LOAN SCHEME FOR FINANCING ROOFTOP SOLAR PV GRID
CONNECTED/ INTERACTIVE POWER PROJECTS (INDUSTRIAL,
COMMERCIAL AND INSTITUTIONAL)
Financial & Operational Guidelines
06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 2 of 7
Table of Contents
1. Eligible Projects for Assistance .............................................................................................................. 3
2. Application documentation guidelines ................................................................................................. 4
3. Credit Rating, Interest Rates etc............................................................................................................ 5
4. Project Monitoring & provision of Lender’s Engineer .......................................................................... 6
5. Other Guidelines. ................................................................................................................................... 7
06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 3 of 7
1. Eligible Projects for Assistance
I. Scheme is available for all Grid connected/interactive Solar PV projects located on Rooftops.
II. Applications can be submitted under Aggregator Category and Direct Category.
III. Aggregator Category:
a. Application can include either single project or aggregate multiple projects.
b. Minimum project capacity to be submitted shall be at least 1000 kWp.
c. Minimum capacity of sub projects under this mode shall not be less than 20 kWp.
IV. Direct Category:
a. Applicants shall include projects from single roof owners only.
b. Minimum project capacity to be submitted shall be at least 1000 kWp.
V. General Applicant Eligibility norms.
Eligible Entities/ Categories as per IREDA norms shall include the following.
• Private Sector Companies/ firms
• Central Public Sector Undertaking (CPSU)
• State Utilities/ Discoms/ Transcos/ Gencos/ Corporations
• Joint Sector Companies
Applicants, registered in India, falling under any of the above categories, with borrowing
powers and powers to take up new and renewable energy and energy efficiency projects
as per their Charter, are only eligible to apply for financial assistance from IREDA except
for the following:
a) Trusts, Societies, Individuals, Proprietary concerns and Partnership firms (other
than Limited Liability Partnerships, LLPs). However, they can be considered for
financing only if they provide Bank Guarantee / Pledge of FDR issued by Scheduled
Commercial Banks as described in RBI Act for the entire loan.
b) Loss making applicants and / or, Applicants with accumulated losses (without
taking in to account effect of revaluation of asset, if any) as per audited Annual
Accounts of the immediate preceding financial year of operation. However, they
can be considered for financing only if they provide security of Bank Guarantee /
Pledge of Fixed Deposit Receipt (FDR) issued by Scheduled Commercial Bank as
described in RBI Act for the entire loan.
c) Applicants who are in default in payment of dues to Financial Institutions, Banks,
NBFCs and/or IREDA.
d) Applicants/ Group Companies and/or Core promoters of the applicant company
who
 Default in payment of IREDA dues and/ or defaults of other banks/FI.
 Classified as willful defaulters as defined by RBI/ classified by other
FIs and/ or,
 Had availed OTS from IREDA and/ or, from other Banks/FI.
 Convicted by court for criminal/ economic offences or under national security
laws
e) Greenfield Projects involving second-hand equipment and machinery.
*******
06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 4 of 7
2. Application documentation
a. Applicants shall be required to submit loan application forms alongwith all attachments of
required documents as per detailed checklist. Application forms and checklist is available at IREDA
website.
b. Applicants shall be required to submit external credit rating under Rooftop Grading System from
empanelled credit Rating agencies of IREDA.
c. Projects can be located on single or multiple roofs. In case of multiple owner roofs, the same
should be located within the geographical boundary of the district/single discom. (Single
contiguous roofs are generally encouraged/ preferred.)
d. Projects under one application shall be required to be based on single revenue model.
e. All Projects shall be required to comply with minimum technical standards as per MNRE /CEA
guidelines for rooftop solar/distributed generation “CEA (Technical Standards for Connectivity of
the Distributed Generation Resources) Regulations 2013”.
f. Applicants shall follow following general guidelines for Rooftop lease, Private PPA agreements.
- Submit copy of legal document establishing roof ownership rights.
- Provision in Roof lease for free access to roof (project site) to system
owner/contractor, IREDA/its authorized person during the currency of IREDA’s loan.
- Provision in Private PPAs for Payment security mechanism (i.e. BG/revolving LC for 2
billing cycles) assignable to IREDA.
- Provision in Roof lease for No termination clause during the currency of IREDA’s loan
except under force majeure/performance. However, termination clause may be
stipulated with appropriate termination payment which shall be either equal to or
more than loan outstanding at the time of invocation of clause.
- Under third party PPA, applicant/ roof owner shall ensure that off-taker shall more
than 80% of sanctioned load demand and is profitable Profit & Loss accounts for last
2 financial years.
*******
06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 5 of 7
3. Credit Rating, Interest Rates etc.
IREDA shall conduct credit rating for all grid connected projects and provides grading in a band of 4
grades (I, II, III & IV) based on the risk assessment. The interest rates are linked with the grades. The
interest rates are fixed by a Committee for fixing interest rates.
a) The applicable interest rates range from 9.9% to 10.75% –
S.No. Borrower/Sector GRADE I GRADE II GRADE III GRADE IV
ROOFTOP SOLAR PV
b) Additional Interest @ 0.50% over and above the applicable rate of interest shall be charged till
the date of commissioning of the project.
c) External Credit Rating
All applicants shall be required to obtain credit rating from external rating agencies under the
IREDA Rooftop Rating Model (IRRM) from empanelled Credit Rating Agencies. Applicants under
aggregator and direct category shall be rated on various sector specific parameters including
sponsor strength as project promoter.
d) Maximum repayment period for the loan shall be up to 9 years, with the moratorium period of
12 months from the date of COD of the project. The maximum construction period shall be 12
months from first disbursement.
e) COD of the project shall be considered from the date of commissioning of complete capacity as
per application.
f) Quantum of loan from IREDA shall be 70% of the project cost with minimum promoter’s
contribution of 30%. However, IREDA may extend loan upto 75% of the project cost on the basis
of the creditworthiness of the promoter, track record, project parameters etc. as per the Financing
Norms and Operational Guidelines of Rooftop Scheme.
*******
06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 6 of 7
4. Project Monitoring & Provision of Lender’s Engineer
IREDA shall engage lender’s engineer from IREDA’s empanelled list of Lender Engineers for
monitoring and quality assurance, safety issues in project construction and operational
monitoring. Broad Roles and Responsibilities of LE shall include the following.
a) Lender’s engineer shall also provide its independent recommendations/comments on the
quality and performance of project for minimum three instances i.e. one each at Pre-
sanction, during construction and project commissioning.
b) Lender’s Engineer shall review pre sanction techno commercial feasibility including
existing shadow profile, construction progress, and project commissioning & completion
report.
c) Lender’s Engineer shall monitor compliance of applicable EHS norms including fire safety
clearance on project site during construction and post commissioning.
d) Lender’s Engineer shall submit performance review of commissioned projects vis a vis
envisaged at the time of appraisal/EPC contract and give its final Completion Report
including its Recommendations and Observations.
*******
06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 7 of 7
5. Other Norms
a. Following Revenue Models shall be generally considered for the projects.
i. Captive Power Generation of roof owner.
System aggregator and roof Owners shall enter into roof lease and O&M
agreement for guaranteed solar generation. Direct applicants shall be
required to submit O&M agreement for loan tenor or performance guarantee
if self.
ii. Sale to Grid under Net Metering /PPA.
Roof Owners enter into agreement with discom and aggregator as per Net
metering policy.
iii. Sale to Grid under Gross Metering PPA.
Aggregator enters into agreement with discom/third party and roof owner
under Applicable solar Policy.
iv. Distribution licensee/ Govt. / Semi Govt bodies provides appropriate funds.
The DISCOM/Govt/Semi Govt bodies may appoint Aggregator to implement
the Solar Facilities on its behalf for implementing projects.
v. Other revenue models shall also be considered depending upon viability.
b. Following Project ownership Models shall be considered for the projects.
Rooftops under the project are owned by single party.
 Either Aggregator or direct user can apply for loan.
 All project related agreements shall comply with conditions for roof lease and
project PPA.
 Project’s revenue model can be structured under any of the revenue based
models as mentioned above, however all projects under the application shall
be based on single revenue model.
Rooftops and Projects owned by multiple parties.
 Application shall be through aggregator only.
 Project shall be structured under solar lease model/ any other alternative
revenue model notified above.
 All project related agreements between aggregator and roof owners shall
comply with conditions for roof lease and project PPA.
c. Applicant shall be required to submit structure load bearing capacity, seismic load safety
and wind load safety reports for highest wind speeds in the region for all sub projects
from Structural expert/engineer/Civil engineer empanelled with local Govt
authority/Town Planning authority/Municipal Corporation.
d. Regular Disbursement on pro rata basis shall be done as per the physical and financial
progress of the project. Disbursement through reimbursement mode may be taken at
sub project level.
e. All other terms and conditions shall be as per IREDA’s existing Financing norms.
*******
LOAN APPLICATION FORM
FOR
ROOFTOP SOLAR PV GRID
CONNECTED/INTERATIVE POWER
PROJECTS
(Industrial/Commercial/Institutional)
IREDA
Indian Renewable Energy Development Agency Ltd.
Core-4A, East Court 1st
floor, India Habitat Centre Complex
Lodi Road, New Delhi – 110 003
Tel, 91-11-24682214-21, Fax : 91-11-24682202
ENERGY FOR EVER
Page | 2
NOTES
i) All communications to be addressed to the Chairman & Managing Director, IREDA
ii) Demand Draft for Registration Fee as given in the table below is payable along
with the application:
Loan Applied for Amount*
Upto Rs.1 crore Rs. 10,000
Above Rs.1 crore upto 20 crores Rs. 30,000
Above Rs.20 cr. upto 40 crores Rs. 50,000
Above Rs.40 crores Rs. 60,000
(*)Note:-
 Service tax including educational cess will be extra
 Subject to change, Please refer to current IREDA’s financing guidelines. iii)
iii) Demand Draft shall be made in favour of Indian Renewable Energy Development
Agency Ltd. Payable at Delhi/New Delhi only.
iv) Loan Application form in the prescribed format shall be submitted. The Format can
be downloaded from IREDA website : www.ireda.gov.in
v) Detailed Project Report (DPR) in duplicate shall be submitted along with the
Application Form and shall conform to IREDA’s Guidelines. Please read IREDA’s
current Financing Guidelines
vi) If any of the points in the application is not applicable, please specify so. Enclose
additional notes/sheets wherever necessary.
vii) The application shall be signed by an authorized signatory.
viii) All necessary documents indicated in the Application Form shall be enclosed
along with the Application Form.
ix) Incomplete and/or ineligible applications shall not be registered by IREDA.
x) Mere submission of loan application shall not vest any right with the applicant for
registration with IREDA.
xi) IREDA will maintain the confidentiality of information provided by the applicant
unless otherwise as required under law and / or directions of RBI and other statutory
authorities.
xii) In case of Loan availed under International Line of Credit, the Procurement
Procedures as prescribed by the respective International Donor(s) shall be fulfilled by
the applicant.
Page | 3
xiii) IREDA accepts application forms filled in English and Hindi only. Any document in
any other language has to be submitted along with attested translated copy.
PART A – GENERAL
1.0 SUMMARY OF THE PROPOSAL
1.1 Type of Applicant
(Aggregator/Direct)
:
Project Capacity
( Aggregated, MWp)
1.2 Breakup of Aggregated
Capacity sub-project wise. If
applicable. (kWp)
: (i)
(ii)
(iii)
…
1.3 Total project cost/Project Cost
of each sub- Project ( Rs
Lakhs)
: (i)
(ii)
(iii)
1.4 Loan Assistance sought from
IREDA
:
1.5 Loan Assistance sought from
others, if any
:
1.6 Cost of Generation/Unit :
1.7 Type of project revenue model
(a) Sale to Grid/Captive/Open
Access /Other Model/other model:
(b) Type of PPA & Metering
Systems(Gross/Net/
Combination/Others
* Only single revenue model subprojects
shall be aggregated under one application.
: (Please enclose copy of PPA/Consent/Permission/other
relevant documents from concern Authority/Power purchaser
for each sub-project)
1.8 Sub Project Performance Indicators: (Please attach copy of financial model of Project
and of each Sub-project)
Project IRR :
Average DSCR :
Payback Period :
Page | 4
Break Even Point :
External credit rating report enclosed Yes No
1.9 Details of payment of registration fee
Mode of Payment : Demand Draft
Demand Draft No. :
Date :
Amount :
Drawn on (Name & Branch of
Bank)
:
PAN No. :
2.0 PARTICULARS OF APPLICANT COMPANY
2.1 Name & Correspondence
Address of the
:
Applicant Company
Telephone :
Fax :
E-mail Address :
Website :
2.2 Address of the Registered
Office
:
Telephone :
Fax :
E-mail Address :
2.3 Address of the Corporate
Office
:
Telephone :
Fax :
E-mail Address :
2.4 Name & Designation of Chief
Executive
:
Telephone (Land Line)
(Mobile)
Fax
:
:
Page | 5
E-mail Address :
2.5 Details of Authorized Dealing Official(s):
Name Designation Telephone Fax
Land Line Mobile
2.6 Whether the Company is
existing or new or formed as
Special Purpose Vehicle(SPV)
for taking up this project (Pls.
Tick mark appropriately)
:
Existing New SPV
2.7 If existing, Nature of Industry
& Products
:
(Provide detailed write up in a
separate sheet )
_______________________________
2.8 Name of Business house or
Group to which the company
belongs
:
2.9 List of Associate Concerns in
the group (Provide details in
separate sheet in case number
of companies are more)
:
2.10 Total Shareholding pattern of the Applicant Company (as on latest date):
Sl.
No.
Name of share holder No. of
shares
Face Value
Rs.
% to total
Share capital
Total 100%
2.11 Details of the promoter(s), Promoter Director(s) and Promoter Company(ies)
Sl.No Name of Promoter(s)/Promoter
Director(s)/Company(ies)
Designation Shareholding
(%)
*Networth
Rs. in Lacs
Page | 6
Total
2.12 Furnish Returns filed for the latest Financial Year give below:
Name of the
Promoter/
Promoter
Companies
Income Tax
Assessment
Wealth Tax
Assessment
Sales Tax
Assessment(*)
Assessed
Taxable
Income
Income
Tax
Assessed/
Paid
Wealth
Assessed
Wealth
Tax
Assessed/
Paid
Sales Tax
Assessed
Sales Tax
Assessed
/paid
*wherever applicable
Net worth declared by individuals by Chartered Accountant shall be as per IREDA Form
II. Enclose copies of IT & Wealth Tax Returns for Promoters & Promoter Companies giving
guarantees
2.13 (a) Details of Facilities already sanctioned/ availed from IREDA by the
Applicant Company:
Sl.
No.
Project
Name
Year of
sanction
IREDA Loan Disbursed
Amount
Repaid
Amount
(b) Details of Facilities already sanctioned/availed from IREDA by the
group/associated companies:
Sl.
No.
Project Name Year of
sanction
IREDA Loan Disbursed
Amount
Repaid Amount
(c) Please provide information of other projects set up by the Company either
on their own or with assistance from other financial institutions, if any:
Sl.
No.
Project
Details with
Location
Year of
Commissioning
Project
capacity
(MWp)
Generation Loan taken
from FIs/bank
3.0 LEGAL STATUS OF THE APPLICANT:
3.1 Type of Organization
Public Sector Private Sector Jt. Sector Co-Operative Others
Page | 7
3.2 Clause No. of Memorandum & Articles of Association (MOA)/ Bye-laws :
a) to undertake the project
b) to borrow loans
c) empowering Board of the
company to borrow loans
d) date of passing resolution
u/s 149(2) in case of Limited
companies & Board resolution in
case of Pvt Limited companies
(*)
:
:
:
:
(*) Required in case the (MOA) contain the clause in object clause C. Please submit the relevant
required documents filed with the ROC as required under Companies Act, 1956
3.3 Date of :
a) Incorporation/ Registration :
b) Commencement of Business :
3.4 Whether Applicant Company is
NBFC
: Yes No
If Yes, Registration No. with
RBI & enclose copy
(Please note that Finance
Company is not eligible for grid
interactive solar power
generation incentive)
: Not Applicable______________________
3.5 Whether Listed in Stock
Exchange?
: Yes No
If, yes
Name of Stock Exchange(s) :
High in last 52 weeks :
Low in last 52 weeks :
4.0EXI EXISTING ACTIVITIES of APPLICANT:
4.1 Name & address of the unit
(Enclose separate sheet for
more than one unit)
:
Telephone :
Fax :
Page | 8
E-mail address/Web site :
4.2 Type of Industry :
4.3 Brief history of the Company
(indicating the various
developments, prospects,
etc. In chronological order)
(please provide in separate
sheet)
_________________________________
__________________________
5.0 PERFORMANCE DETAILS OF THE APPLICANT
(In case of New Company, provide information of group companies)
5.1 Latest Credit Rating of the
Organization
:
a) Name of the Rating Agency _________________________________
b) Year of Rating _________________________________
c) Debt of Instrument _________________________________
d) Rating
5.2 Names of Bankers/Financial Institutions including IREDA from whom the
Company has taken loan for their existing activities. Indicate facilities
sanctioned:
Name of
Instituti
on/Bank
Nature
of
Facilities
Details of the Loan Security Repayme
nt StatusInte
rest
(%)
Date
of
Sanct
ion
Loan
Amount
Sanction
Repayme
nt Period
(yrs)
Outstand
ing
Amount
(Rs. In
Lakhs)
(Enclose certificate(s) from the existing Financial Institution /Bankers, that
Dealing of company’s accounts with them is satisfactory in Form VII)
5.3 Financial Performance
(for the last three years)
:
( I ) Financial Parameters of the firm for
the last three years (as per Audited
Balance Sheet)
(Rs. in lacs)
Year I Year II Year III
Page | 9
a) Equity
b) Reserve and Surplus
c) Net Worth
d) Sales Turnover
e) PBDT
f) Net Profit
g) Loan (Term Loan)
h) Fixed Asset
i) Dividend (%)
j) Debt-Equity Ratio
k) Capital Employed
Credit Rating, if any
(Enclose Audited balance sheet and profit and loss account and Annual
reports for the past three years of the company(s)/firms. Provisional
Balance Sheet submitted if any should be in line with statutory
requirements.)
(II) Any qualifying remarks by Auditors
in the Annual Report regarding
litigation/contingent liabilities
pending with Statutory Authorities
(III) Whether the applicant has given
any guarantee for the loans raised
by other companies/others and if
so, provide details thereof.
(IV) Major legal cases against the
company which may have impact
on financial position of the applicant
(V) Any qualifying remarks by Auditors
in the Annual Report regarding
litigation/contingent liabilities in
respect where disputes with
SEB/Income Tax
Department/Machinery Suppliers
and other creditors are pending
(VI) Any qualifying remarks by Auditors
in the Annual Report regarding
litigation/contingent liabilities
pending with Statutory Authorities
(VII) Whether any provision has been made
to meet the contingent liabilities
(VIII) Reasons for non-provision for
depreciation/ reduction in value of
investments/ sundry debtors
(IX) Details of Litigation/Contingent Liability
i. Income Tax Demands against which
the applicant has gone on appeal
ii. Interest Tax
iii. Sales Tax Demands against which
the applicant has gone on appeal
Page | 10
iv. Customs/ Excise demands under
dispute, not provided for
v. Guarantees issued & Outstanding
5.4 Whether applicant company or
Group company’s name is in the
list of RBI Defaulter?
:
5.5 If the company’s name is in the
list of RBI Defaulter, give detail
:
5.6 Legal Proceedings / Court cases,
if any, pending against the
applicant or any of the group
companies / associates
:
If yes, please enclose details
6.0 SECURITY OFFERED
(Please tick mark)
:
6.1 Bank Guarantee from a scheduled bank :
OR
6.2 State Government Guarantee :
OR
6.3 Unconditional and irrevocable guarantee of All India Public Financial
Institutions having “AAA” or equivalent rating.
OR
6.4 Equitable Mortgage (Mortgage by deposit of title deeds) of all the
immovable properties; hypothecation of all movable assets, both
existing and future, subject to prior charge of Banks on specified
current assets; guarantees by promoters and/or promoter directors
and/or promoter companies and deposit of postdated Cheques in
accordance with repayment schedule of principal loan amount and
interest.
:
Note: Pari-pasu charge on the assets instead of Mortgage by deposit
of title deeds and hypothecation of assets shall be taken
wherever applicable specifically in case of Energy Efficiency &
joint financing projects
6.5 Details of Guarantors :
Sl.
No.
Name of the
company/promoter director
% share holding NetWorth *
(Rs. Lacs)
1.
2.
Page | 11
* Enclose NetWorth Certificate of each guarantor/company providing Corporate
Guarantee Duly certified by C.A. in the Form II
6.6 Additional/collateral Security
offered located in urban area, if
any (Give details and enclose
the valuation certificate from
Govt. Approved Valuer)
:
For Security, please refer to the current IREDA’s Financing Guidelines. Please note that stipulation
of security requirement finally rests with IREDA.
7.0 RISK FACTORS AS PERCIEVED BY THE APPLICANT:
Please indicate list of risk factors in the project as perceived by the applicant as
Project Promoter and mitigation measures proposed to be undertaken.
8.0 EMPLOYMENT GENERATION
Sl.
No.
Category Direct Indirect
1. Managerial & Supervisory
2. Skilled
3. Semi-skilled
4. Unskilled
5. Others (Please Specify)
9.0 SOCIAL & ECONOMIC BENEFITS
Benefits Value
In terms of end-products
Foreign Exchange Savings
Import Substitution
Direct Revenue in terms of excise
duty & sales tax to National
Exchequer
Page | 12
Indirect revenue
 Effect on per capita in the
region
 Creation of Ancillary Industries
Any Other (Specify)
10.0 LIST OF ENCLOSURES :
Documents/Papers Enclosed
(Put tick)
Remarks
i. Demand draft as applicable to the
project as Application Registration Fee
towards processing and document
charges. (Registration fee is non-
refundable)
ii. Two copies of Detailed Project Report
(DPR)
iii. PVSyst Report of all sub projects.
iv. Certified true copy of Memorandum &
Articles Association, Certificate of
Incorporation and commencement of
Business
By-laws and Registration Certificate in
case of cooperatives & societies
v. Board Resolution to undertake the
project
vi. Bio-data of Directors/Promoters
vii.Copy of Income Tax/Wealth tax/Sales
tax return filed by the applicant and the
Guarantor(s) for the last three years.
viii. Copy of Sales tax return in respect
of applicant company
ix. Certificate from Statutory Auditor for
registration in Form-I
x. Net worth certificate in respect of the
Guarantor(s) duly certified by the
Chartered Accountant in Form II
separately for each Guarantor
xi. Particulars of existing debentures &
secured loans in the Form III
xii.Authority letter to the Bankers to
provide any information to IREDA in the
Form IV
Page | 13
xiii. Letter authorizing dealing officer(s)
& their attested specimen signatures in
the Form V
xiv. Certificate from Statutory Auditors
for Group companies in the Format VI
xv.Copy of MNRE/Concern State
Authority/Nodal Agency
approval/sanction letter for proposed
rooftop solar PV power generation
project
xvi. Certificate(s) from the existing
financial institutions & bankers that
company’s accounts are operating
satisfactorily
xvii. Audited balance sheet and Profit &
Loss account/Annual reports for the
past 3 years of the company(s).
xviii. Details of Tenders floated,
quotations /evaluation report etc. as
basis for Cost submitted.
xix. KYC Formats (A,B,C)
xx.Other documents
- Copies of Roof Lease Agreement.
- Copies of O&M/ Project Performance
Guarantee agreement.
- Copy of PPA
11.0 DECLARATION :
I…………………………… the applicant for the loan, hereby DECLARE that,
i. All information furnished is to the best of my/our knowledge
ii. No borrowing arrangements except as indicated have been made
iii. I/we shall furnish all other information that may be required by IREDA in connection
with the application
iv. The information pertaining to us may be exchanged by IREDA with any agency you
may deem fit.
v. IREDA or its nominees or any agency authorized by IREDA may, at any time
inspect/verify our assets, books of accounts, etc. in my/our factory & office premises.
vi. The present proposal of loan is not for cost overrun financing
vii. The present proposal of loan is not for procurement of any Second-hand equipment
and machinery
viii. The applicant and/or main promoters of the Applicant Company have not been
convicted for criminal/economic offences or under national security laws
ix. The project under consideration is/ is not commissioned (Please indicate date of
commissioning in case the project is already commissioned)
x. The Applicant Company shall not purchase plant & machinery and give
contracts/sub-contracts to the firms & group companies of the Applicant. Further, it
Page | 14
is confirmed that the Directors of the applicant company are not
interested/connected in other firms/companies from whom machinery are procured
or contract and subcontracted are being given without permission.
xi. Our dues of loan from other financial institutions are being paid on time as per the
respective loan agreements. (Not Applicable as ASW is a newly formed SPV and does
not have any loans from any financial institution as on date)
xii. The information given herein and the details in the statements and other papers
enclosed as part of the application are, to the best of our knowledge and belief, true
and correct in all particulars.
xiii. The company shall open Trust & Retention Account (TRA) in the Format provided by
IREDA, if the same is stipulated by IREDA.
Place: Signature : ___________
Name & Designation of signatory :
Date : Name of the Company:
Rubber Stamp :_________________
Page | 1
PART B – SECTOR SPECIFIC INFORMATION
ROOFTOP SOLAR PV GRID CONNECTED/INTERACTIVE POWER
PROJECTS
(Industrial/Commercial/Institutional)
1.0 GENERAL
1.1 Proposed Total Installed
Capacity of the Project
: (For Aggregator, please provide details of
each sub-projects)
1.2 Geographical area of Proposed
Project*
:
Village :
Taluk :
District :
State :
*project shall not be located beyond district/ discom limits.
1.3 Location/s of the Project
Address of Roof top Project Installations Name of Power Buyer/Roof owner for each project
(i) Address
Nearest Grid/Substation/Distribution
Transformer
(ii) Address
Nearest
Grid/Substation/Distribution
Transformer
(iii)Address
Nearest
Grid/Substation/Distribution
Transformer
1.4 Special Category if any – Location based
( Tick as applicable) 
NE States
& Sikkim
Islands &
Estuaries
Hilly
Area
Jammu &
Kashmir
Deserts Newly formed
states
Not
applicable
1.5 Details of proposed Project Site(s)(Please tick appropriate)
1.5.1 Land/Site Nature
Roof Area of Roof
(sq.mtr)
Category Roof Owner
(Govt./Institution/
Type of Roof Rights (Own
Roof/Lease Rent/profit
Page | 2
Private/ Others please
Specify
Sharing/Others (please attach
Roof agreement if roof is not
owned by applicant company)
1
2
3
4
Total
(Please enclose documents pertaining to Roof rights. It may be noted that roof
rights shall not have provision for mutually agreed termination without termination
payment equivalent to loan outstanding. Proof of Roof ownership/Lease
Agreement/Consent letter from each of the roof owner shall be attached.)
2.0 TECHNICAL
2.A
2.A1
SOLAR PV Rooftop project and
component details:
Meteorological parameters for
the Roof:
(Detailed project report along with
Building layout/blueprint of roof
/building area proposed to be
used for installation of solar PV
power project shall be submitted)
- Solar Radiation.
- Roof shadow analysis attached.
2.A2 PV Module Type:
(Please mention the technology,
make and model of PV modules)
Whether certification obtained for
PV modules(Please enclose recent
copy of certificate)
2.A3 Technical Details of PV Module
to be used in the project:
- Module Make & Model
- PV module power output at
STC
- Dimensions of a single module
- Total no. of modules to be
used
- Total PV array capacity
- Performance Warranty of PV
Module.
- Manufacturing defect
Page | 3
warrantee of PV Module
2.A4 Power Conditioning
Unit/Inverter to be used in
the project :
- Model and Make of Inverter
- Rated capacity of the PCU
- Input voltage range
- Output voltage and frequency
- Performance warranty of
Inverters:
- Manufacturing defect warranty
of Inverter.
- Efficiency of the PCU
- Number of units to be used
2.A5 Details of mounting
arrangement:
- Mounting Structure steel
requirement for the project
( MT)
- Proposed tilt angle of Mounting
Str.
- Tracking arrangements if any
- Estimated power losses due to
site conditions/building
orientations and any special
system design, please give
details.
2.A6 Details of monitoring and
data:
Logging instruments/Monitoring
systems to be installed at the
project site (Please give item wise
details)
2.A7 Details of power evacuation
arrangement:
- Voltage and frequency of the
grid to which PV power will be
fed and Capacity of Distribution
Transformer/substation
2.A8 Any other salient features of
the rooftop solar PV power
plant
Page | 4
3.0 Procurement Procedure:
3.1 Details of Procurement
Procedure followed
:  Single Quotation  RFQ Procedure
 Limited Tender  Published
Tender Any Other
3.2 Detailed Quotation Evaluation
Report
: Enclosed/Not enclosed
3.3 Note on procurement with
justification for choosing the
supplier and item-wise project
cost
: Enclosed/Not enclosed
3.5 Mode of implementation of the
Project
EPC Contractor/Consultant/Supplier/
Self
(Please tick appropriate & indicate the
name of EPC Contractor / Consultant /
Supplier)
4.0 COMMERCIAL
4.1 Proposed Project cost Estimates : ( In case of multiple sub projects, a
project wise breakup shall be attached)
PARTICULARS UNIT COST
(RS. IN LAKHS)
TOTAL AMOUNT
(RS. IN LAKHS)
REFERENCE OF
PURCHASE
ORDERS &
INVOICES USED
FOR ARRIVING AT
ESTIMATES
a) Roof area for solar plant /site and
Roof rent if any
b) PV Modules
Solar panels & Accessories
Installation, testing &
commissioning
c) Inverters & Accessories
d) BoS, Electrical items.
e) Mounting Structures
f) Civil Works
g) Evacuation Charges if payable to
Discom/SNA/SEB.
h) Statutory expenses service Tax
etc., if any and not included in the
cost of Plant & machinery
i) Preliminary & Pre-operative
Page | 5
expenses
 Registration & Front-ends fee
 Stamp duty
 Any other(Please specify)
j) Others, if any (please Specify)
Total Project Cost
Copies of Purchase Orders & Invoices if raised enclosed (Invoices are required to be
submitted along with the Loan Application for already commissioned projects)
4.2 PROPOSED MEANS OF FINANCING
PARTICULARS** AMOUNT (RS. IN LACS)
A) Promoter’s contribution
Equity Share Capital
Internal Accruals
Unsecured Loan from Promoters, friends, relatives
& their associates
Others, if any specify
SUB TOTAL (A)
B) Term Loan Proposed
From IREDA
From Others (FI/Bank)
*Subsidy, if any
Sub Total (B)
Total Project Cost (A+B)
* (Capital subsidy if available will reduce IREDA’s loan) ** Details of each sub-
project cost with means of financing shall be attached.
4.3 Purpose of Proposed Project Rate
(Rs./Unit)
Captive consumption : Yes/No
Selling power to DISCOM : Yes/ No
Selling to third party : Yes/No
Captive Use
Annual Reports for last 3 years
and Copies of Agreement with
the third party.
(In case of selling to third
party)
:
(MNRE GBI is available only for selling power to State Electricity Board/Utility)
Page | 6
4.4 Details of PPA in case of sale to DISCOM/Third party
a) Date of signing :
b) Period of PPA :
c) Tariff Rate :
d) Rate of Escalation of tariff. :
e) Discount/ penalty clause :
f) Payment Security clause
( in case of third party PPA,
payment security BG/Letter of
Credit for two bills shall be
mandatory.)
g) PPA Termination Clause
( In case of third party PPA,
termination clause shall be as
per guidelines of scheme.)
4.5 In case of Captive Use to Roof owner:
a) Connected Power load (kW) : ____________________________
b) Monthly & Annual power
consumption (Average, attach
copy of power bills)
: ____________________________
c) Power Sale Revenue Rate for
Solar Power.
:
d) Present Tariff Rate of Discom. :
e) Copies of Electricity Bills for last
12 months and Summary
:
4.6 In case PPA is yet to be executed, please give information based on the
approved Central/state policy of Rooftop Solar Power projects along with
final draft of PPA/Power Sale Agreement.
4.7 Implementation Period :
Page | 7
4.8 Assumptions taken for
Performance Indicators for
each project
:
a) Installed Capacity (kW) :
b) Rate of Interest for proposed
loan from IREDA
:
c) Repayment period :
d) Grace Period :
e) Selling Price (as per Power
Purchase Agreement/ Power
Sale Arrangement)
:
f) Selling Price escalation per
annum
:
g) Wheeling Charges if applicable :
h) Average Solar Insolation :
i) Average Solar day
j) Annual O & M Charges :
k) Annual escalation of O & M
Charges
:
l) CUF/PLF of project
m) Any other (Please Specify) :
4.9 Performance Indicators
a) IRR (Financial) :
b) DSCR (Average) :
c) Pay Back Period :
5.0 ENVIRONMENTAL IMPACT
5.1 Provide details of environmental
benefits expected by putting up Grid
Interactive Solar PV Generation
Projects
Page | 8
5.2 SECTOR SPECIFIC ANY OTHER INFORMATION
5.3 SECTOR SPECIFIC APPROVALS
S.
No.
Documents/Papers Enclosed
(Pl indicate
Annexure No.)
Remarks
I No objection Certificate (NOC) from
State Electricity Board or any other
Authority
II Copy of SERC approved Power
Purchase Agreement
III Copy of Wheeling Agreement for
Captive use, if applicable
IV Copy of Agreement for third party sale
of electricity, if applicable
V Annual Reports of third party
purchasers, if applicable
VI Copy of Sale/Roof Lease Deed
VII Copy of site map
VIII Copy of Connectivity Diagram
IX Note on Procurement justifying
selection of particular suppliers.
X Copies of Quotation/Purchase Orders
and Invoices
XI Copies of Invoices along with the
Money receipts from the suppliers for
commissioned projects
Page | 9
XII Detailed cash-flow statements if the
same are not annexed with the DPR
XIII Other Clearances (Please Specify)
Place: Signature :__________________
Name & Designation :
Name of the Company:
Date : Rubber Stamp :__________________
1 IREDA Loan Application Form 
2 Application Registration Fee (non‐refundable)
3 External Credit Rating  of Project  & Sponsor as per IREDA Credit Rating model for Rooftop PV Solar Financing 
4 Certified true copy of Memorandum & Articles of Association, Certificate of Incorporation and Commencement of 
Business of  applicant
5 Proposed shareholding pattern of the applicant Company certified by competent authority
6 Audited Annual reports for the past three years of the applicant company
7 Audited Annual reports of the promoter company(s)/ Guarantor company of applicant for last three years 
8 Provisional Balance Sheet of the company/Promoter company(s), if last audited balance sheet is more than six months 
old.
9 Board resolution to undertake the project
10 Authorized letter to the Bankers of applicant company to provide information to IREDA
11 Letter from their existing Bank(s)/Financial Institutions regarding status of loan account(s)
12 Copy of Sales tax return in respect of applicant company/ promoter companies/ Guarantor company for last three 
years.
13 Copy of Income tax & wealth tax return in respect of applicant company/ promoter(s)/Guarantor(s) for last three years.
14 Letter authorizing dealing officer(s) & their attested specimen signatures
15 Certificate from Statutory Auditors regarding the Group companies on IREDA's format
16 Particulars of existing debentures & secured loans of applicant company
17 Certificate from Statutory Auditor for Eligibility of applicant company in IREDA format
18 Net worth certificate in respect of the applicant company/ Promoter Company & Guarantor duly certified by the 
Chartered Accountant
19 KYC Formats (A,B,C) of applicant and its promoters for KYC, AML 
20 Project related documents
21 Copy of lease agreements for all roofs for all project sites
22 Copy of PPA, Captive sale agreement,Net Metering energy sales agreement with power buyer.
23 Copy of Rooftop approval from Discom ( for net metering)
24 Copy of registration/NOC from SNA if applicable 
25 Copy of Rooftop interconnection NOC from discom ( for PPA/Captive sale)
26 Project DPR 
27 PV Syst Energy Assessment Report ( for all sub projects)
28 Solar Radiation Assessment report including horizon shadow effect assessment
29 Copy of EPC & O&M contract ( in case aggregator is not the applicant)
30 Execution and O&M guarantees by aggregator for the project ( all sub projects).
31 Details of PV Modules supplier finalized by aggregator ( tech specs and guarantee/warrantee clauses) 
32 Details of Inverter supplier finalized by aggregator ( tech specs and guarantee/warantee clauses) 
33 Project Cost breakup in IREDA Format
34 Details of Tenders floated, quotations received, tender evaluation report for project cost submitted by applicant
35 Means of Finance and Sources of Finance for the project
36 Module/Inverter supplier profiles including  total Production/ Installed capacity/total capacity supplied globally & India  
37 Copy of all Roof layouts/ blue print of rooftop to be used
38 Pollution Control Board clearance ( if applicable)
39 NOC from Town Country planning department / Gram Panchayat ( if applicable, )
40 Credit Rating details of the company, if any
41 Detail Company profiles of applicant/holding/guarantor and core business activities 
42 Present shareholding pattern of applicant Company
43 copy of PAN
46 Net worth/ financials of EPC/Contractor ( if aggregator is not the applicant)
47 Brief of Core/Lead technical team/staffs
48 Background of Contractors, details of solar projects executed and Performance certificate from existing clients
Checklist of Documents Required for Appraisal of Rooftop Solar PV power 
Projects 

More Related Content

What's hot

Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in indiaSHAMSHAD AHAMAD
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemShoeb Ali Khan
 
Off grid pv system for indonesia
Off grid pv system for indonesiaOff grid pv system for indonesia
Off grid pv system for indonesiaNany Wardhani
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolarReference
 
Floating solar PV: Overview
Floating solar PV: OverviewFloating solar PV: Overview
Floating solar PV: OverviewViveha S
 
Floating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging TechnologyFloating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging TechnologyPooja Agarwal
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantAvish Thakral
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantVignesh Sekar
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Nilam Shah
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV systemRajesh Pindoriya
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Abhay Ocean India ltd.
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plantRusiru Sanjaya
 
2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)Leonardo ENERGY
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic ProjectHarry Indig
 

What's hot (20)

Renewable energy in india
Renewable energy in indiaRenewable energy in india
Renewable energy in india
 
Introduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power systemIntroduction to Off Grid Solar Power system
Introduction to Off Grid Solar Power system
 
Solar rooftop presentation
Solar rooftop presentationSolar rooftop presentation
Solar rooftop presentation
 
Off grid pv system for indonesia
Off grid pv system for indonesiaOff grid pv system for indonesia
Off grid pv system for indonesia
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Floating solar PV: Overview
Floating solar PV: OverviewFloating solar PV: Overview
Floating solar PV: Overview
 
Hydro Power in India
Hydro Power in IndiaHydro Power in India
Hydro Power in India
 
Floating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging TechnologyFloating Solar Photovoltaic system An Emerging Technology
Floating Solar Photovoltaic system An Emerging Technology
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
 
Phases of Construction - Solar Project
Phases of Construction - Solar ProjectPhases of Construction - Solar Project
Phases of Construction - Solar Project
 
Project Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power PlantProject Proposal on 10 MW Solar PV Power Plant
Project Proposal on 10 MW Solar PV Power Plant
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
 
Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
Design off grid solar PV system
Design off grid solar PV systemDesign off grid solar PV system
Design off grid solar PV system
 
Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015Aoil floating solar power plant ppt 2015
Aoil floating solar power plant ppt 2015
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plant
 
2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)2nd CSP Training series : solar desalination (1/2)
2nd CSP Training series : solar desalination (1/2)
 
Photovoltaic Project
Photovoltaic ProjectPhotovoltaic Project
Photovoltaic Project
 
roof top solar
roof top solarroof top solar
roof top solar
 

Viewers also liked

10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-systemExergy
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentationAnjali Khandelwal
 
Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Doris Capurro
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Headway Solar
 
Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...Smart Chicago Collaborative
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 
Tender Document for 3 MW solar plant at Diu
Tender Document for 3 MW solar plant at DiuTender Document for 3 MW solar plant at Diu
Tender Document for 3 MW solar plant at DiuHeadway Solar
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013Headway Solar
 
Bridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working PaperBridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working PaperGW Solar Institute
 
Proposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel FieldProposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel FieldMahmood Said Al Amri
 
Solar & Grid Stability: A Primer for Local Governments
Solar & Grid Stability: A Primer for Local GovernmentsSolar & Grid Stability: A Primer for Local Governments
Solar & Grid Stability: A Primer for Local GovernmentsThe Solar Foundation
 
India's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesIndia's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesHeadway Solar
 
Veterans in Solar: Securing America’s Energy Future
Veterans in Solar: Securing America’s Energy FutureVeterans in Solar: Securing America’s Energy Future
Veterans in Solar: Securing America’s Energy FutureThe Solar Foundation
 
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosQuantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosBSI
 

Viewers also liked (19)

10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
 
Renewables and World Bank Guarantees
Renewables and World Bank Guarantees Renewables and World Bank Guarantees
Renewables and World Bank Guarantees
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...Specification No. 119440: RFP for New 311 System for the Municipal Government...
Specification No. 119440: RFP for New 311 System for the Municipal Government...
 
Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
Tender Document for 3 MW solar plant at Diu
Tender Document for 3 MW solar plant at DiuTender Document for 3 MW solar plant at Diu
Tender Document for 3 MW solar plant at Diu
 
Kerala solar energy policy 2013
Kerala solar energy policy 2013Kerala solar energy policy 2013
Kerala solar energy policy 2013
 
National Solar Jobs Census 2012
National Solar Jobs Census 2012National Solar Jobs Census 2012
National Solar Jobs Census 2012
 
Bridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working PaperBridging the Solar Income Gap Working Paper
Bridging the Solar Income Gap Working Paper
 
National Solar Jobs Census 2012
National Solar Jobs Census 2012National Solar Jobs Census 2012
National Solar Jobs Census 2012
 
National Solar Jobs Census 2011
National Solar Jobs Census 2011National Solar Jobs Census 2011
National Solar Jobs Census 2011
 
Proposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel FieldProposal for Procurement Officer at Daleel Field
Proposal for Procurement Officer at Daleel Field
 
Solar & Grid Stability: A Primer for Local Governments
Solar & Grid Stability: A Primer for Local GovernmentsSolar & Grid Stability: A Primer for Local Governments
Solar & Grid Stability: A Primer for Local Governments
 
India's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 GuidelinesIndia's National Solar Mission - Phase 1 Guidelines
India's National Solar Mission - Phase 1 Guidelines
 
Solar panels
Solar panelsSolar panels
Solar panels
 
Veterans in Solar: Securing America’s Energy Future
Veterans in Solar: Securing America’s Energy FutureVeterans in Solar: Securing America’s Energy Future
Veterans in Solar: Securing America’s Energy Future
 
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-VideosQuantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
Quantifying WOM Diffusion – Who gains, Who loses, from Viral-Videos
 
Top 5 States Sector Breakdowns
Top 5 States Sector BreakdownsTop 5 States Sector Breakdowns
Top 5 States Sector Breakdowns
 

Similar to IREDA Scheme for Loan for grid connected Solar PV rooftop plant

Sbi rooftop program
Sbi rooftop programSbi rooftop program
Sbi rooftop programJay Ranvir
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS Harish Sharma
 
Single Project PI Insurance
Single Project PI InsuranceSingle Project PI Insurance
Single Project PI InsuranceRam Garg
 
VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)Sam Lipman
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEHarish Sharma
 
Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...
Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...
Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...ssuser668a58
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
Renewable Energy Program : Geothermal and Wind Projects
Renewable Energy Program: Geothermal and Wind ProjectsRenewable Energy Program: Geothermal and Wind Projects
Renewable Energy Program : Geothermal and Wind ProjectsEquality Pennsylvania
 
PA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind ProjectsPA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind ProjectsEquality Pennsylvania
 
Credit appraisal and evaluation
Credit appraisal and evaluationCredit appraisal and evaluation
Credit appraisal and evaluationVAIBHAV SINHA
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreementChirag Jain
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Informationhunter111
 
IDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdfIDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdfSteadfast Business Consulting
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptxssuser4ae21a
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 
IDFC Floating Rate Fund_Scheme information document
IDFC Floating Rate Fund_Scheme information documentIDFC Floating Rate Fund_Scheme information document
IDFC Floating Rate Fund_Scheme information documentTesssttest
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Tahir B Mirza
 
Deciphering the legal and commercial aspects of RERA
Deciphering the legal and commercial aspects of RERADeciphering the legal and commercial aspects of RERA
Deciphering the legal and commercial aspects of RERASparsh Sharma
 
Project finance
Project financeProject finance
Project financeDharmik
 

Similar to IREDA Scheme for Loan for grid connected Solar PV rooftop plant (20)

Sbi rooftop program
Sbi rooftop programSbi rooftop program
Sbi rooftop program
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
 
Single Project PI Insurance
Single Project PI InsuranceSingle Project PI Insurance
Single Project PI Insurance
 
VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)VC Brochure - Renewable Energy Project Financing (003)
VC Brochure - Renewable Energy Project Financing (003)
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEME
 
Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...
Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...
Guidelines for Modified Scheme for setting up of Compound Semiconductors and ...
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Renewable Energy Program : Geothermal and Wind Projects
Renewable Energy Program: Geothermal and Wind ProjectsRenewable Energy Program: Geothermal and Wind Projects
Renewable Energy Program : Geothermal and Wind Projects
 
PA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind ProjectsPA DCED Renewable Energy Program GeoThermal And Wind Projects
PA DCED Renewable Energy Program GeoThermal And Wind Projects
 
Credit appraisal and evaluation
Credit appraisal and evaluationCredit appraisal and evaluation
Credit appraisal and evaluation
 
Session 16 contract structure & agreement
Session 16   contract structure & agreementSession 16   contract structure & agreement
Session 16 contract structure & agreement
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Information
 
IDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdfIDT - Operational Revised Guidelines for Cold chain Projects.pdf
IDT - Operational Revised Guidelines for Cold chain Projects.pdf
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
IDFC Floating Rate Fund_Scheme information document
IDFC Floating Rate Fund_Scheme information documentIDFC Floating Rate Fund_Scheme information document
IDFC Floating Rate Fund_Scheme information document
 
Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)Contracts & Claims Management Workshop (Session-1)
Contracts & Claims Management Workshop (Session-1)
 
Deciphering the legal and commercial aspects of RERA
Deciphering the legal and commercial aspects of RERADeciphering the legal and commercial aspects of RERA
Deciphering the legal and commercial aspects of RERA
 
Project finance
Project financeProject finance
Project finance
 

More from Ashish Verma

Us solar market outlook and growth trajectory 2025
Us solar market outlook and growth trajectory 2025Us solar market outlook and growth trajectory 2025
Us solar market outlook and growth trajectory 2025Ashish Verma
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...Ashish Verma
 
Gensol's credentials in solar industry
Gensol's credentials in solar industryGensol's credentials in solar industry
Gensol's credentials in solar industryAshish Verma
 
Gensol group of companies corporate presentation
Gensol group of companies corporate presentationGensol group of companies corporate presentation
Gensol group of companies corporate presentationAshish Verma
 
Steps to simulate grid connected solar pv project through PVSyst Software
 Steps to simulate grid connected solar pv project through PVSyst Software Steps to simulate grid connected solar pv project through PVSyst Software
Steps to simulate grid connected solar pv project through PVSyst SoftwareAshish Verma
 
Renewable Energy Global Status Report 2015-REN21
Renewable Energy Global Status Report 2015-REN21Renewable Energy Global Status Report 2015-REN21
Renewable Energy Global Status Report 2015-REN21Ashish Verma
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Ashish Verma
 
Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...
Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...
Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...Ashish Verma
 
Meghalaya state power potential and tapping Renewable opportunity
Meghalaya state power potential and tapping Renewable opportunityMeghalaya state power potential and tapping Renewable opportunity
Meghalaya state power potential and tapping Renewable opportunityAshish Verma
 
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...Ashish Verma
 
Solar wind power integration with grid-issues and mitigation strategy
Solar wind power integration with grid-issues and mitigation strategy Solar wind power integration with grid-issues and mitigation strategy
Solar wind power integration with grid-issues and mitigation strategy Ashish Verma
 
How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?Ashish Verma
 
State Wise -Solar Power Potential in India
State Wise -Solar Power Potential in IndiaState Wise -Solar Power Potential in India
State Wise -Solar Power Potential in IndiaAshish Verma
 
Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEAAshish Verma
 
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE Ashish Verma
 
Energy -A UPES inhouse journal
Energy -A UPES inhouse journal Energy -A UPES inhouse journal
Energy -A UPES inhouse journal Ashish Verma
 
REC Mechanism -A overview
REC Mechanism -A overview REC Mechanism -A overview
REC Mechanism -A overview Ashish Verma
 
BEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemesBEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemesAshish Verma
 
Green building GRIHA criteria 32 &33
Green building GRIHA  criteria 32 &33Green building GRIHA  criteria 32 &33
Green building GRIHA criteria 32 &33Ashish Verma
 
Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Ashish Verma
 

More from Ashish Verma (20)

Us solar market outlook and growth trajectory 2025
Us solar market outlook and growth trajectory 2025Us solar market outlook and growth trajectory 2025
Us solar market outlook and growth trajectory 2025
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
 
Gensol's credentials in solar industry
Gensol's credentials in solar industryGensol's credentials in solar industry
Gensol's credentials in solar industry
 
Gensol group of companies corporate presentation
Gensol group of companies corporate presentationGensol group of companies corporate presentation
Gensol group of companies corporate presentation
 
Steps to simulate grid connected solar pv project through PVSyst Software
 Steps to simulate grid connected solar pv project through PVSyst Software Steps to simulate grid connected solar pv project through PVSyst Software
Steps to simulate grid connected solar pv project through PVSyst Software
 
Renewable Energy Global Status Report 2015-REN21
Renewable Energy Global Status Report 2015-REN21Renewable Energy Global Status Report 2015-REN21
Renewable Energy Global Status Report 2015-REN21
 
Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015Growth of Electricity Sector in India since 1947 to 2015
Growth of Electricity Sector in India since 1947 to 2015
 
Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...
Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...
Techno-Financial Analysis of Energy Access through Hybrid System with Solar P...
 
Meghalaya state power potential and tapping Renewable opportunity
Meghalaya state power potential and tapping Renewable opportunityMeghalaya state power potential and tapping Renewable opportunity
Meghalaya state power potential and tapping Renewable opportunity
 
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...CERC Final Order  order on Benchmark cost of Solar PV and Solar Thermal for F...
CERC Final Order order on Benchmark cost of Solar PV and Solar Thermal for F...
 
Solar wind power integration with grid-issues and mitigation strategy
Solar wind power integration with grid-issues and mitigation strategy Solar wind power integration with grid-issues and mitigation strategy
Solar wind power integration with grid-issues and mitigation strategy
 
How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?How China become Solar PV manufacturing hub ?
How China become Solar PV manufacturing hub ?
 
State Wise -Solar Power Potential in India
State Wise -Solar Power Potential in IndiaState Wise -Solar Power Potential in India
State Wise -Solar Power Potential in India
 
Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEA
 
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
Photovoltaic Review -Fraunhofer Institute for Solar Energy System ISE
 
Energy -A UPES inhouse journal
Energy -A UPES inhouse journal Energy -A UPES inhouse journal
Energy -A UPES inhouse journal
 
REC Mechanism -A overview
REC Mechanism -A overview REC Mechanism -A overview
REC Mechanism -A overview
 
BEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemesBEE and Role of SDAs in BEE schemes
BEE and Role of SDAs in BEE schemes
 
Green building GRIHA criteria 32 &33
Green building GRIHA  criteria 32 &33Green building GRIHA  criteria 32 &33
Green building GRIHA criteria 32 &33
 
Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant Preliminary Site Survey , PFR and basic design of SHP plant
Preliminary Site Survey , PFR and basic design of SHP plant
 

Recently uploaded

Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at workChristina Parmionova
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...ranjana rawat
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 

Recently uploaded (20)

Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
Climate change and safety and health at work
Climate change and safety and health at workClimate change and safety and health at work
Climate change and safety and health at work
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
↑VVIP celebrity ( Pune ) Serampore Call Girls 8250192130 unlimited shot and a...
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
(SHINA) Call Girls Khed ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wadki ( 7001035870 ) HI-Fi Pune Escorts Service
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 

IREDA Scheme for Loan for grid connected Solar PV rooftop plant

  • 1. LOAN SCHEME FOR FINANCING ROOFTOP SOLAR PV GRID CONNECTED/ INTERACTIVE POWER PROJECTS (INDUSTRIAL, COMMERCIAL AND INSTITUTIONAL) Financial & Operational Guidelines
  • 2. 06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 2 of 7 Table of Contents 1. Eligible Projects for Assistance .............................................................................................................. 3 2. Application documentation guidelines ................................................................................................. 4 3. Credit Rating, Interest Rates etc............................................................................................................ 5 4. Project Monitoring & provision of Lender’s Engineer .......................................................................... 6 5. Other Guidelines. ................................................................................................................................... 7
  • 3. 06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 3 of 7 1. Eligible Projects for Assistance I. Scheme is available for all Grid connected/interactive Solar PV projects located on Rooftops. II. Applications can be submitted under Aggregator Category and Direct Category. III. Aggregator Category: a. Application can include either single project or aggregate multiple projects. b. Minimum project capacity to be submitted shall be at least 1000 kWp. c. Minimum capacity of sub projects under this mode shall not be less than 20 kWp. IV. Direct Category: a. Applicants shall include projects from single roof owners only. b. Minimum project capacity to be submitted shall be at least 1000 kWp. V. General Applicant Eligibility norms. Eligible Entities/ Categories as per IREDA norms shall include the following. • Private Sector Companies/ firms • Central Public Sector Undertaking (CPSU) • State Utilities/ Discoms/ Transcos/ Gencos/ Corporations • Joint Sector Companies Applicants, registered in India, falling under any of the above categories, with borrowing powers and powers to take up new and renewable energy and energy efficiency projects as per their Charter, are only eligible to apply for financial assistance from IREDA except for the following: a) Trusts, Societies, Individuals, Proprietary concerns and Partnership firms (other than Limited Liability Partnerships, LLPs). However, they can be considered for financing only if they provide Bank Guarantee / Pledge of FDR issued by Scheduled Commercial Banks as described in RBI Act for the entire loan. b) Loss making applicants and / or, Applicants with accumulated losses (without taking in to account effect of revaluation of asset, if any) as per audited Annual Accounts of the immediate preceding financial year of operation. However, they can be considered for financing only if they provide security of Bank Guarantee / Pledge of Fixed Deposit Receipt (FDR) issued by Scheduled Commercial Bank as described in RBI Act for the entire loan. c) Applicants who are in default in payment of dues to Financial Institutions, Banks, NBFCs and/or IREDA. d) Applicants/ Group Companies and/or Core promoters of the applicant company who  Default in payment of IREDA dues and/ or defaults of other banks/FI.  Classified as willful defaulters as defined by RBI/ classified by other FIs and/ or,  Had availed OTS from IREDA and/ or, from other Banks/FI.  Convicted by court for criminal/ economic offences or under national security laws e) Greenfield Projects involving second-hand equipment and machinery. *******
  • 4. 06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 4 of 7 2. Application documentation a. Applicants shall be required to submit loan application forms alongwith all attachments of required documents as per detailed checklist. Application forms and checklist is available at IREDA website. b. Applicants shall be required to submit external credit rating under Rooftop Grading System from empanelled credit Rating agencies of IREDA. c. Projects can be located on single or multiple roofs. In case of multiple owner roofs, the same should be located within the geographical boundary of the district/single discom. (Single contiguous roofs are generally encouraged/ preferred.) d. Projects under one application shall be required to be based on single revenue model. e. All Projects shall be required to comply with minimum technical standards as per MNRE /CEA guidelines for rooftop solar/distributed generation “CEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013”. f. Applicants shall follow following general guidelines for Rooftop lease, Private PPA agreements. - Submit copy of legal document establishing roof ownership rights. - Provision in Roof lease for free access to roof (project site) to system owner/contractor, IREDA/its authorized person during the currency of IREDA’s loan. - Provision in Private PPAs for Payment security mechanism (i.e. BG/revolving LC for 2 billing cycles) assignable to IREDA. - Provision in Roof lease for No termination clause during the currency of IREDA’s loan except under force majeure/performance. However, termination clause may be stipulated with appropriate termination payment which shall be either equal to or more than loan outstanding at the time of invocation of clause. - Under third party PPA, applicant/ roof owner shall ensure that off-taker shall more than 80% of sanctioned load demand and is profitable Profit & Loss accounts for last 2 financial years. *******
  • 5. 06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 5 of 7 3. Credit Rating, Interest Rates etc. IREDA shall conduct credit rating for all grid connected projects and provides grading in a band of 4 grades (I, II, III & IV) based on the risk assessment. The interest rates are linked with the grades. The interest rates are fixed by a Committee for fixing interest rates. a) The applicable interest rates range from 9.9% to 10.75% – S.No. Borrower/Sector GRADE I GRADE II GRADE III GRADE IV ROOFTOP SOLAR PV b) Additional Interest @ 0.50% over and above the applicable rate of interest shall be charged till the date of commissioning of the project. c) External Credit Rating All applicants shall be required to obtain credit rating from external rating agencies under the IREDA Rooftop Rating Model (IRRM) from empanelled Credit Rating Agencies. Applicants under aggregator and direct category shall be rated on various sector specific parameters including sponsor strength as project promoter. d) Maximum repayment period for the loan shall be up to 9 years, with the moratorium period of 12 months from the date of COD of the project. The maximum construction period shall be 12 months from first disbursement. e) COD of the project shall be considered from the date of commissioning of complete capacity as per application. f) Quantum of loan from IREDA shall be 70% of the project cost with minimum promoter’s contribution of 30%. However, IREDA may extend loan upto 75% of the project cost on the basis of the creditworthiness of the promoter, track record, project parameters etc. as per the Financing Norms and Operational Guidelines of Rooftop Scheme. *******
  • 6. 06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 6 of 7 4. Project Monitoring & Provision of Lender’s Engineer IREDA shall engage lender’s engineer from IREDA’s empanelled list of Lender Engineers for monitoring and quality assurance, safety issues in project construction and operational monitoring. Broad Roles and Responsibilities of LE shall include the following. a) Lender’s engineer shall also provide its independent recommendations/comments on the quality and performance of project for minimum three instances i.e. one each at Pre- sanction, during construction and project commissioning. b) Lender’s Engineer shall review pre sanction techno commercial feasibility including existing shadow profile, construction progress, and project commissioning & completion report. c) Lender’s Engineer shall monitor compliance of applicable EHS norms including fire safety clearance on project site during construction and post commissioning. d) Lender’s Engineer shall submit performance review of commissioned projects vis a vis envisaged at the time of appraisal/EPC contract and give its final Completion Report including its Recommendations and Observations. *******
  • 7. 06.07.2015 FINANCIAL & OPERATIONAL GUIDELINES Page 7 of 7 5. Other Norms a. Following Revenue Models shall be generally considered for the projects. i. Captive Power Generation of roof owner. System aggregator and roof Owners shall enter into roof lease and O&M agreement for guaranteed solar generation. Direct applicants shall be required to submit O&M agreement for loan tenor or performance guarantee if self. ii. Sale to Grid under Net Metering /PPA. Roof Owners enter into agreement with discom and aggregator as per Net metering policy. iii. Sale to Grid under Gross Metering PPA. Aggregator enters into agreement with discom/third party and roof owner under Applicable solar Policy. iv. Distribution licensee/ Govt. / Semi Govt bodies provides appropriate funds. The DISCOM/Govt/Semi Govt bodies may appoint Aggregator to implement the Solar Facilities on its behalf for implementing projects. v. Other revenue models shall also be considered depending upon viability. b. Following Project ownership Models shall be considered for the projects. Rooftops under the project are owned by single party.  Either Aggregator or direct user can apply for loan.  All project related agreements shall comply with conditions for roof lease and project PPA.  Project’s revenue model can be structured under any of the revenue based models as mentioned above, however all projects under the application shall be based on single revenue model. Rooftops and Projects owned by multiple parties.  Application shall be through aggregator only.  Project shall be structured under solar lease model/ any other alternative revenue model notified above.  All project related agreements between aggregator and roof owners shall comply with conditions for roof lease and project PPA. c. Applicant shall be required to submit structure load bearing capacity, seismic load safety and wind load safety reports for highest wind speeds in the region for all sub projects from Structural expert/engineer/Civil engineer empanelled with local Govt authority/Town Planning authority/Municipal Corporation. d. Regular Disbursement on pro rata basis shall be done as per the physical and financial progress of the project. Disbursement through reimbursement mode may be taken at sub project level. e. All other terms and conditions shall be as per IREDA’s existing Financing norms. *******
  • 8. LOAN APPLICATION FORM FOR ROOFTOP SOLAR PV GRID CONNECTED/INTERATIVE POWER PROJECTS (Industrial/Commercial/Institutional) IREDA Indian Renewable Energy Development Agency Ltd. Core-4A, East Court 1st floor, India Habitat Centre Complex Lodi Road, New Delhi – 110 003 Tel, 91-11-24682214-21, Fax : 91-11-24682202 ENERGY FOR EVER
  • 9. Page | 2 NOTES i) All communications to be addressed to the Chairman & Managing Director, IREDA ii) Demand Draft for Registration Fee as given in the table below is payable along with the application: Loan Applied for Amount* Upto Rs.1 crore Rs. 10,000 Above Rs.1 crore upto 20 crores Rs. 30,000 Above Rs.20 cr. upto 40 crores Rs. 50,000 Above Rs.40 crores Rs. 60,000 (*)Note:-  Service tax including educational cess will be extra  Subject to change, Please refer to current IREDA’s financing guidelines. iii) iii) Demand Draft shall be made in favour of Indian Renewable Energy Development Agency Ltd. Payable at Delhi/New Delhi only. iv) Loan Application form in the prescribed format shall be submitted. The Format can be downloaded from IREDA website : www.ireda.gov.in v) Detailed Project Report (DPR) in duplicate shall be submitted along with the Application Form and shall conform to IREDA’s Guidelines. Please read IREDA’s current Financing Guidelines vi) If any of the points in the application is not applicable, please specify so. Enclose additional notes/sheets wherever necessary. vii) The application shall be signed by an authorized signatory. viii) All necessary documents indicated in the Application Form shall be enclosed along with the Application Form. ix) Incomplete and/or ineligible applications shall not be registered by IREDA. x) Mere submission of loan application shall not vest any right with the applicant for registration with IREDA. xi) IREDA will maintain the confidentiality of information provided by the applicant unless otherwise as required under law and / or directions of RBI and other statutory authorities. xii) In case of Loan availed under International Line of Credit, the Procurement Procedures as prescribed by the respective International Donor(s) shall be fulfilled by the applicant.
  • 10. Page | 3 xiii) IREDA accepts application forms filled in English and Hindi only. Any document in any other language has to be submitted along with attested translated copy. PART A – GENERAL 1.0 SUMMARY OF THE PROPOSAL 1.1 Type of Applicant (Aggregator/Direct) : Project Capacity ( Aggregated, MWp) 1.2 Breakup of Aggregated Capacity sub-project wise. If applicable. (kWp) : (i) (ii) (iii) … 1.3 Total project cost/Project Cost of each sub- Project ( Rs Lakhs) : (i) (ii) (iii) 1.4 Loan Assistance sought from IREDA : 1.5 Loan Assistance sought from others, if any : 1.6 Cost of Generation/Unit : 1.7 Type of project revenue model (a) Sale to Grid/Captive/Open Access /Other Model/other model: (b) Type of PPA & Metering Systems(Gross/Net/ Combination/Others * Only single revenue model subprojects shall be aggregated under one application. : (Please enclose copy of PPA/Consent/Permission/other relevant documents from concern Authority/Power purchaser for each sub-project) 1.8 Sub Project Performance Indicators: (Please attach copy of financial model of Project and of each Sub-project) Project IRR : Average DSCR : Payback Period :
  • 11. Page | 4 Break Even Point : External credit rating report enclosed Yes No 1.9 Details of payment of registration fee Mode of Payment : Demand Draft Demand Draft No. : Date : Amount : Drawn on (Name & Branch of Bank) : PAN No. : 2.0 PARTICULARS OF APPLICANT COMPANY 2.1 Name & Correspondence Address of the : Applicant Company Telephone : Fax : E-mail Address : Website : 2.2 Address of the Registered Office : Telephone : Fax : E-mail Address : 2.3 Address of the Corporate Office : Telephone : Fax : E-mail Address : 2.4 Name & Designation of Chief Executive : Telephone (Land Line) (Mobile) Fax : :
  • 12. Page | 5 E-mail Address : 2.5 Details of Authorized Dealing Official(s): Name Designation Telephone Fax Land Line Mobile 2.6 Whether the Company is existing or new or formed as Special Purpose Vehicle(SPV) for taking up this project (Pls. Tick mark appropriately) : Existing New SPV 2.7 If existing, Nature of Industry & Products : (Provide detailed write up in a separate sheet ) _______________________________ 2.8 Name of Business house or Group to which the company belongs : 2.9 List of Associate Concerns in the group (Provide details in separate sheet in case number of companies are more) : 2.10 Total Shareholding pattern of the Applicant Company (as on latest date): Sl. No. Name of share holder No. of shares Face Value Rs. % to total Share capital Total 100% 2.11 Details of the promoter(s), Promoter Director(s) and Promoter Company(ies) Sl.No Name of Promoter(s)/Promoter Director(s)/Company(ies) Designation Shareholding (%) *Networth Rs. in Lacs
  • 13. Page | 6 Total 2.12 Furnish Returns filed for the latest Financial Year give below: Name of the Promoter/ Promoter Companies Income Tax Assessment Wealth Tax Assessment Sales Tax Assessment(*) Assessed Taxable Income Income Tax Assessed/ Paid Wealth Assessed Wealth Tax Assessed/ Paid Sales Tax Assessed Sales Tax Assessed /paid *wherever applicable Net worth declared by individuals by Chartered Accountant shall be as per IREDA Form II. Enclose copies of IT & Wealth Tax Returns for Promoters & Promoter Companies giving guarantees 2.13 (a) Details of Facilities already sanctioned/ availed from IREDA by the Applicant Company: Sl. No. Project Name Year of sanction IREDA Loan Disbursed Amount Repaid Amount (b) Details of Facilities already sanctioned/availed from IREDA by the group/associated companies: Sl. No. Project Name Year of sanction IREDA Loan Disbursed Amount Repaid Amount (c) Please provide information of other projects set up by the Company either on their own or with assistance from other financial institutions, if any: Sl. No. Project Details with Location Year of Commissioning Project capacity (MWp) Generation Loan taken from FIs/bank 3.0 LEGAL STATUS OF THE APPLICANT: 3.1 Type of Organization Public Sector Private Sector Jt. Sector Co-Operative Others
  • 14. Page | 7 3.2 Clause No. of Memorandum & Articles of Association (MOA)/ Bye-laws : a) to undertake the project b) to borrow loans c) empowering Board of the company to borrow loans d) date of passing resolution u/s 149(2) in case of Limited companies & Board resolution in case of Pvt Limited companies (*) : : : : (*) Required in case the (MOA) contain the clause in object clause C. Please submit the relevant required documents filed with the ROC as required under Companies Act, 1956 3.3 Date of : a) Incorporation/ Registration : b) Commencement of Business : 3.4 Whether Applicant Company is NBFC : Yes No If Yes, Registration No. with RBI & enclose copy (Please note that Finance Company is not eligible for grid interactive solar power generation incentive) : Not Applicable______________________ 3.5 Whether Listed in Stock Exchange? : Yes No If, yes Name of Stock Exchange(s) : High in last 52 weeks : Low in last 52 weeks : 4.0EXI EXISTING ACTIVITIES of APPLICANT: 4.1 Name & address of the unit (Enclose separate sheet for more than one unit) : Telephone : Fax :
  • 15. Page | 8 E-mail address/Web site : 4.2 Type of Industry : 4.3 Brief history of the Company (indicating the various developments, prospects, etc. In chronological order) (please provide in separate sheet) _________________________________ __________________________ 5.0 PERFORMANCE DETAILS OF THE APPLICANT (In case of New Company, provide information of group companies) 5.1 Latest Credit Rating of the Organization : a) Name of the Rating Agency _________________________________ b) Year of Rating _________________________________ c) Debt of Instrument _________________________________ d) Rating 5.2 Names of Bankers/Financial Institutions including IREDA from whom the Company has taken loan for their existing activities. Indicate facilities sanctioned: Name of Instituti on/Bank Nature of Facilities Details of the Loan Security Repayme nt StatusInte rest (%) Date of Sanct ion Loan Amount Sanction Repayme nt Period (yrs) Outstand ing Amount (Rs. In Lakhs) (Enclose certificate(s) from the existing Financial Institution /Bankers, that Dealing of company’s accounts with them is satisfactory in Form VII) 5.3 Financial Performance (for the last three years) : ( I ) Financial Parameters of the firm for the last three years (as per Audited Balance Sheet) (Rs. in lacs) Year I Year II Year III
  • 16. Page | 9 a) Equity b) Reserve and Surplus c) Net Worth d) Sales Turnover e) PBDT f) Net Profit g) Loan (Term Loan) h) Fixed Asset i) Dividend (%) j) Debt-Equity Ratio k) Capital Employed Credit Rating, if any (Enclose Audited balance sheet and profit and loss account and Annual reports for the past three years of the company(s)/firms. Provisional Balance Sheet submitted if any should be in line with statutory requirements.) (II) Any qualifying remarks by Auditors in the Annual Report regarding litigation/contingent liabilities pending with Statutory Authorities (III) Whether the applicant has given any guarantee for the loans raised by other companies/others and if so, provide details thereof. (IV) Major legal cases against the company which may have impact on financial position of the applicant (V) Any qualifying remarks by Auditors in the Annual Report regarding litigation/contingent liabilities in respect where disputes with SEB/Income Tax Department/Machinery Suppliers and other creditors are pending (VI) Any qualifying remarks by Auditors in the Annual Report regarding litigation/contingent liabilities pending with Statutory Authorities (VII) Whether any provision has been made to meet the contingent liabilities (VIII) Reasons for non-provision for depreciation/ reduction in value of investments/ sundry debtors (IX) Details of Litigation/Contingent Liability i. Income Tax Demands against which the applicant has gone on appeal ii. Interest Tax iii. Sales Tax Demands against which the applicant has gone on appeal
  • 17. Page | 10 iv. Customs/ Excise demands under dispute, not provided for v. Guarantees issued & Outstanding 5.4 Whether applicant company or Group company’s name is in the list of RBI Defaulter? : 5.5 If the company’s name is in the list of RBI Defaulter, give detail : 5.6 Legal Proceedings / Court cases, if any, pending against the applicant or any of the group companies / associates : If yes, please enclose details 6.0 SECURITY OFFERED (Please tick mark) : 6.1 Bank Guarantee from a scheduled bank : OR 6.2 State Government Guarantee : OR 6.3 Unconditional and irrevocable guarantee of All India Public Financial Institutions having “AAA” or equivalent rating. OR 6.4 Equitable Mortgage (Mortgage by deposit of title deeds) of all the immovable properties; hypothecation of all movable assets, both existing and future, subject to prior charge of Banks on specified current assets; guarantees by promoters and/or promoter directors and/or promoter companies and deposit of postdated Cheques in accordance with repayment schedule of principal loan amount and interest. : Note: Pari-pasu charge on the assets instead of Mortgage by deposit of title deeds and hypothecation of assets shall be taken wherever applicable specifically in case of Energy Efficiency & joint financing projects 6.5 Details of Guarantors : Sl. No. Name of the company/promoter director % share holding NetWorth * (Rs. Lacs) 1. 2.
  • 18. Page | 11 * Enclose NetWorth Certificate of each guarantor/company providing Corporate Guarantee Duly certified by C.A. in the Form II 6.6 Additional/collateral Security offered located in urban area, if any (Give details and enclose the valuation certificate from Govt. Approved Valuer) : For Security, please refer to the current IREDA’s Financing Guidelines. Please note that stipulation of security requirement finally rests with IREDA. 7.0 RISK FACTORS AS PERCIEVED BY THE APPLICANT: Please indicate list of risk factors in the project as perceived by the applicant as Project Promoter and mitigation measures proposed to be undertaken. 8.0 EMPLOYMENT GENERATION Sl. No. Category Direct Indirect 1. Managerial & Supervisory 2. Skilled 3. Semi-skilled 4. Unskilled 5. Others (Please Specify) 9.0 SOCIAL & ECONOMIC BENEFITS Benefits Value In terms of end-products Foreign Exchange Savings Import Substitution Direct Revenue in terms of excise duty & sales tax to National Exchequer
  • 19. Page | 12 Indirect revenue  Effect on per capita in the region  Creation of Ancillary Industries Any Other (Specify) 10.0 LIST OF ENCLOSURES : Documents/Papers Enclosed (Put tick) Remarks i. Demand draft as applicable to the project as Application Registration Fee towards processing and document charges. (Registration fee is non- refundable) ii. Two copies of Detailed Project Report (DPR) iii. PVSyst Report of all sub projects. iv. Certified true copy of Memorandum & Articles Association, Certificate of Incorporation and commencement of Business By-laws and Registration Certificate in case of cooperatives & societies v. Board Resolution to undertake the project vi. Bio-data of Directors/Promoters vii.Copy of Income Tax/Wealth tax/Sales tax return filed by the applicant and the Guarantor(s) for the last three years. viii. Copy of Sales tax return in respect of applicant company ix. Certificate from Statutory Auditor for registration in Form-I x. Net worth certificate in respect of the Guarantor(s) duly certified by the Chartered Accountant in Form II separately for each Guarantor xi. Particulars of existing debentures & secured loans in the Form III xii.Authority letter to the Bankers to provide any information to IREDA in the Form IV
  • 20. Page | 13 xiii. Letter authorizing dealing officer(s) & their attested specimen signatures in the Form V xiv. Certificate from Statutory Auditors for Group companies in the Format VI xv.Copy of MNRE/Concern State Authority/Nodal Agency approval/sanction letter for proposed rooftop solar PV power generation project xvi. Certificate(s) from the existing financial institutions & bankers that company’s accounts are operating satisfactorily xvii. Audited balance sheet and Profit & Loss account/Annual reports for the past 3 years of the company(s). xviii. Details of Tenders floated, quotations /evaluation report etc. as basis for Cost submitted. xix. KYC Formats (A,B,C) xx.Other documents - Copies of Roof Lease Agreement. - Copies of O&M/ Project Performance Guarantee agreement. - Copy of PPA 11.0 DECLARATION : I…………………………… the applicant for the loan, hereby DECLARE that, i. All information furnished is to the best of my/our knowledge ii. No borrowing arrangements except as indicated have been made iii. I/we shall furnish all other information that may be required by IREDA in connection with the application iv. The information pertaining to us may be exchanged by IREDA with any agency you may deem fit. v. IREDA or its nominees or any agency authorized by IREDA may, at any time inspect/verify our assets, books of accounts, etc. in my/our factory & office premises. vi. The present proposal of loan is not for cost overrun financing vii. The present proposal of loan is not for procurement of any Second-hand equipment and machinery viii. The applicant and/or main promoters of the Applicant Company have not been convicted for criminal/economic offences or under national security laws ix. The project under consideration is/ is not commissioned (Please indicate date of commissioning in case the project is already commissioned) x. The Applicant Company shall not purchase plant & machinery and give contracts/sub-contracts to the firms & group companies of the Applicant. Further, it
  • 21. Page | 14 is confirmed that the Directors of the applicant company are not interested/connected in other firms/companies from whom machinery are procured or contract and subcontracted are being given without permission. xi. Our dues of loan from other financial institutions are being paid on time as per the respective loan agreements. (Not Applicable as ASW is a newly formed SPV and does not have any loans from any financial institution as on date) xii. The information given herein and the details in the statements and other papers enclosed as part of the application are, to the best of our knowledge and belief, true and correct in all particulars. xiii. The company shall open Trust & Retention Account (TRA) in the Format provided by IREDA, if the same is stipulated by IREDA. Place: Signature : ___________ Name & Designation of signatory : Date : Name of the Company: Rubber Stamp :_________________
  • 22. Page | 1 PART B – SECTOR SPECIFIC INFORMATION ROOFTOP SOLAR PV GRID CONNECTED/INTERACTIVE POWER PROJECTS (Industrial/Commercial/Institutional) 1.0 GENERAL 1.1 Proposed Total Installed Capacity of the Project : (For Aggregator, please provide details of each sub-projects) 1.2 Geographical area of Proposed Project* : Village : Taluk : District : State : *project shall not be located beyond district/ discom limits. 1.3 Location/s of the Project Address of Roof top Project Installations Name of Power Buyer/Roof owner for each project (i) Address Nearest Grid/Substation/Distribution Transformer (ii) Address Nearest Grid/Substation/Distribution Transformer (iii)Address Nearest Grid/Substation/Distribution Transformer 1.4 Special Category if any – Location based ( Tick as applicable)  NE States & Sikkim Islands & Estuaries Hilly Area Jammu & Kashmir Deserts Newly formed states Not applicable 1.5 Details of proposed Project Site(s)(Please tick appropriate) 1.5.1 Land/Site Nature Roof Area of Roof (sq.mtr) Category Roof Owner (Govt./Institution/ Type of Roof Rights (Own Roof/Lease Rent/profit
  • 23. Page | 2 Private/ Others please Specify Sharing/Others (please attach Roof agreement if roof is not owned by applicant company) 1 2 3 4 Total (Please enclose documents pertaining to Roof rights. It may be noted that roof rights shall not have provision for mutually agreed termination without termination payment equivalent to loan outstanding. Proof of Roof ownership/Lease Agreement/Consent letter from each of the roof owner shall be attached.) 2.0 TECHNICAL 2.A 2.A1 SOLAR PV Rooftop project and component details: Meteorological parameters for the Roof: (Detailed project report along with Building layout/blueprint of roof /building area proposed to be used for installation of solar PV power project shall be submitted) - Solar Radiation. - Roof shadow analysis attached. 2.A2 PV Module Type: (Please mention the technology, make and model of PV modules) Whether certification obtained for PV modules(Please enclose recent copy of certificate) 2.A3 Technical Details of PV Module to be used in the project: - Module Make & Model - PV module power output at STC - Dimensions of a single module - Total no. of modules to be used - Total PV array capacity - Performance Warranty of PV Module. - Manufacturing defect
  • 24. Page | 3 warrantee of PV Module 2.A4 Power Conditioning Unit/Inverter to be used in the project : - Model and Make of Inverter - Rated capacity of the PCU - Input voltage range - Output voltage and frequency - Performance warranty of Inverters: - Manufacturing defect warranty of Inverter. - Efficiency of the PCU - Number of units to be used 2.A5 Details of mounting arrangement: - Mounting Structure steel requirement for the project ( MT) - Proposed tilt angle of Mounting Str. - Tracking arrangements if any - Estimated power losses due to site conditions/building orientations and any special system design, please give details. 2.A6 Details of monitoring and data: Logging instruments/Monitoring systems to be installed at the project site (Please give item wise details) 2.A7 Details of power evacuation arrangement: - Voltage and frequency of the grid to which PV power will be fed and Capacity of Distribution Transformer/substation 2.A8 Any other salient features of the rooftop solar PV power plant
  • 25. Page | 4 3.0 Procurement Procedure: 3.1 Details of Procurement Procedure followed :  Single Quotation  RFQ Procedure  Limited Tender  Published Tender Any Other 3.2 Detailed Quotation Evaluation Report : Enclosed/Not enclosed 3.3 Note on procurement with justification for choosing the supplier and item-wise project cost : Enclosed/Not enclosed 3.5 Mode of implementation of the Project EPC Contractor/Consultant/Supplier/ Self (Please tick appropriate & indicate the name of EPC Contractor / Consultant / Supplier) 4.0 COMMERCIAL 4.1 Proposed Project cost Estimates : ( In case of multiple sub projects, a project wise breakup shall be attached) PARTICULARS UNIT COST (RS. IN LAKHS) TOTAL AMOUNT (RS. IN LAKHS) REFERENCE OF PURCHASE ORDERS & INVOICES USED FOR ARRIVING AT ESTIMATES a) Roof area for solar plant /site and Roof rent if any b) PV Modules Solar panels & Accessories Installation, testing & commissioning c) Inverters & Accessories d) BoS, Electrical items. e) Mounting Structures f) Civil Works g) Evacuation Charges if payable to Discom/SNA/SEB. h) Statutory expenses service Tax etc., if any and not included in the cost of Plant & machinery i) Preliminary & Pre-operative
  • 26. Page | 5 expenses  Registration & Front-ends fee  Stamp duty  Any other(Please specify) j) Others, if any (please Specify) Total Project Cost Copies of Purchase Orders & Invoices if raised enclosed (Invoices are required to be submitted along with the Loan Application for already commissioned projects) 4.2 PROPOSED MEANS OF FINANCING PARTICULARS** AMOUNT (RS. IN LACS) A) Promoter’s contribution Equity Share Capital Internal Accruals Unsecured Loan from Promoters, friends, relatives & their associates Others, if any specify SUB TOTAL (A) B) Term Loan Proposed From IREDA From Others (FI/Bank) *Subsidy, if any Sub Total (B) Total Project Cost (A+B) * (Capital subsidy if available will reduce IREDA’s loan) ** Details of each sub- project cost with means of financing shall be attached. 4.3 Purpose of Proposed Project Rate (Rs./Unit) Captive consumption : Yes/No Selling power to DISCOM : Yes/ No Selling to third party : Yes/No Captive Use Annual Reports for last 3 years and Copies of Agreement with the third party. (In case of selling to third party) : (MNRE GBI is available only for selling power to State Electricity Board/Utility)
  • 27. Page | 6 4.4 Details of PPA in case of sale to DISCOM/Third party a) Date of signing : b) Period of PPA : c) Tariff Rate : d) Rate of Escalation of tariff. : e) Discount/ penalty clause : f) Payment Security clause ( in case of third party PPA, payment security BG/Letter of Credit for two bills shall be mandatory.) g) PPA Termination Clause ( In case of third party PPA, termination clause shall be as per guidelines of scheme.) 4.5 In case of Captive Use to Roof owner: a) Connected Power load (kW) : ____________________________ b) Monthly & Annual power consumption (Average, attach copy of power bills) : ____________________________ c) Power Sale Revenue Rate for Solar Power. : d) Present Tariff Rate of Discom. : e) Copies of Electricity Bills for last 12 months and Summary : 4.6 In case PPA is yet to be executed, please give information based on the approved Central/state policy of Rooftop Solar Power projects along with final draft of PPA/Power Sale Agreement. 4.7 Implementation Period :
  • 28. Page | 7 4.8 Assumptions taken for Performance Indicators for each project : a) Installed Capacity (kW) : b) Rate of Interest for proposed loan from IREDA : c) Repayment period : d) Grace Period : e) Selling Price (as per Power Purchase Agreement/ Power Sale Arrangement) : f) Selling Price escalation per annum : g) Wheeling Charges if applicable : h) Average Solar Insolation : i) Average Solar day j) Annual O & M Charges : k) Annual escalation of O & M Charges : l) CUF/PLF of project m) Any other (Please Specify) : 4.9 Performance Indicators a) IRR (Financial) : b) DSCR (Average) : c) Pay Back Period : 5.0 ENVIRONMENTAL IMPACT 5.1 Provide details of environmental benefits expected by putting up Grid Interactive Solar PV Generation Projects
  • 29. Page | 8 5.2 SECTOR SPECIFIC ANY OTHER INFORMATION 5.3 SECTOR SPECIFIC APPROVALS S. No. Documents/Papers Enclosed (Pl indicate Annexure No.) Remarks I No objection Certificate (NOC) from State Electricity Board or any other Authority II Copy of SERC approved Power Purchase Agreement III Copy of Wheeling Agreement for Captive use, if applicable IV Copy of Agreement for third party sale of electricity, if applicable V Annual Reports of third party purchasers, if applicable VI Copy of Sale/Roof Lease Deed VII Copy of site map VIII Copy of Connectivity Diagram IX Note on Procurement justifying selection of particular suppliers. X Copies of Quotation/Purchase Orders and Invoices XI Copies of Invoices along with the Money receipts from the suppliers for commissioned projects
  • 30. Page | 9 XII Detailed cash-flow statements if the same are not annexed with the DPR XIII Other Clearances (Please Specify) Place: Signature :__________________ Name & Designation : Name of the Company: Date : Rubber Stamp :__________________
  • 31. 1 IREDA Loan Application Form  2 Application Registration Fee (non‐refundable) 3 External Credit Rating  of Project  & Sponsor as per IREDA Credit Rating model for Rooftop PV Solar Financing  4 Certified true copy of Memorandum & Articles of Association, Certificate of Incorporation and Commencement of  Business of  applicant 5 Proposed shareholding pattern of the applicant Company certified by competent authority 6 Audited Annual reports for the past three years of the applicant company 7 Audited Annual reports of the promoter company(s)/ Guarantor company of applicant for last three years  8 Provisional Balance Sheet of the company/Promoter company(s), if last audited balance sheet is more than six months  old. 9 Board resolution to undertake the project 10 Authorized letter to the Bankers of applicant company to provide information to IREDA 11 Letter from their existing Bank(s)/Financial Institutions regarding status of loan account(s) 12 Copy of Sales tax return in respect of applicant company/ promoter companies/ Guarantor company for last three  years. 13 Copy of Income tax & wealth tax return in respect of applicant company/ promoter(s)/Guarantor(s) for last three years. 14 Letter authorizing dealing officer(s) & their attested specimen signatures 15 Certificate from Statutory Auditors regarding the Group companies on IREDA's format 16 Particulars of existing debentures & secured loans of applicant company 17 Certificate from Statutory Auditor for Eligibility of applicant company in IREDA format 18 Net worth certificate in respect of the applicant company/ Promoter Company & Guarantor duly certified by the  Chartered Accountant 19 KYC Formats (A,B,C) of applicant and its promoters for KYC, AML  20 Project related documents 21 Copy of lease agreements for all roofs for all project sites 22 Copy of PPA, Captive sale agreement,Net Metering energy sales agreement with power buyer. 23 Copy of Rooftop approval from Discom ( for net metering) 24 Copy of registration/NOC from SNA if applicable  25 Copy of Rooftop interconnection NOC from discom ( for PPA/Captive sale) 26 Project DPR  27 PV Syst Energy Assessment Report ( for all sub projects) 28 Solar Radiation Assessment report including horizon shadow effect assessment 29 Copy of EPC & O&M contract ( in case aggregator is not the applicant) 30 Execution and O&M guarantees by aggregator for the project ( all sub projects). 31 Details of PV Modules supplier finalized by aggregator ( tech specs and guarantee/warrantee clauses)  32 Details of Inverter supplier finalized by aggregator ( tech specs and guarantee/warantee clauses)  33 Project Cost breakup in IREDA Format 34 Details of Tenders floated, quotations received, tender evaluation report for project cost submitted by applicant 35 Means of Finance and Sources of Finance for the project 36 Module/Inverter supplier profiles including  total Production/ Installed capacity/total capacity supplied globally & India   37 Copy of all Roof layouts/ blue print of rooftop to be used 38 Pollution Control Board clearance ( if applicable) 39 NOC from Town Country planning department / Gram Panchayat ( if applicable, ) 40 Credit Rating details of the company, if any 41 Detail Company profiles of applicant/holding/guarantor and core business activities  42 Present shareholding pattern of applicant Company 43 copy of PAN 46 Net worth/ financials of EPC/Contractor ( if aggregator is not the applicant) 47 Brief of Core/Lead technical team/staffs 48 Background of Contractors, details of solar projects executed and Performance certificate from existing clients Checklist of Documents Required for Appraisal of Rooftop Solar PV power  Projects