SlideShare a Scribd company logo
1 of 6
CMGT/410 NEW UPDATED COURSE

   CLICK THIS LINK TO PURCHASE THE ENTIRE COURSE

http://homeworkfox.com/questions/general-questions/1085/cmgt410-
      entire-course-university-of-phoenix-new-updated-course/


CMGT/410 Week 1 Individual Assignment

Consider the following scenario:

You have been hired by a large company with branch offices around the country to assist with
rollout of a new companywide compliance system. While initially the focus was on
implementation of the technology, it was found that success will require at least 10 hours of
training for all managers across the country on both the use of the new platform as well as a host
of new compliance policies being introduced. Of the options discussed, it was generally agreed
than the training should be hands-on and conducted in person at a central location. This will
obviously require getting organizational buy in as not all managers are going to be willing to
commit to taking time out from their normal responsibilities just for some training. In addition,
such large scale centralized training has not been done before by this company; therefore, the
CEO wants feedback from participants to evaluate the effectiveness of any training sessions. As
a result, your manager has given you the responsibility to develop an outline for a proposed
project that would meet this upcoming need.

Submit a 2- to 3-page memo that does the following:

   •   Names the project
   •   Briefly describes the project

   •   Identifies potential stakeholders directly or indirectly involved

   •   Specifies the overall objective and any outcomes for this project

   •   Details how success will be evaluated

   •   Highlights what is needed to ascertain the measurable organizational value (MOV) of this
       project.

You will need to make some assumptions (it is even encouraged) but the assumptions must be
documented.

Week 1 DQ1


Carton et al (2008) describe what they consider a “successful” enterprise
resource planning (ERP) implementation. What aspects of the project made it
“successful” in their definition? Would your organization describe this as
successful? Why or why not?
Week 1 DQ2

Based on the article by Anantatmula (2010), why is the project manager so

critical to the success of the project?

CMGT/410 Week 2 Individual Assignment

You have been tasked with the project of organizing a company offsite 2-day training session in
which people are brought in from different parts of the country.

This entails everything from preparation, accommodations, and facilities.

Submit a 2- to 3-page executive memo summarizing the project's objective, any scoping
boundaries used to define the project, and relevant facts about the tasks or resources.

Identify all related tasks and resources needed to complete this project.

Highlight or specify any measurable deliverables relating to your project.

Attach a task list with assigned resources from a Microsoft® Project file that supports what you
have outlined in your memo.

Week 2 DQ1

Analyze the techniques discussed in the Guldemond et al. article (2008), and

propose how you would apply them to your own skill set as a Project Manager.

Week 2 DQ2


In their 2009 article, Turner et al. describe the relatively low implementation rate
of Gantt chart, CPM diagrams, etc. in projects. Does your organization use these
tools? How does this data compare to the implementation of these tools in your
organization? Why?

CMGT/410 Week 3 Individual Assignment

The project for the company offsite 2-day training session has been given a preliminary go-
ahead. However a budget needs to be submitted for approval.

Write a 2- to 3-page memo explaining the financial implications of your project that does the
following:

Adds costs estimates to your resources (both labor and material) – Refer to websites like the
United States Department of Labor for estimates.

Adds estimates for all task duration and sequencing of tasks (including precedence relations)
Summarizes any relevant facts about the project duration, number or type of resources, critical
task sequencing, and how duration estimates were arrived at

Highlights if there are any milestones for your project Include a Microsoft® Project Gantt chart,
as an attachment, showing the WBS of tasks (with dependencies) and task sequences, along with
any budget or cost reports to support your memo.

CMGT/410 Week 3 Learning Team Assignment

This is the core of any project plan used to communicate what tasks are needed and the order of
sequence to be done to meet deadlines and deliverables.

At a minimum the section will contain the following:

   Business requirements document (BRD) that provides additional details regarding the
   expectations (such as user, system, and functional) that must be met for achieving goals of
   the project

   Work breakdown structure (WBS) showing discrete work tasks and grouped hierarchically
   that helps to organize and define the total work scope of the project


Write 3 to 4 pages on your findings

Week 3 DQ1

In Hurley’s 2009 article, what type of costs should project managers be tracking

to get an accurate total cost? Why is it critical to track these costs?

Week 3 DQ2


Why is cost and quality management so important to know how to successfully
apply in project management? What are the potential consequences of a project
manager not knowing these two valuable tools?

CMGT/410 Week 4 Individual Assignment

The company offsite 2-day training session project is about ready to enter the execution phase.
However, management has a history of being surprised with projects that finished over-budget,
did not adhere to the timeline, evinced waste of resources, or did not meet expectations.

Address your strategy for the following in a 2- to 3-page memo to gain their confidence in your
project management abilities:

Analyze and report unplanned changes

Evaluate project quality

Procedures you plan to implement for handling change control issues
How you plan to communicate whether the project is meeting any stated performance and
quality objectives



CMGT/410 Week 4 Learning Team Assignment

The allocation and cost of resources need to be carefully monitored if a project is to be delivered
on-time and on-budget.

At a minimum this section will contain the following:

Allocation of resources to project tasks (both labor and material)

Cost estimates for project resources

Gantt diagram showing duration estimates for all tasks and their sequencing (including
precedence relations) and highlighting any critical path(s) arising from task dependencies
ultimately determining the minimal duration of a project

In addition summarize any relevant facts about the project duration, number or type of resources,
critical task sequencing, or how duration estimates were arrived at, and any financial
implications (for example, budget or cost reports of the project as well)

Develop a baseline for your project plan so that all future variances are captured.

Write 3 to 4 pages on your findings.

Just need highlighted part completed, attached is team project information to use to complete
section

Week 4 DQ1


In his 2008 article, Moore talks about contract project professionals. What does
he believe is the role that contract project professionals play? Why/how are
those roles important in managing a company’s human resources?


Week 4 DQ2


Based on the article by Swinarksi et al (2010), how would you go about making
sure that team members have the required skill sets for the specific project?

WEEK 5

CMGT/410 Week 5 Individual Assignment

Project Postmortem
Now that the company offsite 2-day training session project is over, conduct a postmortem
review.

Submit a 1- to 2-page memo that does the following:

Details the benefits and drawbacks of a postmortem review

Lists who should partake in this meeting,

Indicates what you hope to discover at the conclusion

CMGT/410 Week 5 Learning Team Assignment

Revise and submit all sections of your Learning Team project along with the Week Five section
below.

It is essential for establishing confidence that a project will be executed effectively and with
minimal waste. A plan for performance measurement requires identifying which critical element
should be measured, how they are measured, and when they are measured to communicate if the
project is on track.

At a minimum the section will contain the following:

       Measurable objectives identified as milestones on the Gantt chart

   Risk mitigation strategy for analyzing and reporting unplanned changes as well what
   procedures you plan to implement for handling change control issues

   Description of project reporting regarding the on-going evaluation and status of project
   efforts to stakeholder and participants on the project team

   Method for determining whether the project has met its objectives and how the project is
   terminated

Write 3 to 4 pages on your findings.


Prepare a 10- to 12-slide Microsoft® PowerPoint® presentation of the entire Learning Team
Project, as completed in Weeks Two, Three, Four, and Five.

Week 5 DQ1


Based on the article by Kutsch, why is it important to conduct a project risk
management process? What are some of the downfalls to not conducting one?


Week 5 DQ2
In your own words, how would you explain project risk management? What are

some real-life examples where project risk management would be imperative?

Give details for each example.

More Related Content

What's hot

What's hot (12)

Ch5 - Project Management
Ch5 - Project ManagementCh5 - Project Management
Ch5 - Project Management
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Project mgmt.
Project mgmt.Project mgmt.
Project mgmt.
 
Session 6 gdas pmp study group presentation
Session 6   gdas pmp study group presentationSession 6   gdas pmp study group presentation
Session 6 gdas pmp study group presentation
 
Agile Project Management Procedures
Agile Project Management ProceduresAgile Project Management Procedures
Agile Project Management Procedures
 
Session 5 gdas pmp study group presentation
Session 5   gdas pmp study group presentationSession 5   gdas pmp study group presentation
Session 5 gdas pmp study group presentation
 
An introduction
An introductionAn introduction
An introduction
 
Spm unit2
Spm unit2Spm unit2
Spm unit2
 
PPTs on MS Project 2010
PPTs on MS Project 2010PPTs on MS Project 2010
PPTs on MS Project 2010
 
Project Mangement
Project MangementProject Mangement
Project Mangement
 
Building a Credible Performance Measurement Baseline
Building a Credible Performance Measurement BaselineBuilding a Credible Performance Measurement Baseline
Building a Credible Performance Measurement Baseline
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9
 

Viewers also liked

Cmgt 445 entire course
Cmgt 445 entire courseCmgt 445 entire course
Cmgt 445 entire courseyouvsignedio
 
Velappan ALA Annual Conference 2014 presentation
Velappan ALA Annual Conference 2014 presentationVelappan ALA Annual Conference 2014 presentation
Velappan ALA Annual Conference 2014 presentationVelappan Velappan
 
Transferencia de-electrones
Transferencia de-electronesTransferencia de-electrones
Transferencia de-electronesDaniela Vega
 

Viewers also liked (7)

Cmgt 445 entire course
Cmgt 445 entire courseCmgt 445 entire course
Cmgt 445 entire course
 
Velappan ALA Annual Conference 2014 presentation
Velappan ALA Annual Conference 2014 presentationVelappan ALA Annual Conference 2014 presentation
Velappan ALA Annual Conference 2014 presentation
 
Act 1 recognition forum
Act 1 recognition forumAct 1 recognition forum
Act 1 recognition forum
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Kinder masinop family day
Kinder masinop family dayKinder masinop family day
Kinder masinop family day
 
Transferencia de-electrones
Transferencia de-electronesTransferencia de-electrones
Transferencia de-electrones
 
Diccionario mapuche
Diccionario mapucheDiccionario mapuche
Diccionario mapuche
 

Similar to Cmgt410

Cmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagramCmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagramenininvin1980
 
Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxdanhaley45372
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your CruzIbarra161
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxwkyra78
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET Journal
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.comUOPCourseHelp
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningAmr E. Mohamed
 
Student guide for unit 9
Student guide for unit 9Student guide for unit 9
Student guide for unit 9Peter R Breach
 
Chapter7 database management system.pptx
Chapter7 database management system.pptxChapter7 database management system.pptx
Chapter7 database management system.pptxMohammedNouh7
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project ManagementMostafa Ewees
 
Section-1 250 words Subject Initiating the ProjectR.docx
Section-1 250 words  Subject Initiating the ProjectR.docxSection-1 250 words  Subject Initiating the ProjectR.docx
Section-1 250 words Subject Initiating the ProjectR.docxjeffreye3
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course reviewAsa Chan
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management ProjectMary Stevenson
 

Similar to Cmgt410 (20)

Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagramCmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagram
 
Cmgt 410 cmgt410
Cmgt 410 cmgt410Cmgt 410 cmgt410
Cmgt 410 cmgt410
 
Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docx
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Project Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docxProject Scope StatementProject NameStudent NameDateI.docx
Project Scope StatementProject NameStudent NameDateI.docx
 
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project Planning
 
Cpmgt 305 cpmgt305
Cpmgt 305 cpmgt305Cpmgt 305 cpmgt305
Cpmgt 305 cpmgt305
 
Ch23
Ch23Ch23
Ch23
 
Student guide for unit 9
Student guide for unit 9Student guide for unit 9
Student guide for unit 9
 
Chapter7 database management system.pptx
Chapter7 database management system.pptxChapter7 database management system.pptx
Chapter7 database management system.pptx
 
Definition Of Project Management
Definition Of Project ManagementDefinition Of Project Management
Definition Of Project Management
 
Section-1 250 words Subject Initiating the ProjectR.docx
Section-1 250 words  Subject Initiating the ProjectR.docxSection-1 250 words  Subject Initiating the ProjectR.docx
Section-1 250 words Subject Initiating the ProjectR.docx
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
Project Plan For A Project Management Project
Project Plan For A Project Management ProjectProject Plan For A Project Management Project
Project Plan For A Project Management Project
 

Cmgt410

  • 1. CMGT/410 NEW UPDATED COURSE CLICK THIS LINK TO PURCHASE THE ENTIRE COURSE http://homeworkfox.com/questions/general-questions/1085/cmgt410- entire-course-university-of-phoenix-new-updated-course/ CMGT/410 Week 1 Individual Assignment Consider the following scenario: You have been hired by a large company with branch offices around the country to assist with rollout of a new companywide compliance system. While initially the focus was on implementation of the technology, it was found that success will require at least 10 hours of training for all managers across the country on both the use of the new platform as well as a host of new compliance policies being introduced. Of the options discussed, it was generally agreed than the training should be hands-on and conducted in person at a central location. This will obviously require getting organizational buy in as not all managers are going to be willing to commit to taking time out from their normal responsibilities just for some training. In addition, such large scale centralized training has not been done before by this company; therefore, the CEO wants feedback from participants to evaluate the effectiveness of any training sessions. As a result, your manager has given you the responsibility to develop an outline for a proposed project that would meet this upcoming need. Submit a 2- to 3-page memo that does the following: • Names the project • Briefly describes the project • Identifies potential stakeholders directly or indirectly involved • Specifies the overall objective and any outcomes for this project • Details how success will be evaluated • Highlights what is needed to ascertain the measurable organizational value (MOV) of this project. You will need to make some assumptions (it is even encouraged) but the assumptions must be documented. Week 1 DQ1 Carton et al (2008) describe what they consider a “successful” enterprise resource planning (ERP) implementation. What aspects of the project made it “successful” in their definition? Would your organization describe this as successful? Why or why not?
  • 2. Week 1 DQ2 Based on the article by Anantatmula (2010), why is the project manager so critical to the success of the project? CMGT/410 Week 2 Individual Assignment You have been tasked with the project of organizing a company offsite 2-day training session in which people are brought in from different parts of the country. This entails everything from preparation, accommodations, and facilities. Submit a 2- to 3-page executive memo summarizing the project's objective, any scoping boundaries used to define the project, and relevant facts about the tasks or resources. Identify all related tasks and resources needed to complete this project. Highlight or specify any measurable deliverables relating to your project. Attach a task list with assigned resources from a Microsoft® Project file that supports what you have outlined in your memo. Week 2 DQ1 Analyze the techniques discussed in the Guldemond et al. article (2008), and propose how you would apply them to your own skill set as a Project Manager. Week 2 DQ2 In their 2009 article, Turner et al. describe the relatively low implementation rate of Gantt chart, CPM diagrams, etc. in projects. Does your organization use these tools? How does this data compare to the implementation of these tools in your organization? Why? CMGT/410 Week 3 Individual Assignment The project for the company offsite 2-day training session has been given a preliminary go- ahead. However a budget needs to be submitted for approval. Write a 2- to 3-page memo explaining the financial implications of your project that does the following: Adds costs estimates to your resources (both labor and material) – Refer to websites like the United States Department of Labor for estimates. Adds estimates for all task duration and sequencing of tasks (including precedence relations)
  • 3. Summarizes any relevant facts about the project duration, number or type of resources, critical task sequencing, and how duration estimates were arrived at Highlights if there are any milestones for your project Include a Microsoft® Project Gantt chart, as an attachment, showing the WBS of tasks (with dependencies) and task sequences, along with any budget or cost reports to support your memo. CMGT/410 Week 3 Learning Team Assignment This is the core of any project plan used to communicate what tasks are needed and the order of sequence to be done to meet deadlines and deliverables. At a minimum the section will contain the following: Business requirements document (BRD) that provides additional details regarding the expectations (such as user, system, and functional) that must be met for achieving goals of the project Work breakdown structure (WBS) showing discrete work tasks and grouped hierarchically that helps to organize and define the total work scope of the project Write 3 to 4 pages on your findings Week 3 DQ1 In Hurley’s 2009 article, what type of costs should project managers be tracking to get an accurate total cost? Why is it critical to track these costs? Week 3 DQ2 Why is cost and quality management so important to know how to successfully apply in project management? What are the potential consequences of a project manager not knowing these two valuable tools? CMGT/410 Week 4 Individual Assignment The company offsite 2-day training session project is about ready to enter the execution phase. However, management has a history of being surprised with projects that finished over-budget, did not adhere to the timeline, evinced waste of resources, or did not meet expectations. Address your strategy for the following in a 2- to 3-page memo to gain their confidence in your project management abilities: Analyze and report unplanned changes Evaluate project quality Procedures you plan to implement for handling change control issues
  • 4. How you plan to communicate whether the project is meeting any stated performance and quality objectives CMGT/410 Week 4 Learning Team Assignment The allocation and cost of resources need to be carefully monitored if a project is to be delivered on-time and on-budget. At a minimum this section will contain the following: Allocation of resources to project tasks (both labor and material) Cost estimates for project resources Gantt diagram showing duration estimates for all tasks and their sequencing (including precedence relations) and highlighting any critical path(s) arising from task dependencies ultimately determining the minimal duration of a project In addition summarize any relevant facts about the project duration, number or type of resources, critical task sequencing, or how duration estimates were arrived at, and any financial implications (for example, budget or cost reports of the project as well) Develop a baseline for your project plan so that all future variances are captured. Write 3 to 4 pages on your findings. Just need highlighted part completed, attached is team project information to use to complete section Week 4 DQ1 In his 2008 article, Moore talks about contract project professionals. What does he believe is the role that contract project professionals play? Why/how are those roles important in managing a company’s human resources? Week 4 DQ2 Based on the article by Swinarksi et al (2010), how would you go about making sure that team members have the required skill sets for the specific project? WEEK 5 CMGT/410 Week 5 Individual Assignment Project Postmortem
  • 5. Now that the company offsite 2-day training session project is over, conduct a postmortem review. Submit a 1- to 2-page memo that does the following: Details the benefits and drawbacks of a postmortem review Lists who should partake in this meeting, Indicates what you hope to discover at the conclusion CMGT/410 Week 5 Learning Team Assignment Revise and submit all sections of your Learning Team project along with the Week Five section below. It is essential for establishing confidence that a project will be executed effectively and with minimal waste. A plan for performance measurement requires identifying which critical element should be measured, how they are measured, and when they are measured to communicate if the project is on track. At a minimum the section will contain the following: Measurable objectives identified as milestones on the Gantt chart Risk mitigation strategy for analyzing and reporting unplanned changes as well what procedures you plan to implement for handling change control issues Description of project reporting regarding the on-going evaluation and status of project efforts to stakeholder and participants on the project team Method for determining whether the project has met its objectives and how the project is terminated Write 3 to 4 pages on your findings. Prepare a 10- to 12-slide Microsoft® PowerPoint® presentation of the entire Learning Team Project, as completed in Weeks Two, Three, Four, and Five. Week 5 DQ1 Based on the article by Kutsch, why is it important to conduct a project risk management process? What are some of the downfalls to not conducting one? Week 5 DQ2
  • 6. In your own words, how would you explain project risk management? What are some real-life examples where project risk management would be imperative? Give details for each example.