Group work 2 coordination mechanism

393 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
393
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Group work 2 coordination mechanism

  1. 1. Existence of the coordination mechanism Government : CDRC, DDRC I/NGO : Dpnet, AIN, DIPECHO UN System : IASC Cluster Approach Interface : National Platform (under consideration)
  2. 2. Government: CDRC, DDRC <ul><li>Relief fund increase </li></ul><ul><li>Drafted Strategy, Policy, Acts </li></ul><ul><ul><li>CDRC under the process of restructuring </li></ul></ul><ul><ul><li>Main streaming </li></ul></ul><ul><ul><li>Focal desk establishment in concerned ministries </li></ul></ul><ul><ul><li>Inclusion in national plan (3-year Interim) </li></ul></ul><ul><li>Standardization of Relief Packages and Response procedure </li></ul><ul><li>Stocking of emergence materials in concerned ministries and departments </li></ul><ul><li>Sporadic community awareness activities </li></ul>
  3. 3. I/NGO: Dpnet, AIN, DIPECHO <ul><li>Community Awareness activities </li></ul><ul><li>Formation of task groups </li></ul><ul><li>Facilitation to link between govt. and Ngo </li></ul><ul><li>Capacity building –Organizational, Community, </li></ul><ul><li>Mainstreaming with development activities </li></ul>
  4. 4. UN System; IASC Cluster Approach <ul><li>Advocacy, Coordination </li></ul><ul><li>Information sharing </li></ul><ul><li>IASC Cluster Contingency Plans </li></ul><ul><li>Policy level Capacity building </li></ul>
  5. 5. Challenges : <ul><li>Linking inter agency activities </li></ul><ul><li>Information Management </li></ul><ul><ul><li>Organizational Specific Assessment system </li></ul></ul><ul><ul><li>Reluctance to share information </li></ul></ul><ul><ul><li>Consolidation and verification of information </li></ul></ul><ul><li>Response centered coordination </li></ul><ul><li>Incorporation of Indigenous Knowledge </li></ul><ul><li>Inclusion of Gender, OVC and minorities </li></ul><ul><li>Inventories of Stockpiling System and physical facilities </li></ul><ul><li>Frequent Change of Dedicated Staff </li></ul><ul><li>Transparency and accountability of PM Relief fund </li></ul><ul><li>Political manipulation </li></ul><ul><li>Absence of elected local body </li></ul>

×