SlideShare a Scribd company logo
1 of 2
FORM JURNAL INTERNET No. Form : FM-GKM-TI-PJ5-LBer-05-04
Revisi : 00
Tgl. Efektif : 2 Juli 2012
LABORATORIUM ERGONOMI DAN
PERANCANGAN SISTEM KERJA
NO.
JUDUL JURNAL
INTERNET
TAHUN
JURNET
KEL.
PRAKTIKUM
/MODUL
PROGRAM
STUDI
GEL.
1
An Effort to Apply Work and
Time Study Techniques in a
Manufacturing Unit for
Enhancing Productivity
2013 I
Activity
Sampling
Reguler &
Ekstension
I
(2014)
2
Workload Analysis for
Planning Needs of Employees
in the Corporate
Administration unit PT TIMAH
(Persero) TBK
2013 II
Activity
Sampling
Reguler &
Ekstension
I
(2014)
3
Vission-Based Action
Recognition in the Internal
Construction Site using
Interactions between Worker
Actions and Construction
Objects
2013 III
Activity
Sampling
Reguler &
Ekstension
I
(2014)
4
Establishing Time Standards
for Hydraulic Cylinder
Assembly Operations using
MOST
2013 IV
Activity
Sampling
Reguler &
Ekstension
I
(2014)
5
Exploring Reallocation’s
Apparent Weak Contribution to
Growth
2013 V
Activity
Sampling
Reguler &
Ekstension
I
(2014)
6
Produktifitas Tenaga Kerja
Berdasarkan Faktor Demografi
di Perusahaan Manufaktur
2013 VI
Activity
Sampling
Reguler &
Ekstension
I
(2014)
7
Dampak Penurunan Ekspor
Terhadap Penyerapan Tenaga
Kerja
2013 VII
Activity
Sampling
Reguler &
Ekstension
I
(2014)
8
Analisis Beban Kerja Sumber
Daya Manusia dalam Aktivitas
Produksi Komoditi Sayuran
Selada (Studi Kasus: CV Spirit
Wira Utama)
2013 VIII
Activity
Sampling
Reguler &
Ekstension
I
(2014)
9
Usulan Perhitungan Insentif
Karyawan CV. Miracle
Berdasarkan Jumlah Produksi
2013 IX
Activity
Sampling
Reguler &
Ekstension
I
(2014)
FORM JURNAL INTERNET No. Form : FM-GKM-TI-PJ5-LBer-05-04
Revisi : 00
Tgl. Efektif : 2 Juli 2012
LABORATORIUM ERGONOMI DAN
PERANCANGAN SISTEM KERJA
NO.
JUDUL JURNAL
INTERNET
TAHUN
JURNET
KEL.
PRAKTIKUM
/MODUL
PROGRAM
STUDI
GEL.
10
Working Conditions and
Employees’ Productivity in
Manufacturing Companies in
Sub-Saharan African Context:
Case of Somalia
2013 X
Activity
Sampling
Reguler &
Ekstension
I
(2014)

More Related Content

Viewers also liked

Jurnet Postur Kerja Gelombang 1 2014
Jurnet Postur Kerja Gelombang 1 2014Jurnet Postur Kerja Gelombang 1 2014
Jurnet Postur Kerja Gelombang 1 2014LAB ERGONOMI-TI-USU
 
Jurnet Anthropometri Gelombang 2 2014
Jurnet Anthropometri Gelombang 2 2014Jurnet Anthropometri Gelombang 2 2014
Jurnet Anthropometri Gelombang 2 2014LAB ERGONOMI-TI-USU
 
Jurnet Biomekanika Gelombang 3 2014
Jurnet Biomekanika Gelombang 3 2014Jurnet Biomekanika Gelombang 3 2014
Jurnet Biomekanika Gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jurnet Activity Sampling Gelombang 4 2014
Jurnet Activity Sampling Gelombang 4 2014Jurnet Activity Sampling Gelombang 4 2014
Jurnet Activity Sampling Gelombang 4 2014LAB ERGONOMI-TI-USU
 
Jurnet Lingkungan Kerja Gelombang 4 2014
Jurnet Lingkungan Kerja Gelombang 4 2014Jurnet Lingkungan Kerja Gelombang 4 2014
Jurnet Lingkungan Kerja Gelombang 4 2014LAB ERGONOMI-TI-USU
 
Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jurnet Antropometri Gelombang 4 2014
Jurnet Antropometri Gelombang 4 2014Jurnet Antropometri Gelombang 4 2014
Jurnet Antropometri Gelombang 4 2014LAB ERGONOMI-TI-USU
 
Jurnet Peta Kerja Gelombang 4 2014
Jurnet Peta Kerja Gelombang 4 2014Jurnet Peta Kerja Gelombang 4 2014
Jurnet Peta Kerja Gelombang 4 2014LAB ERGONOMI-TI-USU
 
Jurnet Biomekanika Gelombang 1 2014
Jurnet Biomekanika Gelombang 1 2014Jurnet Biomekanika Gelombang 1 2014
Jurnet Biomekanika Gelombang 1 2014LAB ERGONOMI-TI-USU
 
Jurnet Activity Sampling Gelombang 3 2014
Jurnet Activity Sampling Gelombang 3 2014Jurnet Activity Sampling Gelombang 3 2014
Jurnet Activity Sampling Gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jurnet Postur Kerja Gelombang 2 2014
Jurnet Postur Kerja Gelombang 2 2014Jurnet Postur Kerja Gelombang 2 2014
Jurnet Postur Kerja Gelombang 2 2014LAB ERGONOMI-TI-USU
 
Jurnet Peta Kerja Gelombang 2 2014
Jurnet Peta Kerja Gelombang 2 2014Jurnet Peta Kerja Gelombang 2 2014
Jurnet Peta Kerja Gelombang 2 2014LAB ERGONOMI-TI-USU
 
Jurnet Fisiologi Gelombang 1 2014
Jurnet Fisiologi Gelombang 1 2014Jurnet Fisiologi Gelombang 1 2014
Jurnet Fisiologi Gelombang 1 2014LAB ERGONOMI-TI-USU
 
Jurnet Antropometri Gelombang 3 2014
Jurnet Antropometri Gelombang 3 2014Jurnet Antropometri Gelombang 3 2014
Jurnet Antropometri Gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jurnet Fisiologi Gelombang 2 2014
Jurnet Fisiologi Gelombang 2 2014Jurnet Fisiologi Gelombang 2 2014
Jurnet Fisiologi Gelombang 2 2014LAB ERGONOMI-TI-USU
 
Jurnet Fisiologi Gelombang 4 2014
Jurnet Fisiologi Gelombang 4 2014Jurnet Fisiologi Gelombang 4 2014
Jurnet Fisiologi Gelombang 4 2014LAB ERGONOMI-TI-USU
 
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2LAB ERGONOMI-TI-USU
 
Jurnet Anthropometri Gelombang 1 2014
Jurnet Anthropometri Gelombang 1 2014Jurnet Anthropometri Gelombang 1 2014
Jurnet Anthropometri Gelombang 1 2014LAB ERGONOMI-TI-USU
 
Jurnet Fisiologi Gelombang 3 2014
Jurnet Fisiologi Gelombang 3 2014Jurnet Fisiologi Gelombang 3 2014
Jurnet Fisiologi Gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jurnet Biomekanika Gelombang 4 2014
Jurnet Biomekanika Gelombang 4 2014Jurnet Biomekanika Gelombang 4 2014
Jurnet Biomekanika Gelombang 4 2014LAB ERGONOMI-TI-USU
 

Viewers also liked (20)

Jurnet Postur Kerja Gelombang 1 2014
Jurnet Postur Kerja Gelombang 1 2014Jurnet Postur Kerja Gelombang 1 2014
Jurnet Postur Kerja Gelombang 1 2014
 
Jurnet Anthropometri Gelombang 2 2014
Jurnet Anthropometri Gelombang 2 2014Jurnet Anthropometri Gelombang 2 2014
Jurnet Anthropometri Gelombang 2 2014
 
Jurnet Biomekanika Gelombang 3 2014
Jurnet Biomekanika Gelombang 3 2014Jurnet Biomekanika Gelombang 3 2014
Jurnet Biomekanika Gelombang 3 2014
 
Jurnet Activity Sampling Gelombang 4 2014
Jurnet Activity Sampling Gelombang 4 2014Jurnet Activity Sampling Gelombang 4 2014
Jurnet Activity Sampling Gelombang 4 2014
 
Jurnet Lingkungan Kerja Gelombang 4 2014
Jurnet Lingkungan Kerja Gelombang 4 2014Jurnet Lingkungan Kerja Gelombang 4 2014
Jurnet Lingkungan Kerja Gelombang 4 2014
 
Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014Jurnet Lingkungan Kerja Gelombang 3 2014
Jurnet Lingkungan Kerja Gelombang 3 2014
 
Jurnet Antropometri Gelombang 4 2014
Jurnet Antropometri Gelombang 4 2014Jurnet Antropometri Gelombang 4 2014
Jurnet Antropometri Gelombang 4 2014
 
Jurnet Peta Kerja Gelombang 4 2014
Jurnet Peta Kerja Gelombang 4 2014Jurnet Peta Kerja Gelombang 4 2014
Jurnet Peta Kerja Gelombang 4 2014
 
Jurnet Biomekanika Gelombang 1 2014
Jurnet Biomekanika Gelombang 1 2014Jurnet Biomekanika Gelombang 1 2014
Jurnet Biomekanika Gelombang 1 2014
 
Jurnet Activity Sampling Gelombang 3 2014
Jurnet Activity Sampling Gelombang 3 2014Jurnet Activity Sampling Gelombang 3 2014
Jurnet Activity Sampling Gelombang 3 2014
 
Jurnet Postur Kerja Gelombang 2 2014
Jurnet Postur Kerja Gelombang 2 2014Jurnet Postur Kerja Gelombang 2 2014
Jurnet Postur Kerja Gelombang 2 2014
 
Jurnet Peta Kerja Gelombang 2 2014
Jurnet Peta Kerja Gelombang 2 2014Jurnet Peta Kerja Gelombang 2 2014
Jurnet Peta Kerja Gelombang 2 2014
 
Jurnet Fisiologi Gelombang 1 2014
Jurnet Fisiologi Gelombang 1 2014Jurnet Fisiologi Gelombang 1 2014
Jurnet Fisiologi Gelombang 1 2014
 
Jurnet Antropometri Gelombang 3 2014
Jurnet Antropometri Gelombang 3 2014Jurnet Antropometri Gelombang 3 2014
Jurnet Antropometri Gelombang 3 2014
 
Jurnet Fisiologi Gelombang 2 2014
Jurnet Fisiologi Gelombang 2 2014Jurnet Fisiologi Gelombang 2 2014
Jurnet Fisiologi Gelombang 2 2014
 
Jurnet Fisiologi Gelombang 4 2014
Jurnet Fisiologi Gelombang 4 2014Jurnet Fisiologi Gelombang 4 2014
Jurnet Fisiologi Gelombang 4 2014
 
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
Jadwal Laboratorium Egonomi & Perancangan Sistem Kerja 2015 Gelombang 1 dan 2
 
Jurnet Anthropometri Gelombang 1 2014
Jurnet Anthropometri Gelombang 1 2014Jurnet Anthropometri Gelombang 1 2014
Jurnet Anthropometri Gelombang 1 2014
 
Jurnet Fisiologi Gelombang 3 2014
Jurnet Fisiologi Gelombang 3 2014Jurnet Fisiologi Gelombang 3 2014
Jurnet Fisiologi Gelombang 3 2014
 
Jurnet Biomekanika Gelombang 4 2014
Jurnet Biomekanika Gelombang 4 2014Jurnet Biomekanika Gelombang 4 2014
Jurnet Biomekanika Gelombang 4 2014
 

Similar to Jurnet Activity Sampling Gelombang 1 2014

Jurnet Peta Kerja Gelombang 1 2014
Jurnet Peta Kerja Gelombang 1 2014Jurnet Peta Kerja Gelombang 1 2014
Jurnet Peta Kerja Gelombang 1 2014LAB ERGONOMI-TI-USU
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...IRJET Journal
 
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...IRJET Journal
 
Operation Management
Operation ManagementOperation Management
Operation ManagementPrabu U
 
Determination of flexibility of workers working time through Taguchi method a...
Determination of flexibility of workers working time through Taguchi method a...Determination of flexibility of workers working time through Taguchi method a...
Determination of flexibility of workers working time through Taguchi method a...TELKOMNIKA JOURNAL
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL JOSHI
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET Journal
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case studyomkar jagtap
 
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...IJERA Editor
 
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET Journal
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 

Similar to Jurnet Activity Sampling Gelombang 1 2014 (20)

Jurnet Peta Kerja Gelombang 1 2014
Jurnet Peta Kerja Gelombang 1 2014Jurnet Peta Kerja Gelombang 1 2014
Jurnet Peta Kerja Gelombang 1 2014
 
A9 r30d0
A9 r30d0A9 r30d0
A9 r30d0
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
Ffeb69332c5a484
Ffeb69332c5a484Ffeb69332c5a484
Ffeb69332c5a484
 
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
Critical Study, Analysis and Suggestion for Labor Productivity Improvement in...
 
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...Improvement of supply chain process using Maynard Operation Sequence Techniqu...
Improvement of supply chain process using Maynard Operation Sequence Techniqu...
 
Operation Management
Operation ManagementOperation Management
Operation Management
 
Use of network scheduling technique
Use of network scheduling technique Use of network scheduling technique
Use of network scheduling technique
 
Determination of flexibility of workers working time through Taguchi method a...
Determination of flexibility of workers working time through Taguchi method a...Determination of flexibility of workers working time through Taguchi method a...
Determination of flexibility of workers working time through Taguchi method a...
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
ACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_ProfileACHAL_JOSHI_Academic_Profile
ACHAL_JOSHI_Academic_Profile
 
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
IRJET- Application of Time Divisions Scheduling Techniques for Duration and Q...
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
 
Joined document 24_5
Joined document 24_5Joined document 24_5
Joined document 24_5
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case study
 
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
 
IRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall ProductivityIRJET- Project on Time Study to Increase the Overall Productivity
IRJET- Project on Time Study to Increase the Overall Productivity
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 

More from LAB ERGONOMI-TI-USU

Dimensi anthropometridiametergenggaman.docx
Dimensi anthropometridiametergenggaman.docxDimensi anthropometridiametergenggaman.docx
Dimensi anthropometridiametergenggaman.docxLAB ERGONOMI-TI-USU
 
Dimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) TerbaruDimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) TerbaruLAB ERGONOMI-TI-USU
 
Jurnet Postur Kerja Gelombang 3 2014
Jurnet Postur Kerja Gelombang 3 2014Jurnet Postur Kerja Gelombang 3 2014
Jurnet Postur Kerja Gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jurnet Postur Kerja Gelombang 4 2014
Jurnet Postur Kerja Gelombang 4 2014Jurnet Postur Kerja Gelombang 4 2014
Jurnet Postur Kerja Gelombang 4 2014LAB ERGONOMI-TI-USU
 
Jurnet peta kerja gelombang 3 2014
Jurnet peta kerja gelombang 3 2014Jurnet peta kerja gelombang 3 2014
Jurnet peta kerja gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jurnet peta kerja gelombang 4 2014
Jurnet peta kerja gelombang 4 2014Jurnet peta kerja gelombang 4 2014
Jurnet peta kerja gelombang 4 2014LAB ERGONOMI-TI-USU
 
Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014LAB ERGONOMI-TI-USU
 
Jadwal Praktikum Gelombang 1 dan 2 2015
Jadwal Praktikum Gelombang 1 dan 2 2015Jadwal Praktikum Gelombang 1 dan 2 2015
Jadwal Praktikum Gelombang 1 dan 2 2015LAB ERGONOMI-TI-USU
 
Jurnal Internet Gelombang III dan IV 2014
Jurnal Internet Gelombang III dan IV 2014Jurnal Internet Gelombang III dan IV 2014
Jurnal Internet Gelombang III dan IV 2014LAB ERGONOMI-TI-USU
 

More from LAB ERGONOMI-TI-USU (10)

Dimensi anthropometridiametergenggaman.docx
Dimensi anthropometridiametergenggaman.docxDimensi anthropometridiametergenggaman.docx
Dimensi anthropometridiametergenggaman.docx
 
Dimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) TerbaruDimensi Anthropometri Diameter Genggaman (DG) Terbaru
Dimensi Anthropometri Diameter Genggaman (DG) Terbaru
 
Jurnet Postur Kerja Gelombang 3 2014
Jurnet Postur Kerja Gelombang 3 2014Jurnet Postur Kerja Gelombang 3 2014
Jurnet Postur Kerja Gelombang 3 2014
 
Jurnet Postur Kerja Gelombang 4 2014
Jurnet Postur Kerja Gelombang 4 2014Jurnet Postur Kerja Gelombang 4 2014
Jurnet Postur Kerja Gelombang 4 2014
 
Jurnet peta kerja gelombang 3 2014
Jurnet peta kerja gelombang 3 2014Jurnet peta kerja gelombang 3 2014
Jurnet peta kerja gelombang 3 2014
 
Jurnet peta kerja gelombang 4 2014
Jurnet peta kerja gelombang 4 2014Jurnet peta kerja gelombang 4 2014
Jurnet peta kerja gelombang 4 2014
 
Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014Jurnet lingkungan kerja gelombang 3 2014
Jurnet lingkungan kerja gelombang 3 2014
 
Daftar ukm
Daftar ukmDaftar ukm
Daftar ukm
 
Jadwal Praktikum Gelombang 1 dan 2 2015
Jadwal Praktikum Gelombang 1 dan 2 2015Jadwal Praktikum Gelombang 1 dan 2 2015
Jadwal Praktikum Gelombang 1 dan 2 2015
 
Jurnal Internet Gelombang III dan IV 2014
Jurnal Internet Gelombang III dan IV 2014Jurnal Internet Gelombang III dan IV 2014
Jurnal Internet Gelombang III dan IV 2014
 

Recently uploaded

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 

Recently uploaded (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 

Jurnet Activity Sampling Gelombang 1 2014

  • 1. FORM JURNAL INTERNET No. Form : FM-GKM-TI-PJ5-LBer-05-04 Revisi : 00 Tgl. Efektif : 2 Juli 2012 LABORATORIUM ERGONOMI DAN PERANCANGAN SISTEM KERJA NO. JUDUL JURNAL INTERNET TAHUN JURNET KEL. PRAKTIKUM /MODUL PROGRAM STUDI GEL. 1 An Effort to Apply Work and Time Study Techniques in a Manufacturing Unit for Enhancing Productivity 2013 I Activity Sampling Reguler & Ekstension I (2014) 2 Workload Analysis for Planning Needs of Employees in the Corporate Administration unit PT TIMAH (Persero) TBK 2013 II Activity Sampling Reguler & Ekstension I (2014) 3 Vission-Based Action Recognition in the Internal Construction Site using Interactions between Worker Actions and Construction Objects 2013 III Activity Sampling Reguler & Ekstension I (2014) 4 Establishing Time Standards for Hydraulic Cylinder Assembly Operations using MOST 2013 IV Activity Sampling Reguler & Ekstension I (2014) 5 Exploring Reallocation’s Apparent Weak Contribution to Growth 2013 V Activity Sampling Reguler & Ekstension I (2014) 6 Produktifitas Tenaga Kerja Berdasarkan Faktor Demografi di Perusahaan Manufaktur 2013 VI Activity Sampling Reguler & Ekstension I (2014) 7 Dampak Penurunan Ekspor Terhadap Penyerapan Tenaga Kerja 2013 VII Activity Sampling Reguler & Ekstension I (2014) 8 Analisis Beban Kerja Sumber Daya Manusia dalam Aktivitas Produksi Komoditi Sayuran Selada (Studi Kasus: CV Spirit Wira Utama) 2013 VIII Activity Sampling Reguler & Ekstension I (2014) 9 Usulan Perhitungan Insentif Karyawan CV. Miracle Berdasarkan Jumlah Produksi 2013 IX Activity Sampling Reguler & Ekstension I (2014)
  • 2. FORM JURNAL INTERNET No. Form : FM-GKM-TI-PJ5-LBer-05-04 Revisi : 00 Tgl. Efektif : 2 Juli 2012 LABORATORIUM ERGONOMI DAN PERANCANGAN SISTEM KERJA NO. JUDUL JURNAL INTERNET TAHUN JURNET KEL. PRAKTIKUM /MODUL PROGRAM STUDI GEL. 10 Working Conditions and Employees’ Productivity in Manufacturing Companies in Sub-Saharan African Context: Case of Somalia 2013 X Activity Sampling Reguler & Ekstension I (2014)