Short- Term Scheduling
(Theory, Issues, and Processes)
Done by:
•Paula Caballero
•Alvaro Terry
1. The Importance of Short-Time
Scheduling
``Scheduling concerns the allocation of limited resources to
tasks overtime.'' (Pinedo 1995)
Example:
 Airlines (eg: Delta Airline) try to expect the unexpected  Weather
 Bad weather caused 10% of flights cancelations  Looses of 440
M$
 Solution An investment of 33M$ in High-Tech Nerve Center
 “Its function is to reallocate the passengers as soon as possible to
maintain their level of satisfaction”
1. The Importance of Short-Time
Scheduling
Example video:
https://www.youtube.com/watch?v=kOw-Fyk5X_c
1. The Importance of Short-Time
Scheduling
 Delta ( Schedules/daily)  753 aircrafts + 10,000 pilots and flight
attendants
 Good Scheduling = Customer Satisfaction
 Objective: Allocate and prioritize demand, matching daily or hourly
requirements to specific personnel and equipment
A Good scheduling approach shoulg be simple, clear, easily understood,
easy to carry out, flexible and realistic
 Strategic Importance:
 Effective Scheduling ( fast movement of G/S, decrease of costs)
 Added Capacity , Faster Performance and Flexibility (faster delivery)
Good Scheduling (realistic commitments and dependable delivery)
 Schedule Decissions:
1. The Importance of Short-Time
Scheduling
2. Other examples
3. Forward and backward
scheduling
Forward: begins the schedule as soon as possible as the
requirements are known (…). Customized products that are
needed as soon as possible.
Backward: Begins with the due date of the final operation. The
resources neccesary to accomplish the schedule may not
exist
Examples: Hospitals, Clinics, Machine
tool manufacturing, Restaurants
Examples: Banquet, catering, scheduling
surgery, service environment
4. Scheduling Issues
 Most common case is to find an organization with a mix of
both applied.
 Even having the date scheduled; the elaboration process
could fail because of………………., so it does not ensure that
the G/S will be ready.
Could you think about any factor
that complicates scheduling?
Weather, Absenteeism, Machine breakdown
Workers falling asleep, Shortage
5. Goals of Short-term
scheduling
 Minimize completion time (average of production time
 Maximize utilization (percentage of time the facility is
used)
 Minimize Work-in-Process (WIP) to reduce inventories
( average number of jobs in the system)
 Minimize customer waiting time (average of late days)
 All these goals depend on the volume of the orders,
nature of the operations, and the complexity of the jobs.
6. Scheduling Process-
Focused Facilities
This system should…
1. Schedule incoming orders without exceeding capacity
2. Check availability of tools and materials before releasing
an order (raw materials)
3. Establish due dates for each job and check progress
4. Provide feedback
5. Provide work efficiency to increase employees motivation
Process focus facilities are compound of high variety
and low volume systems (manufacturing and service
organizations) in which products are made to order
Revising…
Question 1
1. Could you tell me 2 factors that could lead to the
disruption of airlines schedules
Weather
Absenteeism
Machine breakdown
Workers falling asleep
Shortage
Question 2
Could you give me 2 examples of forward scheduling?
Hospital
Clinic
Machine tool manufacturing
Restaurant
Question 3
3. Which is a characteristic of good scheduling?
a) Clear
b) Simple
c) Flexible
d) All of the above
Correct answer:
d) All of the above
Question 4
4. Which of these factors do not contribute to the
strategic importance of scheduling?
a) Added capacity
b) Independent delivery
c) Effective scheduling
Correct answer:
b) Independent delivery
Question 5
5. Which of these statements is False concerning the strategic
importance of sheduling?
a) Added capacity and the related flexibility mean faster
delivery and better customer service
b) Added capacity and the related simplicity mean faster
delivery and better customer service
c) Effective scheduling means faster movement of goods and
services through a facility
d) Effective scheduling means greater use of assets and hence
greater capacity per dollar invested
Correct answer:
b) Simplicity
Question 6
6. Short-term schedules translate capacity decisions, aggregate
planning, and master schedules into job sequences and
specific assignments of personnel, materials and machinery.
a) True
b) Flase
Correct answer:
a) True
Question 7
7. Scheduling goods and services in the short run involve
matching daily or hourly requirements to specific personnel and
equipment
a) True
b) Flase
Correct answer:
a) True
Question 8
8. Which 2 types of scheduling have we seen in this
chapter?
a) Forward and backward scheduling
Question 9
8. Manufacturing firms do not have to deal with the problem of
short-term scheduling
a) True
b) Flase
Correct answer:
a) False
Question 10
10. Can you tell me at least one goal of short-term
scheduling?
Minimize completion time
Maximize utilization
Minimize work-in progress inventory
Minimize customer waiting time
Question 11
3. If something happens on the day of operations you are able
to recover from that disruption without throwing your schedule
away and thus spending more money to trying to cover the
flight. This statement is talking about?
a) Schedule simplicity
b) Schedule robustness
c) Schedule capacity
Correct answer:
b) Schedule robustness
Question 12
12. Mining does not have to deal with the problem of short-term
scheduling:
a) True
b) False
Correct answer: b) False
Question 13
13. Choose the wrong answer: Specialized techniques have
been developed to aid in preparing reliable schedules…
a) As assignment of a date does not ensure that the work will
be performed according to the schedule
b) In order to be 100% sure that the schedule will be perfectly
executed
c) Because schedules are an essential factor that contributes to
the efficiency of the company
Correct answer:
b)
Question 14
14. Which statement is False?
a) Focused facilities are compound of low variety and low
volume systems (manufacturing and service organizations)
in which products are made to order
b) Focused facilities are compound of high variety and high
volume systems (manufacturing and service organizations) in
which products are made to order
c) Focused facilities are compound of high variety and low
volume systems (manufacturing and service organizations) in
which products are made to order
Correct answer: c)
Thank you for your attention!

More Related Content

What's hot

Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production schedulingmrinalmanik64
 
Productivity and operation management
Productivity and operation managementProductivity and operation management
Productivity and operation managementShreyas Metri
 
Operation management History
Operation management HistoryOperation management History
Operation management HistoryQC Labs
 
Production and Operations Management- Chapters 1-8
Production and Operations Management- Chapters 1-8Production and Operations Management- Chapters 1-8
Production and Operations Management- Chapters 1-8vc_santos
 
DECISION THEORY WITH EXAMPLE
DECISION THEORY WITH EXAMPLEDECISION THEORY WITH EXAMPLE
DECISION THEORY WITH EXAMPLEAnasuya Barik
 
Distribution Requirements Planning from indiana.edu
Distribution Requirements Planning from indiana.eduDistribution Requirements Planning from indiana.edu
Distribution Requirements Planning from indiana.eduwarmleon
 
Ch 1 introduction_om
Ch 1 introduction_omCh 1 introduction_om
Ch 1 introduction_omitzmeyash
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and servicesgerlyn bonus
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -ExampleJoseph Konnully
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningAtif Ghayas
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operationskahogan62
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysisvideoaakash15
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout pptAnju Rana
 

What's hot (20)

Location decision
Location decisionLocation decision
Location decision
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Jonson"s Rule Production scheduling
 Jonson"s Rule Production scheduling Jonson"s Rule Production scheduling
Jonson"s Rule Production scheduling
 
Productivity and operation management
Productivity and operation managementProductivity and operation management
Productivity and operation management
 
Operation management History
Operation management HistoryOperation management History
Operation management History
 
Lean operations presentation
Lean operations   presentationLean operations   presentation
Lean operations presentation
 
Production and Operations Management- Chapters 1-8
Production and Operations Management- Chapters 1-8Production and Operations Management- Chapters 1-8
Production and Operations Management- Chapters 1-8
 
DECISION THEORY WITH EXAMPLE
DECISION THEORY WITH EXAMPLEDECISION THEORY WITH EXAMPLE
DECISION THEORY WITH EXAMPLE
 
Distribution Requirements Planning from indiana.edu
Distribution Requirements Planning from indiana.eduDistribution Requirements Planning from indiana.edu
Distribution Requirements Planning from indiana.edu
 
C8 scheduling
C8 schedulingC8 scheduling
C8 scheduling
 
Supply Chain Strategy
Supply Chain StrategySupply Chain Strategy
Supply Chain Strategy
 
Process Analysis
Process Analysis Process Analysis
Process Analysis
 
Ch 1 introduction_om
Ch 1 introduction_omCh 1 introduction_om
Ch 1 introduction_om
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
SUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIESSUPPLY CHAIN STRATEGIES
SUPPLY CHAIN STRATEGIES
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operations
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 

Similar to Chapter 15; Short-Term Scheduling

Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityJoanRachelCalansingi
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)Steve Nails
 
Program Management using the Triple constraints
Program Management using the Triple constraints Program Management using the Triple constraints
Program Management using the Triple constraints Drew Harris
 
Managing the triple constraints in a program Drew harris
Managing the triple constraints in a program Drew harrisManaging the triple constraints in a program Drew harris
Managing the triple constraints in a program Drew harrisDrew Harris
 
UOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comUOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comkopiko118
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comclaric77
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.commyrealit
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceJames Fitzgerald
 
Facility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxFacility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxMeetLalcheta
 
Facility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptxFacility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptxMeetLalcheta
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipmentjohann11371
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processingjohann11372
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.pptTecnicoItca
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consistingjohann11369
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...johann11371
 
Three primary steps in maintenance reliability engineering
Three primary steps in maintenance reliability engineeringThree primary steps in maintenance reliability engineering
Three primary steps in maintenance reliability engineeringJim Taylor, ASQ-CRE, CPE, CPMM
 
OPS 571 HELP Education for Service--ops571help.com
 OPS 571 HELP Education for Service--ops571help.com OPS 571 HELP Education for Service--ops571help.com
OPS 571 HELP Education for Service--ops571help.commamata44
 
A simple project listing of five activities and their respective time
A simple project listing of five activities and their respective timeA simple project listing of five activities and their respective time
A simple project listing of five activities and their respective timejohann11370
 

Similar to Chapter 15; Short-Term Scheduling (20)

Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)
 
Program Management using the Triple constraints
Program Management using the Triple constraints Program Management using the Triple constraints
Program Management using the Triple constraints
 
Managing the triple constraints in a program Drew harris
Managing the triple constraints in a program Drew harrisManaging the triple constraints in a program Drew harris
Managing the triple constraints in a program Drew harris
 
UOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.comUOP OPS 571 Inspiring Innovation--uopops571.com
UOP OPS 571 Inspiring Innovation--uopops571.com
 
Zero Tolerancev
Zero TolerancevZero Tolerancev
Zero Tolerancev
 
OPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.comOPS 571 HELP Inspiring Innovation--ops571help.com
OPS 571 HELP Inspiring Innovation--ops571help.com
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.com
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 
Facility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptxFacility Capacity Planning & its Measurement[1].pptx
Facility Capacity Planning & its Measurement[1].pptx
 
Facility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptxFacility Capacity Planning & its Measurement[1] - Copy.pptx
Facility Capacity Planning & its Measurement[1] - Copy.pptx
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipment
 
ch09s.ppt
ch09s.pptch09s.ppt
ch09s.ppt
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processing
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.ppt
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consisting
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...
 
Three primary steps in maintenance reliability engineering
Three primary steps in maintenance reliability engineeringThree primary steps in maintenance reliability engineering
Three primary steps in maintenance reliability engineering
 
OPS 571 HELP Education for Service--ops571help.com
 OPS 571 HELP Education for Service--ops571help.com OPS 571 HELP Education for Service--ops571help.com
OPS 571 HELP Education for Service--ops571help.com
 
A simple project listing of five activities and their respective time
A simple project listing of five activities and their respective timeA simple project listing of five activities and their respective time
A simple project listing of five activities and their respective time
 

Recently uploaded

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCRsoniya singh
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherPerry Belcher
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...lizamodels9
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio managementJunaidKhan750825
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...Khaled Al Awadi
 

Recently uploaded (20)

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In BELLMONT HOTEL ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Hauz Khas 🔝 Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio management
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...NewBase  22 April  2024  Energy News issue - 1718 by Khaled Al Awadi  (AutoRe...
NewBase 22 April 2024 Energy News issue - 1718 by Khaled Al Awadi (AutoRe...
 

Chapter 15; Short-Term Scheduling

  • 1. Short- Term Scheduling (Theory, Issues, and Processes) Done by: •Paula Caballero •Alvaro Terry
  • 2. 1. The Importance of Short-Time Scheduling ``Scheduling concerns the allocation of limited resources to tasks overtime.'' (Pinedo 1995) Example:  Airlines (eg: Delta Airline) try to expect the unexpected  Weather  Bad weather caused 10% of flights cancelations  Looses of 440 M$  Solution An investment of 33M$ in High-Tech Nerve Center  “Its function is to reallocate the passengers as soon as possible to maintain their level of satisfaction”
  • 3. 1. The Importance of Short-Time Scheduling Example video: https://www.youtube.com/watch?v=kOw-Fyk5X_c
  • 4. 1. The Importance of Short-Time Scheduling  Delta ( Schedules/daily)  753 aircrafts + 10,000 pilots and flight attendants  Good Scheduling = Customer Satisfaction  Objective: Allocate and prioritize demand, matching daily or hourly requirements to specific personnel and equipment A Good scheduling approach shoulg be simple, clear, easily understood, easy to carry out, flexible and realistic  Strategic Importance:  Effective Scheduling ( fast movement of G/S, decrease of costs)  Added Capacity , Faster Performance and Flexibility (faster delivery) Good Scheduling (realistic commitments and dependable delivery)
  • 5.  Schedule Decissions: 1. The Importance of Short-Time Scheduling
  • 7. 3. Forward and backward scheduling Forward: begins the schedule as soon as possible as the requirements are known (…). Customized products that are needed as soon as possible. Backward: Begins with the due date of the final operation. The resources neccesary to accomplish the schedule may not exist Examples: Hospitals, Clinics, Machine tool manufacturing, Restaurants Examples: Banquet, catering, scheduling surgery, service environment
  • 8. 4. Scheduling Issues  Most common case is to find an organization with a mix of both applied.  Even having the date scheduled; the elaboration process could fail because of………………., so it does not ensure that the G/S will be ready. Could you think about any factor that complicates scheduling? Weather, Absenteeism, Machine breakdown Workers falling asleep, Shortage
  • 9. 5. Goals of Short-term scheduling  Minimize completion time (average of production time  Maximize utilization (percentage of time the facility is used)  Minimize Work-in-Process (WIP) to reduce inventories ( average number of jobs in the system)  Minimize customer waiting time (average of late days)  All these goals depend on the volume of the orders, nature of the operations, and the complexity of the jobs.
  • 10. 6. Scheduling Process- Focused Facilities This system should… 1. Schedule incoming orders without exceeding capacity 2. Check availability of tools and materials before releasing an order (raw materials) 3. Establish due dates for each job and check progress 4. Provide feedback 5. Provide work efficiency to increase employees motivation Process focus facilities are compound of high variety and low volume systems (manufacturing and service organizations) in which products are made to order
  • 12. Question 1 1. Could you tell me 2 factors that could lead to the disruption of airlines schedules Weather Absenteeism Machine breakdown Workers falling asleep Shortage
  • 13. Question 2 Could you give me 2 examples of forward scheduling? Hospital Clinic Machine tool manufacturing Restaurant
  • 14. Question 3 3. Which is a characteristic of good scheduling? a) Clear b) Simple c) Flexible d) All of the above Correct answer: d) All of the above
  • 15. Question 4 4. Which of these factors do not contribute to the strategic importance of scheduling? a) Added capacity b) Independent delivery c) Effective scheduling Correct answer: b) Independent delivery
  • 16. Question 5 5. Which of these statements is False concerning the strategic importance of sheduling? a) Added capacity and the related flexibility mean faster delivery and better customer service b) Added capacity and the related simplicity mean faster delivery and better customer service c) Effective scheduling means faster movement of goods and services through a facility d) Effective scheduling means greater use of assets and hence greater capacity per dollar invested Correct answer: b) Simplicity
  • 17. Question 6 6. Short-term schedules translate capacity decisions, aggregate planning, and master schedules into job sequences and specific assignments of personnel, materials and machinery. a) True b) Flase Correct answer: a) True
  • 18. Question 7 7. Scheduling goods and services in the short run involve matching daily or hourly requirements to specific personnel and equipment a) True b) Flase Correct answer: a) True
  • 19. Question 8 8. Which 2 types of scheduling have we seen in this chapter? a) Forward and backward scheduling
  • 20. Question 9 8. Manufacturing firms do not have to deal with the problem of short-term scheduling a) True b) Flase Correct answer: a) False
  • 21. Question 10 10. Can you tell me at least one goal of short-term scheduling? Minimize completion time Maximize utilization Minimize work-in progress inventory Minimize customer waiting time
  • 22. Question 11 3. If something happens on the day of operations you are able to recover from that disruption without throwing your schedule away and thus spending more money to trying to cover the flight. This statement is talking about? a) Schedule simplicity b) Schedule robustness c) Schedule capacity Correct answer: b) Schedule robustness
  • 23. Question 12 12. Mining does not have to deal with the problem of short-term scheduling: a) True b) False Correct answer: b) False
  • 24. Question 13 13. Choose the wrong answer: Specialized techniques have been developed to aid in preparing reliable schedules… a) As assignment of a date does not ensure that the work will be performed according to the schedule b) In order to be 100% sure that the schedule will be perfectly executed c) Because schedules are an essential factor that contributes to the efficiency of the company Correct answer: b)
  • 25. Question 14 14. Which statement is False? a) Focused facilities are compound of low variety and low volume systems (manufacturing and service organizations) in which products are made to order b) Focused facilities are compound of high variety and high volume systems (manufacturing and service organizations) in which products are made to order c) Focused facilities are compound of high variety and low volume systems (manufacturing and service organizations) in which products are made to order Correct answer: c)
  • 26. Thank you for your attention!