New binding solution for high speed railways’ ballast
                        consolidation
•   Concept and main objective: Development of a binding solution for
    stabilizing and consolidating the ballast of high speed railways with the
    objective of reducing and preventing the effect known as “ballast projection”


•   Advantages:
     - Prevention of ballast projection phenomena in
     railways
     - Increased platform service life by preventing
     the formation of micro-fissures in the ballast
     - Low maintenance requirements and
     economical savings associated
     - Noise and vibration reduction
New binding solution for high speed railways’ ballast
                        consolidation

Type of partners required:

•   Countries: any of the Eureka network.
•   Organization: Large company, SME.
•   Expertise: related to construction/operation of railway infrastructures or
    systems for railway applications
Risk assessment and decision support system for tunnelling and
                      underground construction works

Concept and main objective: Development of an intelligent decision support tool to
identify, control and manage the risks associated to tunnelling and underground
construction works.

This software tool would be used by engineers, technicians as well as decision makers
involved in the construction process to evaluate and assess the different impacts of the
project during all the project’s stages including its study, deployment and implementation.
The use of the tool in the decision making process will result in cost and time savings, too.

Innovative aspects of the project:
• Improvement of the tenders through a better assessment of the different alternatives,
obtaining a more competitive bid in economical and technical terms in tender processes
while minimizing risks.
• Construction works simulations, evaluating and anticipating the different possible
scenarios
• Reducing the margin for human errors in specific situations which require quick
decisions
Risk assessment and decision support system for tunnelling and
                      underground construction works


Type of partners required:

•   Countries: any of the Eureka network.
•   Organization: Large company, SME.
•   Expertise: related to tunnelling /underground technologies




Contact Details:

Name: Asier Sorli, Email: asorli@acciona.es , Phone: +34 94 427 80 88

More Related Content

Viewers also liked

Participatory Multi-Hazard Disaster Risk Reduction Project in Armenia
Participatory Multi-Hazard Disaster Risk Reduction Project in ArmeniaParticipatory Multi-Hazard Disaster Risk Reduction Project in Armenia
Participatory Multi-Hazard Disaster Risk Reduction Project in ArmeniaSupportToCommunities
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9Eric Peabody
 
Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction ProjectDr. Firdaus Basbeth
 
Risk assesment template
Risk assesment templateRisk assesment template
Risk assesment templateGlen Alleman
 
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...Sibo Kanyambari Aimable
 
Project risk management focus on risk identification techniques
Project risk management   focus on risk identification techniquesProject risk management   focus on risk identification techniques
Project risk management focus on risk identification techniquesMarco De Santis, PMP, CFPP
 
A study of various factors affecting risk management techniques in constructi...
A study of various factors affecting risk management techniques in constructi...A study of various factors affecting risk management techniques in constructi...
A study of various factors affecting risk management techniques in constructi...eSAT Journals
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk managementIQPC
 
Basic Risk Identification Techniques
Basic Risk Identification TechniquesBasic Risk Identification Techniques
Basic Risk Identification TechniquesRicardo Viana Vargas
 

Viewers also liked (12)

Participatory Multi-Hazard Disaster Risk Reduction Project in Armenia
Participatory Multi-Hazard Disaster Risk Reduction Project in ArmeniaParticipatory Multi-Hazard Disaster Risk Reduction Project in Armenia
Participatory Multi-Hazard Disaster Risk Reduction Project in Armenia
 
BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9BIM vs Risk on Stanford Cath 9
BIM vs Risk on Stanford Cath 9
 
Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction Project
 
Disaster Risk Reduction (DRR) Project Portal - User Guide
Disaster Risk Reduction (DRR) Project Portal - User GuideDisaster Risk Reduction (DRR) Project Portal - User Guide
Disaster Risk Reduction (DRR) Project Portal - User Guide
 
Risk assesment template
Risk assesment templateRisk assesment template
Risk assesment template
 
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
EFFECTS OF RISK MANAGEMENT METHODS ON PROJECT PERFORMANCE IN RWANDAN CONSTRUC...
 
Project risk management focus on risk identification techniques
Project risk management   focus on risk identification techniquesProject risk management   focus on risk identification techniques
Project risk management focus on risk identification techniques
 
A study of various factors affecting risk management techniques in constructi...
A study of various factors affecting risk management techniques in constructi...A study of various factors affecting risk management techniques in constructi...
A study of various factors affecting risk management techniques in constructi...
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Construction project risk management
Construction project risk managementConstruction project risk management
Construction project risk management
 
Basic Risk Identification Techniques
Basic Risk Identification TechniquesBasic Risk Identification Techniques
Basic Risk Identification Techniques
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 

Similar to Acciona: Binding solution risk assesment

A responsive satellite-industry_ka2015_lisi_v02
A responsive satellite-industry_ka2015_lisi_v02A responsive satellite-industry_ka2015_lisi_v02
A responsive satellite-industry_ka2015_lisi_v02Marco Lisi
 
OpenMAMA Governance
OpenMAMA GovernanceOpenMAMA Governance
OpenMAMA GovernanceOpenMAMA
 
Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...imadhammoud
 
Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...
Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...
Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...Invest Northern Ireland
 
Electrification Infrastructure: Whole Life Cost Reduction Congress 2014
Electrification Infrastructure: Whole Life Cost Reduction Congress 2014Electrification Infrastructure: Whole Life Cost Reduction Congress 2014
Electrification Infrastructure: Whole Life Cost Reduction Congress 2014marketinglbcg
 
innovation in Indian Railways.pptx
innovation in Indian Railways.pptxinnovation in Indian Railways.pptx
innovation in Indian Railways.pptxRajeshBansal62
 
Computaris Services Presentation
Computaris Services PresentationComputaris Services Presentation
Computaris Services PresentationComputaris
 
U-QASAR Project Presentation at IoS Plenary Brussels 2012
U-QASAR Project Presentation at IoS Plenary Brussels 2012U-QASAR Project Presentation at IoS Plenary Brussels 2012
U-QASAR Project Presentation at IoS Plenary Brussels 2012U-QASAR
 
DataArt Financial Services and Capital Markets
DataArt Financial Services and Capital MarketsDataArt Financial Services and Capital Markets
DataArt Financial Services and Capital MarketsDataArt
 
GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...
GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...
GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...mfrancis
 
Resume_DharshanBM
Resume_DharshanBMResume_DharshanBM
Resume_DharshanBMDarshan Bm
 
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...KTN
 
Adeel Technical Project management
Adeel Technical Project managementAdeel Technical Project management
Adeel Technical Project managementEngineer Adeel Ahmad
 

Similar to Acciona: Binding solution risk assesment (20)

A responsive satellite-industry_ka2015_lisi_v02
A responsive satellite-industry_ka2015_lisi_v02A responsive satellite-industry_ka2015_lisi_v02
A responsive satellite-industry_ka2015_lisi_v02
 
OpenMAMA Governance
OpenMAMA GovernanceOpenMAMA Governance
OpenMAMA Governance
 
Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...Jullian Valverde - the promotion and coordination of consortia for the provis...
Jullian Valverde - the promotion and coordination of consortia for the provis...
 
IP PPT.pptx
IP PPT.pptxIP PPT.pptx
IP PPT.pptx
 
CETRI profile_2015_Q4
CETRI profile_2015_Q4CETRI profile_2015_Q4
CETRI profile_2015_Q4
 
Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...
Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...
Horizon2020 - Engagement in EU projects, Professor Roger Woods, Analytics Eng...
 
Electrification Infrastructure: Whole Life Cost Reduction Congress 2014
Electrification Infrastructure: Whole Life Cost Reduction Congress 2014Electrification Infrastructure: Whole Life Cost Reduction Congress 2014
Electrification Infrastructure: Whole Life Cost Reduction Congress 2014
 
The SNAP Project
The SNAP ProjectThe SNAP Project
The SNAP Project
 
innovation in Indian Railways.pptx
innovation in Indian Railways.pptxinnovation in Indian Railways.pptx
innovation in Indian Railways.pptx
 
Computaris Services Presentation
Computaris Services PresentationComputaris Services Presentation
Computaris Services Presentation
 
Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
 
U-QASAR Project Presentation at IoS Plenary Brussels 2012
U-QASAR Project Presentation at IoS Plenary Brussels 2012U-QASAR Project Presentation at IoS Plenary Brussels 2012
U-QASAR Project Presentation at IoS Plenary Brussels 2012
 
Shantanu Resume
Shantanu ResumeShantanu Resume
Shantanu Resume
 
SV_Intro
SV_IntroSV_Intro
SV_Intro
 
DataArt Financial Services and Capital Markets
DataArt Financial Services and Capital MarketsDataArt Financial Services and Capital Markets
DataArt Financial Services and Capital Markets
 
CV_JANA
CV_JANACV_JANA
CV_JANA
 
GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...
GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...
GST – An End-to-end Architecture for Automotive Telematics Services - Peter V...
 
Resume_DharshanBM
Resume_DharshanBMResume_DharshanBM
Resume_DharshanBM
 
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
Network Rail & Innovate UK: Scope of "SBRI Innovation in Automated Tunnel Exa...
 
Adeel Technical Project management
Adeel Technical Project managementAdeel Technical Project management
Adeel Technical Project management
 

More from eurekabuild2

Green bud mobivap_uva
Green bud mobivap_uvaGreen bud mobivap_uva
Green bud mobivap_uvaeurekabuild2
 
Tise research group-upm
Tise research group-upmTise research group-upm
Tise research group-upmeurekabuild2
 
Katharina Lehmeier Eureka Secretariat
Katharina Lehmeier Eureka SecretariatKatharina Lehmeier Eureka Secretariat
Katharina Lehmeier Eureka Secretariateurekabuild2
 
Katharina lehmeier eureka-secretariat_plus
Katharina lehmeier eureka-secretariat_plusKatharina lehmeier eureka-secretariat_plus
Katharina lehmeier eureka-secretariat_pluseurekabuild2
 
Green bud mobivap_uva
Green bud mobivap_uvaGreen bud mobivap_uva
Green bud mobivap_uvaeurekabuild2
 
The green light_partnership-i_ds
The green light_partnership-i_dsThe green light_partnership-i_ds
The green light_partnership-i_dseurekabuild2
 
The green light_partnership-affinity
The green light_partnership-affinityThe green light_partnership-affinity
The green light_partnership-affinityeurekabuild2
 
Optimus advance composite_fibers
Optimus advance composite_fibersOptimus advance composite_fibers
Optimus advance composite_fiberseurekabuild2
 
Geosuite i og_ii_sw
Geosuite i og_ii_swGeosuite i og_ii_sw
Geosuite i og_ii_sweurekabuild2
 
Alonso, Hernandez & Asociados
Alonso, Hernandez & AsociadosAlonso, Hernandez & Asociados
Alonso, Hernandez & Asociadoseurekabuild2
 
Miguel Amerigo_eureka_build2
Miguel Amerigo_eureka_build2Miguel Amerigo_eureka_build2
Miguel Amerigo_eureka_build2eurekabuild2
 
Lidia Hipolito_eureka_build2
Lidia Hipolito_eureka_build2Lidia Hipolito_eureka_build2
Lidia Hipolito_eureka_build2eurekabuild2
 

More from eurekabuild2 (19)

Green bud mobivap_uva
Green bud mobivap_uvaGreen bud mobivap_uva
Green bud mobivap_uva
 
Tise research group-upm
Tise research group-upmTise research group-upm
Tise research group-upm
 
Im tecnics
Im tecnicsIm tecnics
Im tecnics
 
Im tecnics
Im tecnicsIm tecnics
Im tecnics
 
Katharina Lehmeier Eureka Secretariat
Katharina Lehmeier Eureka SecretariatKatharina Lehmeier Eureka Secretariat
Katharina Lehmeier Eureka Secretariat
 
Katharina lehmeier eureka-secretariat_plus
Katharina lehmeier eureka-secretariat_plusKatharina lehmeier eureka-secretariat_plus
Katharina lehmeier eureka-secretariat_plus
 
Green bud mobivap_uva
Green bud mobivap_uvaGreen bud mobivap_uva
Green bud mobivap_uva
 
Im tecnics
Im tecnicsIm tecnics
Im tecnics
 
The green light_partnership-i_ds
The green light_partnership-i_dsThe green light_partnership-i_ds
The green light_partnership-i_ds
 
The green light_partnership-affinity
The green light_partnership-affinityThe green light_partnership-affinity
The green light_partnership-affinity
 
Optimus advance composite_fibers
Optimus advance composite_fibersOptimus advance composite_fibers
Optimus advance composite_fibers
 
Ger maas ectp
Ger maas ectpGer maas ectp
Ger maas ectp
 
Geosuite i og_ii_sw
Geosuite i og_ii_swGeosuite i og_ii_sw
Geosuite i og_ii_sw
 
Flo103 sh floatec
Flo103 sh floatecFlo103 sh floatec
Flo103 sh floatec
 
Cdti
CdtiCdti
Cdti
 
B720 Arquitectos
B720 ArquitectosB720 Arquitectos
B720 Arquitectos
 
Alonso, Hernandez & Asociados
Alonso, Hernandez & AsociadosAlonso, Hernandez & Asociados
Alonso, Hernandez & Asociados
 
Miguel Amerigo_eureka_build2
Miguel Amerigo_eureka_build2Miguel Amerigo_eureka_build2
Miguel Amerigo_eureka_build2
 
Lidia Hipolito_eureka_build2
Lidia Hipolito_eureka_build2Lidia Hipolito_eureka_build2
Lidia Hipolito_eureka_build2
 

Recently uploaded

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 

Recently uploaded (20)

Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 

Acciona: Binding solution risk assesment

  • 1. New binding solution for high speed railways’ ballast consolidation • Concept and main objective: Development of a binding solution for stabilizing and consolidating the ballast of high speed railways with the objective of reducing and preventing the effect known as “ballast projection” • Advantages: - Prevention of ballast projection phenomena in railways - Increased platform service life by preventing the formation of micro-fissures in the ballast - Low maintenance requirements and economical savings associated - Noise and vibration reduction
  • 2. New binding solution for high speed railways’ ballast consolidation Type of partners required: • Countries: any of the Eureka network. • Organization: Large company, SME. • Expertise: related to construction/operation of railway infrastructures or systems for railway applications
  • 3. Risk assessment and decision support system for tunnelling and underground construction works Concept and main objective: Development of an intelligent decision support tool to identify, control and manage the risks associated to tunnelling and underground construction works. This software tool would be used by engineers, technicians as well as decision makers involved in the construction process to evaluate and assess the different impacts of the project during all the project’s stages including its study, deployment and implementation. The use of the tool in the decision making process will result in cost and time savings, too. Innovative aspects of the project: • Improvement of the tenders through a better assessment of the different alternatives, obtaining a more competitive bid in economical and technical terms in tender processes while minimizing risks. • Construction works simulations, evaluating and anticipating the different possible scenarios • Reducing the margin for human errors in specific situations which require quick decisions
  • 4. Risk assessment and decision support system for tunnelling and underground construction works Type of partners required: • Countries: any of the Eureka network. • Organization: Large company, SME. • Expertise: related to tunnelling /underground technologies Contact Details: Name: Asier Sorli, Email: asorli@acciona.es , Phone: +34 94 427 80 88