Spring Hill Metro Emergency Sewer Replacement

38 views

Published on

This emergency project replaced approximately 60 feet of 10-inch wastewater sewer pipe that was broken during the installation of an electricity utility conduit. The project included installation of an emergency wastewater bypass pumping system, excavation and removal of the broken wastewater sewer pipe, installation of new manholes, and rehabilitation of the work site. The repairs were conducted between the hours of 9 p.m. and 5 a.m. to limit disruptions to traffic in this busy corridor.

Published in: Government & Nonprofit
  • Be the first to comment

  • Be the first to like this

Spring Hill Metro Emergency Sewer Replacement

  1. 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Spring Hill Metro Emergency Sewer Replacement Project Number: WW-000028-002 Providence District December 18, 2018
  2. 2. Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division
  3. 3. Project Details Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division Project Overview: • Installation of an emergency wastewater bypass pumping system. • Communication and coordination between Contractors, Dominion Virginia Power, VDOT, and surrounding businesses. • Excavation and removal of broken wastewater sewer pipe. • Installation of two new manholes and new wastewater sewer pipe. • Rehabilitation of work site. Project Team: • Robert White, Jr. - Wastewater Collection Division • Brendan Schillo - Wastewater Design and Construction Division Project Description: The purpose of this project was to replace approximately 60-ft of 10-inch wastewater sewer pipe that was broken from the installation of a electricity utility conduit by Dominion Power. The break occurred in the westbound lane of Route 7 near Spring Hill Metro Station. Repairs were done between the hours of 9pm and 5am to limit disruptions to the flow of traffic. This project was substantially complete on November 20, 2018.
  4. 4. Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division Providence District – Tax Map No. 29-3
  5. 5. Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division Installation of Emergency Bypass Pumping System
  6. 6. Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division Utility Conflict FFC Wastewater Sewer Pipe Dominion Virginia Power Conduit
  7. 7. Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division Installation of New Sewer Pipe Over Utility Conflict
  8. 8. Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division Installation of New Manholes
  9. 9. Before After Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division
  10. 10. Additional Information For additional Information, please call www.fairfaxcounty.gov/publicworks Spring Hill Metro Emergency Sewer Replacement Capital Facilities/Wastewater Design and Construction Division Matthew Kaiser Public Information Officer 703-324-8455, TTY 711 Matthew.Kaiser@fairfaxcounty.gov

×