1. CUSTOMER RELEASE VERSION
NAME: FANDTA RONY WIJAYA
TITLE: TECHNICAL SERVICE PERSONNEL
EDUCATION:
2003-2006 Diploma Degree (D3), Mechanical Engineering,Gadjah Mada
University, Yogyakarta , Indonesia
EXPERIENCE:
2008 – Present Field Service Representative of PT FMC Santana PEI, Jakarta
Responsibilities:
• Supervision of all wellheads installations, maintenance, and de-
commissionning operations as and when required by the company
• Advise all customer personnel in the selection and use of wellheads
equipments particular to individual requirements
Field Experience
• Saudi Aramco
Install Casing slip:
-C 121 26 ¾ X 18 5/8 Casing Slips
-C 129 20 ¾ X 13 5/8 Casing Slips
Install 26 ¾ X 20 ¾ Casing spool
Install Casing Spool 10 K with RCMS seal
Install 26 ¾ X 26 ¾ Double Studs Double Pack off
• PHE WMO
Sucessfully Perform wellhead installation of 18 ¾ CM-1 big unihead at
COSL SEEKER RIG
Succesfully perform the installation of 3 in 1 Christmas Tree 13.5/8” x
4.1/16” – 3K, Tubing Head 3 in 1 , 13 3/8” FS BTM x 13 5/8”-5K Threaded
Top, Casing Head 3 in 1 20 BTC BTM x 18 ¾”.
• Eergy Equity Sengkang
Perform wellhead maitenance of 3 1/8 GV M20+ at Sampi-Sampi well
• Mubadala Petroleum
Perform wellhead installation at Mubadala sebuku Project on Randolp yoss,
Perform preventive maintenance and repair FMC HY series hydraulic
actuator
• Total Indonesie
Peciko Project
Installation surface s x s wellhead for s x s 2 in 1 wellhead system for Total
Peciko.
Install Upper male and Lower male connection, Install Casing Spliter.
Installation Mandrel Hanger 13 3/8, Installation unihead Assy.
Complation Job, installation Tubing hanger and Installation Chirstmas Tree
Assy.
• HESS PANGKAH B
Succesfully perform the installation of Wellhead F/22 OD CSG x 13 3/8 OD
CSG x 9 5/8 OD CSG x 4 ½” TBG. 22 SOL x 20 ¾-3K CLP HUB x 13 5/8-5K
FLAMP WELLHEAD CONN & 4 1/6”-5K X-MAS TREE.
2. CUSTOMER RELEASE VERSION
• PHE ONWJ
Completion and Work-over jobs
Install Tubing hanger Assy Type:
-TC-1A-ENS
-TC-EC
-TC-Electro Sub
-TC-60 Dual Tubing Hanger
• BP Indonesia
Perform Maintenance and troubleshooting of Wellheads and Christmas Tree
at BP-West Java Project. Well Integrity, Disassembly and assembly GV
M120-Manual, GV M120-Pref/Act, GV M20-Manual, and GV M20-Pref/Act at
LIMA, ECHO, BRAVO, UNIFORM, KLA, AVSA, KILO and AVA Area
Well Integrity, Disassembly and assembly GV M120-Manual, GV M120-
Pref/Act, GV M20-Manual, and GV M20-Pref/Act at LIMA, ECHO, BRAVO,
UNIFORM, KLA, AVSA, KILO and AVA Area
INDUSTRY EXPERIENCE:
2006– 2008 Mechanical Engineer of PT Astra Otoparts, winteq division, Bogor
Responsibilities:
• Together with design engineer create machine design as per customer
requirement
• Manufacture machine parts and assembly
• Function test machine until ready to be delivered to customer
• Install machine and function test on customer plant
INDUSTRY TRAINING AND QUALIFICATIONS:
2015 H2S Basic training, AIMS, Saudi Arabia.
2015 Service Skill Training (Advanched Service Skill), FMC Technology University, Jakarta
2015 Service Skill Training (Gate Valve), FMC Technology University, Jakarta
2014 Jungle Surval Trainning ( Jungle survival training for BP well survey project by Samson
tiara, BP Tangguh, Jakarta-Indonesia)
2014 Level 2 PA training for PHE ONWJ ( Control of work and performing authority training,
PHE ONWJ-Jakarta, Indonesia)
2014 Level 2 PA training for PHE WMO (Control of work and performing authority training,
PHE WMO-Jakarta, Indonesia)
2012 T-BOSIET (Tropical - Basic Offshore Safety Induction and Emergency Training),
PT SAMSON TIARA, Survival Systems Asia – Cilegon, Indonesia
2009 SERVICE SKILL TRAINING,
PT FMC Santana PEI – Jakarta, Indonesia
2009 STOP (Safety Training Observation Program for Supervision,
PT FMC Santana PEI – Jakarta, Indonesia)
LANGUAGES
• Bahasa Indonesia, Native
• English, Minimum Professional Proficiency