■ Sustainable waste management involves managing waste in a environmentally sound
,socially satisfactory and techno economically viable manner
Construction waste
production in india
Kg/sqm
New construction 40-60
Demolition 400-600
Repair works 40-50
City Waste production
(tonne/day )
Delhi 4600
Ahmedabad 700
Chennai 2500
Factors affecting waste generation
Factors
Low
availability
of land
Old buildings
Trends in
renovation &
recycling
Labour cost
Demolition
High rate of
urbanisation
Concrete Brick
asphalt Metal
Timber Plastic
excavation stone Soil & sand
Concrete • Crushing techniques
• Low grade roads as base /subbase
Brick • Reuse of bricks
• Reuse in roads as base/subbase
Asphalt • Reclaimed & recycled asphalt pavement
• 100 % recyclable
Plastic • Can be recycled in low grade plastic
productions
• Proper collection is very important
Timber • Reuse of furniture after touch work
• Infrastructure timber – poles ,sleepers
Metal • 95 % recycled material is steel and iron
• If rust free can be recycled
Stone • Crushing & reusing
• Decoration works
Soil & sand • Unless reused in site ,requires treatment
and disposal
Waste disposal
■ As per construction & demolition waste management rules 2016
■ Have provisions for generator and local authority
■ Generator has the responsibility for collection ,segregation and storage of waste
■ Generator also has to ensure the avoidance of mixing of C&D waste and solid waste
■ Generator also has to prepare waste management plan and get it approved by local
authority (20 tonnes /day or 300 tonnes /month )
■ Waste collected has to be kept in premises or dumped to designated sites ( landfills ) or
should be handed over for treatment
■ Authority has the responsibility of
– Development of strategy for waste management
– Collection and transportation of waste
– Maintenance of records
– Instalation of processing facilities
Solid waste management plan
■ Should contain
– Responsibilities of stakeholders
– Waste identification and its
management
– disposal of waste
– Communication and training
– Measuring and monitoring
– documentation
THANKYOU

More Related Content

Similar to Waste disposal &recycling

Current status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptxCurrent status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptxwashifahmednaqib
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste ManagementDr K M SONI
 
Solid wast management
Solid wast management Solid wast management
Solid wast management Vijay Krishna
 
Waste-Managementppt.pptx
Waste-Managementppt.pptxWaste-Managementppt.pptx
Waste-Managementppt.pptxJunarCano2
 
Solid wast mangement
Solid wast mangementSolid wast mangement
Solid wast mangementVijay Krishna
 
Waste Management Methods.pptx
Waste Management Methods.pptxWaste Management Methods.pptx
Waste Management Methods.pptxssuser54b5c5
 
Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014) Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014) PAS_Team
 
durgesh ppt mswm.pptx
durgesh ppt mswm.pptxdurgesh ppt mswm.pptx
durgesh ppt mswm.pptxDilipPaytm
 
Waste management.pptx
Waste management.pptxWaste management.pptx
Waste management.pptxRohanRathod47
 
Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02priyesh12
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into LandSaleh Sayem
 
Solid waste management
Solid waste managementSolid waste management
Solid waste managementRosidah Saad
 
Construction demolition waste
Construction demolition wasteConstruction demolition waste
Construction demolition wasteRanjan Kumar Lal
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudharySubham Goyal
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudharytarun choudhary
 
Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10Zero Waste Scotland
 
Minning waste management
Minning waste managementMinning waste management
Minning waste managementMubbara Arshad
 

Similar to Waste disposal &recycling (20)

Current status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptxCurrent status of municipal solid waste management of Mymensingh City.pptx
Current status of municipal solid waste management of Mymensingh City.pptx
 
Landfill - Basics
Landfill - BasicsLandfill - Basics
Landfill - Basics
 
C & D Waste Management
C & D Waste ManagementC & D Waste Management
C & D Waste Management
 
Solid wast management
Solid wast management Solid wast management
Solid wast management
 
Waste-Managementppt.pptx
Waste-Managementppt.pptxWaste-Managementppt.pptx
Waste-Managementppt.pptx
 
Solid wast mangement
Solid wast mangementSolid wast mangement
Solid wast mangement
 
Waste Management Methods.pptx
Waste Management Methods.pptxWaste Management Methods.pptx
Waste Management Methods.pptx
 
Lynch Total Waste Solutions 2016
Lynch Total Waste Solutions 2016Lynch Total Waste Solutions 2016
Lynch Total Waste Solutions 2016
 
Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014) Approaching decisions on minerals and waste applications (May 2014)
Approaching decisions on minerals and waste applications (May 2014)
 
durgesh ppt mswm.pptx
durgesh ppt mswm.pptxdurgesh ppt mswm.pptx
durgesh ppt mswm.pptx
 
Waste management.pptx
Waste management.pptxWaste management.pptx
Waste management.pptx
 
Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02Ecowise 100528210344-phpapp02
Ecowise 100528210344-phpapp02
 
Solid waste
Solid wasteSolid waste
Solid waste
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into Land
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Construction demolition waste
Construction demolition wasteConstruction demolition waste
Construction demolition waste
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
 
Solid waste management by tarun choudhary
Solid waste management by tarun choudharySolid waste management by tarun choudhary
Solid waste management by tarun choudhary
 
Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10Allan Sandilands - Strathclyde University Presentation - Nov 10
Allan Sandilands - Strathclyde University Presentation - Nov 10
 
Minning waste management
Minning waste managementMinning waste management
Minning waste management
 

More from EVERSENDAI ENGINEERING (L.L.C.) (20)

Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Laws company act
Laws company actLaws company act
Laws company act
 
Hrm
HrmHrm
Hrm
 
construction planning
construction planningconstruction planning
construction planning
 
Bim notes
Bim notesBim notes
Bim notes
 
basic qs notes
basic qs notesbasic qs notes
basic qs notes
 
statistics basic
statistics basicstatistics basic
statistics basic
 
Sustainability
Sustainability Sustainability
Sustainability
 
Stratergy notes 2
Stratergy notes 2Stratergy notes 2
Stratergy notes 2
 
Strategy note 1
Strategy note 1Strategy note 1
Strategy note 1
 
Qhsem
Qhsem Qhsem
Qhsem
 
Project planning notes
Project planning notesProject planning notes
Project planning notes
 
Quantity surveying notes......
Quantity surveying notes......  Quantity surveying notes......
Quantity surveying notes......
 
stakeholder management
stakeholder managementstakeholder management
stakeholder management
 
Finance
FinanceFinance
Finance
 
construction Contracts
construction Contractsconstruction Contracts
construction Contracts
 
Bim notes
Bim notesBim notes
Bim notes
 
Basic civil notes
Basic civil notesBasic civil notes
Basic civil notes
 
Reinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinnerReinforcement theory of motivation -proposed by bf skinner
Reinforcement theory of motivation -proposed by bf skinner
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 

Recently uploaded

Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...MohammadAliNayeem
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxalijaker017
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Lovely Professional University
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdfKamal Acharya
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDrGurudutt
 
solid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidessolid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidesARUN AV
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdfKamal Acharya
 
Object Oriented Programming OOP Lab Manual.docx
Object Oriented Programming OOP Lab Manual.docxObject Oriented Programming OOP Lab Manual.docx
Object Oriented Programming OOP Lab Manual.docxRashidFaridChishti
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdfKamal Acharya
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor banktawat puangthong
 
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineLow rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineAftabkhan575376
 
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdfBURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdfKamal Acharya
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdfKamal Acharya
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdfKamal Acharya
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxwendy cai
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisDr.Costas Sachpazis
 

Recently uploaded (20)

Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
Complex plane, Modulus, Argument, Graphical representation of a complex numbe...
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
solid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidessolid state electronics ktu module 5 slides
solid state electronics ktu module 5 slides
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
Object Oriented Programming OOP Lab Manual.docx
Object Oriented Programming OOP Lab Manual.docxObject Oriented Programming OOP Lab Manual.docx
Object Oriented Programming OOP Lab Manual.docx
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbineLow rpm Generator for efficient energy harnessing from a two stage wind turbine
Low rpm Generator for efficient energy harnessing from a two stage wind turbine
 
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdfBURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
 
Furniture showroom management system project.pdf
Furniture showroom management system project.pdfFurniture showroom management system project.pdf
Furniture showroom management system project.pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 

Waste disposal &recycling

  • 1. WASTE DISPOSAL & RECYCLING ABIN BABU MBA ( CE & QS ) A13559015043 PROCUREMENT & SUPPLYCHAIN MANAGEMENT SEM4
  • 2. ■ Sustainable waste management involves managing waste in a environmentally sound ,socially satisfactory and techno economically viable manner Construction waste production in india Kg/sqm New construction 40-60 Demolition 400-600 Repair works 40-50 City Waste production (tonne/day ) Delhi 4600 Ahmedabad 700 Chennai 2500
  • 3. Factors affecting waste generation Factors Low availability of land Old buildings Trends in renovation & recycling Labour cost Demolition High rate of urbanisation
  • 4. Concrete Brick asphalt Metal Timber Plastic excavation stone Soil & sand Concrete • Crushing techniques • Low grade roads as base /subbase Brick • Reuse of bricks • Reuse in roads as base/subbase Asphalt • Reclaimed & recycled asphalt pavement • 100 % recyclable Plastic • Can be recycled in low grade plastic productions • Proper collection is very important Timber • Reuse of furniture after touch work • Infrastructure timber – poles ,sleepers Metal • 95 % recycled material is steel and iron • If rust free can be recycled Stone • Crushing & reusing • Decoration works Soil & sand • Unless reused in site ,requires treatment and disposal
  • 5. Waste disposal ■ As per construction & demolition waste management rules 2016 ■ Have provisions for generator and local authority ■ Generator has the responsibility for collection ,segregation and storage of waste ■ Generator also has to ensure the avoidance of mixing of C&D waste and solid waste ■ Generator also has to prepare waste management plan and get it approved by local authority (20 tonnes /day or 300 tonnes /month ) ■ Waste collected has to be kept in premises or dumped to designated sites ( landfills ) or should be handed over for treatment ■ Authority has the responsibility of – Development of strategy for waste management – Collection and transportation of waste – Maintenance of records – Instalation of processing facilities
  • 6. Solid waste management plan ■ Should contain – Responsibilities of stakeholders – Waste identification and its management – disposal of waste – Communication and training – Measuring and monitoring – documentation
  • 7.