Lay a Laminate Floor
To complete this project, you'll need accurate measuring and
cutting skills.
Floormaster laminate floors are precision-made, making
them easy to work with.
Always wear a face mask and goggles when cutting laminate
flooring. Ensure children and animals are out of the way.
Laminate flooring can transform any room with its warmth
and beauty. Simply choose from our range of LOC or Tongue
and Groove laminate flooring and give your room a facelift
by following these step by step instructions
2 - How Much Will I Need?
How much underlay will I need?
To work out the amount of underlay needed for your floor,
measure the length and width of the room. Multiply the two
numbers together - this figure will tell you how many square
metres the underlay needs to cover.
For example: if your room is 4 metres long and 3
metres wide, 4 x 3 =12 square metres. You will need
to buy underlay to cover 12 square metres of flooring.
Never be tempted to buy less than you really need and allow
an extra 5% for cutting.
How much laminate flooring will I need?
Remembering the length and width of your room, use the
tables below to calculate the number of packs of laminate
flooring you will need.
For example, if your room is 6 metres long and 5
metres wide and you have chosen to use Floormaster
900 LOC laminate flooring, you will need to buy 15
packs of flooring to cover the floor.
Floormaster 900 LOC
LOC laminate flooring
requiring no adhesive.
• Can be fitted anywhere except bathrooms and
humid areas
• Resistant against cigarette burns, fading, stains,
impact and scratching
• Available in wood effects and coloured
Floormaster 1600 LOC
LOC laminate flooring
requiring no adhesive.
• Water resistant, so can be fitted anywhere
including bathrooms
• Resistant against cigarette burns, fading, stains,
impact and scratching
• Available in wood effects and coloured
Floormaster Tile LOC
LOC laminate flooring
requiring no adhesive.
• Water resistant, so can be fitted anywhere
including bathrooms
• Resistant against cigarette burns, fading, stains,
impact and scratching
• Ceramic tile effect, available in a range of colours
Extras
You should not fit your laminate floor right to the edge of the
room. You will need to allow a 10mm gap for it to contract
and expand with the room temperature. Use fitting wedges
(shaped pieces of plastic), included in the fitting kits, to
create this 10mm expansion gap. When the floor has been
laid, the wedges are removed and the gaps can be covered
with skirting or laminate flooring edging trim for a
professional looking finish.
Measure round the perimeter of the room (or add the length
and width measurements of your room together and multiply
by two) to find the length of beading needed to cover the
extension gap.
3 - Laminate Flooring Basics
Laminate flooring is laid as a loose, 'floating' floor. The
boards are not nailed to the floor but simply joined to each
other without the need for nails or screws. This means
laminate flooring can be laid on top of most surfaces,
including timber or concrete, as long as it's dry, clean, and
level.
Choose carefully
In bathrooms or other areas of high humidity, ensure you
select a suitable grade of flooring. The Floormaster 1600
LOC and Floormaster Tile LOC ranges are water resistant
and suitable for bathrooms where the flooring may get wet.
And remember, inappropriate floor covering is always a false
economy, especially where there is a lot of foot traffic or
other wear and tear.
Condition the laminate flooring
Before you lay your laminate flooring, it must be conditioned
to the room's atmosphere. If this is not done it could warp
(become twisted and bent out of shape).
To condition the flooring:
• Make sure it's kept in its original packaging
• Put it in the room where the floor will be laid (ideal
temperature of 18o
C to 20o
C)
• Lie the pack horizontally
• Leave the flooring in this position for at least 48
hours
4 - Sub-Floor Preparation
The floor you intend to lay the laminate flooring on top of
must be dry, firm and level. A floor is considered level if the
deviation in height is less than 1mm over a distance of 1
linear metre. Sheets of fibre-board can be used to level
minor deviations and they have additional acoustic and
thermal properties. Deviations above this must be levelled
out before laying the new floor. The following sections advise
how this should be done, depending on the type of sub-floor
you have.
Wooden sub-floor preparation
• Remove any protruding nails or tacks to ensure you
have a smooth surface.
• If you are laying your laminate flooring on an upper
floor, re-fix any loose boards using screws rather
than nails as hammering might damage the ceiling
plaster below.
• Use a detector to identify if there is any underlying
pipework or electricity cables so that you can avoid
these areas when driving in nails or screws.
• Smooth any high spots in the floor using a plane,
and fill hollow patches with levelling compound
(sometimes called screed) to make the floor level.
Concrete sub-floor preparation
Some concrete sub-floors have raised 'high' spots of
concrete that can be chipped away with a bolster, but the
easiest way to achieve a smooth surface is with levelling
compound (screed). Simply mix this in a bucket with water,
then pour and spread with a trowel. It will then set to a level
finish.
We recommend that newly laid concrete or screed be
allowed to dry at a rate of 1mm per day prior to fitting
laminate flooring, i.e. 50mm screed = 50 days.
Damp-proof membrane
A damp-proof membrane should be fitted to stop any
moisture from damaging the new boards. This is in addition
to a damp course which may already be present in the sub-
floor. The following sub-floors require a damp proof
membrane of 0.2mm thick:
• concrete
• vinyl tiles
• asphalt
• quarry tiles
Underlay
Once you are sure the sub-floor is
clean, dry and level, you will need to
install underlay prior to laying your
laminate flooring. There are three
types of underlay available:
• Floormaster Laminate Flooring Underlay - can be
used with all laminate floors
• Wood Fibre Underlay - has extra acoustic and
thermal properties
• Combilay - laminate floor underlay and damp
proofing all in one
Doors
Check that your doors will clear the new floor. Place a board
of the laminate flooring you have chosen to lay, together
with any underlay you are using, on top of your sub-floor
and mark off how much of the door (if any) needs to be
planed away.
While you have easy access to your sub-floor, carry
out any plumbing tasks or electrical installations you
have planned.
Cutting laminate flooring
You will need to cut your laminate flooring to fit the shape of
your room, remembering to leave space for items such as
pipework.
Use a power circular saw with a carbide toothed blade and
cut from the non-decorative underside of the boards to avoid
chipping. Alternatively, use a hand saw and cut from the top
of the boards. Ensure you cut the planks carefully - they are
strong and durable but may chip during cutting if care is not
taken.
5 - Laying a LOC laminate floor
LOC laminate flooring simply 'locs' together, so no adhesive
is required. It is quick and easy to install and can be re-laid
up to six times - but remember that care should always be
taken when doing this.
Choose the direction
Most manufacturers recommend
flooring is laid lengthways, along the
room, running the boards towards the
window if there is one. If you're laying
over floorboards, lay the laminate
boards at 90o
(right angles) across
them to reinforce the joints (1).
Laying the first row
Lay the first board with the Groove o
small tongue against the wall. Two
spacers should be used to allow for
the 10mm expansion gap between t
boards and the wall (2).
Check alignment and squaring.
Lay the next board against the short
side and fix into place. Once fixed be
very careful if separating the joints a
this may result in damage.
r
he
s
The end of the row
To measure the correct length of
board to use at the end of a row
(allowing for the 10mm gap), place
the final board next to the existing
flooring with the tongues facing each
other. The groove end should be
pushed up to the spacers against the
wall (3).
Cut the required length and turn the
board so that the groove and tongue are together.
Fitting the boardsFitting the boards
Check that the first row is positioned
correctly and the spacers are in the
right place.
Insert the tongue of the first board at
an angle to 'loc' the boards firmly
together (4).
Starting a new row
When starting to lay a new row of
flooring, make sure that the first
piece you are going to lay is at least
30cm in length.
Remember to stagger the joints
(creating a 'brick wall' effect) when
laying the boards (5) and tap them
together using a tapping block - the
long side first, followed by the short
side.
The final row
When you come to lay the last row,
place a loose board on top of the
previously laid row, then place
another board on top of this with the
tongue touching the wall.
Mark the board underneath so that it
shows the required width (6) and cut
along this line before fitting it.
Pipes
If you need to fit your flooring a
pipes, start by measuring the
diameter of the pipe then drill a hole,
20mm larger than the pipe diameter,
in the laminate board. Saw a section
out of the board which goes through
the hole (7) so that it can be laid
around the pipe and replace the sawn
out section and glue in to place.
round
Mouldings and skirtings
You may need to make minor
adjustments to door mouldings and
skirtings to ensure your new flooring
fits comfortably.
Place a piece of the flooring face d
on to any underlay you are using a
saw the moulding above this board a
the base (8).
Fit the floorboard under the m
remembering to leave a 10mm expansion gap.
own
nd
t
oulding,
Finishing
When you have laid your floor, remove the fitting wedges. If
you are using floor edging to hide the expansion gaps, pin or
glue it to the wall or skirting board (not the floor). Use a nail
punch to drive the pin heads below the surface. Cover holes
made for pipes with pipe covers and glue into place.
To restore your floor's shine, go over the surface with a
broom or vacuum cleaner (with the brushes down). To add
extra shine to your newly installed floor, use a laminate floor
cleaner.
Laminate flooring repair kits are available should your new
floor suffer any damage. Please refer to the product
instructions for advice on ongoing care and maintenance.
If you require additional advice on fitting a laminate floor,
please contact the Floormaster Helpdesk on 01276 410200.

More Related Content

What's hot

All you need to know after you buy your wooden floor by The Reclaimed Floorin...
All you need to know after you buy your wooden floor by The Reclaimed Floorin...All you need to know after you buy your wooden floor by The Reclaimed Floorin...
All you need to know after you buy your wooden floor by The Reclaimed Floorin...Reclaimed Flooring
 
Wall and floor tiling tools and equipment
Wall and floor tiling tools and equipmentWall and floor tiling tools and equipment
Wall and floor tiling tools and equipmentdeaftc232
 
How to tile a floor
How to tile a floorHow to tile a floor
How to tile a floorHSS Hire
 
Wall panels
Wall panelsWall panels
Wall panelschtipu
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wallPraveen Sudarsan
 
Wooden Flooring building construction & management (bcm)- IV sem
Wooden Flooring building construction & management (bcm)- IV semWooden Flooring building construction & management (bcm)- IV sem
Wooden Flooring building construction & management (bcm)- IV semSakshi Srivastava
 
Wooden Flooring, Types of Wooden Flooring and Installation Process
Wooden Flooring, Types of Wooden Flooring and Installation ProcessWooden Flooring, Types of Wooden Flooring and Installation Process
Wooden Flooring, Types of Wooden Flooring and Installation ProcessFuturistech
 
Nitco techical and product knowlege of tiles ppt
Nitco techical and product knowlege of tiles  ppt Nitco techical and product knowlege of tiles  ppt
Nitco techical and product knowlege of tiles ppt Chuchu Beera
 
Use wall and floor tiling tools and equipment
Use  wall and floor tiling tools and equipmentUse  wall and floor tiling tools and equipment
Use wall and floor tiling tools and equipmentdeaftc232
 
Laminate and wood
Laminate  and woodLaminate  and wood
Laminate and woodRahul Verma
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pondPraveen Sudarsan
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal poolPraveen Sudarsan
 

What's hot (19)

Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Wall tiling
Wall tilingWall tiling
Wall tiling
 
Carpet flooring
Carpet flooringCarpet flooring
Carpet flooring
 
All you need to know after you buy your wooden floor by The Reclaimed Floorin...
All you need to know after you buy your wooden floor by The Reclaimed Floorin...All you need to know after you buy your wooden floor by The Reclaimed Floorin...
All you need to know after you buy your wooden floor by The Reclaimed Floorin...
 
Wall and floor tiling tools and equipment
Wall and floor tiling tools and equipmentWall and floor tiling tools and equipment
Wall and floor tiling tools and equipment
 
How to tile a floor
How to tile a floorHow to tile a floor
How to tile a floor
 
Wall panels
Wall panelsWall panels
Wall panels
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
How to build a deck
How to build a deckHow to build a deck
How to build a deck
 
Wooden Flooring building construction & management (bcm)- IV sem
Wooden Flooring building construction & management (bcm)- IV semWooden Flooring building construction & management (bcm)- IV sem
Wooden Flooring building construction & management (bcm)- IV sem
 
Wooden Flooring, Types of Wooden Flooring and Installation Process
Wooden Flooring, Types of Wooden Flooring and Installation ProcessWooden Flooring, Types of Wooden Flooring and Installation Process
Wooden Flooring, Types of Wooden Flooring and Installation Process
 
Nitco techical and product knowlege of tiles ppt
Nitco techical and product knowlege of tiles  ppt Nitco techical and product knowlege of tiles  ppt
Nitco techical and product knowlege of tiles ppt
 
Use wall and floor tiling tools and equipment
Use  wall and floor tiling tools and equipmentUse  wall and floor tiling tools and equipment
Use wall and floor tiling tools and equipment
 
Errth Flex For CD.pptx
Errth Flex For CD.pptxErrth Flex For CD.pptx
Errth Flex For CD.pptx
 
Laminate and wood
Laminate  and woodLaminate  and wood
Laminate and wood
 
How to construct a suimple garden pond
How to construct a suimple garden pondHow to construct a suimple garden pond
How to construct a suimple garden pond
 
Wood and laminates
Wood and laminatesWood and laminates
Wood and laminates
 
How to build a raised formal pool
How to build a raised formal poolHow to build a raised formal pool
How to build a raised formal pool
 
Certainteed Drywall Installation Guide
Certainteed Drywall Installation GuideCertainteed Drywall Installation Guide
Certainteed Drywall Installation Guide
 

Viewers also liked

Viewers also liked (14)

Tena Magušić 8.b - Hrvatska i Europska unija - In varietate concordia
Tena Magušić 8.b - Hrvatska i Europska unija - In varietate concordiaTena Magušić 8.b - Hrvatska i Europska unija - In varietate concordia
Tena Magušić 8.b - Hrvatska i Europska unija - In varietate concordia
 
Apariciones en prensa de "Chiquitita by Amaia Montero"
Apariciones en prensa de "Chiquitita by Amaia Montero"Apariciones en prensa de "Chiquitita by Amaia Montero"
Apariciones en prensa de "Chiquitita by Amaia Montero"
 
JRprojectseconddraft (1)
JRprojectseconddraft (1)JRprojectseconddraft (1)
JRprojectseconddraft (1)
 
Sistema informático
Sistema informáticoSistema informático
Sistema informático
 
Leeway FCNF Program Book
Leeway FCNF Program BookLeeway FCNF Program Book
Leeway FCNF Program Book
 
OP_PANEL
OP_PANELOP_PANEL
OP_PANEL
 
6. MCSE
6. MCSE6. MCSE
6. MCSE
 
PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...
PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...
PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...
 
Sistemas operativos
Sistemas operativosSistemas operativos
Sistemas operativos
 
Deep c slides_oct2011_rus
Deep c slides_oct2011_rusDeep c slides_oct2011_rus
Deep c slides_oct2011_rus
 
Dbus intro
Dbus introDbus intro
Dbus intro
 
Músic@
Músic@Músic@
Músic@
 
Most Incredible pictures
Most Incredible picturesMost Incredible pictures
Most Incredible pictures
 
Prestige royal gardens
Prestige royal gardensPrestige royal gardens
Prestige royal gardens
 

Similar to Lay a laminate floor

Similar to Lay a laminate floor (20)

Wooden flooring and repair
Wooden flooring and repairWooden flooring and repair
Wooden flooring and repair
 
FLOORING & ITS TYPE
FLOORING & ITS TYPEFLOORING & ITS TYPE
FLOORING & ITS TYPE
 
cereamic
cereamiccereamic
cereamic
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
BC repair floors ppt
BC repair floors pptBC repair floors ppt
BC repair floors ppt
 
Laminate flooring
Laminate flooringLaminate flooring
Laminate flooring
 
Lay paving stones
Lay paving stonesLay paving stones
Lay paving stones
 
Flooring in interiors
Flooring in interiorsFlooring in interiors
Flooring in interiors
 
Flooring
FlooringFlooring
Flooring
 
Laying Floor Tiles: A DIY How-to Guide
Laying Floor Tiles: A DIY How-to GuideLaying Floor Tiles: A DIY How-to Guide
Laying Floor Tiles: A DIY How-to Guide
 
different types of flooring
different types of flooringdifferent types of flooring
different types of flooring
 
Artex and plaster
Artex and plasterArtex and plaster
Artex and plaster
 
Wall tiling
Wall tilingWall tiling
Wall tiling
 
FLOORING
FLOORINGFLOORING
FLOORING
 
Flooring.pptx
Flooring.pptxFlooring.pptx
Flooring.pptx
 
flooring and its types
flooring and its typesflooring and its types
flooring and its types
 
3.floor systems.pdf
3.floor systems.pdf3.floor systems.pdf
3.floor systems.pdf
 
How to build a retaining wall
How to build a retaining wallHow to build a retaining wall
How to build a retaining wall
 
Ceramic tiles for worktops
Ceramic tiles for worktopsCeramic tiles for worktops
Ceramic tiles for worktops
 
Floors.pdf
Floors.pdfFloors.pdf
Floors.pdf
 

More from Zulaiha Amaria

More from Zulaiha Amaria (20)

Application of disciplinary system
Application of disciplinary systemApplication of disciplinary system
Application of disciplinary system
 
girl culture dictionary
girl culture dictionarygirl culture dictionary
girl culture dictionary
 
Wiring a ring main
Wiring a ring mainWiring a ring main
Wiring a ring main
 
Waterproof your roof
Waterproof your roofWaterproof your roof
Waterproof your roof
 
Wallpapering techniques
Wallpapering techniquesWallpapering techniques
Wallpapering techniques
 
Wallpaper stripping
Wallpaper strippingWallpaper stripping
Wallpaper stripping
 
Wallpaper a ceiling
Wallpaper a ceilingWallpaper a ceiling
Wallpaper a ceiling
 
Wainscotting
WainscottingWainscotting
Wainscotting
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Tow dolly plans
Tow dolly plansTow dolly plans
Tow dolly plans
 
Timber decking
Timber deckingTimber decking
Timber decking
 
Timber cutting hand saws
Timber cutting hand sawsTimber cutting hand saws
Timber cutting hand saws
 
Size conversion charts
Size conversion chartsSize conversion charts
Size conversion charts
 
Shelving and storage
Shelving and storageShelving and storage
Shelving and storage
 
Safe diy
Safe diySafe diy
Safe diy
 
Replacing a brick
Replacing a brickReplacing a brick
Replacing a brick
 
Replace broken tiles
Replace broken tilesReplace broken tiles
Replace broken tiles
 
Repairing a dripping tap
Repairing a dripping tapRepairing a dripping tap
Repairing a dripping tap
 
Renovating wood
Renovating woodRenovating wood
Renovating wood
 
Remove a radiator
Remove a radiatorRemove a radiator
Remove a radiator
 

Lay a laminate floor

  • 1. Lay a Laminate Floor To complete this project, you'll need accurate measuring and cutting skills. Floormaster laminate floors are precision-made, making them easy to work with. Always wear a face mask and goggles when cutting laminate flooring. Ensure children and animals are out of the way. Laminate flooring can transform any room with its warmth and beauty. Simply choose from our range of LOC or Tongue and Groove laminate flooring and give your room a facelift by following these step by step instructions 2 - How Much Will I Need? How much underlay will I need? To work out the amount of underlay needed for your floor, measure the length and width of the room. Multiply the two numbers together - this figure will tell you how many square metres the underlay needs to cover. For example: if your room is 4 metres long and 3 metres wide, 4 x 3 =12 square metres. You will need to buy underlay to cover 12 square metres of flooring. Never be tempted to buy less than you really need and allow an extra 5% for cutting. How much laminate flooring will I need? Remembering the length and width of your room, use the tables below to calculate the number of packs of laminate flooring you will need. For example, if your room is 6 metres long and 5 metres wide and you have chosen to use Floormaster 900 LOC laminate flooring, you will need to buy 15 packs of flooring to cover the floor.
  • 2. Floormaster 900 LOC LOC laminate flooring requiring no adhesive. • Can be fitted anywhere except bathrooms and humid areas • Resistant against cigarette burns, fading, stains, impact and scratching • Available in wood effects and coloured Floormaster 1600 LOC LOC laminate flooring requiring no adhesive. • Water resistant, so can be fitted anywhere including bathrooms • Resistant against cigarette burns, fading, stains, impact and scratching • Available in wood effects and coloured Floormaster Tile LOC LOC laminate flooring requiring no adhesive. • Water resistant, so can be fitted anywhere
  • 3. including bathrooms • Resistant against cigarette burns, fading, stains, impact and scratching • Ceramic tile effect, available in a range of colours Extras You should not fit your laminate floor right to the edge of the room. You will need to allow a 10mm gap for it to contract and expand with the room temperature. Use fitting wedges (shaped pieces of plastic), included in the fitting kits, to create this 10mm expansion gap. When the floor has been laid, the wedges are removed and the gaps can be covered with skirting or laminate flooring edging trim for a professional looking finish. Measure round the perimeter of the room (or add the length and width measurements of your room together and multiply by two) to find the length of beading needed to cover the extension gap. 3 - Laminate Flooring Basics Laminate flooring is laid as a loose, 'floating' floor. The boards are not nailed to the floor but simply joined to each other without the need for nails or screws. This means laminate flooring can be laid on top of most surfaces, including timber or concrete, as long as it's dry, clean, and level. Choose carefully In bathrooms or other areas of high humidity, ensure you select a suitable grade of flooring. The Floormaster 1600 LOC and Floormaster Tile LOC ranges are water resistant and suitable for bathrooms where the flooring may get wet. And remember, inappropriate floor covering is always a false economy, especially where there is a lot of foot traffic or other wear and tear. Condition the laminate flooring Before you lay your laminate flooring, it must be conditioned to the room's atmosphere. If this is not done it could warp (become twisted and bent out of shape). To condition the flooring: • Make sure it's kept in its original packaging
  • 4. • Put it in the room where the floor will be laid (ideal temperature of 18o C to 20o C) • Lie the pack horizontally • Leave the flooring in this position for at least 48 hours 4 - Sub-Floor Preparation The floor you intend to lay the laminate flooring on top of must be dry, firm and level. A floor is considered level if the deviation in height is less than 1mm over a distance of 1 linear metre. Sheets of fibre-board can be used to level minor deviations and they have additional acoustic and thermal properties. Deviations above this must be levelled out before laying the new floor. The following sections advise how this should be done, depending on the type of sub-floor you have. Wooden sub-floor preparation • Remove any protruding nails or tacks to ensure you have a smooth surface. • If you are laying your laminate flooring on an upper floor, re-fix any loose boards using screws rather than nails as hammering might damage the ceiling plaster below. • Use a detector to identify if there is any underlying pipework or electricity cables so that you can avoid these areas when driving in nails or screws. • Smooth any high spots in the floor using a plane, and fill hollow patches with levelling compound (sometimes called screed) to make the floor level. Concrete sub-floor preparation Some concrete sub-floors have raised 'high' spots of concrete that can be chipped away with a bolster, but the easiest way to achieve a smooth surface is with levelling compound (screed). Simply mix this in a bucket with water, then pour and spread with a trowel. It will then set to a level finish. We recommend that newly laid concrete or screed be allowed to dry at a rate of 1mm per day prior to fitting laminate flooring, i.e. 50mm screed = 50 days. Damp-proof membrane
  • 5. A damp-proof membrane should be fitted to stop any moisture from damaging the new boards. This is in addition to a damp course which may already be present in the sub- floor. The following sub-floors require a damp proof membrane of 0.2mm thick: • concrete • vinyl tiles • asphalt • quarry tiles Underlay Once you are sure the sub-floor is clean, dry and level, you will need to install underlay prior to laying your laminate flooring. There are three types of underlay available: • Floormaster Laminate Flooring Underlay - can be used with all laminate floors • Wood Fibre Underlay - has extra acoustic and thermal properties • Combilay - laminate floor underlay and damp proofing all in one Doors Check that your doors will clear the new floor. Place a board of the laminate flooring you have chosen to lay, together with any underlay you are using, on top of your sub-floor and mark off how much of the door (if any) needs to be planed away. While you have easy access to your sub-floor, carry out any plumbing tasks or electrical installations you have planned. Cutting laminate flooring You will need to cut your laminate flooring to fit the shape of your room, remembering to leave space for items such as pipework.
  • 6. Use a power circular saw with a carbide toothed blade and cut from the non-decorative underside of the boards to avoid chipping. Alternatively, use a hand saw and cut from the top of the boards. Ensure you cut the planks carefully - they are strong and durable but may chip during cutting if care is not taken. 5 - Laying a LOC laminate floor LOC laminate flooring simply 'locs' together, so no adhesive is required. It is quick and easy to install and can be re-laid up to six times - but remember that care should always be taken when doing this. Choose the direction Most manufacturers recommend flooring is laid lengthways, along the room, running the boards towards the window if there is one. If you're laying over floorboards, lay the laminate boards at 90o (right angles) across them to reinforce the joints (1). Laying the first row Lay the first board with the Groove o small tongue against the wall. Two spacers should be used to allow for the 10mm expansion gap between t boards and the wall (2). Check alignment and squaring. Lay the next board against the short side and fix into place. Once fixed be very careful if separating the joints a this may result in damage. r he s The end of the row To measure the correct length of board to use at the end of a row (allowing for the 10mm gap), place the final board next to the existing flooring with the tongues facing each other. The groove end should be pushed up to the spacers against the wall (3). Cut the required length and turn the board so that the groove and tongue are together.
  • 7. Fitting the boardsFitting the boards Check that the first row is positioned correctly and the spacers are in the right place. Insert the tongue of the first board at an angle to 'loc' the boards firmly together (4). Starting a new row When starting to lay a new row of flooring, make sure that the first piece you are going to lay is at least 30cm in length. Remember to stagger the joints (creating a 'brick wall' effect) when laying the boards (5) and tap them together using a tapping block - the long side first, followed by the short side. The final row When you come to lay the last row, place a loose board on top of the previously laid row, then place another board on top of this with the tongue touching the wall. Mark the board underneath so that it shows the required width (6) and cut along this line before fitting it. Pipes If you need to fit your flooring a pipes, start by measuring the diameter of the pipe then drill a hole, 20mm larger than the pipe diameter, in the laminate board. Saw a section out of the board which goes through the hole (7) so that it can be laid around the pipe and replace the sawn out section and glue in to place. round Mouldings and skirtings
  • 8. You may need to make minor adjustments to door mouldings and skirtings to ensure your new flooring fits comfortably. Place a piece of the flooring face d on to any underlay you are using a saw the moulding above this board a the base (8). Fit the floorboard under the m remembering to leave a 10mm expansion gap. own nd t oulding, Finishing When you have laid your floor, remove the fitting wedges. If you are using floor edging to hide the expansion gaps, pin or glue it to the wall or skirting board (not the floor). Use a nail punch to drive the pin heads below the surface. Cover holes made for pipes with pipe covers and glue into place. To restore your floor's shine, go over the surface with a broom or vacuum cleaner (with the brushes down). To add extra shine to your newly installed floor, use a laminate floor cleaner. Laminate flooring repair kits are available should your new floor suffer any damage. Please refer to the product instructions for advice on ongoing care and maintenance. If you require additional advice on fitting a laminate floor, please contact the Floormaster Helpdesk on 01276 410200.