2. 1. Summary of Experience & Accomplishments
2. Completed Simulation Projects (a partial list)
◦ Results and model screen shots from several
completed modeling projects
3. Contact Information
3. David Tucker is a Lean Six Sigma (L6S) Master Black Belt for Logistics, Materials,
& Supply Chain at United Space Alliance (USA), located at the Kennedy Space
Center in Florida. USA is the prime contractor to NASA responsible for the
Space Shuttle.
Dave has over 20 years experience leading teams, mentoring employees,
solving problems, conducting training, and improving operations. He has led
more than forty Kaizen Events, completed nearly two dozen process simulation
modeling projects, conducted dozens of training sessions, facilitated over a
hundred Belts & Team Leaders, and assisted with the implementation of
numerous process improvements saving millions of dollars.
Dave has an extensive background in numerous process improvement tools
utilized in Lean Six Sigma DMAIC & DMEDI approaches, as well as Kaizen team
methods and process simulation modeling. He has over 9 years experience
using ProModel process simulation modeling tools for process improvement.
In addition, he is a sought after speaker and has made many well-received
presentations at Process Improvement, Simulation, and Aerospace Conferences.
He has a BSBA in Management from the University of Central Florida. Dave is a
Certified Lean Six Sigma Black Belt and a Certified Master Black Belt.
4. 1. Avionics Mix Room
◦ Found best of 3 room layout options with different
equipment; justified new equipment expenditure
2. Tile Production
◦ Identified ways to speed up tile manufacturing by 40%;
optimized resources & equipment
3. Booster Stacking in Vehicle Assembly Building (VAB)
◦ Provided predictive tool to find best & fastest of three
methods to stack boosters when starting on a certain date
4. Thermoform Cover Production
◦ Explored shop move from VAB; determined production
capacity; found process improvement opportunities
5. Document Scan Team
◦ Provided equipment & labor resource needs to scan 24
million pages of documentation under various scenarios
5. 6. L6S Tile Removal & Replacement
◦ Predicted impact of solutions to reduce cycle time by 35%
and scrap & rework by 50%
7. L6S Flight Crew Equipment Discrepancy Reports
◦ Determined impact of process changes in various solution
scenarios to reduce cycle time by 40%
8. L6S Requisition Approval Team
◦ Provided data to help determine impact of various process
changes to reduce cycle time by 30% and improve efficiency
9. Orbiter Thrusters Supply Chain
◦ Modeled remaining space shuttle flights to predict thruster
spare asset shortages & showed potential impacts on the
NASA Flight Manifest
10. Space Exploration Concepts
◦ Created Lunar exploration concept models with output data
& analysis on process cycle times, mission sequencing
impacts, inventory requirements, and reliability impacts
6. Identified ways to speed up tile manufacturing by
40%; optimized resources & equipment; determined
production capacity
7. Determined impact of process changes in various
solution scenarios to reduce cycle time by 40%
8. Modeled remaining shuttle flights to predict
thruster spare asset shortages & showed potential
impacts on the NASA Flight Manifest
9. Created Lunar exploration concept models with output
data & analysis on process cycle times, mission impacts,
inventory requirements, and reliability impacts