The Aires Corporation is highly desirous of implementing a
new time tracking system to help automate their project control
system, accounting and account receivables. The time tracking
system is designed to allow employees and subcontractors to
charge hours against project control accounts and to help
prevent mischarging. The system is called Chronos and it is
written in a modern database management system, which is the
preferred database platform by Aires. The project is to integrate
the time card system to project management, accounting and
accounts receivable/payables. The Director of Information
Technology (IT) has assigned an integration project to you as
project manager; in addition, the director assigned a senior
systems engineer to be the project's technical lead.
The Software Engineer has a team of five (5) developers that
will work on the project; the Director has asked for a project
management plan to be briefed to the IT senior leadership team,
which is in a few days. Your mission is to construct a Microsoft
Project proposal to help prepare for the briefing. You are also to
construct a quick Total Project Cost (TPC) cross reference work
sheet to verify the accuracy of the MS Project effort.
Organizing
As project manager, you meet with your development team and
determine that the interface will be composed of input screens,
interface processes, and verification reports for the integration
of the time tracking system to the other legacy financial
systems. The Developers have indicated that they would like to
receive training on the Chronos system to help them with the
database structures to facilitate the integration. The training
would have to occur before any other activity could evolve. The
team is highly adept to the other systems being used and the
integration risk is mainly centered on Chronos Time Tracking
system since it is new to the organization. The team has decided
that the plan should be oriented on Design, Programming,
Quality Assurance, Rework, Documentation, User Training, and
Production. Lastly, the team recommended support from the
Chronos vendor to address technical questions they might have
during development of the interface. As project manager, you
note that there are special stakeholders and decide to involve
support from Finance and Project Management to address
process and procedure questions that might arise during the
design, development and testing of the interface. The outcome
of the planning meeting with the entire project team is
represented in the list under scope and schedule.
Scope and Schedule
The following preliminary WBS was developed as a result of
your meeting:
WBSDescription Scope Units
Duration Relationships
1. Chronos Interface 1 Interface
Summary
1.1. Design 1 Spec Summary
1.1.1. Screens 5 Screens 8
1.1.1->1.1.3
1.1.2. Interfaces 3 Process Algorithms
10 1.1.2->1.1.3
1.1.3. Reports 6 Reports 5
1.1.3->1.1.4, 1.1.3->1.1.7
1.1.4. Engineering Support20 Issues
35 1.1.4->1.3 FF
1.1.5. Database 7 Tables 15
1.1.5->1.1.1, 1.1.5->1.1.2, 1.1.5->1.2.4
1.1.6. Technical Training 1 Class
5 1.1.6->1.1.5
1.1.7. Design Done
Milestone 1.1.7->1.3
1.2. Programming
1.2.1. Screens 5 Screens 10
1.2.1->1.2.3, 1.2.1->1.3 SS
1.2.2. Interfaces 3 Processes 20
1.2.2->1.2.3
1.2.3. Reports 6 Reports 10
1.2.3->1.2.5
1.2.4. Database Systems 7 Tables
15 1.2.4->1.2.1, 1.2.4->1.2.2
1.2.5. Programming Done
Milestone 1.2.5->1.5
1.3. Quality Assurance 21 Tests
40 1.3->1.4 SS, 1.3->1.5
1.4. Rework (Bug Fixes) ? Issues
40 1.4->1.5
1.5. Documentation
1.5.1. Reference Guide 1 Manual
10 1.5.1->1.5.2
1.5.2. Training manuals 1 Manual
10 1.5.2->1.5.3
1.5.3. Manuals Done
Milestone 1.5.3->1.6
1.6. User Training 1 Class 5
1.6->1.7
1.7. Production 1 Interface
Milestone
Resources & Cost
After a discussion, the team decided that the project had
sufficient detail in terms of scope and schedule. Resources
would be loaded against the top summary level activity only for
the entire duration of the project. So the resource and cost
estimate would be estimated at the, "1 Chronos Interface" level.
The following resources will be applied in terms of labor across
the project:
Heads Resource Name Resource Description
Direct Rate
1.00 L1PRJM Project Manager $75/hr
1.00 L2SWE Software Engineer $60/hr
5.00 L3DEVL Software Developers $40/hr
0.50 L4CONS Chronos Consultant $200/hr
0.25 L5FCON Finance Support Staff $85/hr
0.25 L5PRJM Project Management Support $85/hr
The finance department provided the labor codes above and the
burden rates below. Finance provided guidance that the Chronos
Consultant is a subcontractor an only the G&A rate applies. All
other rates associated to labor are to be fully burdened with the
following rate:
Burden Description Rate
Direct Labor Overhead (DLO) 80%
General & Administrative 20%
Since this is a capital project, there is no profit or fee inclusion
in the burden rate. Capital projects are financially sponsored by
the host organization so the total rate is discounted by both
profit and fee; the company will only pay expense rates.
usually, all burden rates come from Finance and are derived
from the financial statements. What is the multiplier and what
are the final rates for each category? You will need to know the
final rates before entering them into MS Project.
Other Project Costs
The director has notified you that the IT Department has
procured a special server for this project to allow for the
development and testing to occur in a non-production
environment. The server is equipment and is to be included as
an investment on the project. The full amount of the service
through installation is $29,234. The server cost is not allocated
against the activities, but is to be included in the total project
cost.
Project Start & Calendar
You are to assume a project start date of 1/1/2011. The project
has not started yet, and the calendar is a five (5) day work
week.
Management Reserve
The director has stipulated a Management Reserve to be
imposed on the total project budget of 10%.
How to do the assignment:
1. Enter MS Project and change all time scales to Quarter for
Second Tear, and Monthly for bottom tier. Change all views
including resource views to quarterly and monthly timescale.
Why?
2. Set the project start date to the project start set herein.
Also, put in the status date as none or to 12/31/10. Why?
3. Go to Gantt View and insert the following custom fields:
Scope, Actual, Units. Scope and Actual fields will be numeric
and will require a text field. The Unit field will also have to be
a text field and will be a text format. We inserted fields for the
Week 2 assignment. Also include the WBS number or Outline
Number and make sure they align to the task list above in terms
of numbering. What is a summary activity? What is a
milestone? How many milestones does an activity have when
there is a duration greater than zero?
4. You will need the top level summary task to enter in
resources and you will need to get the duration to create a quick
Total Project Cost in the work book provided. You will load
resources only against that one task; however, you need to
create the schedule correctly to derive the overall summary
activity duration. This can only be done by correctly entering in
the project activities correctly with the proper summary levels.
Enter in the activities, make sure every activity is appropriately
identified as a milestone and summary task. Enter in the scope
for each activity and then enter the relationships. When
entering relationships, how does MS Project differ from the list
above?
5. Set all activities to Fixed Duration and turn off the Effort
Driven on the Activity Detail screen on the Advanced tab.
6. Insert the early start and finish, late start and finish, free
slack, and total slack fields on the Gantt View; then format the
Gantt view to show the critical path. How can you identify
critical path activities?
7. You should now know the durations of all summary tasks
and you can begin to calculate the TPC. Before showing the
TPC, you will have to calculate the fully burdened rates for all
resources. use the workbook to calculate the final rates for all
resources.
8. Once the fully burdened rates are know, enter the task
name and all resources into the TPC spreadsheet in the
Workbook. Enter the appropriate rates; enter the head count and
the spreadsheet should calculate the hours as all resources will
be loaded across the entire duration of the project, which is
given to you by the top-level summary cost. You will use the
spreadsheet as a cross reference in what you input into MS
Project.
9. Don't forget the project server that was procured; this cost
represents the other project costs the IT department did outside
the project.
10. Enter resources into the Resource Screen in MS Project.
All labor resources are represented as work resources. Ensure
that the right rates are applied. The Other Charges and
Management Reserve (MR) are depicted as costs and will
transpire respectively at the start and end of the summary level.
11. Load resources against the top-level activity. The numbers
should match exactly to the workbook. What is the purpose of
MR and Other Charges?

More Related Content

Similar to DescriptionThe Aires Corporation is highly desirous of implementi.docx

A Case Study in the Design of a Restaurant Management System.pdf
A Case Study in the Design of a Restaurant Management System.pdfA Case Study in the Design of a Restaurant Management System.pdf
A Case Study in the Design of a Restaurant Management System.pdfCarrie Cox
 
Cmgt410
Cmgt410Cmgt410
Cmgt410joituy
 
Cmgt410 Entire Course
Cmgt410 Entire CourseCmgt410 Entire Course
Cmgt410 Entire CourseCMGT410
 
Cmgt 410 Entire Course
Cmgt 410 Entire CourseCmgt 410 Entire Course
Cmgt 410 Entire CourseCMGT410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410sci207
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxjessiehampson
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410joituy
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9Ian Sommerville
 
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docxmercysuttle
 
Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)scorpissons123
 

Similar to DescriptionThe Aires Corporation is highly desirous of implementi.docx (20)

A Case Study in the Design of a Restaurant Management System.pdf
A Case Study in the Design of a Restaurant Management System.pdfA Case Study in the Design of a Restaurant Management System.pdf
A Case Study in the Design of a Restaurant Management System.pdf
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410 Entire Course
Cmgt410 Entire CourseCmgt410 Entire Course
Cmgt410 Entire Course
 
Cmgt 410 Entire Course
Cmgt 410 Entire CourseCmgt 410 Entire Course
Cmgt 410 Entire Course
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
(Worthy & Heatley Networking Kimberly N. WorthyCIS 4.docx
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)
 

More from carolinef5

Design, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docxDesign, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docxcarolinef5
 
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxDESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxcarolinef5
 
Designing Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docxDesigning Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docxcarolinef5
 
Design, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docxDesign, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docxcarolinef5
 
Designa high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docxDesigna high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docxcarolinef5
 
Design your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docxDesign your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docxcarolinef5
 
Design  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docxDesign  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docxcarolinef5
 
Design PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docxDesign PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docxcarolinef5
 
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docxDESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docxcarolinef5
 
Design one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docxDesign one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docxcarolinef5
 
Design of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docxDesign of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docxcarolinef5
 
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docxDesign of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docxcarolinef5
 
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docxDesign Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docxcarolinef5
 
Design DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docxDesign DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docxcarolinef5
 
Design and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docxDesign and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docxcarolinef5
 
Design and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docxDesign and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docxcarolinef5
 
design and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docxdesign and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docxcarolinef5
 
Design a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docxDesign a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docxcarolinef5
 
Design a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docxDesign a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docxcarolinef5
 
Design a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docxDesign a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docxcarolinef5
 

More from carolinef5 (20)

Design, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docxDesign, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docx
 
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docxDESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx
 
Designing Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docxDesigning Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docx
 
Design, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docxDesign, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docx
 
Designa high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docxDesigna high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docx
 
Design your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docxDesign your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docx
 
Design  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docxDesign  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docx
 
Design PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docxDesign PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docx
 
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docxDESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
 
Design one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docxDesign one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docx
 
Design of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docxDesign of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docx
 
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docxDesign of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
 
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docxDesign Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
 
Design DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docxDesign DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docx
 
Design and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docxDesign and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docx
 
Design and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docxDesign and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docx
 
design and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docxdesign and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docx
 
Design a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docxDesign a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docx
 
Design a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docxDesign a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docx
 
Design a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docxDesign a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docx
 

Recently uploaded

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 

Recently uploaded (20)

internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 

DescriptionThe Aires Corporation is highly desirous of implementi.docx

  • 1. Description The Aires Corporation is highly desirous of implementing a new time tracking system to help automate their project control system, accounting and account receivables. The time tracking system is designed to allow employees and subcontractors to charge hours against project control accounts and to help prevent mischarging. The system is called Chronos and it is written in a modern database management system, which is the preferred database platform by Aires. The project is to integrate the time card system to project management, accounting and accounts receivable/payables. The Director of Information Technology (IT) has assigned an integration project to you as project manager; in addition, the director assigned a senior systems engineer to be the project's technical lead. The Software Engineer has a team of five (5) developers that will work on the project; the Director has asked for a project management plan to be briefed to the IT senior leadership team, which is in a few days. Your mission is to construct a Microsoft Project proposal to help prepare for the briefing. You are also to construct a quick Total Project Cost (TPC) cross reference work sheet to verify the accuracy of the MS Project effort. Organizing As project manager, you meet with your development team and determine that the interface will be composed of input screens, interface processes, and verification reports for the integration of the time tracking system to the other legacy financial systems. The Developers have indicated that they would like to receive training on the Chronos system to help them with the database structures to facilitate the integration. The training would have to occur before any other activity could evolve. The team is highly adept to the other systems being used and the
  • 2. integration risk is mainly centered on Chronos Time Tracking system since it is new to the organization. The team has decided that the plan should be oriented on Design, Programming, Quality Assurance, Rework, Documentation, User Training, and Production. Lastly, the team recommended support from the Chronos vendor to address technical questions they might have during development of the interface. As project manager, you note that there are special stakeholders and decide to involve support from Finance and Project Management to address process and procedure questions that might arise during the design, development and testing of the interface. The outcome of the planning meeting with the entire project team is represented in the list under scope and schedule. Scope and Schedule The following preliminary WBS was developed as a result of your meeting: WBSDescription Scope Units Duration Relationships 1. Chronos Interface 1 Interface Summary 1.1. Design 1 Spec Summary 1.1.1. Screens 5 Screens 8 1.1.1->1.1.3 1.1.2. Interfaces 3 Process Algorithms 10 1.1.2->1.1.3 1.1.3. Reports 6 Reports 5 1.1.3->1.1.4, 1.1.3->1.1.7
  • 3. 1.1.4. Engineering Support20 Issues 35 1.1.4->1.3 FF 1.1.5. Database 7 Tables 15 1.1.5->1.1.1, 1.1.5->1.1.2, 1.1.5->1.2.4 1.1.6. Technical Training 1 Class 5 1.1.6->1.1.5 1.1.7. Design Done Milestone 1.1.7->1.3 1.2. Programming 1.2.1. Screens 5 Screens 10 1.2.1->1.2.3, 1.2.1->1.3 SS 1.2.2. Interfaces 3 Processes 20 1.2.2->1.2.3 1.2.3. Reports 6 Reports 10 1.2.3->1.2.5 1.2.4. Database Systems 7 Tables 15 1.2.4->1.2.1, 1.2.4->1.2.2 1.2.5. Programming Done Milestone 1.2.5->1.5 1.3. Quality Assurance 21 Tests 40 1.3->1.4 SS, 1.3->1.5 1.4. Rework (Bug Fixes) ? Issues 40 1.4->1.5 1.5. Documentation
  • 4. 1.5.1. Reference Guide 1 Manual 10 1.5.1->1.5.2 1.5.2. Training manuals 1 Manual 10 1.5.2->1.5.3 1.5.3. Manuals Done Milestone 1.5.3->1.6 1.6. User Training 1 Class 5 1.6->1.7 1.7. Production 1 Interface Milestone Resources & Cost After a discussion, the team decided that the project had sufficient detail in terms of scope and schedule. Resources would be loaded against the top summary level activity only for the entire duration of the project. So the resource and cost estimate would be estimated at the, "1 Chronos Interface" level. The following resources will be applied in terms of labor across the project: Heads Resource Name Resource Description Direct Rate 1.00 L1PRJM Project Manager $75/hr 1.00 L2SWE Software Engineer $60/hr 5.00 L3DEVL Software Developers $40/hr
  • 5. 0.50 L4CONS Chronos Consultant $200/hr 0.25 L5FCON Finance Support Staff $85/hr 0.25 L5PRJM Project Management Support $85/hr The finance department provided the labor codes above and the burden rates below. Finance provided guidance that the Chronos Consultant is a subcontractor an only the G&A rate applies. All other rates associated to labor are to be fully burdened with the following rate: Burden Description Rate Direct Labor Overhead (DLO) 80% General & Administrative 20% Since this is a capital project, there is no profit or fee inclusion in the burden rate. Capital projects are financially sponsored by the host organization so the total rate is discounted by both profit and fee; the company will only pay expense rates. usually, all burden rates come from Finance and are derived from the financial statements. What is the multiplier and what are the final rates for each category? You will need to know the final rates before entering them into MS Project. Other Project Costs The director has notified you that the IT Department has procured a special server for this project to allow for the development and testing to occur in a non-production environment. The server is equipment and is to be included as an investment on the project. The full amount of the service through installation is $29,234. The server cost is not allocated
  • 6. against the activities, but is to be included in the total project cost. Project Start & Calendar You are to assume a project start date of 1/1/2011. The project has not started yet, and the calendar is a five (5) day work week. Management Reserve The director has stipulated a Management Reserve to be imposed on the total project budget of 10%. How to do the assignment: 1. Enter MS Project and change all time scales to Quarter for Second Tear, and Monthly for bottom tier. Change all views including resource views to quarterly and monthly timescale. Why? 2. Set the project start date to the project start set herein. Also, put in the status date as none or to 12/31/10. Why? 3. Go to Gantt View and insert the following custom fields: Scope, Actual, Units. Scope and Actual fields will be numeric and will require a text field. The Unit field will also have to be a text field and will be a text format. We inserted fields for the Week 2 assignment. Also include the WBS number or Outline Number and make sure they align to the task list above in terms of numbering. What is a summary activity? What is a milestone? How many milestones does an activity have when there is a duration greater than zero? 4. You will need the top level summary task to enter in resources and you will need to get the duration to create a quick
  • 7. Total Project Cost in the work book provided. You will load resources only against that one task; however, you need to create the schedule correctly to derive the overall summary activity duration. This can only be done by correctly entering in the project activities correctly with the proper summary levels. Enter in the activities, make sure every activity is appropriately identified as a milestone and summary task. Enter in the scope for each activity and then enter the relationships. When entering relationships, how does MS Project differ from the list above? 5. Set all activities to Fixed Duration and turn off the Effort Driven on the Activity Detail screen on the Advanced tab. 6. Insert the early start and finish, late start and finish, free slack, and total slack fields on the Gantt View; then format the Gantt view to show the critical path. How can you identify critical path activities? 7. You should now know the durations of all summary tasks and you can begin to calculate the TPC. Before showing the TPC, you will have to calculate the fully burdened rates for all resources. use the workbook to calculate the final rates for all resources. 8. Once the fully burdened rates are know, enter the task name and all resources into the TPC spreadsheet in the Workbook. Enter the appropriate rates; enter the head count and the spreadsheet should calculate the hours as all resources will be loaded across the entire duration of the project, which is given to you by the top-level summary cost. You will use the spreadsheet as a cross reference in what you input into MS Project. 9. Don't forget the project server that was procured; this cost represents the other project costs the IT department did outside
  • 8. the project. 10. Enter resources into the Resource Screen in MS Project. All labor resources are represented as work resources. Ensure that the right rates are applied. The Other Charges and Management Reserve (MR) are depicted as costs and will transpire respectively at the start and end of the summary level. 11. Load resources against the top-level activity. The numbers should match exactly to the workbook. What is the purpose of MR and Other Charges?