1. Which of the following is a measure of operations and supply
management efficiency used by Wall Street? Dividend payout ratio
Receivable turnover Current ratio Financial leverage Earnings per
share growth
2. An activity-system map is which of the following? A diagram
that shows how a company's strategy is delivered to customers A
timeline displaying major planned events A network guide to route
airlines A facility layout schematic noting what is done where A
listing of activities that make up a project
3. Which of the following is a total measure of productivity?
Output/Materials Output/Labor Output/(Labor + Capital + Energy)
All of these Output/Inputs
4. Which of the following approaches to service design is
characterized by having the customer take a greater role in the
production of the service? Quality approach Self-service approach
Production-line approach Do-it-yourself approach Personal-
attention approach
5. Which of the following basic types of production layout formats
is one that has similar equipment or functions are grouped together?
Workcenter layout Production line layout Group technology layout
Manufacturing cell layout Assembly line layout
6. Which of the following is a characteristic that can be used to
guide the design of service systems? Services are all similar.
Services cannot be inventoried. Services businesses are inherently
entrepreneurial. Even service businesses have internal services.
Quality work means quality service.
7. An advantage of a make-to-stock process is which of the
following? All units of output are unique. It features rapid delivery
of a standard product. It combines the best features of other
processes. It responds directly to customer orders. It allows the firm
to avoid inventory costs.
8. Getting an autograph from a famous person might involve
standing in which type of queuing line structure? Single channel,
single phase None of these Single channel, multiphase
Multichannel, multiphase Multichannel, single phase
9. For an infinite queuing situation, if the arrival rate for loading
trucks is 5 trucks per hour, what is the mean time between arrivals?
2.5 hours 5 hours 0.2 hour 0.1 hour None of these
10. An assumption of learning curve theory is which of the
following? Organizational learning is not included in learning
theory. The time required to do a task will vary randomly each time
the task is repeated. Unit time will decrease at an increasing rate.
Learning will not be transferred from one worker to the next. The
reduction in unit time will follow a predictable pattern.
11. A company's production process has an 80 percent learning
curve rate. The process has produced 1,000 units to date. A process
refinement is estimated to allow a future learning curve rate for the
identical product of 75 percent. However, the initial unit made using
the new process will take the same amount of time as the initial unit
produced using the old process. At what point, using the new
process, will the production rate exceed the production rate achieved
by the old process? Before the 100th unit Before the 120th unit
Before the 80th unit Before the 50th unit Before the 250th unit
12. For which of the following should we use a p-chart to monitor
process quality? Grades in a freshman "pass/fail" course
Temperatures in a classroom The dimensions of brick entering a
kiln The weight of fluid in a container Lengths of boards cut in a
mill
13. You have been called in as a consultant to set up a Kanban
control system. The first thing to do is to determine the number of
Kanban card sets needed. Your research shows that the expected
demand during lead time for a particular component is 150 per hour.
You estimate the safety stock should be set at 25 percent of the
demand during lead time. The tote trays used as containers can hold
8 units of stock, and the lead time it takes to replenish an order is 2
hours. Which of the following is the number of Kanban card sets
necessary to support this situation? 42 68 89 47 94
14. Which of the following is a fixed-time-period inventory model?
Just-in-time model The EOQ model Periodic system model The Q
model The least cost method
15. A company is planning for its financing needs and uses the basic
fixed-order-quantity inventory model. Which of the following is the
total cost (TC) of the inventory given an annual demand of 10,000,
setup cost of $32, a holding cost per unit per year of $4, an EOQ of
400 units, and a cost per unit of inventory of $150? None of these
$1,501,600 $1,498,200 $499,313 $500,687 A. $1,501,600 Q = 400.
Average Inventory = Q/2 = 200. Holding cost/year = $4. Thus,
annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x
$32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000.
Hence, TC = $1,500,000 + 800 + 800 = $1,501,600.
16. Which of the following is a principle of work center scheduling?
Reschedule every day. Once started, a job can and should be
finished even if unavoidably interrupted. Assign the first worker to
all of the days that require staffing. Achieve certainty in standards
and routings. Give work centers less to do then their maximum.
17. Which of the following is a "focusing step" of Dr. Eli Goldratt's
theory of constraints? Identify system constraints. Support system
constraints. If you have no system constraints, make some. Reduce
system constraints. Reinforce system constraints.
18. In designing a lean production facility layout, a designer should
do which of the following? Locate flexible workstations offline.
Balance capacity using job shop analysis. Design for work flow
balance. Always keep operations on a single floor of the factory.
Link operations through a push system.
19. A simple project listing of five activities and their respective
time estimates are presented here: Using CPM, which activities
make up the critical path? None of these A, B, D, E A, D, E A, C, B,
D, E A, C, D, E
20. A company must perform a maintenance project consisting of
seven activities. The activities, their predecessors, and their
respective time estimates are presented here: Using CPM, which
activities make up the critical path? A, C, B, F, E None of these A,
B, D, F, G A, C, E, F, G A, D, E
21. Which of the following is not a problem definition tool from the
operations consulting tool kit? Issue trees Five forces model
Computer simulation Customer surveys Gap analysis
22. Which of the following is not one of the basic types of
forecasting? Simulation Causal relationships Qualitative Time series
analysis Force field analysis
23. A company has actual unit demand for three consecutive years
of 124, 126, and 135. The respective forecasts for the same three
years are 120, 120, and 130. Which of the following is the resulting
MAD value that can be computed from these data? 3 1 15 123 5 C
MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5.
25. What is transaction processing? The decision support system
used to efficiently handle multiple transactions The movement of
paperwork through a system using a decision tree The scheduling of
machinery to minimize time and scrap The posting and tracking of
the detailed activities of a business
26. If the actual output of a piece of equipment during an hour is
500 units and its best operating level is at a rate of 400 units per
hour, which of the following is the capacity utilization rate? 0.75
1.00 1.25 1.33 100
27. Which of the following is an input to the master production
schedule (MPS)? Planned order schedules The bill of materials The
aggregate plan The exception report Inventory records file
28. Which of the following is considered a primary report in an
MRP system? Cycle counting reports Performance reports Planned
order schedules Planning reports Exception reports
29. The centroid method for plant location uses which of the
following data? Probabilities and payoffs Correlation matrix of
existing facilities Volume of goods to be shipped between existing
points Inbound transportation costs Transport times between
facilities
30. In Hau Lee's uncertainty framework to classify supply chains, a
supply chain for functional products with an evolving supply
process is called which of the following? Responsive Forward
looking Efficient Risk hedging Agile
hour, which of the following is the capacity utilization rate? 0.75
1.00 1.25 1.33 100
27. Which of the following is an input to the master production
schedule (MPS)? Planned order schedules The bill of materials The
aggregate plan The exception report Inventory records file
28. Which of the following is considered a primary report in an
MRP system? Cycle counting reports Performance reports Planned
order schedules Planning reports Exception reports
29. The centroid method for plant location uses which of the
following data? Probabilities and payoffs Correlation matrix of
existing facilities Volume of goods to be shipped between existing
points Inbound transportation costs Transport times between
facilities
30. In Hau Lee's uncertainty framework to classify supply chains, a
supply chain for functional products with an evolving supply
process is called which of the following? Responsive Forward
looking Efficient Risk hedging Agile

More Related Content

What's hot

In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsjohann11371
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivityjohann11373
 
A p chart to monitor process quality
A p chart to monitor process qualityA p chart to monitor process quality
A p chart to monitor process qualityjohann11369
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...johann11371
 
Which of the following is a focusing step
Which of the following is a focusing stepWhich of the following is a focusing step
Which of the following is a focusing stepjohann11373
 
Which of the following basic types of production layout
Which of the following basic types of production layoutWhich of the following basic types of production layout
Which of the following basic types of production layoutjohann11372
 
Which of the following is not a problem definition tool
Which of the following is not a problem definition toolWhich of the following is not a problem definition tool
Which of the following is not a problem definition tooljohann11374
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingjohann11370
 
Which of the following approaches to service design
Which of the following approaches to service designWhich of the following approaches to service design
Which of the following approaches to service designjohann11372
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situationjohann11370
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemjohann11374
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.commyrealit
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)beauti123157
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the followingyearstart2
 
Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...ramuaa128
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...ramuaa130
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivityramuaa129
 
Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018ramuaa124
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelramuaa129
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingyearstart2
 

What's hot (20)

In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chains
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivity
 
A p chart to monitor process quality
A p chart to monitor process qualityA p chart to monitor process quality
A p chart to monitor process quality
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...
 
Which of the following is a focusing step
Which of the following is a focusing stepWhich of the following is a focusing step
Which of the following is a focusing step
 
Which of the following basic types of production layout
Which of the following basic types of production layoutWhich of the following basic types of production layout
Which of the following basic types of production layout
 
Which of the following is not a problem definition tool
Which of the following is not a problem definition toolWhich of the following is not a problem definition tool
Which of the following is not a problem definition tool
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
Which of the following approaches to service design
Which of the following approaches to service designWhich of the following approaches to service design
Which of the following approaches to service design
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situation
 
You have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control systemYou have been called in as a consultant to set up a kanban control system
You have been called in as a consultant to set up a kanban control system
 
OPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.comOPS 571 HELP Expect Success /ops571help.com
OPS 571 HELP Expect Success /ops571help.com
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
An activity system map is which of the following
An activity system map is which of the followingAn activity system map is which of the following
An activity system map is which of the following
 
Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...Which of the following is a characteristic that can be used to guide the desi...
Which of the following is a characteristic that can be used to guide the desi...
 
Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...Which of the following is not a problem definition tool from the operations c...
Which of the following is not a problem definition tool from the operations c...
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivity
 
Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018Ops 571 final exam guide (new, 2018
Ops 571 final exam guide (new, 2018
 
Which of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory modelWhich of the following is a fixed time-period inventory model
Which of the following is a fixed time-period inventory model
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 

Similar to OPS 571 Final Exam Guide

Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...johann11379
 
UOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.comUOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.commyrealit
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)michaelkelinger2
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...ramuaa129
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...ramuaa128
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...ramuq12345
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...ramuaa127
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...ramuaa127
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityyearstart2
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityramuaa126
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo06
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)eshwaryyyy
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)shyaminfo00
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...ramuaa128
 
Which of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingWhich of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingramuaa129
 

Similar to OPS 571 Final Exam Guide (16)

Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
UOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.comUOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.com
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
 
Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...Getting an autograph from a famous person might involve standing in which typ...
Getting an autograph from a famous person might involve standing in which typ...
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process quality
 
For which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process qualityFor which of the following should we use a p chart to monitor process quality
For which of the following should we use a p chart to monitor process quality
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)Uop ops 571 final exam guide (new, 2018)
Uop ops 571 final exam guide (new, 2018)
 
Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...Which of the following approaches to service design is characterized by havin...
Which of the following approaches to service design is characterized by havin...
 
Which of the following is a principle of work center scheduling
Which of the following is a principle of work center schedulingWhich of the following is a principle of work center scheduling
Which of the following is a principle of work center scheduling
 

Recently uploaded

VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spiritegoetzinger
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...makika9823
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawlmakika9823
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Pooja Nehwal
 
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...Suhani Kapoor
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 

Recently uploaded (20)

VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spirit
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
Independent Lucknow Call Girls 8923113531WhatsApp Lucknow Call Girls make you...
 
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(DIYA) Bhumkar Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service AizawlVip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
Vip B Aizawl Call Girls #9907093804 Contact Number Escorts Service Aizawl
 
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsHigh Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
High Class Call Girls Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
Independent Call Girl Number in Kurla Mumbai📲 Pooja Nehwal 9892124323 💞 Full ...
 
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
VIP Call Girls in Saharanpur Aarohi 8250192130 Independent Escort Service Sah...
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 

OPS 571 Final Exam Guide

  • 1. OPS 571 Final Exam Guide (New, 2018) From an operational perspective, yield management is most effective under which of the following circumstances FOR MORE CLASSES VISIT www.ops571help.com 1. Which of the following is a measure of operations and supply management efficiency used by Wall Street? Dividend payout ratio Receivable turnover Current ratio Financial leverage Earnings per share growth 2. An activity-system map is which of the following? A diagram that shows how a company's strategy is delivered to customers A timeline displaying major planned events A network guide to route airlines A facility layout schematic noting what is done where A listing of activities that make up a project 3. Which of the following is a total measure of productivity? Output/Materials Output/Labor Output/(Labor + Capital + Energy) All of these Output/Inputs 4. Which of the following approaches to service design is characterized by having the customer take a greater role in the production of the service? Quality approach Self-service approach Production-line approach Do-it-yourself approach Personal- attention approach 5. Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped together?
  • 2. Workcenter layout Production line layout Group technology layout Manufacturing cell layout Assembly line layout 6. Which of the following is a characteristic that can be used to guide the design of service systems? Services are all similar. Services cannot be inventoried. Services businesses are inherently entrepreneurial. Even service businesses have internal services. Quality work means quality service. 7. An advantage of a make-to-stock process is which of the following? All units of output are unique. It features rapid delivery of a standard product. It combines the best features of other processes. It responds directly to customer orders. It allows the firm to avoid inventory costs. 8. Getting an autograph from a famous person might involve standing in which type of queuing line structure? Single channel, single phase None of these Single channel, multiphase Multichannel, multiphase Multichannel, single phase 9. For an infinite queuing situation, if the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals? 2.5 hours 5 hours 0.2 hour 0.1 hour None of these 10. An assumption of learning curve theory is which of the following? Organizational learning is not included in learning theory. The time required to do a task will vary randomly each time the task is repeated. Unit time will decrease at an increasing rate. Learning will not be transferred from one worker to the next. The reduction in unit time will follow a predictable pattern.
  • 3. 11. A company's production process has an 80 percent learning curve rate. The process has produced 1,000 units to date. A process refinement is estimated to allow a future learning curve rate for the identical product of 75 percent. However, the initial unit made using the new process will take the same amount of time as the initial unit produced using the old process. At what point, using the new process, will the production rate exceed the production rate achieved by the old process? Before the 100th unit Before the 120th unit Before the 80th unit Before the 50th unit Before the 250th unit 12. For which of the following should we use a p-chart to monitor process quality? Grades in a freshman "pass/fail" course Temperatures in a classroom The dimensions of brick entering a kiln The weight of fluid in a container Lengths of boards cut in a mill 13. You have been called in as a consultant to set up a Kanban control system. The first thing to do is to determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety stock should be set at 25 percent of the demand during lead time. The tote trays used as containers can hold 8 units of stock, and the lead time it takes to replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary to support this situation? 42 68 89 47 94 14. Which of the following is a fixed-time-period inventory model? Just-in-time model The EOQ model Periodic system model The Q model The least cost method
  • 4. 15. A company is planning for its financing needs and uses the basic fixed-order-quantity inventory model. Which of the following is the total cost (TC) of the inventory given an annual demand of 10,000, setup cost of $32, a holding cost per unit per year of $4, an EOQ of 400 units, and a cost per unit of inventory of $150? None of these $1,501,600 $1,498,200 $499,313 $500,687 A. $1,501,600 Q = 400. Average Inventory = Q/2 = 200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 = $1,501,600. 16. Which of the following is a principle of work center scheduling? Reschedule every day. Once started, a job can and should be finished even if unavoidably interrupted. Assign the first worker to all of the days that require staffing. Achieve certainty in standards and routings. Give work centers less to do then their maximum. 17. Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints? Identify system constraints. Support system constraints. If you have no system constraints, make some. Reduce system constraints. Reinforce system constraints. 18. In designing a lean production facility layout, a designer should do which of the following? Locate flexible workstations offline. Balance capacity using job shop analysis. Design for work flow balance. Always keep operations on a single floor of the factory. Link operations through a push system. 19. A simple project listing of five activities and their respective time estimates are presented here: Using CPM, which activities
  • 5. make up the critical path? None of these A, B, D, E A, D, E A, C, B, D, E A, C, D, E 20. A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here: Using CPM, which activities make up the critical path? A, C, B, F, E None of these A, B, D, F, G A, C, E, F, G A, D, E 21. Which of the following is not a problem definition tool from the operations consulting tool kit? Issue trees Five forces model Computer simulation Customer surveys Gap analysis 22. Which of the following is not one of the basic types of forecasting? Simulation Causal relationships Qualitative Time series analysis Force field analysis 23. A company has actual unit demand for three consecutive years of 124, 126, and 135. The respective forecasts for the same three years are 120, 120, and 130. Which of the following is the resulting MAD value that can be computed from these data? 3 1 15 123 5 C MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5. 25. What is transaction processing? The decision support system used to efficiently handle multiple transactions The movement of paperwork through a system using a decision tree The scheduling of machinery to minimize time and scrap The posting and tracking of the detailed activities of a business 26. If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per
  • 6. hour, which of the following is the capacity utilization rate? 0.75 1.00 1.25 1.33 100 27. Which of the following is an input to the master production schedule (MPS)? Planned order schedules The bill of materials The aggregate plan The exception report Inventory records file 28. Which of the following is considered a primary report in an MRP system? Cycle counting reports Performance reports Planned order schedules Planning reports Exception reports 29. The centroid method for plant location uses which of the following data? Probabilities and payoffs Correlation matrix of existing facilities Volume of goods to be shipped between existing points Inbound transportation costs Transport times between facilities 30. In Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following? Responsive Forward looking Efficient Risk hedging Agile
  • 7. hour, which of the following is the capacity utilization rate? 0.75 1.00 1.25 1.33 100 27. Which of the following is an input to the master production schedule (MPS)? Planned order schedules The bill of materials The aggregate plan The exception report Inventory records file 28. Which of the following is considered a primary report in an MRP system? Cycle counting reports Performance reports Planned order schedules Planning reports Exception reports 29. The centroid method for plant location uses which of the following data? Probabilities and payoffs Correlation matrix of existing facilities Volume of goods to be shipped between existing points Inbound transportation costs Transport times between facilities 30. In Hau Lee's uncertainty framework to classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following? Responsive Forward looking Efficient Risk hedging Agile