Looking forward for the Role of VP/GM/ Consultant- indivisionof Maintenance/
Manufacturing/ProjectManagement/Engineering
Skills- Costreduction,Production&Productivityenhancement,TPM/TQM/Kaizens,TeamHandling.
SalientFeaturesof Skillsand performance with TATA STEEL LTD.
1. Mechanical Maintenance- Coal Beneficiary Group.(CB group)
1.1 Enhancedavailabilityof equipment’sfrom85% 90% by reducingunplanned20hrsto10hrs
and frequency(15to6 nos)
1.2 Reducedthe MTTR and MTBF of the equipmentbyclose monitoringof chronicproblems.
1.3 ReducedMan machine interference byintroducingHydraulicsystemforturningof sieve
bend.
1.4 Increasedthe TPH from360 to 425 for CB group
1.5 Erectionand commissionof HRTfor ease of hydraulicoperations.
1.6 Maintainedthe costas per ABP.
2. Workshop(Maintenance) division :
2.1 Expertise inErectionandcommissioningof horizontal balancingm/cforHEMM equipment.
2.2 Reducedthe costof manufacturingbyintroducingTPM& Qualitytools,Kaizens.
2.3 Introducedscheduleroute cardsformanufacturingcomponents.
3. Water Resource Management:-
3.1 Enhancedthe flowof filteredwatertosoftenerbyinstallationof JohnsonandJohnson
screen.
3.2 Monitoredthe watervolume toindustrial unitsanddomesticunitsbyinstallingof flow
meters.Reducedconsumptionof domesticfrom4MGDto 2MGD
4. HEMM:
4.1 Maintainedthe fleetof dozers,cranes,dozersbypreventivemaintenance techniques.
4.2 Reducedcostof overhaulingbyre- engineeringtechniquesand in-houserepairs.

More Related Content

What's hot

Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster Menezes
 
Ahmed Mansour Cover letter
Ahmed Mansour Cover letterAhmed Mansour Cover letter
Ahmed Mansour Cover letterAhmed Mansour
 
EHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEhab Lamee
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationChad Broussard
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Flevy.com Best Practices
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsMatthew Clemens
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and ProgramRicky Smith CMRP
 

What's hot (12)

Royster menezes - Mechanical Engineer
Royster menezes - Mechanical EngineerRoyster menezes - Mechanical Engineer
Royster menezes - Mechanical Engineer
 
Ahmed Mansour Cover letter
Ahmed Mansour Cover letterAhmed Mansour Cover letter
Ahmed Mansour Cover letter
 
CV.
CV.CV.
CV.
 
EHAB GAMEEL LAMEE
EHAB GAMEEL LAMEEEHAB GAMEEL LAMEE
EHAB GAMEEL LAMEE
 
Reliability Through Correlation and Colaboration
Reliability Through Correlation and ColaborationReliability Through Correlation and Colaboration
Reliability Through Correlation and Colaboration
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
Reliability Centered Maintenance (RCM) and Total Productive Maintenance (TPM)...
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
Rcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teamsRcm 4 hour overview for rcm teams
Rcm 4 hour overview for rcm teams
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 

Similar to VP/GM Consultant Skills in Maintenance, Manufacturing, Project Management

Similar to VP/GM Consultant Skills in Maintenance, Manufacturing, Project Management (20)

sendhil7y6m
sendhil7y6msendhil7y6m
sendhil7y6m
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenance
 
RESUME
RESUMERESUME
RESUME
 
oooo
oooooooo
oooo
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 
CustomerCopy final damodaran
CustomerCopy  final damodaranCustomerCopy  final damodaran
CustomerCopy final damodaran
 
khaled ramadan (process l engineer
khaled ramadan (process l engineerkhaled ramadan (process l engineer
khaled ramadan (process l engineer
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
 
khaled ramdan osman -kiln coach
khaled ramdan osman -kiln coachkhaled ramdan osman -kiln coach
khaled ramdan osman -kiln coach
 
Resume
ResumeResume
Resume
 
PARESH KUMAR DASH-RESUME-BOILER (1)
PARESH KUMAR   DASH-RESUME-BOILER (1)PARESH KUMAR   DASH-RESUME-BOILER (1)
PARESH KUMAR DASH-RESUME-BOILER (1)
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
CustomerCopy_doc_doc
CustomerCopy_doc_docCustomerCopy_doc_doc
CustomerCopy_doc_doc
 
Process Improvements[1]
Process Improvements[1]Process Improvements[1]
Process Improvements[1]
 
Feb 20
Feb 20Feb 20
Feb 20
 
Ajay
AjayAjay
Ajay
 
Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0Optimising Efficiency & Capacity Sep 04 Rev 0
Optimising Efficiency & Capacity Sep 04 Rev 0
 
Cv Rafee
Cv Rafee Cv Rafee
Cv Rafee
 
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning MillsProductivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 

VP/GM Consultant Skills in Maintenance, Manufacturing, Project Management

  • 1. Looking forward for the Role of VP/GM/ Consultant- indivisionof Maintenance/ Manufacturing/ProjectManagement/Engineering Skills- Costreduction,Production&Productivityenhancement,TPM/TQM/Kaizens,TeamHandling. SalientFeaturesof Skillsand performance with TATA STEEL LTD. 1. Mechanical Maintenance- Coal Beneficiary Group.(CB group) 1.1 Enhancedavailabilityof equipment’sfrom85% 90% by reducingunplanned20hrsto10hrs and frequency(15to6 nos) 1.2 Reducedthe MTTR and MTBF of the equipmentbyclose monitoringof chronicproblems. 1.3 ReducedMan machine interference byintroducingHydraulicsystemforturningof sieve bend. 1.4 Increasedthe TPH from360 to 425 for CB group 1.5 Erectionand commissionof HRTfor ease of hydraulicoperations. 1.6 Maintainedthe costas per ABP. 2. Workshop(Maintenance) division : 2.1 Expertise inErectionandcommissioningof horizontal balancingm/cforHEMM equipment. 2.2 Reducedthe costof manufacturingbyintroducingTPM& Qualitytools,Kaizens. 2.3 Introducedscheduleroute cardsformanufacturingcomponents. 3. Water Resource Management:- 3.1 Enhancedthe flowof filteredwatertosoftenerbyinstallationof JohnsonandJohnson screen. 3.2 Monitoredthe watervolume toindustrial unitsanddomesticunitsbyinstallingof flow meters.Reducedconsumptionof domesticfrom4MGDto 2MGD 4. HEMM: 4.1 Maintainedthe fleetof dozers,cranes,dozersbypreventivemaintenance techniques. 4.2 Reducedcostof overhaulingbyre- engineeringtechniquesand in-houserepairs.