SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
SUJINLAL.A
photograph
From,
SUJINLAL.A
Sr.Surveyor
EKK Infrastructure
Perumbavoor
Kerala
To,
Subject: - Application for the post of a Sr.Surveyor
RespectedSir,
I introduce myself as a qualified Surveyor looking for a suitable job in your esteemedorganization.
In this connection, I am enclosing my detailed resume to assess my competence of suitability for above
said post.
Looking forward to hear from you in the matter, for a detailed interaction.
Thanking you.
Yours truly,
(SUJINLAL.A)
PERSONAL DETAILS
NAME : Sujinlal.A
DATE OF BIRTH : 15TH May 1978
NATIONALITY : Indian
CAST : Hindu
EDUCATION : 1, ITI Surveyor (NCVT)
2, Civil Engineering Diploma (AITES)
3, Electronics Engineering s-term (IHRD)
4, Data Entry and software operation (LBS)
5, Electrical Engineering (KGTE)
PERMANENT ADDRESS : Sujinlal.A
Aiswarya (ho)
Meppayil (po)
Vatakara (via)
Kozhikode (DT)
Kerala-673104
Ph. No. : 09447425313(Kerala), 08111990616(Kerala)
E.mail : omegasujin@gmail.com
PASPORT NO : N1161608
-----------------------------------------------------------------------
--
KEY QUALIFICATION : Have 15+ years’ experience in total planning and
execution of plan metric control traversing,
precision leveling & Global co-ordinate computation
at various platforms with diverse instrumental
expertise with state of art Survey instruments like
Total Station- Leica, Sokkia and experience in
Utilizing total station for setting out co-Ordinate,
building phase and topography, cross section,
engineering survey for road and highways bridges
and structures, power transmission line etc.
Maintaining and servicing all types of electronic
equipment’s.
EMPLOYMENT RECORDS
 FROM:-February2016 TO:-TillThisDate
EMPLOYER : M/s EKK Infrastructure Pvt Ltd
Perumbavoor,Kerala
POSITION HELD : Sr: Surveyor Engineer (Survey Head)
PROJECT OFFICE : Cochin International Airport
PROJECT : 1) Construction of Aircraft Parking Bays, Taxi links
and
Associated Airfield Ground Lights system
CLIENT : Cochin International Airport Ltd (CIAL)
`----------------------------------------------------------------------
---
 FROM:- July2013 TO:-December 2015
EMPLOYER : M/s ESSAR Projects India Ltd
Mumbai
POSITION HELD : Sr: Surveyor(Project HOD Land Survey)
PROJECT OFFICE : EPIL, Mattannur, Kannur
PROJECT : 1) Up gradation of Road from Thalasseri (Km 1+200 to
Valavupara (Km 55+200) 54 Km of SH-30 including
Major and Minor Bridges Culverts etc.
CLIENT : Kerala State Transportation Projects (ADB Fund)
-----------------------------------------------------------------------
--
 FROM:- Octobar 2010 TO: -June2013
EMPLOYER : M/s K M C Construction Ltd
Hyderabad
PROJECT OFFICE : Civil Station Calicut Kerala
POSITION HELD : Sr: ProjectEngineer (Project HOD Land Survey)
PROJECT : 1) 4 Lining of NH 17 from KM 148.00 to KM 313.00
Kannur to kuttippuram Total kilometer 163
including construction of Flyovers and ROBs
and 5 number of Bypasses
CLIENT : National Highway Authority of India (BOT)
: 2) 4Lining of NH 17B from KM 13.100 to KM 18.300
and 4 Lining of Baina Road at RavindraBhavan
Junction from KM 1.24 to KM 1.02 including
construction of Flyover cum ROB up to Gate No. 9 of
Mormugoa Port,
CLIENT : Mormugao Port Trust Goa
-----------------------------------------------------------------------
--
 FROM:- May 2006 TO: - September2010
EMPLOYER : M/s Intercontinental Consultants and Technocrats
Pvt.Ltd.New Delhi, India
POSITION HELD : Assistant Manager Survey
PROJECTS COMMITTED : 1) Topographical survey in NH-4(Tumkur to
Haveri)
Karnataka and Cross section survey with Auto
Level
2) Topographical survey in NH-7 (Bangalore)
For constructing 8 numbers of Junction
Flyovers
And preparing drawings
3) Detailedtopographical survey NH-14 (Bewar to
Pindwada) Rajasthan Project of total 250 km,
with extra survey of bypasses.
4) To locate and setting out Bore Holes for BOT
Project In NH 17,(Kannur to Kuttippuram)
Kerala.
5) Pillar fixing and connecting RL with GTS,
Traversing, Detail Topographic survey of
road with major and Minor bridges and
culverts of NH 83 (Patna to Dhobi)125km in
Bihar with extra survey of more bypasses
6) Posted as a Survey Engineer in Taj Express
Highway (Yamuna Express Highway)
Project, (Six line-extendable Eight line),
Greater Noida to Agra 162 Km.Client NHAI
7) Manage marking center line of NH 17, BOT
Project,
Kannur to Kuttipram 165 Km,chainage 148+000
to
313+000
8) Marking Centerline forSirohi Bypass, NH 14
Rajasthan By using GPS (Hill section)
-----------------------------------------------------------------------
--
 FROM:- August2001 TO:- march 2006
EMPLOYER : M/s ULCCS Construction
Kerala, India
POSITION HELD : Deputy Superintendent (Survey)
DESCRIPTION OF DUTIES : 1) Total station survey for different road works and
leveling, Setting out building phases, Bridges
etc. and computing the area and quantity with Road
Estimator.Prepare the drawings with
Autocadd and Road Estimator
POSITION HELD : Junior Engineer
DESCRIPTION OF DUTIES : 2) Site supervision in several roads and Bridges
projects (PWD, Panchayath) ,Site supervision in
several building projects (Panchayath)
-----------------------------------------------------------------------
--
TRAINIG HELD : Locating co-ordinates with Hand GPS (GARMIN)
Locating and connecting BM Pillars with
GPS (Leica 1200),Hand GPS Trimble,
COMPUER EXPOSURE : SCC(Survey Control Center), Auto-Cad, MS-Word
MS-Excel. Downloading software’s, Leica Geo
System,
Leica Survey office, Leica Construction Manager,
Sokkia Prolink, Top Link. And preparing the maps
WithSCC and Auto-Card, Calquan, Road Estimator
etc.
INSTRUMENT EXPOSURE : G.P.S, Total Station, Theodolite & Auto
Level as per following details.
1. G.P.S Leica -1200
2. G.P.S Channel- Garmin
3. G.P.S Trimble(Handle)
4. Leica Total Station (TC02)
5. Leica Total Station (TC06)
6. Leica Total Station (TC1200)
7. Leica Total Station (TC1102)
8. Leica Total Station (TC905)
9. Leica Total Station (TC801)
10. Leica Total Station (TC800)
11. Leica Total Station (TC702)
12. Leica Total Station (TC407)
13. Sokkia Total Station (Power set 2010)
14. Pentax Total Station (R300)
15. Sokkia Total Station (Set 1030R)
16. Auto Levels of Leica, Sokkia, Topcon.
LANGUAGE KNOWN : English, Hindi, Malayalam, Tamil
PRESENT SALARY :
EXPECTED SALARY : (Negotiable)
I, Sujinlal. A, hereby state that all details mentioned above are true to the best of my knowledge
(SUJINLAL, A)
Date :
Place :kozhikode

More Related Content

What's hot (7)

Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017Erwin Gultom's Cover Letter & Resume 2017
Erwin Gultom's Cover Letter & Resume 2017
 
Final Cv Devender Singh
Final Cv Devender SinghFinal Cv Devender Singh
Final Cv Devender Singh
 
Lawrance-Resume
Lawrance-ResumeLawrance-Resume
Lawrance-Resume
 
M Santosh GIS Engineer
M Santosh GIS EngineerM Santosh GIS Engineer
M Santosh GIS Engineer
 
Hafiz Hassan
Hafiz HassanHafiz Hassan
Hafiz Hassan
 
Current CV Akhil
Current CV Akhil    Current CV Akhil
Current CV Akhil
 
SHAKEEB SHAFIQ Resume
SHAKEEB SHAFIQ ResumeSHAKEEB SHAFIQ Resume
SHAKEEB SHAFIQ Resume
 

Viewers also liked

IPFW Unofficial Transcript
IPFW Unofficial TranscriptIPFW Unofficial Transcript
IPFW Unofficial Transcript
Christie Sekora
 

Viewers also liked (9)

Barbarians Rising Series Provides Insight into Ancient Rome’s Decline
Barbarians Rising Series Provides Insight into Ancient Rome’s DeclineBarbarians Rising Series Provides Insight into Ancient Rome’s Decline
Barbarians Rising Series Provides Insight into Ancient Rome’s Decline
 
Liz resume
Liz resumeLiz resume
Liz resume
 
Yvonne Ojeifoh resume
Yvonne Ojeifoh resumeYvonne Ojeifoh resume
Yvonne Ojeifoh resume
 
IPFW Unofficial Transcript
IPFW Unofficial TranscriptIPFW Unofficial Transcript
IPFW Unofficial Transcript
 
CC resume 09.08.16
CC resume 09.08.16CC resume 09.08.16
CC resume 09.08.16
 
Critério de medição
Critério de mediçãoCritério de medição
Critério de medição
 
Camerawork
CameraworkCamerawork
Camerawork
 
GUIA DEL CONTRIBUYENTE PERSONA NATURAL: Realizado por: Karina Valencia Maldonado
GUIA DEL CONTRIBUYENTE PERSONA NATURAL: Realizado por: Karina Valencia MaldonadoGUIA DEL CONTRIBUYENTE PERSONA NATURAL: Realizado por: Karina Valencia Maldonado
GUIA DEL CONTRIBUYENTE PERSONA NATURAL: Realizado por: Karina Valencia Maldonado
 
Big Data and the Future by Sherri Rose
Big Data and the Future by Sherri RoseBig Data and the Future by Sherri Rose
Big Data and the Future by Sherri Rose
 

Similar to CV SUJINLAL

Chennakesavulu CV tendering format
Chennakesavulu CV tendering formatChennakesavulu CV tendering format
Chennakesavulu CV tendering format
Kesi Chennkesavulu
 
Mandatory course for DPR consultants - inviting nominations.pdf
Mandatory course for DPR consultants - inviting nominations.pdfMandatory course for DPR consultants - inviting nominations.pdf
Mandatory course for DPR consultants - inviting nominations.pdf
DprGeoGroup
 
New (Civ) Ehsan
New (Civ) EhsanNew (Civ) Ehsan
New (Civ) Ehsan
Ehsan Haq
 

Similar to CV SUJINLAL (20)

Chennakesavulu CV tendering format
Chennakesavulu CV tendering formatChennakesavulu CV tendering format
Chennakesavulu CV tendering format
 
CURRICULAM DKS1
CURRICULAM DKS1CURRICULAM DKS1
CURRICULAM DKS1
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Mandatory course for DPR consultants - inviting nominations.pdf
Mandatory course for DPR consultants - inviting nominations.pdfMandatory course for DPR consultants - inviting nominations.pdf
Mandatory course for DPR consultants - inviting nominations.pdf
 
DPS - Copy
DPS - CopyDPS - Copy
DPS - Copy
 
sudarshan mukhopadhyay C.V.
sudarshan mukhopadhyay C.V.sudarshan mukhopadhyay C.V.
sudarshan mukhopadhyay C.V.
 
AUTOCAD DRAFTSMAN
AUTOCAD DRAFTSMANAUTOCAD DRAFTSMAN
AUTOCAD DRAFTSMAN
 
MCS Reddy 22.05.16
MCS Reddy 22.05.16MCS Reddy 22.05.16
MCS Reddy 22.05.16
 
Road construction report
Road construction reportRoad construction report
Road construction report
 
Vishu resume new
Vishu resume newVishu resume new
Vishu resume new
 
Vishu resume new
Vishu resume newVishu resume new
Vishu resume new
 
Vishu resume new (1)
Vishu resume new (1)Vishu resume new (1)
Vishu resume new (1)
 
Training report done on Bridge Construction
Training report done on Bridge ConstructionTraining report done on Bridge Construction
Training report done on Bridge Construction
 
Lmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporationLmrc - Lucknow Metro Rail Co-orporation
Lmrc - Lucknow Metro Rail Co-orporation
 
GDRPL Company Profile - .pptx
GDRPL Company Profile - .pptxGDRPL Company Profile - .pptx
GDRPL Company Profile - .pptx
 
Eg in 049912
Eg in 049912Eg in 049912
Eg in 049912
 
New (Civ) Ehsan
New (Civ) EhsanNew (Civ) Ehsan
New (Civ) Ehsan
 
Metro Project
Metro ProjectMetro Project
Metro Project
 
GOPAL
GOPALGOPAL
GOPAL
 
Prashant - CV simple format
Prashant - CV  simple formatPrashant - CV  simple format
Prashant - CV simple format
 

CV SUJINLAL

  • 1. CURRICULUM VITAE SUJINLAL.A photograph From, SUJINLAL.A Sr.Surveyor EKK Infrastructure Perumbavoor Kerala To, Subject: - Application for the post of a Sr.Surveyor RespectedSir, I introduce myself as a qualified Surveyor looking for a suitable job in your esteemedorganization. In this connection, I am enclosing my detailed resume to assess my competence of suitability for above said post. Looking forward to hear from you in the matter, for a detailed interaction. Thanking you. Yours truly, (SUJINLAL.A)
  • 2. PERSONAL DETAILS NAME : Sujinlal.A DATE OF BIRTH : 15TH May 1978 NATIONALITY : Indian CAST : Hindu EDUCATION : 1, ITI Surveyor (NCVT) 2, Civil Engineering Diploma (AITES) 3, Electronics Engineering s-term (IHRD) 4, Data Entry and software operation (LBS) 5, Electrical Engineering (KGTE) PERMANENT ADDRESS : Sujinlal.A Aiswarya (ho) Meppayil (po) Vatakara (via) Kozhikode (DT) Kerala-673104 Ph. No. : 09447425313(Kerala), 08111990616(Kerala) E.mail : omegasujin@gmail.com PASPORT NO : N1161608 ----------------------------------------------------------------------- -- KEY QUALIFICATION : Have 15+ years’ experience in total planning and execution of plan metric control traversing, precision leveling & Global co-ordinate computation at various platforms with diverse instrumental expertise with state of art Survey instruments like Total Station- Leica, Sokkia and experience in Utilizing total station for setting out co-Ordinate, building phase and topography, cross section, engineering survey for road and highways bridges and structures, power transmission line etc. Maintaining and servicing all types of electronic equipment’s.
  • 3. EMPLOYMENT RECORDS  FROM:-February2016 TO:-TillThisDate EMPLOYER : M/s EKK Infrastructure Pvt Ltd Perumbavoor,Kerala POSITION HELD : Sr: Surveyor Engineer (Survey Head) PROJECT OFFICE : Cochin International Airport PROJECT : 1) Construction of Aircraft Parking Bays, Taxi links and Associated Airfield Ground Lights system CLIENT : Cochin International Airport Ltd (CIAL) `---------------------------------------------------------------------- ---  FROM:- July2013 TO:-December 2015 EMPLOYER : M/s ESSAR Projects India Ltd Mumbai POSITION HELD : Sr: Surveyor(Project HOD Land Survey) PROJECT OFFICE : EPIL, Mattannur, Kannur PROJECT : 1) Up gradation of Road from Thalasseri (Km 1+200 to Valavupara (Km 55+200) 54 Km of SH-30 including Major and Minor Bridges Culverts etc. CLIENT : Kerala State Transportation Projects (ADB Fund) ----------------------------------------------------------------------- --  FROM:- Octobar 2010 TO: -June2013 EMPLOYER : M/s K M C Construction Ltd Hyderabad PROJECT OFFICE : Civil Station Calicut Kerala POSITION HELD : Sr: ProjectEngineer (Project HOD Land Survey)
  • 4. PROJECT : 1) 4 Lining of NH 17 from KM 148.00 to KM 313.00 Kannur to kuttippuram Total kilometer 163 including construction of Flyovers and ROBs and 5 number of Bypasses CLIENT : National Highway Authority of India (BOT) : 2) 4Lining of NH 17B from KM 13.100 to KM 18.300 and 4 Lining of Baina Road at RavindraBhavan Junction from KM 1.24 to KM 1.02 including construction of Flyover cum ROB up to Gate No. 9 of Mormugoa Port, CLIENT : Mormugao Port Trust Goa ----------------------------------------------------------------------- --  FROM:- May 2006 TO: - September2010 EMPLOYER : M/s Intercontinental Consultants and Technocrats Pvt.Ltd.New Delhi, India POSITION HELD : Assistant Manager Survey PROJECTS COMMITTED : 1) Topographical survey in NH-4(Tumkur to Haveri) Karnataka and Cross section survey with Auto Level 2) Topographical survey in NH-7 (Bangalore) For constructing 8 numbers of Junction Flyovers And preparing drawings 3) Detailedtopographical survey NH-14 (Bewar to Pindwada) Rajasthan Project of total 250 km, with extra survey of bypasses.
  • 5. 4) To locate and setting out Bore Holes for BOT Project In NH 17,(Kannur to Kuttippuram) Kerala. 5) Pillar fixing and connecting RL with GTS, Traversing, Detail Topographic survey of road with major and Minor bridges and culverts of NH 83 (Patna to Dhobi)125km in Bihar with extra survey of more bypasses 6) Posted as a Survey Engineer in Taj Express Highway (Yamuna Express Highway) Project, (Six line-extendable Eight line), Greater Noida to Agra 162 Km.Client NHAI 7) Manage marking center line of NH 17, BOT Project, Kannur to Kuttipram 165 Km,chainage 148+000 to 313+000 8) Marking Centerline forSirohi Bypass, NH 14 Rajasthan By using GPS (Hill section) ----------------------------------------------------------------------- --  FROM:- August2001 TO:- march 2006 EMPLOYER : M/s ULCCS Construction Kerala, India POSITION HELD : Deputy Superintendent (Survey) DESCRIPTION OF DUTIES : 1) Total station survey for different road works and leveling, Setting out building phases, Bridges etc. and computing the area and quantity with Road Estimator.Prepare the drawings with Autocadd and Road Estimator POSITION HELD : Junior Engineer
  • 6. DESCRIPTION OF DUTIES : 2) Site supervision in several roads and Bridges projects (PWD, Panchayath) ,Site supervision in several building projects (Panchayath) ----------------------------------------------------------------------- -- TRAINIG HELD : Locating co-ordinates with Hand GPS (GARMIN) Locating and connecting BM Pillars with GPS (Leica 1200),Hand GPS Trimble, COMPUER EXPOSURE : SCC(Survey Control Center), Auto-Cad, MS-Word MS-Excel. Downloading software’s, Leica Geo System, Leica Survey office, Leica Construction Manager, Sokkia Prolink, Top Link. And preparing the maps WithSCC and Auto-Card, Calquan, Road Estimator etc. INSTRUMENT EXPOSURE : G.P.S, Total Station, Theodolite & Auto Level as per following details. 1. G.P.S Leica -1200 2. G.P.S Channel- Garmin 3. G.P.S Trimble(Handle) 4. Leica Total Station (TC02) 5. Leica Total Station (TC06) 6. Leica Total Station (TC1200) 7. Leica Total Station (TC1102) 8. Leica Total Station (TC905) 9. Leica Total Station (TC801) 10. Leica Total Station (TC800) 11. Leica Total Station (TC702) 12. Leica Total Station (TC407) 13. Sokkia Total Station (Power set 2010) 14. Pentax Total Station (R300) 15. Sokkia Total Station (Set 1030R) 16. Auto Levels of Leica, Sokkia, Topcon.
  • 7. LANGUAGE KNOWN : English, Hindi, Malayalam, Tamil PRESENT SALARY : EXPECTED SALARY : (Negotiable) I, Sujinlal. A, hereby state that all details mentioned above are true to the best of my knowledge (SUJINLAL, A) Date : Place :kozhikode