SlideShare a Scribd company logo
1 of 4
Download to read offline
RESUME
Shruti Maurya
E-mail: shruti.maurya@gmail.com
Mobile No.:
+82-10-3044-6673 (Seoul, South Korea)
+91-9717780158 (India)
Summary
• 7+ years of experience in Engineering Procurement & Construction (EPC) sector with Samsung Engineering as an
Instrumentation & Control Engineer.
• Active Involvement in Pre-Bid Engineering as well as Detail engineering phase of Projects.
• Experience in Field Instrumentation with on-site experience at IOCL (Indian Oil Corporation Ltd.) Panipat, India
• Skills in Control System Design along with Experience of Conducting FAT for Honeywell DCS, ESD and F&G
System
• Key Role in Client & Vendor Co-ordination for Work Share based EPC Project Execution
• Handling of Instrument Related Activities for Major Package Equipments along with scope definition in Package
Control Schemes
• B.E. in Electronics & Instrumentation from Institute of Technology & Management (ITM), Gurgaon, India.
• Proficient in Presentation & Communication Skills
• Familiar with International Codes & Standards, adopted during FEED & EPC phases of oil/gas projects
Company Duration and Role Work summary/Project Execution
Present Employer:
Samsung Engineering Korea
(Head Office)
URL:
http://www.samsungengineering.com/
Sept 2014~ Till Date
Assigned I&C Senior
Engineer
- Involved as Core task member in Control &
Instrumentation team and responsible for completion of
engineering & procurement activity for various
Instruments- Flow meters, Level Instruments,
Transmitters, Gauges, Special Multipoint temp Inst.(on
Reactors) for Luberef Refinery Project., Saudi Aramco.
- Remote Site Engineering Support for Luberef Refinery
Project, Saudi Aramco.
Previous Employer:
Samsung Engineering India Pvt.
Ltd
July 2008 ~ Aug 2014
Instrumentation &
Control Engineer
- Engineering Co-ordination for Field Instrument
Engineering & Procurement Activity
Material Requisition, Technical Bid Evaluation, Technical
Query to Client/Vendor, Kick-off Meetings for
Flowmeters, Level, Temperature Instruments &
Electronic transmitters for Luberef Refinery Project,
Saudi Aramco.
- Packages for Polymer Unit HDPE, ONGC Petro-
Additions Ltd.
- Detail Control System Engineering
Factory Acceptance Test for DCS/ESD at Honeywell
Pune, India for Dual Feed Cracker Unit (DFCU), OPaL
(ONGC Petro-Additives Ltd.), Dahej, India
- On-Site Training at MEG (Methyl Ethyl Glycol) Unit at
IOCL, Panipat Site
Key Skills:
- Material Requisition – Field Instruments, DCS, ESD, F&G, Analyzers
- Instrument Datasheet/Specification Sheet
- Technical Bid Evaluation for Field Instruments & Control Systems
- Kick-off Meetings
- Inter-department Document Review
- Vendor Print Checking/Review
- Material Take-off & BOM Preparation
- IO Segregation, IO Summary
- System Architecture
- Datasheet preparations in SPI Intools
- Factory Acceptance Test for DCS/ESD/F&G System
Projects Details:
1. Luberef Yanbu Refinery Expansion Project (LYR), Yanbu, Saudi Arabia (871 Million USD)
Client: Saudi Aramco
PMC: Jacobs Engineering
Licensor: Jacobs & Chevron
Role in Project:
Key Member for Execution of Engineering & Procurement Activities for Various Field Instruments.
SEI Representative to Samsung Engineering, Seoul, South Korea
Project Co-ordination with Client , PMC & Vendor for Field Instrumentation Related Activities
Period : Jan 2013 ~ Till Date
Activities:
Engineering & Procurement for Field Instrumentation:
• Material Requisition & TBE for Flow Instruments like Orifice Plates, Venturi Tube, Averaging Pitot Tube, Vortex,
Variable Area, Flowmeters – Magnetic, Ultrasonic, Turbine, Coriolis Mass, and Thermal Mass.
• Material Requisition & TBE for Special Multipoint Thermocouple for Reactor as per Licensor Chevron
Specification.
• Handling Technical Clarification Meetings with Various Vendors for Field Instrument Items like various Flow
meters, Level Instruments, Special Temperature Elements like Multipoint T/C for Reactors and Electronic
Transmitters.
• Key person for resolving Technical Issues related to field Instruments procurement after discussion/Meetings with
Client & PMC
• Vendor Print Check / Review
• Preparation of Instrument Specification Sheet in Specification Module of SPI Intools
Layouts & Design Documents:
• Design Documents like Hookups, Level Sketches, Main Cable Way Layout, Main Cable Plan, Wiring Diagram
• Involvement in 30%, 60% & 90% 3D Modeling for Instrumentation for Assigned Tankage Area.
• Assisting in Preparation of JB Diagram, Wiring Diagram & Segment Diagram in SPI Intools.
2. HDPE (High Density Polyethylene) Unit, OPaL (ONGC Petro Additive Ltd.), Dahej, Gujrat, India
Client: OPaL (ONGC Petro Additive Ltd.), Dahej, Gujrat, India
PMC: Engineers India Ltd. (EIL), India
Licensor: MCI (Mitsui Chemicals Inc.), Tokyo, Japan
Role in Project:
Key Member for Handling Major Packages for HDPE Unit like Extruder, Pneumatic Conveying System,
Dryer Package, Measuring Feeder, Screw Feeder, Vacuum Pumps, Metering Pumps.
Key Member for Control System Instrumentation
Period: June 2011 ~ Dec 2012
Activities:
Packages:
• Technical Clarification with Package Vendors regarding the Scope Finalization, Control Scheme, PLC Design &
Field Instrumentation
• Attending Kick Off Meeting for Instrumentation Design related Agenda points with Final Package Vendors.
• Vendor Print Checking for Various Packages like Interlock Logic diagram, General Arrangement Drawing for
various Equipments like Pump, Dryer, Compressor etc., GAD for PLC Panels (Marshalling & System), IO List,
Control Scheme for Package PLC, Graphics Design for Package PLC, Instrument Datasheets etc.
Control System Instrumentation:
• Control System Architecture Design
• Control System Design Documents – Logic Diagram, Functional Schematics, Cause & Effect Diagram, IO
Database.
• Participation in HAZOP & SIL Verification Meeting
• SIL Calculation on SIL Solver Software.
• Cable Schedule for Foundation Fieldbus, Inter panel Cables, Power Cables and Direct Run Cables.
• JB Grouping & Segment Validation for Foundation Fieldbus Devices.
• Material Requisition for Foundation Fieldbus Cable & Communication Cable- Fiber Optic Cable.
• Material Requisition for Local Control Panels and other Miscellaneous Cabinets.
• Checking of System vendor Documents like GAD for System & Marshalling Cabinets, IO Assignment, Controller
Loading etc.
• Identification for Control Loops for Advance Process Control System by Ms. Aspentech.
3. Dual Feed Cracker Unit (DFCU), OPaL (ONGC Petro Additive Ltd.), Dahej, Gujrat, India (USD 1.4 Billion)
Client: ONGC Petro additions Ltd. (OPaL Ethylene Project), Dahej
PMC: Engineers India Ltd. (EIL), India
Licensor: Linde Engineering
Role in Project:
Key Member for Control System Instrumentation Engineering
Period: Dec 2009 ~ May 2011
Activities:
Technical Bid Evaluation Control System Vendor Offers
Involved in Preparation of Control System Engineering Design Deliverable to System Vendor (Honeywell
Automation India Ltd.)
System: Honeywell C300 DCS, Safety Manager (SM) ESD/FGS
• Point Database in SPI Intools.
• Development of Interlock Logics for ESD & DCS.
• Cable Schedule & Drum Schedule.
• JB Grouping for Foundation Fieldbus Segment Design.
• Macro Cycle Calculation & Physical Validation of FF segment using P&F Segment Checker.
• Design Guidelines for System Design including major aspects of ITB & other specifications from Licensor/Client
for uniform reference throughout the project team
• Package Unit System Interface
System Vendor Print Checking
• IO Assignment for the Honeywell Controller for ESD, DCS & FGS System
• Checking of Controller Loading
• Checking of General Arrangement Drawing for both System & Marshalling Cabinets
• Functional Design Specification for DCS, ESD & FGS System by Honeywell
Factory Acceptance Test for Honeywell C300 DCS & Safety Manager (SM) ESD & FGS at Honeywell Pune
• Hardware Testing – Marshalling Cabinets, System Cabinets, Network Cabinets, Power Distribution Cabinets
• IO Loop Checking for Analog & Digital
• Scan Time Checking for ESD Controller
• Logic Checking for Honeywell C300 DCS & Experion Safety Manager ESD System
• Controller Loading Check
• Graphics & HMI Testing for Process Area
4. Pre-Bid/Proposal Activities:
Habshan 5 Gas Compression Facilities, Gasco (2015)
Fidihili Gas plant, Saudi Aramco (2015)
NOCL-DHDS, India (2009)
Yanbu Refinery Proposal, Saudi Aramco (2008)
ADCO (Abu Dhabi Company for Onshore Oil Operations) Proposal, Abu Dhabi, UAE (2012)
Activities:
Involved in Preparation of MTO/BOM (Material take Off /Bill of Material) for Pre-Bid Cost Evaluation for:
• Field Instruments and Analyzers
• Bulk Material for Hookups, Cables, Trays, Junction Boxes etc.
Academics:
Education Institution Year of
Passing
% Of Marks Remarks
BE (Instrumentation) Institute of Technology & Management,
Gurgaon, Haryana, India
2008 76% Distinction
AISSCE (XII) C.B.S.E, Delhi Public School, Panipat Refinery
Township, Panipat, Haryana, India
2004 80% Distinction
AISSE (X) C.B.S.E, Delhi Public School, Panipat Refinery
Township, Panipat, Haryana, India
2002 88% Distinction
Personal Details:
• Marital Status – Married
• Nationality – Indian.
• Languages known: English, Hindi
• Date of Birth: 11th June 1987
• PASSPORT NO: G5392264
Present Address:
808, Hanam Prugiocity,
111-33, Deokpung-dong,
Hanam-si,
Gyeonggi-do, Korea
Mobile: +82-10-3044-6673
Permanent Address:
B-704, Designers Park Apartment,
B-9/1A
Sector-62, Noida
Uttar Pradesh, India
Mobile: +91-9717780158

More Related Content

What's hot (19)

Automation Engineer r3 2-2015
Automation Engineer r3 2-2015Automation Engineer r3 2-2015
Automation Engineer r3 2-2015
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Epc projects and cad tools
Epc projects and cad toolsEpc projects and cad tools
Epc projects and cad tools
 
CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
Uday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran Updated Resume
Uday Kiran Updated Resume
 
Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015
 
Raviraj_Jallu_02_new.doc
Raviraj_Jallu_02_new.docRaviraj_Jallu_02_new.doc
Raviraj_Jallu_02_new.doc
 
Koch Modular - Automation and Control System Capabilities
Koch Modular - Automation and Control System CapabilitiesKoch Modular - Automation and Control System Capabilities
Koch Modular - Automation and Control System Capabilities
 
Ravindra_Resume
Ravindra_ResumeRavindra_Resume
Ravindra_Resume
 
Duane lee martin
Duane lee martinDuane lee martin
Duane lee martin
 
Duane martin 11 21 14 resume
Duane martin 11 21 14 resumeDuane martin 11 21 14 resume
Duane martin 11 21 14 resume
 
Bush Carley Resume
Bush Carley ResumeBush Carley Resume
Bush Carley Resume
 
Resume
ResumeResume
Resume
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
resume_Mr_
resume_Mr_resume_Mr_
resume_Mr_
 
Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152
 

Similar to Resume_Shruti Maurya

Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsSanjeeth Thekkada
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale
 
Sachin_Kumar_CV_Instrument
Sachin_Kumar_CV_InstrumentSachin_Kumar_CV_Instrument
Sachin_Kumar_CV_InstrumentSachin Rajput
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRajesh Raval
 
Harshit Resume-Instrumentation
Harshit Resume-InstrumentationHarshit Resume-Instrumentation
Harshit Resume-InstrumentationMamtora Harshit
 
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier
 
BKR Engg, Piping EPC Resume
BKR Engg, Piping EPC ResumeBKR Engg, Piping EPC Resume
BKR Engg, Piping EPC ResumeRaulo Bijay
 
KAPIL_PAWAR_RESUME
KAPIL_PAWAR_RESUMEKAPIL_PAWAR_RESUME
KAPIL_PAWAR_RESUMEKAPIL PAWAR
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceDHRUVA MISHRA
 
Madhu resume
Madhu resumeMadhu resume
Madhu resumeMadhu A
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrGovinda Raman
 

Similar to Resume_Shruti Maurya (20)

SUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CVSUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CV
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
ANILCV R
ANILCV RANILCV R
ANILCV R
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Perminder Kaur
Perminder KaurPerminder Kaur
Perminder Kaur
 
Sachin_Kumar_CV_Instrument
Sachin_Kumar_CV_InstrumentSachin_Kumar_CV_Instrument
Sachin_Kumar_CV_Instrument
 
Raval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_barodaRaval rajesh raval r_2016_master_instrument_baroda
Raval rajesh raval r_2016_master_instrument_baroda
 
Harshit Resume-Instrumentation
Harshit Resume-InstrumentationHarshit Resume-Instrumentation
Harshit Resume-Instrumentation
 
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
Project Controls Expo - 31st Oct 2012 - Extending Earned Value Methodology To...
 
RahulSingh_CV
RahulSingh_CVRahulSingh_CV
RahulSingh_CV
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Ashok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_AerospaceAshok Vannier_Resume_6 Years_Aerospace
Ashok Vannier_Resume_6 Years_Aerospace
 
BKR Engg, Piping EPC Resume
BKR Engg, Piping EPC ResumeBKR Engg, Piping EPC Resume
BKR Engg, Piping EPC Resume
 
SOURAV LAHA
SOURAV LAHASOURAV LAHA
SOURAV LAHA
 
KAPIL_PAWAR_RESUME
KAPIL_PAWAR_RESUMEKAPIL_PAWAR_RESUME
KAPIL_PAWAR_RESUME
 
Allen D. Polowinczak 2016
Allen D. Polowinczak 2016Allen D. Polowinczak 2016
Allen D. Polowinczak 2016
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
Madhu resume
Madhu resumeMadhu resume
Madhu resume
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
 

Resume_Shruti Maurya

  • 1. RESUME Shruti Maurya E-mail: shruti.maurya@gmail.com Mobile No.: +82-10-3044-6673 (Seoul, South Korea) +91-9717780158 (India) Summary • 7+ years of experience in Engineering Procurement & Construction (EPC) sector with Samsung Engineering as an Instrumentation & Control Engineer. • Active Involvement in Pre-Bid Engineering as well as Detail engineering phase of Projects. • Experience in Field Instrumentation with on-site experience at IOCL (Indian Oil Corporation Ltd.) Panipat, India • Skills in Control System Design along with Experience of Conducting FAT for Honeywell DCS, ESD and F&G System • Key Role in Client & Vendor Co-ordination for Work Share based EPC Project Execution • Handling of Instrument Related Activities for Major Package Equipments along with scope definition in Package Control Schemes • B.E. in Electronics & Instrumentation from Institute of Technology & Management (ITM), Gurgaon, India. • Proficient in Presentation & Communication Skills • Familiar with International Codes & Standards, adopted during FEED & EPC phases of oil/gas projects Company Duration and Role Work summary/Project Execution Present Employer: Samsung Engineering Korea (Head Office) URL: http://www.samsungengineering.com/ Sept 2014~ Till Date Assigned I&C Senior Engineer - Involved as Core task member in Control & Instrumentation team and responsible for completion of engineering & procurement activity for various Instruments- Flow meters, Level Instruments, Transmitters, Gauges, Special Multipoint temp Inst.(on Reactors) for Luberef Refinery Project., Saudi Aramco. - Remote Site Engineering Support for Luberef Refinery Project, Saudi Aramco. Previous Employer: Samsung Engineering India Pvt. Ltd July 2008 ~ Aug 2014 Instrumentation & Control Engineer - Engineering Co-ordination for Field Instrument Engineering & Procurement Activity Material Requisition, Technical Bid Evaluation, Technical Query to Client/Vendor, Kick-off Meetings for Flowmeters, Level, Temperature Instruments & Electronic transmitters for Luberef Refinery Project, Saudi Aramco. - Packages for Polymer Unit HDPE, ONGC Petro- Additions Ltd. - Detail Control System Engineering Factory Acceptance Test for DCS/ESD at Honeywell Pune, India for Dual Feed Cracker Unit (DFCU), OPaL (ONGC Petro-Additives Ltd.), Dahej, India - On-Site Training at MEG (Methyl Ethyl Glycol) Unit at IOCL, Panipat Site Key Skills: - Material Requisition – Field Instruments, DCS, ESD, F&G, Analyzers - Instrument Datasheet/Specification Sheet - Technical Bid Evaluation for Field Instruments & Control Systems - Kick-off Meetings - Inter-department Document Review - Vendor Print Checking/Review - Material Take-off & BOM Preparation - IO Segregation, IO Summary
  • 2. - System Architecture - Datasheet preparations in SPI Intools - Factory Acceptance Test for DCS/ESD/F&G System Projects Details: 1. Luberef Yanbu Refinery Expansion Project (LYR), Yanbu, Saudi Arabia (871 Million USD) Client: Saudi Aramco PMC: Jacobs Engineering Licensor: Jacobs & Chevron Role in Project: Key Member for Execution of Engineering & Procurement Activities for Various Field Instruments. SEI Representative to Samsung Engineering, Seoul, South Korea Project Co-ordination with Client , PMC & Vendor for Field Instrumentation Related Activities Period : Jan 2013 ~ Till Date Activities: Engineering & Procurement for Field Instrumentation: • Material Requisition & TBE for Flow Instruments like Orifice Plates, Venturi Tube, Averaging Pitot Tube, Vortex, Variable Area, Flowmeters – Magnetic, Ultrasonic, Turbine, Coriolis Mass, and Thermal Mass. • Material Requisition & TBE for Special Multipoint Thermocouple for Reactor as per Licensor Chevron Specification. • Handling Technical Clarification Meetings with Various Vendors for Field Instrument Items like various Flow meters, Level Instruments, Special Temperature Elements like Multipoint T/C for Reactors and Electronic Transmitters. • Key person for resolving Technical Issues related to field Instruments procurement after discussion/Meetings with Client & PMC • Vendor Print Check / Review • Preparation of Instrument Specification Sheet in Specification Module of SPI Intools Layouts & Design Documents: • Design Documents like Hookups, Level Sketches, Main Cable Way Layout, Main Cable Plan, Wiring Diagram • Involvement in 30%, 60% & 90% 3D Modeling for Instrumentation for Assigned Tankage Area. • Assisting in Preparation of JB Diagram, Wiring Diagram & Segment Diagram in SPI Intools. 2. HDPE (High Density Polyethylene) Unit, OPaL (ONGC Petro Additive Ltd.), Dahej, Gujrat, India Client: OPaL (ONGC Petro Additive Ltd.), Dahej, Gujrat, India PMC: Engineers India Ltd. (EIL), India Licensor: MCI (Mitsui Chemicals Inc.), Tokyo, Japan Role in Project: Key Member for Handling Major Packages for HDPE Unit like Extruder, Pneumatic Conveying System, Dryer Package, Measuring Feeder, Screw Feeder, Vacuum Pumps, Metering Pumps. Key Member for Control System Instrumentation Period: June 2011 ~ Dec 2012 Activities: Packages: • Technical Clarification with Package Vendors regarding the Scope Finalization, Control Scheme, PLC Design & Field Instrumentation • Attending Kick Off Meeting for Instrumentation Design related Agenda points with Final Package Vendors. • Vendor Print Checking for Various Packages like Interlock Logic diagram, General Arrangement Drawing for various Equipments like Pump, Dryer, Compressor etc., GAD for PLC Panels (Marshalling & System), IO List, Control Scheme for Package PLC, Graphics Design for Package PLC, Instrument Datasheets etc.
  • 3. Control System Instrumentation: • Control System Architecture Design • Control System Design Documents – Logic Diagram, Functional Schematics, Cause & Effect Diagram, IO Database. • Participation in HAZOP & SIL Verification Meeting • SIL Calculation on SIL Solver Software. • Cable Schedule for Foundation Fieldbus, Inter panel Cables, Power Cables and Direct Run Cables. • JB Grouping & Segment Validation for Foundation Fieldbus Devices. • Material Requisition for Foundation Fieldbus Cable & Communication Cable- Fiber Optic Cable. • Material Requisition for Local Control Panels and other Miscellaneous Cabinets. • Checking of System vendor Documents like GAD for System & Marshalling Cabinets, IO Assignment, Controller Loading etc. • Identification for Control Loops for Advance Process Control System by Ms. Aspentech. 3. Dual Feed Cracker Unit (DFCU), OPaL (ONGC Petro Additive Ltd.), Dahej, Gujrat, India (USD 1.4 Billion) Client: ONGC Petro additions Ltd. (OPaL Ethylene Project), Dahej PMC: Engineers India Ltd. (EIL), India Licensor: Linde Engineering Role in Project: Key Member for Control System Instrumentation Engineering Period: Dec 2009 ~ May 2011 Activities: Technical Bid Evaluation Control System Vendor Offers Involved in Preparation of Control System Engineering Design Deliverable to System Vendor (Honeywell Automation India Ltd.) System: Honeywell C300 DCS, Safety Manager (SM) ESD/FGS • Point Database in SPI Intools. • Development of Interlock Logics for ESD & DCS. • Cable Schedule & Drum Schedule. • JB Grouping for Foundation Fieldbus Segment Design. • Macro Cycle Calculation & Physical Validation of FF segment using P&F Segment Checker. • Design Guidelines for System Design including major aspects of ITB & other specifications from Licensor/Client for uniform reference throughout the project team • Package Unit System Interface System Vendor Print Checking • IO Assignment for the Honeywell Controller for ESD, DCS & FGS System • Checking of Controller Loading • Checking of General Arrangement Drawing for both System & Marshalling Cabinets • Functional Design Specification for DCS, ESD & FGS System by Honeywell Factory Acceptance Test for Honeywell C300 DCS & Safety Manager (SM) ESD & FGS at Honeywell Pune • Hardware Testing – Marshalling Cabinets, System Cabinets, Network Cabinets, Power Distribution Cabinets • IO Loop Checking for Analog & Digital • Scan Time Checking for ESD Controller • Logic Checking for Honeywell C300 DCS & Experion Safety Manager ESD System • Controller Loading Check • Graphics & HMI Testing for Process Area 4. Pre-Bid/Proposal Activities: Habshan 5 Gas Compression Facilities, Gasco (2015)
  • 4. Fidihili Gas plant, Saudi Aramco (2015) NOCL-DHDS, India (2009) Yanbu Refinery Proposal, Saudi Aramco (2008) ADCO (Abu Dhabi Company for Onshore Oil Operations) Proposal, Abu Dhabi, UAE (2012) Activities: Involved in Preparation of MTO/BOM (Material take Off /Bill of Material) for Pre-Bid Cost Evaluation for: • Field Instruments and Analyzers • Bulk Material for Hookups, Cables, Trays, Junction Boxes etc. Academics: Education Institution Year of Passing % Of Marks Remarks BE (Instrumentation) Institute of Technology & Management, Gurgaon, Haryana, India 2008 76% Distinction AISSCE (XII) C.B.S.E, Delhi Public School, Panipat Refinery Township, Panipat, Haryana, India 2004 80% Distinction AISSE (X) C.B.S.E, Delhi Public School, Panipat Refinery Township, Panipat, Haryana, India 2002 88% Distinction Personal Details: • Marital Status – Married • Nationality – Indian. • Languages known: English, Hindi • Date of Birth: 11th June 1987 • PASSPORT NO: G5392264 Present Address: 808, Hanam Prugiocity, 111-33, Deokpung-dong, Hanam-si, Gyeonggi-do, Korea Mobile: +82-10-3044-6673 Permanent Address: B-704, Designers Park Apartment, B-9/1A Sector-62, Noida Uttar Pradesh, India Mobile: +91-9717780158