WinEst As
1. Es
2. Ta
ssignment
stInfo (Estim
a. Name
b. Due:
c. Estima
d. Start
e. Estima
f. Rate
i.
ii.
ake Off (Ite
mate Inform
e: Driveway
1 month fro
ate Type: B
Date: Toda
ate Status:
Tables:
Sample L
Sample E
ems)
P
C
mation)
y Proposal
om today
udgetary
ay
Submitted
abor Rates
quipment R
Page 1 of 2
COMPU
Rates
TERS FO
Engi
OR CONS
TEC
neering Tec
Un
Colleg
STRUCTI
CHNOLO
hnology Pro
niversity of To
ge of Engine
ON
OGY
gram
oledo
eering
Page 2 of 2
3. Adding Markups
a. Add Net Markup
i. Name: Overhead and Profit
ii. Type: 15%
b. Add Sales Tax
i. Name: Sales Tax
ii. Type: 6.5%
iii. Restrict this Tax Markup to: Material
4. Print Report
a. Report 1:
i. Sheet View, set Filter to “’95 Div Details”
ii. File -> Print Preview -> Style
1. Layout: Landscape
2. Header/Footer -> Custom Header
a. Left Text (Use Field Tags…)
i. Est Info – Project Name
ii. Est Info – Start Date
iii. Est Info – Due Date
b. Center Text (Use Field Tags…)
i. Est Info – Type
ii. Est Info – Status
c. Right Text
i. Name
ii. Professor Name
iii. Class
iv. Date
b. Report 2:
i. Totals View
ii. File -> Print Preview
1. Ensure the Layout and Headers match Report 1
5. DUE: Monday, April 7, 2014 by 5:00 pm
1
Getting Started with WinEst
Sample Exercise v10.1
Professional Cost Estimating and Budgeting
Things you need to know about WinEst
Pull Down Menus & Tool Bars
There are different ways to view your toolbar in WinEst. Here are 2 examples. If you prefer large toolbar buttons,
select ‘Preferences’ from the ‘Tools’ menu option. Now select the Toolbars option from the displayed list of
preferences. To the right, under ‘Style’, change the Images to ‘Large’. Click OK.
Toolbar - Small Images with Short Text
Toolbar - Large Images with Text
WinEst has pull down menus for each of the following - File, Edit, View, Filters, Tables, Tools, Database, Reports,
Custom, Window and Help. When the mouse is clicked on one of these menu items, a list drops down and the
available commands display for that menu. Scan the menus to see the features available in the WinEst program.
Help
Help is always available. You can select the Contents command on the Help menu or press the F1 key to view
help.
2
Navigating in WinEst
WinEst has three main views. These enable you to follow a structured method for building and reviewing your
estimates. You can move from view to view at any time by clicking one of the corresponding toolbar buttons
(‘Takeoff’, ‘Sheet’ and ‘Totals’) or by making selections from the ‘View’ Menu.
Takeoff View
This view is for adding items to your estimate from the price book Database. From here you can:
• Lookup items in the database
• Perform takeoff calculations
• Assign Work Breakdown Structures (WBS) to items
• Analyze the Item takeoff audit trail
• Enter unique, “one time” items
• Add notes to it.
1. WinEst As
1. Es
2. Ta
ssignment
stInfo (Estim
a. Name
b. Due:
c. Estima
d. Start
e. Estima
f. Rate
i.
ii.
ake Off (Ite
mate Inform
e: Driveway
1 month fro
ate Type: B
Date: Toda
ate Status:
Tables:
Sample L
3. Colleg
STRUCTI
CHNOLO
hnology Pro
niversity of To
ge of Engine
ON
OGY
gram
oledo
eering
Page 2 of 2
3. Adding Markups
a. Add Net Markup
i. Name: Overhead and Profit
ii. Type: 15%
b. Add Sales Tax
i. Name: Sales Tax
ii. Type: 6.5%
iii. Restrict this Tax Markup to: Material
4. Print Report
a. Report 1:
4. i. Sheet View, set Filter to “’95 Div Details”
ii. File -> Print Preview -> Style
1. Layout: Landscape
2. Header/Footer -> Custom Header
a. Left Text (Use Field Tags…)
i. Est Info – Project Name
ii. Est Info – Start Date
iii. Est Info – Due Date
b. Center Text (Use Field Tags…)
i. Est Info – Type
ii. Est Info – Status
c. Right Text
i. Name
ii. Professor Name
iii. Class
iv. Date
b. Report 2:
i. Totals View
ii. File -> Print Preview
1. Ensure the Layout and Headers match Report 1
5. DUE: Monday, April 7, 2014 by 5:00 pm
1
5. Getting Started with WinEst
Sample Exercise v10.1
Professional Cost Estimating and Budgeting
Things you need to know about WinEst
Pull Down Menus & Tool Bars
There are different ways to view your toolbar in WinEst. Here
are 2 examples. If you prefer large toolbar buttons,
select ‘Preferences’ from the ‘Tools’ menu option. Now select
the Toolbars option from the displayed list of
preferences. To the right, under ‘Style’, change the Images to
‘Large’. Click OK.
Toolbar - Small Images with Short Text
Toolbar - Large Images with Text
WinEst has pull down menus for each of the following - File,
Edit, View, Filters, Tables, Tools, Database, Reports,
Custom, Window and Help. When the mouse is clicked on one
of these menu items, a list drops down and the
available commands display for that menu. Scan the menus to
see the features available in the WinEst program.
Help
6. Help is always available. You can select the Contents command
on the Help menu or press the F1 key to view
help.
2
Navigating in WinEst
WinEst has three main views. These enable you to follow a
structured method for building and reviewing your
estimates. You can move from view to view at any time by
clicking one of the corresponding toolbar buttons
(‘Takeoff’, ‘Sheet’ and ‘Totals’) or by making selections from
the ‘View’ Menu.
Takeoff View
This view is for adding items to your estimate from the price
book Database. From here you can:
• Lookup items in the database
• Perform takeoff calculations
• Assign Work Breakdown Structures (WBS) to items
• Analyze the Item takeoff audit trail
• Enter unique, “one time” items
• Add notes to items
• Access the calculator and digital takeoff
• Assign Quantities to items
• Perform assembly takeoff (Adding many related items to the
estimate at the same time)
Sheet View
7. This view is for analyzing and modifying the estimate. The
Sheet View is a spreadsheet. From here you can:
• Change cost information on an item in several categories
• Reprice the estimate based on current pricing
• Apply City Cost Indexes to adjust pricing by location
• Change an item’s description and takeoff quantity
• Filter and sort your estimate with standard or custom designed
filters and reports
• Add Notes and Memos to items
• Make adjustments to an item specific piece of information
such as pricing and productivity rates
• View the Estimate as Net or Gross (Cost or Billable) values
This spreadsheet can have the column widths altered and
filtered to show the information most appropriate for
examining the costs, including summary information. Display
columns can be alternately added, deleted or
hidden by clicking the right mouse button while on the column
heading row. The column heading row contains
each column’s text description.
Totals View
This view is for summarizing costs and adding Markups. From
here you can:
• See a dollar amount and percentage summary of the categories
of work
• Apply percentage, hourly, and lump sum markups, and step
bond calculations and taxes
8. • View the total net costs, markups, and total costs for the job
3
Sample Exercise
WinEst is well suited for use in a wide variety of applications.
In terms of determining estimated costs, concepts
are the same whether you are a General Contractor on a
commercial building project, an IT director configuring a
Wide Area Network, or a Project Manager designing a
nationwide Cellular Network. Wherever projects are
constructed with labor and materials, WinEst can assist in
determining the project’s final cost. For the purposes
of this sample, we will be using a General Construction Price
Book to demonstrate WinEst’s features and
functionality. If you are not a General Contractor, try to
visualize how the concepts presented in this sample can
fit your unique estimating requirements. WinEst has a wide
variety of Standard Industry Price Book Databases
available. Contact your WinEst Sales representative for
information on the Price Book best suited to your needs.
Before you begin, start a new estimate by selecting ‘New’ from
the File menu.
1. Click the ‘Takeoff’ button and then click the ‘EstInfo’
button.
2. Click the ‘Choose’ button for the labor rate table and select
‘WEI Rates’
3. Click the ‘Choose’ button for the equipment rate table and
select ‘Base Equipment Rates’
9. Item Takeoff
Start the sample by adding items to the estimate. This is
referred to as “Item Takeoff”.
1. Change to the Item Takeoff view by clicking on the ‘Takeoff’
button
2. Click the ‘Add’ button on the toolbar
Toolbar Small Images (Takeoff View)
The database browser appears, displaying the contents of the
current database price book. The price book is
broken into 3 sections (Division, Major Section & Minor
Section). These groupings allow for quicker access to
items based on the section they belong to. For example all
concrete related items are found under “Division 3000
Concrete”.
As you highlight combinations of Divisions, Major Sections and
Minor Sections, corresponding items display
below. To select an item, highlight it and click the ‘Add Item’
button, or double-click on the item itself. Items that
have been selected display in the Takeoff list box at the bottom
of the screen. The icons to the left of the items
are visual indicators of the costs related to the item. (Labor,
Materials, Subcontract, Equipment, Other & User)
Item Cost Icons
10. Category Icon Description
Labor Person
Materials Bricks
Equipment Truck
Subcontractor Hard Hat
Other Money Stack
User Coin
4
Database Browser
Division Major Section Minor Section
To find items in the database, click on the Division, then the
Major Section, and finally the Minor Section.
To add an item to the estimate:
a) Select it with the mouse cursor
b) Double click on the item, or highlight it and click the ‘Add
Item’ button
c) Click the ‘Accept’ button to input into your estimate
1. For this sample exercise, we will take off the following
items:
Minor Section Item Code Item Description
2200 – Earthwork 0030 Site Earthwork Cut & Fill
2212 – Rough Grading 0070 Rough Grade – Ditches/Swales
2222 – Excavation - Swale 0012 Excavation – 245 Crew
11. To find the items listed above, we:
a) Find the first item by selecting:
2000 Sitework (Division)
2200 Earthwork (Major Section)
2200 Earthwork (Minor Section)
5
b) Double click on the item description, “Site Earthwork Cut &
Fill” in the item view box below to add it to
the takeoff list or while it is highlighted, click the ‘Add Item’
button.
c) Find the second item by selecting:
2000 Sitework (Division)
2200 Earthwork (Major Section)
2212 Rough Grading (Minor Section)
d) Find the third item by selecting:
2000 Sitework (Division)
2220 Excavation (Major Section)
2222 Excavation – Swale (Minor Section)
Adding Individual Items from the Database Price Book
12. 6
The Accept & Close Buttons
2. Click the ‘Accept’ button and then click the ‘Close’ button.
This will accept your items into the estimate and
return you to the Takeoff view.
Calculating Item Quantities (Takeoff)
Each item has a formula assigned to it in the price book
database. This formula appears while items are being
added to the estimate. Each formula has a set of questions
which are used to calculate an Item quantity. These
are called dimensional variables. The first item you selected in
the database browser, Site Earthwork Cut & Fill, is
now ready for a takeoff quantity.
The Item’s Takeoff Quantity Cell
The first item selected has its Qty (Quantity) field highlighted
and the cursor (blinking) ready for numerical input in
the dimensional variable for item. In this case there is only one
dimensional question required to determine the
items quantity, ‘Volume in Cubic Yards’.
Enter a value for the Cut & Fill quantity: (Be sure the Num
lock option is turned on)
a) Type 8000
b) Press the Enter key. The cursor automatically moves to the
‘Add’ button. Press the Enter Key again.
13. Notice: The first item in the spreadsheet now has a value. All
costs related to that item have also been
calculated. The total current estimated cost displays on the
status bar in the lower left of the window.
c) Press the ‘Next’ button to quantify the next item
Note: You can click back into the Variable cell, “Volume in
Cubic Yards”, and enter more quantities for the same
item if you wish.
7
You can also enter values directly into the spreadsheet. WinEst
keeps an audit history of every change made to
every item. You can see the items history log by double-
clicking in the items quantity cell or by selecting ‘Item
History’ from the View Menu.
Enter a value for the “Rough Grade – Ditches/Swales” item:
1. Because you will move 8,000 cubic yards of soil, type 8000
in the Cuyd Load & Haul box.
2. Press ‘Enter ‘. The cursor moves to the box for the next
formula variable
3. Type 500 in the Production sqyd/day box
4. Press ‘Enter’ to move to the next variable
14. 5. Press ‘Enter’ to move the ‘Add’ button. The takeoff quantity
for the dump truck is calculated
7. Press ‘Enter’ again to add the takeoff quantity to the
spreadsheet
8
Adding Assemblies to the Estimate (Groups of Related Items)
With WinEst you can also perform assembly takeoff. Using this
method of takeoff WinEst enables you to add
groups of related items into the estimate together, while
calculating their quantities from a common set of
dimensional Questions. From the Takeoff window:
1. Click the ‘Add’ button.
2. Select ‘Assembly’ from the list box at the top left hand side
of the database browser or off the ‘By’ grid Select
Hierarch and off the ‘List’ grid select Assemblies
Assembly Browser
3. Highlight the “3000 Concrete” Heading then the “Concrete
Flatwork” – 3320 Group. Assemblies belonging to
this heading display below
4. Select the Slab on Grade – (Area) w/Rebar, assembly 03322r.
You may need to scroll down the item listing to
find the correct item. (Depending on your screen resolution)
15. 5. Click the ‘Add Item’ button
When this Assembly was created, some of its items were
defined as ‘Specification Variables’. This enables you
to select alternate items during item takeoff, dependant on
project specifications. You will be presented with
items lists for each ‘Specification Variable’. Select the gravel
item that you want by highlighting it and clicking the
‘OK’ button on the bottom right hand corner of the window, or
Double-Clicking on the item itself. If no gravel is
desired you could click the ‘Skip’ button. Use this same method
to select item specification for all remaining
‘Variable Choices’ that are presented, or click ‘Accept’ to
accept the defaults on all items in the Assembly. A box
of ‘Pick Items’ comes up. Here you can ‘pick’ any item you
want in the entire database. In this example, click
‘Accept Remaining Picks’. You will now see a ‘tree’ showing
all the items included in your assembly. Click ‘Finish’.
Once the Assembly appears in the Takeoff Items list, you can
click the ‘Accept’ button on the bottom right hand
corner. This will bring the assembly and all of its related items
into the Estimate spreadsheet
9
6. Click the ‘Close’ Button and the Assembly Takeoff Browser
will disappear
7. Input the following values into the variable input boxes for
the assembly:
Length of Slab 180 lnft
16. Width of Slab 65 lnft
Depth of Concrete Slab 5.5 in
Gravel Depth 4 in
Sand Depth 6 in
Reinforcing Per SF Concrete Slab 2.68 lb
Length of Special Forms 20 lnft
Spacing of SOG Rebar 12 sqft
Quantifying an Assembly
8. Click the ‘Add Qty’ button and quantities will be calculated
for the items that are part of the Slab on Grade
assembly. More takeoff passes can be performed to accumulate
quantities for the assembly.
10
Using the ‘Estimate Sheet View’ for Analysis
Now that you have generated the takeoff quantities, you’ll
analyze the results on the estimate sheet.
1. Click the ‘Estimate Sheet’ button on the toolbar
2. Click the ‘Division Details’ button. This filter shows the
estimate broken down and sorted by division.
17. Change Views (Filters)
3. The second row of buttons in the screenshot above, display
the following filters: Alerts, Incomplete, Unit
Prices, Labor, Materials, All Details, Division Details, and
Division Summary. The depressed button indicates
the active filter. There are many more filters available. To see
these, click Filters…More Estimate Filters.
The buttons on the toolbar simply point to some of these filters.
If you use a filter often, you can add
additional toolbar buttons and set them to point to the filters
you use.
Icon definitions (Spreadsheet View)
Labor – Displays Labor related items only.
Materials – Displays Materials related items only.
11
Subcontract – Displays Subcontract related items only.
18. Sections - CSI Major Section Summary
Division – CSI Division Summary
Making Changes in the Sheet View
This section describes how to change items in the Sheet view.
Changing the Description Name
1. Click the ‘Labor’ button. Select the cell containing the
description for the Rough Grade – Ditches/Swales item
and then press the enter key to highlight the item’s description
Changing Information on the spreadsheet
2. Type ‘Rough Grading’
3. Press Enter
12
The item now has the new description you gave it. Descriptions
can be up to 80 characters long.
19. To undo a change in a cell, select the Undo function from the
Edit menu. Try this on the description field.
Changing the Labor Productivity
1. Select the Labor Prod (labor productivity) cell for the ‘Resin
Based Curing Compound’ item
2. Type .04
3. Press Enter
Column relationships in WinEst are predefined, and therefore
cannot be tampered with or accidentally broken. A
change made in one column will always make the appropriate
changes in other columns. This serves to maintain
the estimate’s cost integrity.
Any numbers changed in the Labor Price (labor unit price) and
Labor Hours (labor hours) for that item change in
relation to the productivity change. As other Labor columns
change, you’ll want to check the effects here.
Changes to the Equipment categories follow the same strategy
as the labor categories.
Changing the Column Contents
Experiment with changing values in the estimate sheet and see
how those changes affect the other columns.
Every job must be analyzed in accordance to the specific factors
that affect costs: the time of year, labor market
considerations, current material prices, subcontractor bids, and
so on.
It’s expected that you’ll need to change a variety of the default
20. values. The default values that appear in the
estimate sheet are copies of values set in the database. Any
changes you make on the estimate sheet do not
affect the original values stored in the database. You can
update prices in the database from the estimate by
highlighting the row or rows, then right click and select ‘Update
to Database’.
Reviewing the Detailed Audit Trail
Every action taken during an estimating session is recorded into
a detailed item history. The item history for any
item of work in the estimate can be reviewed by selecting the
takeoff quantity cell for the item to be reviewed and
double clicking or by selecting the Show Item History option
from the View menu.
View the detailed item history for the Cut & Fill item:
1. Select the takeoff quantity cell for the ‘Rough Grading’ item
2. Double-click the mouse while the cursor is positioned in the
takeoff quantity cell
or select ‘Show Item History’ from the View menu
Item History
3. To close the history dialog box, select the ‘Close’ button
found in the lower right hand corner
21. 13
Filters
Filters allow you to view your estimate detail in a variety of
different ways. By allowing you to; condition, sort and
subtotal information, you can focus on specific areas of
concern.
Look at the effect the filters have on the Sheet view by clicking
on Filters, More Estimate Filters. Column widths
are adjustable. Try adjusting the width of the columns so that
they fit on the screen. When you switch from one
filter to another one, the program saves the column widths. The
Sections and Divisions Summary filters display a
summary of the total costs of the work by CSI sections and
divisions, respectively. These two filters allow you to
quickly view the distribution of costs across the entire project.
You may find these filters easiest to read if you
change the widths of the columns to fit in a single screen width.
Custom Filters
WinEst has the capability to create and customize the filters to
display the estimate spreadsheet according to your
criteria. You can edit the spreadsheet in the following manner:
• Select which columns display
• Select the order that the columns display
• Display data columns as well as cost information
• Select the sort order of the estimate sheet
• Filter items to display only certain cost categories
• Change the column header names to your preferred names
Data contained in any specific filter can be adjusted on the fly.
To an additional column;
1. Select where in the filter view you want the column to
22. display
2. Select the column heading to the right of where you want the
new column to reside
Inserting Columns on the Spreadsheet
3. Depress the right mouse button and click ‘Insert Filter
Columns’ to view the column options
4. A list containing all available columns will display
14
5. Select on by either Highlighting it or Double-Clicking
Note: Columns can also be Removed and/or Hidden. Remove
by selecting the column, Right-Clicking and
Selecting Remove
The Choose Filter Box
From the Filters menu, select ‘More Estimate Filters’. A
selection box will appear.
Highlight the filter ‘Item Takeoff View’ and click on the ‘OK’
button. You will notice the filter is completely different
than the others. Next try the ‘Totals By Division – Detailed’
filter. You can try all of these filters to see the different
display options that come with WinEst Pro Plus. In the software
you can make new filters to display the estimate
23. sheet to your criteria.
Edit Modify & Fill Down
Large portions of the estimate may be modified at once by
selecting a column or a range in a column and
choosing either the Modify from the Edit menu or Fill Down
from the right click menu. The Modify command
allows you to make percentage changes, value additions, or
value replacements within the selection. The Fill
Down command copies the contents of the first cell into all of
the other selected cells.
1. Click the Labor filter button on the toolbar
2. Click on the top of the ‘Labor Prod’ column. This will
highlight the entire column
3. Right Click and select Modify
The Modify Cells dialog box appears. Select the Add Percentage
option from the Method menu and type 10 in
the Value box. Click ‘OK’
Notice that all of the selected labor productivities are increased
by 10%. This function can be used to adjust an
amount by a percentage (positive or negative), add (or subtract)
an amount, or completely replace any existing
value.
Note – You cannot adjust labor rates here because these rates
come from the labor rate table. If you want to
change or assign labor rates directly in the filter, go back to the
Takeoff View and select Est Info. Change the
labor rate table to ‘none’.
24. Viewing Totals for the Estimate
The Totals Page view gives you an overall summary of your
estimate and lets you add markups, bonds, and other
expenses that don’t fall into the work item categories. To move
to the totals page, click the Totals Page button on
the toolbar. The Totals Page view appears.
The Percent and Dollar Amount columns on the left side of the
screen show the distribution of the job’s costs. On
the right side, the Hours column shows the total hours required
to complete the job for labor and for equipment as
estimated. The first seven rows of the Totals Page view display
the estimate’s net costs based on the contents of
the Sheet View, and cannot be changed here. To make any
changes, switch back to the Sheet View and alter the
contents of individual work items in order to change the totals.
Totals Page
15
Adding Markups
You can add markups to your project costs by either adding
them as a percentage of the net cost, cost per hour,
margin markup, or as a lump sum. To work with markups, click
25. the ‘Net’ button on the toolbar. The Net Markups
spreadsheet dialog box appears.
Select the Net icon on the tool bar
Click the ‘Add’ button. At the top of the window you can give
the markup a name and indicate the percentage
amount for the markup. You can restrict the markup to be based
on a range of CSI numbers or to a particular
category (Labor, Materials, Equipment, Subs, Other or User).
Once you have clicked on the ‘OK’ button, the net
markup will be saved, the Edit Estimate Net Markup dialog box
will disappear, and you will return to the Net
Markups spreadsheet dialog box. You can repeat this process to
add, delete, and change net markups. You can
also use the Move Up and Move Down buttons to reorder the net
markups. Once you have clicked the ‘Close’
button, the name of the markup appear beneath the Net Costs
row in the Totals Page view. The value of the
markup is added to the Subtotal.
As an example, create a new markup named “Overhead” based
on 12% of the net costs:
1. Click the ‘Net’ icon on the toolbar . The Edit Estimate Net
Markups spreadsheet dialog box appears
2. Click ‘Add’, to add a new markup to this estimate
3. In the Markup Name box, type Overhead
4. Adjust the Markup Type list to show Percent. In the Markup
Value box, type 12
26. 5. If no category (Labor, Material, Equipment, Subs, Other or
User) is selected, all is assumed
6. Click ‘OK’ twice
7. Click ‘View…Show Net as Allocations’. The net markup is
removed from the Totals Page and the amount is
allocated to all applicable items. The Labor, Material,
Subcontractor, and Equipment costs are adjusted.
8. Click ‘View…Show Normal’ to return to the previous view
16
WinEst will add the Overhead markup to the Totals Page and
adds 12 percent to the Net Costs Subtotal. You
can see that when a markup is created it is placed on the totals
page view in the appropriate location on the
sheet.
Tip: You can double-click on the name of a markup to
redisplay the Edit Estimate Net Markups dialog box for that
particular markup.
Adding Bonds
You can add bond costs to your estimate easily and quickly.
Bond costs are based on a series of step
27. calculations, using the Subtotal value on the totals page as the
project cost.
Use the Edit Bonds dialog box to add up to 10 Bonds to each
estimate.
As an example, create a new bond for guaranteeing
performance:
1. Click the Edit Bonds button on the toolbar. The Edit
Estimate Bonds spreadsheet appears
2. Click on the ‘Add’ button. The Choose Bond window
appears
3. Select an existing Bond or click ‘New’, to add a new bond to
the estimate
4. In the Bond Name box, type Step Bond
5. In the Bond Step Calculation grid, add the step calculations
for the bond. In this case, assume the following
step calculations. Type the highest number in each percentage
range in the Amount boxes, and the related
percentages in the adjacent Percentage boxes
Bond Dialog Box
6. Click ‘OK’
7. Click ‘OK’ again to exit the Step Bond screen
WinEst will add the new Bond beneath the Subtotal row on the
28. Totals Page view, and adds the bond cost to the
Total Bid value.
Totals Page
17
Note: Like all Data Views in WinEst, the presentation of data
on the totals page is customizable.
Viewing Reports with Print Preview
Now that you’ve completed the basic process involved in
preparing an estimate in WinEst Pro Plus, you will want
to evaluate the reporting process.
There are 3 types of reports in WinEst:
1. Pre-built reports found listed on the Reports menu.
2. Standard filters and user created filters.
3. Custom Reports pulling information from WinEst
Pre Built and Filter report types use the Print Page Setup
options to custom tailor the headers, footers, font styles,
page layout and printing options to customize the output. The
main difference is that the reports from the menu
are pre-built and complex, the filters are user definable and sort
and arrange the estimate data according to your
layouts. Because the demonstration software is disabled, you
will not be able to preview reports, only filters.
Custom Reports are found on the Report…Custom Reports
menu. They use exterior products such as MS Word
29. or Internet Explorer to print.
To Preview a Filter Report:
1. Click on the Estimate Sheet Button
2. Click the ‘Division Details’ filter button
3. Select Print Preview from the File menu
You can zoom in on the picture by placing the cursor over the
text portion of the preview and clicking. Also the
various options to customize the report can be accessed via the
Setup button on the toolbar or the Style button in
the Print Preview dialog
To change the Print Page Setup options from the preview
screen:
1. Select the Setup... button from the preview mode
2. Make any changes desired to the report
4. Click ‘OK’ to return to the print preview to review the
changes
For More Information
Thank you for taking the time to review WinEst Pro Plus, the
construction estimating software for Windows. The
features shown here are only some of the ones available in the
complete product.
18
For more information about purchasing our best selling software
Please call 1‐800‐950‐2374 or