1. ASAHAN NO. 3 HYDROELECTRIC POWER PLANT
• BATCHING PLANT – CLEANING OF DRUM MIXER
• ADMIXTURE DRUM - OPENING TO BE COVERED
REPORT ON SITE VISIT BY MR. KAWATA ON
22nd & 23rd MARCH 2023
2. ROUTINE MAINTENANCE OF BATCHING PLANT
FOR SATISFACTORY MIXING & OPERATING CONDITIONS
S.NO. DESCRIPTION
1. The Mixer drums shall be kept free of hardened concrete.
2. Mixer Blades shall be replaced when worn down more than ten percent of their
depth.
3. The Admixture Drum cap need to be covered to avoid contamination of water, dust
etc. in the admixture drum.