This emergency project replaced approximately 60 feet of 10-inch wastewater sewer pipe that was broken during the installation of an electricity utility conduit. The project included installation of an emergency wastewater bypass pumping system, excavation and removal of the broken wastewater sewer pipe, installation of new manholes, and rehabilitation of the work site. The repairs were conducted between the hours of 9 p.m. and 5 a.m. to limit disruptions to traffic in this busy corridor.
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Spring Hill Metro Emergency Sewer Replacement
Project Number: WW-000028-002
Providence District
December 18, 2018
2. Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
3. Project Details
Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
Project Overview:
• Installation of an emergency wastewater bypass pumping system.
• Communication and coordination between Contractors, Dominion Virginia Power, VDOT,
and surrounding businesses.
• Excavation and removal of broken wastewater sewer pipe.
• Installation of two new manholes and new wastewater sewer pipe.
• Rehabilitation of work site.
Project Team:
• Robert White, Jr. - Wastewater Collection Division
• Brendan Schillo - Wastewater Design and Construction Division
Project Description:
The purpose of this project was to replace approximately 60-ft of 10-inch wastewater sewer pipe
that was broken from the installation of a electricity utility conduit by Dominion Power. The break
occurred in the westbound lane of Route 7 near Spring Hill Metro Station. Repairs were done
between the hours of 9pm and 5am to limit disruptions to the flow of traffic. This project was
substantially complete on November 20, 2018.
4. Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
Providence District – Tax Map No. 29-3
5. Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
Installation of Emergency Bypass Pumping System
6. Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
Utility Conflict
FFC Wastewater
Sewer Pipe
Dominion
Virginia Power
Conduit
7. Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
Installation of New Sewer Pipe Over Utility Conflict
8. Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
Installation of New Manholes
9. Before After
Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division
10. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Spring Hill Metro Emergency Sewer Replacement
Capital Facilities/Wastewater Design and Construction Division