Strategic Plan
Mission
Provide all aspects of general networking support - design, acquisition, installation, operation,
monitoring, maintenance, and documentation of cabling plant, device infrastructure, and network
services necessary to support the Laboratory's onsite and wide-area network needs.
Componentsof StrategicPlan
The scope of network support at the Laboratory is sufficiently broad that this strategic plan is
broken out into three distinct components:
 Core network infrastructure and operations – {self explanatory}
 Wide-area network infrastructure, operations, and collaboration – {self explanatory}
 Contextand Assessmentof CurrentState
Vision
Stakeholders
The list of stakeholders in the facility network planning and support includes everyone that works
on or collaborates with.
Strategies
The strategies for networking are based on a set of high level, architectural principles.
These principles define a core philosophy that helps ensure decisions on the design,
implementation, and upgrade of the Laboratory network are made consistent with a
common, long term strategic direction. They provide the basis for all levels of networking
decisions within the organization, from the design of major projects to the implementation
of small project tasks. The strategies are applicable to all three network components in this
plan, as appropriate.
StrategicGoalsand Objectives
Strategic goals are practical manifestations of our general network strategies. They usually
encompass a multi-year scope. Strategic objectives are tangible targets for efforts or activity
areas that are intended to be the means of achieving strategic goals. They may be specific
enough to be applicable to only one network area of activity, or may be applicable across
multiple areas. There are normally timeframes associated with strategic objectives.
 Wide-area network services:
 Core Networking:
 Network in support of high impact scientific computing:
ResourceNeeds
ProgressIndicators
The level of progress in attaining strategic objectives for this plan will be determined
through a combination of three factors:
1. Comparison between the timeline expectations for strategic objectives listed in this plan, and
what is actually achieved in the tactical plans covering those time frames. This comparison is
not intended to be absolute. It is expected that there will be some time shifting in
implementation of identified objectives, given the dependencies on technological evolution,
personnel resources, and changing requirements. Rather, the progress is better gauged by how
closely implementation compares to the general trend outlined for the objective.
2. Measurement and observation how on the capacity and capabilities of the network
infrastructure, be it wide-area, local-area, or high impact scientific computing, compare to the
utilization and performance at any particular time. Insufficient capacity or capabilities to
meet current requirements is a potential indicator that progress needs to be greater.
3. Feedback from stakeholders. In the end, the network needs to satisfy the needs of the
stakeholders, and they should be the ones to determine how well their needs are being met.

More Related Content

Similar to Strategic Plan Template 01.doc

ROC Asset Assurance - Brochure
ROC Asset Assurance - BrochureROC Asset Assurance - Brochure
ROC Asset Assurance - Brochure
Ashkan Mirzaei
 
1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf
1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf
1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf
ssuserd6ce341
 
Recommendation re proactive approach
Recommendation re proactive approachRecommendation re proactive approach
Recommendation re proactive approach
Honolulu Civil Beat
 
Co c dc-best practices
Co c dc-best practicesCo c dc-best practices
Co c dc-best practices
avdsouza
 

Similar to Strategic Plan Template 01.doc (20)

Using Demand Side Management to Support Electricity Grids
Using Demand Side Management to Support Electricity GridsUsing Demand Side Management to Support Electricity Grids
Using Demand Side Management to Support Electricity Grids
 
Using Demand-Side Management to Support Electricity Grids
Using Demand-Side Management to Support Electricity GridsUsing Demand-Side Management to Support Electricity Grids
Using Demand-Side Management to Support Electricity Grids
 
Network barometer report 2014
Network barometer report 2014Network barometer report 2014
Network barometer report 2014
 
Day 1 - 3PM Revision
Day 1 - 3PM RevisionDay 1 - 3PM Revision
Day 1 - 3PM Revision
 
ROC Asset Assurance - Brochure
ROC Asset Assurance - BrochureROC Asset Assurance - Brochure
ROC Asset Assurance - Brochure
 
Support for Goal Oriented Requirements Engineering in Elastic Cloud Applications
Support for Goal Oriented Requirements Engineering in Elastic Cloud ApplicationsSupport for Goal Oriented Requirements Engineering in Elastic Cloud Applications
Support for Goal Oriented Requirements Engineering in Elastic Cloud Applications
 
Forecasting Capacity Issues in Stateful Systems: A Proactive Approach
Forecasting Capacity Issues in Stateful Systems: A Proactive ApproachForecasting Capacity Issues in Stateful Systems: A Proactive Approach
Forecasting Capacity Issues in Stateful Systems: A Proactive Approach
 
IntenGrid WP8 dissemination brochure 20 May 2020
IntenGrid WP8 dissemination brochure 20 May 2020IntenGrid WP8 dissemination brochure 20 May 2020
IntenGrid WP8 dissemination brochure 20 May 2020
 
1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf
1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf
1)The Steps for Data to ImplimentationPlanning for ChangeChange.pdf
 
Recommendation re proactive approach
Recommendation re proactive approachRecommendation re proactive approach
Recommendation re proactive approach
 
43194352-Feasibility-study.ppt
43194352-Feasibility-study.ppt43194352-Feasibility-study.ppt
43194352-Feasibility-study.ppt
 
UtiliGRIDMOD - Utility Grid Modernization - Indigo Advisory Group
UtiliGRIDMOD - Utility Grid Modernization - Indigo Advisory Group UtiliGRIDMOD - Utility Grid Modernization - Indigo Advisory Group
UtiliGRIDMOD - Utility Grid Modernization - Indigo Advisory Group
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Project Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP WorkgroupProject Schedule Management - Sequence Activities - PMP Workgroup
Project Schedule Management - Sequence Activities - PMP Workgroup
 
AUTOMATED POLICY COMPLIANCE AND CHANGE DETECTION MANAGED SERVICE IN DATA NETW...
AUTOMATED POLICY COMPLIANCE AND CHANGE DETECTION MANAGED SERVICE IN DATA NETW...AUTOMATED POLICY COMPLIANCE AND CHANGE DETECTION MANAGED SERVICE IN DATA NETW...
AUTOMATED POLICY COMPLIANCE AND CHANGE DETECTION MANAGED SERVICE IN DATA NETW...
 
16 & 2 marks in i unit for PG PAWSN
16 & 2 marks in i unit for PG PAWSN16 & 2 marks in i unit for PG PAWSN
16 & 2 marks in i unit for PG PAWSN
 
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
 
Co c dc-best practices
Co c dc-best practicesCo c dc-best practices
Co c dc-best practices
 
Automated policy compliance and
Automated policy compliance andAutomated policy compliance and
Automated policy compliance and
 
Automated policy compliance and
Automated policy compliance andAutomated policy compliance and
Automated policy compliance and
 

Recently uploaded

Recently uploaded (14)

Databricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdfDatabricks Machine Learning Associate Exam Dumps 2024.pdf
Databricks Machine Learning Associate Exam Dumps 2024.pdf
 
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
Abortion Pills Fahaheel ௹+918133066128💬@ Safe and Effective Mifepristion and ...
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
Using AI to boost productivity for developers
Using AI to boost productivity for developersUsing AI to boost productivity for developers
Using AI to boost productivity for developers
 
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptxTSM unit 5 Toxicokinetics seminar by  Ansari Aashif Raza.pptx
TSM unit 5 Toxicokinetics seminar by Ansari Aashif Raza.pptx
 
The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...The Concession of Asaba International Airport: Balancing Politics and Policy ...
The Concession of Asaba International Airport: Balancing Politics and Policy ...
 
"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR"I hear you": Moving beyond empathy in UXR
"I hear you": Moving beyond empathy in UXR
 
2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptx2024-05-15-Surat Meetup-Hyperautomation.pptx
2024-05-15-Surat Meetup-Hyperautomation.pptx
 
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINESBIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
BIG DEVELOPMENTS IN LESOTHO(DAMS & MINES
 
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdfMicrosoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
Microsoft Fabric Analytics Engineer (DP-600) Exam Dumps 2024.pdf
 
2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf2024 mega trends for the digital workplace - FINAL.pdf
2024 mega trends for the digital workplace - FINAL.pdf
 
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
STM valmiusseminaari 26-04-2024 PUUMALAINEN Ajankohtaista kansainvälisestä yh...
 
Modernizing The Transport System:Dhaka Metro Rail
Modernizing The Transport System:Dhaka Metro RailModernizing The Transport System:Dhaka Metro Rail
Modernizing The Transport System:Dhaka Metro Rail
 
SaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of GuruSaaStr Workshop Wednesday with CEO of Guru
SaaStr Workshop Wednesday with CEO of Guru
 

Strategic Plan Template 01.doc

  • 1. Strategic Plan Mission Provide all aspects of general networking support - design, acquisition, installation, operation, monitoring, maintenance, and documentation of cabling plant, device infrastructure, and network services necessary to support the Laboratory's onsite and wide-area network needs. Componentsof StrategicPlan The scope of network support at the Laboratory is sufficiently broad that this strategic plan is broken out into three distinct components:  Core network infrastructure and operations – {self explanatory}  Wide-area network infrastructure, operations, and collaboration – {self explanatory}  Contextand Assessmentof CurrentState Vision Stakeholders The list of stakeholders in the facility network planning and support includes everyone that works on or collaborates with. Strategies The strategies for networking are based on a set of high level, architectural principles. These principles define a core philosophy that helps ensure decisions on the design, implementation, and upgrade of the Laboratory network are made consistent with a common, long term strategic direction. They provide the basis for all levels of networking decisions within the organization, from the design of major projects to the implementation of small project tasks. The strategies are applicable to all three network components in this plan, as appropriate. StrategicGoalsand Objectives
  • 2. Strategic goals are practical manifestations of our general network strategies. They usually encompass a multi-year scope. Strategic objectives are tangible targets for efforts or activity areas that are intended to be the means of achieving strategic goals. They may be specific enough to be applicable to only one network area of activity, or may be applicable across multiple areas. There are normally timeframes associated with strategic objectives.  Wide-area network services:  Core Networking:  Network in support of high impact scientific computing: ResourceNeeds ProgressIndicators The level of progress in attaining strategic objectives for this plan will be determined through a combination of three factors: 1. Comparison between the timeline expectations for strategic objectives listed in this plan, and what is actually achieved in the tactical plans covering those time frames. This comparison is not intended to be absolute. It is expected that there will be some time shifting in implementation of identified objectives, given the dependencies on technological evolution, personnel resources, and changing requirements. Rather, the progress is better gauged by how closely implementation compares to the general trend outlined for the objective. 2. Measurement and observation how on the capacity and capabilities of the network infrastructure, be it wide-area, local-area, or high impact scientific computing, compare to the utilization and performance at any particular time. Insufficient capacity or capabilities to meet current requirements is a potential indicator that progress needs to be greater. 3. Feedback from stakeholders. In the end, the network needs to satisfy the needs of the stakeholders, and they should be the ones to determine how well their needs are being met.