Alex is considering using two robots instead of one worker on an assembly line. The robots cost $271,232 together and have an expected life of 11 years with zero scrap value. Annual maintenance and operating costs are $2,774 per shift. Each worker costs $59,347 per year. The equivalent annual value is calculated for the robots for one shift and three shifts over 10 years with a 13% interest rate.