain remarks about the technical requirements of the project. The customer assumed that the line manager’s remarks reflected company policy. Our line managers don’t realize that only the project manager can make commitments (on resources) to the customer as well as on company policy. I know this can happen on large projects as well, but it is more pronounced on small projects.” LARGE CUSTOMER PROJECT MANAGEMENT Project manager: “Those of us who manage the large projects are also marketing personnel, and occasionally, we are the ones who bring in the work. Yet, every- one appears to be our superior. Marketing always looks down on us, and when we bring in a large contract, marketing just looks down on us as if we’re riding their coattails or as if we were just lucky. The engineering group outranks us because all managers and executives are promoted from there. Those guys never live up to commitments. Last month I sent an inflammatory memo to a line manager because of his poor response to my requests. Now, I get no support at all from him. This doesn’t happen all of the time, but when it does, it’s frustrating.” Project manager: “On large projects, how do we, the project managers, know when the project is in trouble? How do we decide when the project will fail? Some of our large projects are total disasters and should fail, but management comes to the rescue and pulls the best resources off of the good projects to cure the ailing projects. We then end up with six marginal projects and one partial catastrophe as opposed to six excellent projects and one failure. Why don’t we just let the bad projects fail?” Vice president: “We have to keep up our image for our customers. In most other companies, performance is sacrificed in order to meet time and cost. Here at QCI, with our professional integrity at stake, our engineers are willing to sacrifice time and cost in order to meet specifications. Several of our customers come to us because of this. Last year we had a project where, at the scheduled project termination date, engineering was able to satisfy only 75 percent of the customer’s performance specifications. The project manager showed the results to the customer, and the customer decided to change his specification requirements to agree with the product that we designed. Our engineering people thought that this was a ‘slap in the face’ and refused to sign off the engineering drawings. The problem went all the way up to the president for resolution. The final result was that the customer would give us an additional few months if we would spend our own money to try to meet the original specification. It cost us a bundle, but we did it because our integrity and professional reputation were at stake.” CAPITAL EQUIPMENT PROJECT MANAGEMENT Project manager: “My biggest complaint is with this new priority scheduling computer
  • 4. package we’re supposedly considering to install. The way I understand it, the computer program will establish priorities for all of the projects in-house, based on the feasibility study, cost-benefit analysis, and return on investment. Somehow I feel as though my projects will always be the lowest priority, and I’ll never be able to get sufficient functional resources.” Project manager: “Every time I lay out a reasonable schedule for one of our capital equipment projects, a problem occurs in the manufacturing area and the functional employees are always pulled off of my project to assist manufacturing. And now I have to explain to everyone why I’m behind schedule. Why am I always the one to suffer?” The vice president carefully weighed the remarks of his project managers. Now came the difficult part. What, if anything, could the vice president do to amend the situation given the current organizational environment? Solution