DESIGN STUDIO III ARCP 301
R. Belton, AIA, NOMA, CSI Associates Professor
PROBLEM 1
FALL 2018
COMMERCIAL GROUND FLOOR AND OFFICE BUILDING
8/22/2018
Ralph Belton, AIA
Table of Contents
I. INTRODUCTION3
A. Preamble3
B. Program3
II. PROJECT STATEMENT3
III. SITE AND ENVIRONMENTAL DATA3
A. Climate and Geographical Data3
B. Adjacencies and Zoning4
C. Topography4
D. Major View4
E. Utilities4
F. Soil and Sub-Surface Conditions4
IV. PROGRAM REQUIREMENTS5
A. General Requirements5
B. Site Requirements5
C. Building Requirements5
V. CODE REQUIREMENTS7
A. General7
B. Classifications7
C. Exiting Requirements7
D. Occupant Load8
E. Stairs8
F. Fire Ratings8
G. Barrier-Free Design9
APPENDIX A11
Required Drawings11
Grading Criteria12
APPENDIX B13
APPENDIX C14
APPENDIX D15
APPENDIX E16
RECREATIONAL RETIAL MALL AND OFFICE BUILDING
I. INTRODUCTION
A. Preamble
The District of Columbia has embarked on an ambitious city
planning scheme to reshape the city scape to accommodate the
younger generation interested in compact activity zone were
shopping recreation and work all happen in close proximity. In
part this phenomena is driven by the baby boomers who has a
age factor that make living and entertainment in the close
proximity a necessity of life. The options for boomers are
suburban senior homes or an urban area with all the needed
amenities within reach. Transportation access is also important
for both groups.
So the city Mixed Use (MU) … “zones are designed to provide
facilities for housing, shopping, and business needs, including
residential, office, service, and employment centers.”
B. Program
XYZ Corporation has acquired a 2.4 acre parcel of land on the
Connecticut Ave corridor in North West Washington DC. (See
subdivision record plat Appendix B). In partnership with the
Giant Corp., the company intends to develop a mixed use
building to include retail and office activities on the land in
keeping with the Washington DC Connecticut Ave corridor
urban plan. The project is envisioned to conform to the
implementation of the Comprehensive Plan.
II. PROJECT STATEMENT
With the influx genXers, Milennials, and an establish
population of professional and elderly people[footnoteRef:1]
the XYZ Corporation has determined through market studies
that this site will support a retail and office building. [1:
http://apps.urban.org/features/OurChangingCity/demographics/i
ndex.html#index ]
XYZ Corporation recognizes the business advantage of locating
its branch offices in close proximity to several Universities and
on the metro red line. As a result the corporation has assembled
a strategic parcel of land on Connecticut Ave NW adjacent to
the Metro line. (See also Appendix B.)
III. SITE AND ENVIRONMENTAL DATA
A. Climate and Geographical Data
1. Location:Latitude 38° 57' N
Longitude 77° 1' W
2. Elevation at Building Site: 322.0 feet above sea level.
3. Sun Angles:December 21st at Noon 28.55°
June 21st at Noon 75.45°
4. Precipitation:
Normal Annual Rainfall/Moderate (39.73”) (includes 17.3” of
snow)
Snow Fall/Moderate (17.3”)
5. Weather:
Summer-- Days: Hot and Humid
Temperature:Daytime Average: 84.67°F
Nighttime Average: 65.67°F
Wind: Southwest 8.1 – 9.0 MPH
Winter -- Days: Cold and Dry
Temperature:Daytime Average: 43.70°F
Nighttime Range: 28.00°F
Wind: Northwest 9.6 – 10.3 MPH
B. Adjacencies and Zoning
The site is located in an MU-7 zone and surrounded by
Institutional use and residential R8 and RA-4 and R-1-B zones.
The zone will provide a broad range of commercial and
institutional activities including office, retail, housing, and
mixed. Consideration shall also be given to DCMR 11 Subtitle
G-17 Article 407 Green Area Ratio (GAR)
The site is bordered on the west by Connecticut Avenue on the
north by Windom Street and on the south by Veazey Terrace.
The east boundary of the site is a major residential complex.
(See Appendix B)
C. Topography
The site is mostly flat but has a difference in elevation
diagonally dropping form east to west. An elevational
difference of approximately eight feet exists between south east
corner and the North West corner of the lot. (See Appendix B)
D. Major View
The major view is to the university campus west and the award
winning Intelsat complex to the south west.
E. Utilities
Underground gas, power, water, sanitary sewer, storm sewer and
communication services are available from Connecticut avenue.
F. Soil and Sub-Surface Conditions
1. Soils are a mixture of very compact sands and gravel with
rock being encountered at depths of 25'-0" to 30'-0".
2. Bearing Capacities:
a. Compact Sands and Gravels 6000 lbs/sq.ft.
b. Granite Bedrock Unlimited
c. Footings:
Bearing wall and/or point loading shall bear on spread footing
on the compact gravel or bedrock.
IV. PROGRAM REQUIREMENTS
A. General Requirements
1. General
a. The program requires the design of a multi-storey building
with the first level dedicate to commercial activities. See the
space program (Appendix E). Two floors shall be configured to
accommodate the corporation’s activities with the remaining
loft spaces to be leased to other businesses interested in
locating in the area.
b. The building design shall be visually compatible with
adjacent and surrounding buildings.
B. Site Requirements
l. General
a. The site is an urban site in uptown Washington, DC. It
consists of approximately 104,718.39 square feet (2.4 acres).
2. Site Circulation
a. Vehicle and Service Access
(1) Parking shall be provided as per DC Zoning Code (DCMR
11 revised) for such sites based on MU-7 zone requirements.
(2) Building service and trash collection shall be from the side
streets only.
b. Pedestrian Circulation/Point of Entry
Public access to the building lobby shall be from Connecticut
Ave and located to reflect the location of the metro rail access.
An open plaza will be developed based on the requirements of
MU-10 zone[footnoteRef:2] coordinated with the access of the
office entry lobby. [2: See Mu-10 zone requirements for
plazas]
The corporation has decided that if possible they would like to
utilize the plaza requirements found in MU-10 zones. This they
envision is an enhancement that is complemented by the metro
entrance being on this site in relationship to the multistory
building.
C. Building Requirements
1. General
f. The floor-to-floor heights shall be as follows:
(1) First Floor to Second Floor 15'-0"
(2) Second Floor to Third Floor 10'-0"
(3) Typical Floors 10'-0"
(5) Mechanical & Elevator as required by the program
2. FIRST FLOOR commercial retail43632.66 SF
a. Common Office Building Facilities 2148.00 SF
(1) Entry Vestibule/Building Lobby 800 SF
The main public entry into the office building is an air lock, 8
ft. deep, with two pairs of double doors each at the entry side
and the lobby side. After people pass through the entry
vestibule, they enter the office building lobby. Access to some
of the commercial ground floor space can be provided through
this lobby.
(2) Elevators 144.0 SF (net)
Provide four (4) traction-type elevators with a 5 ft. 8 ins. x 4 ft.
8 ins. platforms.
Provide one (1) freight elevator (traction-type) with a 5 ft 4 ins.
x 7 ft 0 ins.
Freight elevator:
https://www.stanleyelevator.com/wp-content/uploads/pdf/A-
Freight-Planning-Guide.pdf
Passenger elevator:
http://sweets.construction.com/swts_content_files/2051/1035_1
42000-oti_08.pdf
(3) Mechanical Equipment Room 300 SF
This room contains the air handling units, electrical switchgear
and panels, water heater(s), and other mechanical equipment for
the first floor. A chase shall be provided in the floors above to
connect the hot and chilled water lines to the boiler and chiller
in the rooftop penthouse. The walls of the mechanical
equipment room shall be of 2-hour fire-resistive construction.
(4) Trash Room/ Receiving Room 350 SF
This is an un-air-conditioned space where trash is collected and
where deliveries are made. Trash will be collected in large
containers which will be rolled out to the street for emptying
into the sanitation trucks. This space shall be on an outside wall
with an exit door and an overhead rolling door approximately 10
ft. wide and 10 ft. tall. The space should be convenient to the
elevators, and it should be directly accessible from the non-
public work areas of the office floors and the commercial
floors. Some demarcation shall be provided between the
commercial loading dock and the office floors loading dock.
(5) Miscellaneous Circulation/Stairs 554 SF
b. Leasable floor41484.68 SF
Giant Food Store 9600.00 SF
CVS8000.00 SF
Store(s) of your choice8000.00 SF
Store(s) of your choice7884.68 SF
Store(s) of your choice8000.00SF
3. SECOND through FOURTH FLOOR typical floors130897.98
SF
4. FIFTH and SIXTH FLOOR (Corporate Offices)87265.32 SF
A. Structural System Requirements
Designers are required to show building columns and designate
bearing walls to clearly demonstrate their understanding of the
required structural system. Non-structural floor slabs shall bear
directly on compacted structural fill. Also see soil report at
Section III, F and Code Requirements at Section V.
B. Mechanical Systems Requirements
The mechanical system will be a 4-pipe hot and chilled water
system with a gas fired boiler in the penthouse and an electric,
air-cooled chiller (also in penthouse) employing remote air
handlers in multiple zones. Appropriate chases and horizontal
runs for ductwork must be provided.
V. CODE REQUIREMENTS
A. General
The requirements for protecting life, health and public welfare
must be incorporated into your design solution. The site is
located in a hypothetical Fire District and the design shall
conform to codes as indicated below. The International
Building Code shall govern this project.
B. Classifications
The building is classified as business occupancy. The structure
will be non-combustible, protected. An automatic fire
suppression system will be provided throughout.
C. Exiting Requirements
1. Each floor must have a minimum of two exits remotely
located from one another.
2. All doors shall swing in the direction of egress when serving
an occupant load of 50 or more people.
3. The maximum distance of travel from any point to an exterior
exit door, exit passageway, or enclosed exit stair shall not
exceed 200 feet (measured along the line of travel).
4. Dead end pockets or hallways in excess of 20 feet in depth
shall not occur.
5. Every room or suite with an occupant load of more than 50
people shall have at least two egress doorways as remote as
possible from one another.
D. Occupant Load
In determining required exit facilities, the number of occupants
for a given space shall be established by the largest number
computed in accordance with the following criteria:
USE
FLOOR AREA (SQ. FT.) PER OCCUPANT
Assembly without fixed seats
7 net
Business Areas
100 gross
E. Stairs
1. Exit stairs shall discharge directly to the exterior of the
building or into an exit passageway leading directly to the
exterior of the building. An exit passageway shall be without
other openings and shall be separated from the remainder of the
building by at least 2-hour fire resistive construction.
Exception: In buildings of business or residential occupancy,
not more than fifty percent (50%) of the required stairways may
discharge through a lobby at grade provided that all spaces at
that level are equipped with an automatic fire suppression
system.
2. An exit stair may discharge into an interior vestibule or
foyer--other than an "exit passageway" or "grade lobby" (See
item E.1. above)--which meets the following criteria:
a. The depth from the exterior of the building is not greater than
ten (10) feet and the length not greater than twenty (20) feet.
b. The foyer is separated from the remainder of the level of
discharge by self-closing doors and at least 2-hour fire resistive
construction.
3. The path of exit from a street or grade floor may pass through
an exit stair tower serving the upper floor.
4. Exit stairs wrapping around elevator shafts shall not be
allowed.
5. In buildings of four or more stories, at least one exit stair
shall extend to the roof.
F. Fire Ratings
l. All room and corridor walls, floors and ceilings shall be of at
least one-hour fire-resistive construction.
2. All exit stairs and exit passageways shall have walls, floors
and ceilings of at least two-hour fire-resistive construction.
Exception: In buildings of business or residential occupancy
where a grade lobby is used as an existing element, the lobby
need not be separated from adjacent spaces by a rated partition
provided that all such spaces are equipped with an automatic
fire suppression system.
3. All elevator shafts, mechanical shafts, chases, mechanical
rooms, and trash rooms shall have walls, floors and ceilings of
at least two-hour, fire-resistive construction.
G. Barrier-Free Design
Access to the site and the building shall meet the minimum
requirements of the American National Standards Institute,
Standard A 117.1—latest edition
Note: For further clarification on building code requirements
see Building Codes Illustrated: A Guide to Understanding the
2012 International Building Code Jul 10, 2012 by Francis D. K.
Ching and Steven R. Winkel and other resource listed on the
references page (p21)
Blank page
APPENDIX A
Required Drawings
l. Site and First Level Plan (Scale 1/8" = 1'- 0")
a. Indicate building floor plan; label all spaces; show clearly all
walks, site access, service areas, exterior walls, fenestration,
partitions, doors, door swings, stairs, elevators and other major
elements of the design.
b. Show layout of the office lobby, indicating details as directed
by Program Requirements.
c. Indicate Section Cuts.
e. Label all fire wall separations of 2 hours or greater. Color
code red on all drawings.
2. Typical Floor Plan (Scale 1/8" = 1'- 0")
a. Indicate building floor plan; label all spaces; show clearly all
service areas, exterior walls, fenestration, partitions, doors,
door swings, stairs, elevators and other major elements of your
design.
b. Indicate Section Cuts.
c. Label all fire wall separations of 2 hours or greater. Color
code red on all drawings.
3. North, and South, East, and West Elevation (Scale 1/8" = 1'-
0")
Show all fenestration and response to sun exposure.
5. Building Sections (Scale 1/8" = 1'- 0")
Draw a complete longitudinal and cross section through your
building. The sections must indicate a clear understanding of
materials, assemblies, and building systems. Show the
following:
a. Structural System Elements
b. Mechanical System Elements
c. Critical Vertical Dimensions (foundation, floor to floor, floor
to ceiling, etc.)
d. Label all fire wall separations of 2 hours or greater. Color
code red on all drawings.
6. Wall Section (Scale 1 ½” = 1’- 0”)
Draw a wall section at the scale indicated to show the exterior
wall relationship to the floors, roof and foundation and footing
system.
In a separate schedule place in your project binder additional
brief notes should be used to further describe and clarify your
building design solution. Indicate the location of section cuts
on all floor plans.
Grading Criteria
Solution
s will be graded in the following areas. A solution must be at
least minimally acceptable in each major category.
1. Program Requirements
a. Development of All Programmed Spaces.
b. Conformance to Square Footage/Proportions.
c. Compliance with Required Spatial Relationships.
2. Design
a. Circulation.
b. Spatial Relationships/Proportions/Adjacencies.
c. Relationship to Existing Context.
3. Code Compliance
a. Fire Separations.
b. Accessibility.
c. Means of Egress.
d. Zoning requirements
4. Technical Aspects
a. Materials Selection.
b. Structural Systems.
c. Mechanical Systems.
5. Completeness & Clarity of Presentation, Adherence to
program Instructions, or Required drawing(s). Missing drawing
elements will reduce score by 5 points.
NOTE:

More Related Content

Similar to DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx

Contractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing UpdateContractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing UpdateTheChamber
 
Item # 4 160 Terrell Compatibility Review
Item # 4   160 Terrell Compatibility ReviewItem # 4   160 Terrell Compatibility Review
Item # 4 160 Terrell Compatibility Reviewahcitycouncil
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1Dan Caouette
 
Technical Drafting Module 7
Technical Drafting Module 7Technical Drafting Module 7
Technical Drafting Module 7DepEd
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogdenahcitycouncil
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Coronaahcitycouncil
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001Minh Bui Si
 
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)Marcellus Drilling News
 
76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractors76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractorsKrishna Patel
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 AHMED afifi
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures ConstructionDavid H Moloney
 
Fairfax County Land Development Services 2018 Highlights
Fairfax County Land Development Services 2018 HighlightsFairfax County Land Development Services 2018 Highlights
Fairfax County Land Development Services 2018 HighlightsFairfax County
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresAyan Sengupta
 

Similar to DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx (20)

Contractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing UpdateContractor Night 2014 Wall Bracing Update
Contractor Night 2014 Wall Bracing Update
 
Item # 4 160 Terrell Compatibility Review
Item # 4   160 Terrell Compatibility ReviewItem # 4   160 Terrell Compatibility Review
Item # 4 160 Terrell Compatibility Review
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
Singular Projects Gibraltar
Singular Projects GibraltarSingular Projects Gibraltar
Singular Projects Gibraltar
 
Technical Drafting Module 7
Technical Drafting Module 7Technical Drafting Module 7
Technical Drafting Module 7
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
 
Kd6
Kd6Kd6
Kd6
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
 
Building work method statement cm - ms- bw - 001
Building work method statement  cm - ms- bw - 001Building work method statement  cm - ms- bw - 001
Building work method statement cm - ms- bw - 001
 
Singular Projects Gibraltar
Singular Projects GibraltarSingular Projects Gibraltar
Singular Projects Gibraltar
 
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractors76063596 cibse-site-management-of-building-services-contractors
76063596 cibse-site-management-of-building-services-contractors
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
Unit 3
Unit 3Unit 3
Unit 3
 
Presentation 2016
Presentation  2016Presentation  2016
Presentation 2016
 
Airport Buildings & Structures Construction
Airport Buildings & Structures ConstructionAirport Buildings & Structures Construction
Airport Buildings & Structures Construction
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Fairfax County Land Development Services 2018 Highlights
Fairfax County Land Development Services 2018 HighlightsFairfax County Land Development Services 2018 Highlights
Fairfax County Land Development Services 2018 Highlights
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structures
 

More from carolinef5

Design, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docxDesign, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docxcarolinef5
 
Designing Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docxDesigning Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docxcarolinef5
 
Design, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docxDesign, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docxcarolinef5
 
Designa high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docxDesigna high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docxcarolinef5
 
Design your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docxDesign your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docxcarolinef5
 
Design  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docxDesign  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docxcarolinef5
 
Design PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docxDesign PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docxcarolinef5
 
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docxDESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docxcarolinef5
 
Design one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docxDesign one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docxcarolinef5
 
Design of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docxDesign of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docxcarolinef5
 
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docxDesign of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docxcarolinef5
 
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docxDesign Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docxcarolinef5
 
Design DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docxDesign DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docxcarolinef5
 
Design and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docxDesign and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docxcarolinef5
 
Design and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docxDesign and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docxcarolinef5
 
design and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docxdesign and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docxcarolinef5
 
Design a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docxDesign a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docxcarolinef5
 
Design a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docxDesign a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docxcarolinef5
 
Design a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docxDesign a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docxcarolinef5
 
DescriptionIn this activity, you will analyze and study the subj.docx
DescriptionIn this activity, you will analyze and study the subj.docxDescriptionIn this activity, you will analyze and study the subj.docx
DescriptionIn this activity, you will analyze and study the subj.docxcarolinef5
 

More from carolinef5 (20)

Design, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docxDesign, develop, and justify a public safety agency budget of EMS. I.docx
Design, develop, and justify a public safety agency budget of EMS. I.docx
 
Designing Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docxDesigning Mobile Health Technology for Bipolar DisorderA Fi.docx
Designing Mobile Health Technology for Bipolar DisorderA Fi.docx
 
Design, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docxDesign, develop, and justify a public safety agency budget of EMS..docx
Design, develop, and justify a public safety agency budget of EMS..docx
 
Designa high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docxDesigna high-level conceptual view of a data warehouse (DW) fo.docx
Designa high-level conceptual view of a data warehouse (DW) fo.docx
 
Design your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docxDesign your one assignment of Creating Rubrics for students of eleme.docx
Design your one assignment of Creating Rubrics for students of eleme.docx
 
Design  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docxDesign  a PowerPoint presentation for high school aged students .docx
Design  a PowerPoint presentation for high school aged students .docx
 
Design PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docxDesign PatternsChristian Behrenshttpswww.behance.netgall.docx
Design PatternsChristian Behrenshttpswww.behance.netgall.docx
 
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docxDESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
DESIGN TECHNOLOGY CLASS” DescriptionUsing the various tool.docx
 
Design one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docxDesign one assignment of the Word Find and the one of Using Digital .docx
Design one assignment of the Word Find and the one of Using Digital .docx
 
Design of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docxDesign of Pareto optimal CO2 cap-and-trade policies for de.docx
Design of Pareto optimal CO2 cap-and-trade policies for de.docx
 
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docxDesign of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
Design of a non-invasive Hip Exoskeleton DISCLAIMERThis repo.docx
 
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docxDesign Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
Design Document – Week 1 – ProposalCourse ID IT 491 CAPSTONE .docx
 
Design DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docxDesign DissertationDeveloping a coherent methodologyAimTo p.docx
Design DissertationDeveloping a coherent methodologyAimTo p.docx
 
Design and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docxDesign and implement a Java program that transfers fragments of a fi.docx
Design and implement a Java program that transfers fragments of a fi.docx
 
Design and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docxDesign and Mechanism ofControlling a Robotic ArmIntroduction.docx
Design and Mechanism ofControlling a Robotic ArmIntroduction.docx
 
design and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docxdesign and develop an interactive and user-friendly GUI-based networ.docx
design and develop an interactive and user-friendly GUI-based networ.docx
 
Design a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docxDesign a Lesson plan on the subject of Reflections and Guide Reflect.docx
Design a Lesson plan on the subject of Reflections and Guide Reflect.docx
 
Design a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docxDesign a Java application that will read a file containing data rela.docx
Design a Java application that will read a file containing data rela.docx
 
Design a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docxDesign a high-level conceptual view of a data warehouse (DW) for H.docx
Design a high-level conceptual view of a data warehouse (DW) for H.docx
 
DescriptionIn this activity, you will analyze and study the subj.docx
DescriptionIn this activity, you will analyze and study the subj.docxDescriptionIn this activity, you will analyze and study the subj.docx
DescriptionIn this activity, you will analyze and study the subj.docx
 

Recently uploaded

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 

Recently uploaded (20)

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 

DESIGN STUDIO III ARCP 301R. Belton, AIA, NOMA, CSI Associates.docx

  • 1. DESIGN STUDIO III ARCP 301 R. Belton, AIA, NOMA, CSI Associates Professor PROBLEM 1 FALL 2018 COMMERCIAL GROUND FLOOR AND OFFICE BUILDING 8/22/2018 Ralph Belton, AIA Table of Contents
  • 2. I. INTRODUCTION3 A. Preamble3 B. Program3 II. PROJECT STATEMENT3 III. SITE AND ENVIRONMENTAL DATA3 A. Climate and Geographical Data3 B. Adjacencies and Zoning4 C. Topography4 D. Major View4 E. Utilities4 F. Soil and Sub-Surface Conditions4 IV. PROGRAM REQUIREMENTS5 A. General Requirements5 B. Site Requirements5 C. Building Requirements5 V. CODE REQUIREMENTS7 A. General7 B. Classifications7 C. Exiting Requirements7 D. Occupant Load8 E. Stairs8 F. Fire Ratings8 G. Barrier-Free Design9 APPENDIX A11 Required Drawings11 Grading Criteria12 APPENDIX B13 APPENDIX C14 APPENDIX D15 APPENDIX E16 RECREATIONAL RETIAL MALL AND OFFICE BUILDING I. INTRODUCTION
  • 3. A. Preamble The District of Columbia has embarked on an ambitious city planning scheme to reshape the city scape to accommodate the younger generation interested in compact activity zone were shopping recreation and work all happen in close proximity. In part this phenomena is driven by the baby boomers who has a age factor that make living and entertainment in the close proximity a necessity of life. The options for boomers are suburban senior homes or an urban area with all the needed amenities within reach. Transportation access is also important for both groups. So the city Mixed Use (MU) … “zones are designed to provide facilities for housing, shopping, and business needs, including residential, office, service, and employment centers.” B. Program XYZ Corporation has acquired a 2.4 acre parcel of land on the Connecticut Ave corridor in North West Washington DC. (See subdivision record plat Appendix B). In partnership with the Giant Corp., the company intends to develop a mixed use building to include retail and office activities on the land in keeping with the Washington DC Connecticut Ave corridor urban plan. The project is envisioned to conform to the implementation of the Comprehensive Plan. II. PROJECT STATEMENT With the influx genXers, Milennials, and an establish population of professional and elderly people[footnoteRef:1] the XYZ Corporation has determined through market studies that this site will support a retail and office building. [1: http://apps.urban.org/features/OurChangingCity/demographics/i ndex.html#index ]
  • 4. XYZ Corporation recognizes the business advantage of locating its branch offices in close proximity to several Universities and on the metro red line. As a result the corporation has assembled a strategic parcel of land on Connecticut Ave NW adjacent to the Metro line. (See also Appendix B.) III. SITE AND ENVIRONMENTAL DATA A. Climate and Geographical Data 1. Location:Latitude 38° 57' N Longitude 77° 1' W 2. Elevation at Building Site: 322.0 feet above sea level. 3. Sun Angles:December 21st at Noon 28.55° June 21st at Noon 75.45° 4. Precipitation: Normal Annual Rainfall/Moderate (39.73”) (includes 17.3” of snow) Snow Fall/Moderate (17.3”) 5. Weather: Summer-- Days: Hot and Humid Temperature:Daytime Average: 84.67°F Nighttime Average: 65.67°F Wind: Southwest 8.1 – 9.0 MPH Winter -- Days: Cold and Dry Temperature:Daytime Average: 43.70°F Nighttime Range: 28.00°F
  • 5. Wind: Northwest 9.6 – 10.3 MPH B. Adjacencies and Zoning The site is located in an MU-7 zone and surrounded by Institutional use and residential R8 and RA-4 and R-1-B zones. The zone will provide a broad range of commercial and institutional activities including office, retail, housing, and mixed. Consideration shall also be given to DCMR 11 Subtitle G-17 Article 407 Green Area Ratio (GAR) The site is bordered on the west by Connecticut Avenue on the north by Windom Street and on the south by Veazey Terrace. The east boundary of the site is a major residential complex. (See Appendix B) C. Topography The site is mostly flat but has a difference in elevation diagonally dropping form east to west. An elevational difference of approximately eight feet exists between south east corner and the North West corner of the lot. (See Appendix B) D. Major View The major view is to the university campus west and the award winning Intelsat complex to the south west. E. Utilities Underground gas, power, water, sanitary sewer, storm sewer and communication services are available from Connecticut avenue. F. Soil and Sub-Surface Conditions
  • 6. 1. Soils are a mixture of very compact sands and gravel with rock being encountered at depths of 25'-0" to 30'-0". 2. Bearing Capacities: a. Compact Sands and Gravels 6000 lbs/sq.ft. b. Granite Bedrock Unlimited c. Footings: Bearing wall and/or point loading shall bear on spread footing on the compact gravel or bedrock. IV. PROGRAM REQUIREMENTS A. General Requirements 1. General a. The program requires the design of a multi-storey building with the first level dedicate to commercial activities. See the space program (Appendix E). Two floors shall be configured to accommodate the corporation’s activities with the remaining loft spaces to be leased to other businesses interested in locating in the area. b. The building design shall be visually compatible with adjacent and surrounding buildings. B. Site Requirements l. General a. The site is an urban site in uptown Washington, DC. It consists of approximately 104,718.39 square feet (2.4 acres). 2. Site Circulation a. Vehicle and Service Access (1) Parking shall be provided as per DC Zoning Code (DCMR 11 revised) for such sites based on MU-7 zone requirements.
  • 7. (2) Building service and trash collection shall be from the side streets only. b. Pedestrian Circulation/Point of Entry Public access to the building lobby shall be from Connecticut Ave and located to reflect the location of the metro rail access. An open plaza will be developed based on the requirements of MU-10 zone[footnoteRef:2] coordinated with the access of the office entry lobby. [2: See Mu-10 zone requirements for plazas] The corporation has decided that if possible they would like to utilize the plaza requirements found in MU-10 zones. This they envision is an enhancement that is complemented by the metro entrance being on this site in relationship to the multistory building. C. Building Requirements 1. General f. The floor-to-floor heights shall be as follows: (1) First Floor to Second Floor 15'-0" (2) Second Floor to Third Floor 10'-0" (3) Typical Floors 10'-0" (5) Mechanical & Elevator as required by the program 2. FIRST FLOOR commercial retail43632.66 SF a. Common Office Building Facilities 2148.00 SF (1) Entry Vestibule/Building Lobby 800 SF The main public entry into the office building is an air lock, 8 ft. deep, with two pairs of double doors each at the entry side
  • 8. and the lobby side. After people pass through the entry vestibule, they enter the office building lobby. Access to some of the commercial ground floor space can be provided through this lobby. (2) Elevators 144.0 SF (net) Provide four (4) traction-type elevators with a 5 ft. 8 ins. x 4 ft. 8 ins. platforms. Provide one (1) freight elevator (traction-type) with a 5 ft 4 ins. x 7 ft 0 ins. Freight elevator: https://www.stanleyelevator.com/wp-content/uploads/pdf/A- Freight-Planning-Guide.pdf Passenger elevator: http://sweets.construction.com/swts_content_files/2051/1035_1 42000-oti_08.pdf (3) Mechanical Equipment Room 300 SF This room contains the air handling units, electrical switchgear and panels, water heater(s), and other mechanical equipment for the first floor. A chase shall be provided in the floors above to connect the hot and chilled water lines to the boiler and chiller in the rooftop penthouse. The walls of the mechanical equipment room shall be of 2-hour fire-resistive construction. (4) Trash Room/ Receiving Room 350 SF This is an un-air-conditioned space where trash is collected and where deliveries are made. Trash will be collected in large containers which will be rolled out to the street for emptying into the sanitation trucks. This space shall be on an outside wall with an exit door and an overhead rolling door approximately 10 ft. wide and 10 ft. tall. The space should be convenient to the
  • 9. elevators, and it should be directly accessible from the non- public work areas of the office floors and the commercial floors. Some demarcation shall be provided between the commercial loading dock and the office floors loading dock. (5) Miscellaneous Circulation/Stairs 554 SF b. Leasable floor41484.68 SF Giant Food Store 9600.00 SF CVS8000.00 SF Store(s) of your choice8000.00 SF Store(s) of your choice7884.68 SF Store(s) of your choice8000.00SF 3. SECOND through FOURTH FLOOR typical floors130897.98 SF 4. FIFTH and SIXTH FLOOR (Corporate Offices)87265.32 SF A. Structural System Requirements Designers are required to show building columns and designate bearing walls to clearly demonstrate their understanding of the required structural system. Non-structural floor slabs shall bear directly on compacted structural fill. Also see soil report at Section III, F and Code Requirements at Section V. B. Mechanical Systems Requirements The mechanical system will be a 4-pipe hot and chilled water system with a gas fired boiler in the penthouse and an electric, air-cooled chiller (also in penthouse) employing remote air handlers in multiple zones. Appropriate chases and horizontal runs for ductwork must be provided. V. CODE REQUIREMENTS
  • 10. A. General The requirements for protecting life, health and public welfare must be incorporated into your design solution. The site is located in a hypothetical Fire District and the design shall conform to codes as indicated below. The International Building Code shall govern this project. B. Classifications The building is classified as business occupancy. The structure will be non-combustible, protected. An automatic fire suppression system will be provided throughout. C. Exiting Requirements 1. Each floor must have a minimum of two exits remotely located from one another. 2. All doors shall swing in the direction of egress when serving an occupant load of 50 or more people. 3. The maximum distance of travel from any point to an exterior exit door, exit passageway, or enclosed exit stair shall not exceed 200 feet (measured along the line of travel). 4. Dead end pockets or hallways in excess of 20 feet in depth shall not occur. 5. Every room or suite with an occupant load of more than 50 people shall have at least two egress doorways as remote as possible from one another. D. Occupant Load In determining required exit facilities, the number of occupants
  • 11. for a given space shall be established by the largest number computed in accordance with the following criteria: USE FLOOR AREA (SQ. FT.) PER OCCUPANT Assembly without fixed seats 7 net Business Areas 100 gross E. Stairs 1. Exit stairs shall discharge directly to the exterior of the building or into an exit passageway leading directly to the exterior of the building. An exit passageway shall be without other openings and shall be separated from the remainder of the building by at least 2-hour fire resistive construction. Exception: In buildings of business or residential occupancy, not more than fifty percent (50%) of the required stairways may discharge through a lobby at grade provided that all spaces at that level are equipped with an automatic fire suppression system. 2. An exit stair may discharge into an interior vestibule or foyer--other than an "exit passageway" or "grade lobby" (See item E.1. above)--which meets the following criteria: a. The depth from the exterior of the building is not greater than ten (10) feet and the length not greater than twenty (20) feet. b. The foyer is separated from the remainder of the level of discharge by self-closing doors and at least 2-hour fire resistive
  • 12. construction. 3. The path of exit from a street or grade floor may pass through an exit stair tower serving the upper floor. 4. Exit stairs wrapping around elevator shafts shall not be allowed. 5. In buildings of four or more stories, at least one exit stair shall extend to the roof. F. Fire Ratings l. All room and corridor walls, floors and ceilings shall be of at least one-hour fire-resistive construction. 2. All exit stairs and exit passageways shall have walls, floors and ceilings of at least two-hour fire-resistive construction. Exception: In buildings of business or residential occupancy where a grade lobby is used as an existing element, the lobby need not be separated from adjacent spaces by a rated partition provided that all such spaces are equipped with an automatic fire suppression system. 3. All elevator shafts, mechanical shafts, chases, mechanical rooms, and trash rooms shall have walls, floors and ceilings of at least two-hour, fire-resistive construction. G. Barrier-Free Design Access to the site and the building shall meet the minimum requirements of the American National Standards Institute, Standard A 117.1—latest edition Note: For further clarification on building code requirements
  • 13. see Building Codes Illustrated: A Guide to Understanding the 2012 International Building Code Jul 10, 2012 by Francis D. K. Ching and Steven R. Winkel and other resource listed on the references page (p21) Blank page APPENDIX A Required Drawings l. Site and First Level Plan (Scale 1/8" = 1'- 0") a. Indicate building floor plan; label all spaces; show clearly all walks, site access, service areas, exterior walls, fenestration, partitions, doors, door swings, stairs, elevators and other major elements of the design. b. Show layout of the office lobby, indicating details as directed by Program Requirements. c. Indicate Section Cuts. e. Label all fire wall separations of 2 hours or greater. Color code red on all drawings. 2. Typical Floor Plan (Scale 1/8" = 1'- 0")
  • 14. a. Indicate building floor plan; label all spaces; show clearly all service areas, exterior walls, fenestration, partitions, doors, door swings, stairs, elevators and other major elements of your design. b. Indicate Section Cuts. c. Label all fire wall separations of 2 hours or greater. Color code red on all drawings. 3. North, and South, East, and West Elevation (Scale 1/8" = 1'- 0") Show all fenestration and response to sun exposure. 5. Building Sections (Scale 1/8" = 1'- 0") Draw a complete longitudinal and cross section through your building. The sections must indicate a clear understanding of materials, assemblies, and building systems. Show the following: a. Structural System Elements b. Mechanical System Elements c. Critical Vertical Dimensions (foundation, floor to floor, floor to ceiling, etc.) d. Label all fire wall separations of 2 hours or greater. Color code red on all drawings. 6. Wall Section (Scale 1 ½” = 1’- 0”) Draw a wall section at the scale indicated to show the exterior wall relationship to the floors, roof and foundation and footing system. In a separate schedule place in your project binder additional
  • 15. brief notes should be used to further describe and clarify your building design solution. Indicate the location of section cuts on all floor plans. Grading Criteria Solution s will be graded in the following areas. A solution must be at least minimally acceptable in each major category. 1. Program Requirements a. Development of All Programmed Spaces. b. Conformance to Square Footage/Proportions. c. Compliance with Required Spatial Relationships. 2. Design a. Circulation. b. Spatial Relationships/Proportions/Adjacencies. c. Relationship to Existing Context. 3. Code Compliance
  • 16. a. Fire Separations. b. Accessibility. c. Means of Egress. d. Zoning requirements 4. Technical Aspects a. Materials Selection. b. Structural Systems. c. Mechanical Systems. 5. Completeness & Clarity of Presentation, Adherence to program Instructions, or Required drawing(s). Missing drawing elements will reduce score by 5 points. NOTE: